Loading...
HomeMy WebLinkAboutWQ0003380_More Information (Requested)_20220804 August 4, 2022 M ASON C URRY –P LANT M ANAGER G EORGIA-P ACIFIC W OOD P RODUCTS LLC 139B REWINGTON R OAD D UDLEY,N ORTH C AROLINA 28333 Subject: Application No. WQ0003380 Additional Information Request Dudley Plywood Facility CLRS Closed-Loop Recycle System Wayne County Dear Mr.Curry: Division of Water Resources’ Central and Regional staff has reviewedthe application package received May 16, 2022. However, additional information is required before the review may be completed. Please address the items on the attached page no later than the close of business on September 6, 2022. Please be aware that you are responsible for meeting all requirements set forth in North Carolina rules and regulations. Any oversights that occurred in the review of the subject application package are still the Applicant’s responsibility. In addition, any omissions made in responding to the outstanding items in SectionsA through B, or failure to provide the additional information on or before the above requested date may result in your application being returned as incomplete pursuant to 15A NCAC 02T .0107(e)(2). Please reference the subject application number when providing the requested information. All revised and/or additional documentation shall be signed, sealed and dated(where needed), withan electronic response submitted to my attention at: https://edocs.deq.nc.gov/Forms/NonDischarge-Branch- Submittal-Form-Ver2. If you have any questions regarding this request, please contact me at (919) 707-3656 or leah.parente@ncdenr.gov. Thank you for your cooperation. Sincerely, Leah Parente, Geologist/Hydrogeologist Division of Water Resources cc: Washington Regional Office, Water Quality Regional Operations Section (Electronic Copy) Laserfiche File (Electronic Copy) Mr. Curry August 4, 2022 Page 2 of 2 A.Permit Annual Fee: 1. The annual fee of $360 for permit WQ0003380 is overdue as of July 3, 2022. This payment is for the period beginning on July 1, 2022, through June 30, 2023. This payment was due on July 3, 2022, as listed in Invoice #: 2022PR005512. This permit renewal will not be issued until the annual fee is paid pursuant to 15A NCAC 02T .0120(c). B. Signature Authority Delegation: 1. The person who signed the Closed-Loop Recycle System Renewal Application (Form CLRS- R 02-21), Mason Curry, has not been delegated as a signature authority for this site. Please submit a delegation letter pursuant to 15A NCAC 02T .0106(c) authorizing Mr. Curry to sign this application or resubmit the application signed by a signature authority for this site. 2. An amended affiliations list was submitted with the Closed-Loop Recycle System Renewal Application form. Please confirm that the following persons are no longer affiliated with Georgia-Pacific Wood Products LLC and should be removed from the affiliation list for this facility: Angie Cryder Michael W. Golden Mike O’Brien Harvey L. Barfield Norman R. Hiers Charles O. McLendon Timothy F. Anderson Stephen Peskar Daniel Hutchinson Michael M. Lovell Satrick S. Anthony Additionally, please confirm you would like the following persons added as contact persons: Mason Curry Brandy Turley Lastly, it is unclear if Satrick S. Anthony is still affiliated with this facility. Mr. Anthony is currently listed as the owner, but Mr. Anthony’s name was crossed out on the submitted application. Please confirm Mr. Anthony’s affiliation with Georgia-Pacific Wood LLC. If Mr. Anthony is no longer affiliated with the company, please provide the name, phone number, email address, and physical address of the new owner.