Loading...
HomeMy WebLinkAboutNC0065889_Authorization to Construct_20100930NPDES DOCUMENT SCANNING COVER SHEET NPDES Permit: NC0065889 Catatoga at Lake Toxaway WWTP Document Type: Permit Issuance Wasteload Allocation �;.,r.C;+.wrw.•.,,4yaa, eR4,_ Authorization to Construct (AtC Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Technical Correction Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: September 30, 2010 Thins document ioc printed on reuse paper - igrzore any content on the rereriece Aside IFA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary September 30, 2010 Mr. Brook Cole Merrill Trust Communities & Resorts, LLC 3575 Piedmont Road Building 15, Suite L120 Atlanta, Georgia 30326 SUBJECT: Authorization to Construct A to C No. 065889A03 Merrill Trust Communities & Resorts, LLC Indian Creek Resort WWTP County Transylvania County Dear Mr. Cole: A letter of request for an Authorization to Construct was received January 25, 2010, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.025 MGD Wastewater Treatment Plant, with discharge of treated wastewater into the Indian River in the Savannah River Basin. This authorization results in an increase in design and permitted capacity to 0.070 MGD, and is awarded for the construction of the following specific modifications: Installation of a new manual bar screen, flow splitter box; two (2) 20,000 gallon concrete flow equalization tanks with one (1) 160 scfm flow equalization tank blower and one (1) 156 gpm flow equalization pump; two (2)170,000 gallon concrete aeration tanks with three (3) 430 scfm aeration tank blowers; four (4) 12-ft sidewater depth 8-ft x 8-ft surface area clarifiers, two (2) airlift RAS pumps, two (2) airlift WAS pumps; two (2) 20,000 gallon sludge tanks, effluent flow measurement weir, ultrasonic flow meter; single channel dual bank UV disinfection unit with a peak flow rate of 195 gpm; two (2) 160 gpm effluent pumps; 100 kW standby generator and a 24-ft x 24-ft building, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St Raleigh, North Carolina 27604 Phone: 9194807-63001 FAX: 919-807-6492\ Customer Service: 1-877-623-6748 Internet: vvww.ncwaterquatity.org An Equal Opportunity 1 Affirmative Action Employer No Carolina atura!!y Mr. Brook Cole September 30, 2010 Page 2 This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0065889 issued April 1, 2009, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0065889. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number (828) 296-4500, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Pennittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Pennittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Mr. Brook Cole September 30, 2010 Page 3 During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number (919) 715-6206. Sincerely, .Coleen H. Sullins SWC:sr cc: Paul Lewis, P.E., Goldie & Associates, 210 West N. Second St., Seneca, SC 29678 Translyvania County Health Department Asheville Regional Office, Surface Water Protection Technical Assistance and Certification Unit Point Source Branch, NPDES Program Steve Coffey, P.E. ATC File 065889A03 Merrill Trust Communities & Resort, LLC A To C No. 065889A03 Issued September 30, 2010 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Indian Creek Resort WWTP, located on U.S. Highway 64 in Transylvania County for Merrill Trust Communities & Resorts, LLC, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of a new manual bar screen, flow splitter box; two (2) 20,000 gallon concrete flow equalization tanks, one (1) 160 scfm flow equalization tank blower, one (1) 98 gpm flow equalization pump; two (2) 70,000 gallon concrete aeration tanks, three (3) 430 scfm aeration tank blowers; four (4) 12-ft sidewater depth 8-ft x 8-ft surface area clarifiers, two (2) airlift RAS pumps, 2 (two) airlift WAS pumps; 2 (two) 20,000 gallon sludge tanks, effluent flow measurement weir, ultrasonic flow meter; single channel dual bank UV disinfection unit with a peak flow rate of 195 gpm; 2 (two) 160 gpm effluent pumps; 100 kW standby generator and a 24-ft x 24-ft building, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. We understand that the new limits associated with the modifications to expand to 0.070 MGD now apply. Signature Registration No. Date Send to: Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633