Loading...
HomeMy WebLinkAbout20221269 Ver 1_ePCN Application_20220913DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 7/5/2022 BIMS # Assigned* Version#* 20221269 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Colleen Cohn:eads\cmcohn Information for Initial Review la. Name of project: COURTESY COPY 3608 Kemble Ridge la. Who is the Primary Contact?* Jessica Tisdale Reviewing Office* Raleigh Regional Office - (919) 791-4200 lb. Primary Contact Email:* lc. Primary Contact Phone:* jessica.tisdale@hdrinc.com (919)232-6654 Date Submitted 9/13/2022 Nearest Body of Water Toms Creek (Mill Creek) Basin Neuse Water Classification C;NSW Site Coordinates Latitude: Longitude: 35.913900 -78.515230 A. Processing Information County (or Counties) where the project is located: Wake Is this a NCDMS Project Yes No Is this project a public transportation project? * Yes No la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 58 - Utility Line Activities for Water and Other Substances (frequently used) NWP Numbers (for multiple NWPS): ld. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: City of Raleigh 2b. Deed book and page no.: 2c. Contact Person: Whit Wheeler, PE 2d. Address Street Address 222. W Hargett Street Address Line 2 City Raleigh Postal /Zip Code 27601 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country USA Yes No Yes No 2e. Telephone Number: 2f. Fax Number: (919)996-4540 2g. Email Address:* whit.wheeler@raleighnc.gov 4. Agent/Consultant (if applicable) 4a. Name: Jessica Tisdale 4b. Business Name: HDR Engineering, Inc. of the Carolinas 4c. Address Street Address 555 Fayetteville Street, Suite 900 Address Line 2 City Raleigh Postal / Zip Code 27601 4d. Telephone Number: (919)232-6654 4f. Email Address: * jessica.tisdale@hdrinc.com C. Project Information and Prior Project History State / Province / Region NC Country USA 4e. Fax Number: 1. Project Information 1b. Subdivision name: (if appropriate) lc. Nearest municipality / town: Wake Forest 2. Project Identification 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address 3608 Kemble Ridge Drive Address Line 2 City State / Province / Region Wake Forest North Carolina Postal / Zip Code Country 27587 USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Toms Creek (Mill Creek) 3b. Water Resources Classification of nearest receiving water: * C;NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202010704 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The site is located within a City of Raleigh sewer easement. The gravity sewer pipe is covered in concrete and a nearby streambank is failing which requires maintenance. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: none (study area in easement) 4g. List the total estimated linear feet of all existing streams on the property: 30 4h. Explain the purpose of the proposed project: * The purpose of this project is to stabilize and repair a streambank which has failed and to remove concrete from an aerial sewer pipe. The project will temporarily impact a total of approximately 600 square feet of streambank on Toms Creek (Mill Creek) near 3608 Kemble Ridge Drive at 35.913900, -78.515230 decimal degrees. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * Work will entail creating a dry work area, establishing a stable toe, constructing a stable bank using coir matting or a combination and establishing a stable segment of stream bed at the base of the bank. A sewer bypass system will be constructed based on the state of the sewer pipe after concrete removal. The site will be accessed from the existing sanitary sewer easement to the southwest of the site. The temporary disturbance will occur inside the maintained easement and tree removal will occur outside buffer zones. Erosion control measures will be installed prior to work. A "pump around" will be established to create a dry work area. Disturbed areas will be reseeded and mulched when work is complete. It is expected that a rubber tire loader or skid steer loader and a dump truck will be used to place the boulders, reconstruct the streambank, and stabilize the streambank. Please see the five attached details; "pump around", temporary silt fence, temporary construction entrance, bank stabilization, and seeding details. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes Comments: No Unknown 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 3. Stream Impacts Streams -tributaries Pond Construction Buffers 3a. Reason for impact (?) 3b.Impact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (?) 3f. Type of Jurisdiction* 3g. S. width 3h. Impact length* Si Stream bank stabilization Permanent Stabilization Toms Creek (Mills Creek) Perennial DWR 20 Average (feet) 30 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 30 3i. Total stream and ditch impacts: 30 3j. Comments: 3i. Total temporary stream impacts: 0 E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: See project description in Section C.4.i. lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: See attached details referenced in Section C.4.i. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30% nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No Comments: * This project is only to provide bank stabilization to protect the existing sewer crossing. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. It is a sanitary sewer maintenance project and will not spur development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d. Is another Federal agency involved?* Yes 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP Report 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA Fish Map 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* http://gis.ncdcr.gov/hpoweb/. We anticipate only stream stabilization for a small area and archaeological resources were not reviewed. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b. If yes, explain how project meets FEMA requirements: This project is not constructing any new structures, solely repairing existing and stabilizing nearby streambank 8c. What source(s) did you use to make the floodplain determination?* FEMA Floodplain GIS Map Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 3608 Kemble Ridge_Attachment A.pdf IPaC_ Explore Location resources_3608_KembleRidgeDrive.pdf project_report_3608_ke m b l e_ri d g e_d rive_39198_39198. pdf COR_AgentAuthorization .pdf Kemble Ridge Pre -Filing Meeting Request.pdf File must be PDF or KMZ Comments Supporting information is provided in Attachment A. Agent authorization is attached. NHP report is attached. IPAC is attached. 5.47MB 650.49KB 1.19MB 207.43KB 141.25KB Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Jessica Tisdale Signature Date 9/13/2022