HomeMy WebLinkAbout19991035 Ver 1_Staff Report_19991006To: John Dorney , / f"--m P
Environmental Sciences Branch ���///
DIVISION OF WATER QUALITY lod 6'\ J�
CAMA MAJOR PERMIT APPLICATION REVIEW
REGIONAL OFFICE STAFF REPORT AND RECOMMENDATIONS
REVIEWER: STEENHUIS -.. j (`' r0 y ✓
WQ SUPERVISOR: SHIVERv
DATE: October 6, 1999
WETLAND INFORMATION FOR CENTRAL OFFICE TRACKING
PERMIT YR: 99 PERMIT NO.: 991035 COUNTY: Pender
PROJECT NAME: Forest Sound HOA, Forest Sound Marina rehabilitation
PROJECT TYPE: bulkhead & Dredging PERMIT TYPE: CAMA
COE #: N/A DOT #: N/A
RCD FROM CDA: DCM DATE FROM CDA: September 13, 1999
REG OFFICE: WiRO RIVER AND SUB BASIN#: 030624
*STREAM OR ADJACENT WATER BODY: Intracoastal Waterway (AIWW)
CLASS: SA -ORW STREAM INDEX #: 18-87- (11.5)
*OPEN OR CLOSED: Closed
WL IMPACT: N/A WL TYPE: N/A
WL REQUESTED: N/A WL ACR EST: N/A
WL SCORE: N/A
MITIGATION: N/A MITIGATION TYPE: N/A
MITIGATION SIZE: N/A RATING SHEET ATTACHED ?: N/A
RECOMMENDATION: ISSUE
STORMWATER PLAN REQ'D: N \A
IF YES, DATE APPROVED:
PROJECT DESCRIPTION: The Homeowner's Association of Forest Sound S/D are requesting to replace
the existing bulkhead around the marina basin. Also, they are proposing to maintenance dredge the existing
basin and connecting channel of the AIWW.
WATER QUALITY CERT. (401)
CERT. REQ'D: Yes
IF YES, TYPE: General Certification #3112 for CAMA Permits
SEWAGE DISPOSAL
TYPE OF DISPOSAL PROPOSED: N/A
TO BE PERMITTED BY: N/A
IF BY DWQ, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE: N/A
WATER/WETLAND FIL L
AREA OF FILL - WATER: N/A WETLAND: N/A
IS FILL ELIMINATING A SIGNIFICANT USE? N/A
DREDGIN G
IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS
OF RESOURCE? Maybe this is unknown, but has been previously dredged.
IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? Yes
991035.oct
Page Two
MARINA
ARE THE FOLLOWING ADEQUATELY ADDRESSED?
SEWAGE DISPOSAL: N/A MARINA SERVICES: N/A
OXYGEN IN BASIN: N/A CLOSURE OF SHELLFISHING WATERS: N/A
(ATTACH A MARINA USE ATTAINABILITY EVAL.)
RECONEUE.NDED CONDITIONS OR PERMIT RESTRICTIONS: That the project be done
in such a manner so as to not cause turbidity outside the immediate construction area to exceed
25 NTU. That the project be completed within the dredging window due to the area being a
PNA.
cc: Central Files - John Dorney
Wilmington Regional Office Files
DCM -Janet Russell
Doug Huggett