Loading...
HomeMy WebLinkAbout19991035 Ver 1_Staff Report_19991006To: John Dorney , / f"--m P Environmental Sciences Branch ���/// DIVISION OF WATER QUALITY lod 6'\ J� CAMA MAJOR PERMIT APPLICATION REVIEW REGIONAL OFFICE STAFF REPORT AND RECOMMENDATIONS REVIEWER: STEENHUIS -.. j (`' r0 y ✓ WQ SUPERVISOR: SHIVERv DATE: October 6, 1999 WETLAND INFORMATION FOR CENTRAL OFFICE TRACKING PERMIT YR: 99 PERMIT NO.: 991035 COUNTY: Pender PROJECT NAME: Forest Sound HOA, Forest Sound Marina rehabilitation PROJECT TYPE: bulkhead & Dredging PERMIT TYPE: CAMA COE #: N/A DOT #: N/A RCD FROM CDA: DCM DATE FROM CDA: September 13, 1999 REG OFFICE: WiRO RIVER AND SUB BASIN#: 030624 *STREAM OR ADJACENT WATER BODY: Intracoastal Waterway (AIWW) CLASS: SA -ORW STREAM INDEX #: 18-87- (11.5) *OPEN OR CLOSED: Closed WL IMPACT: N/A WL TYPE: N/A WL REQUESTED: N/A WL ACR EST: N/A WL SCORE: N/A MITIGATION: N/A MITIGATION TYPE: N/A MITIGATION SIZE: N/A RATING SHEET ATTACHED ?: N/A RECOMMENDATION: ISSUE STORMWATER PLAN REQ'D: N \A IF YES, DATE APPROVED: PROJECT DESCRIPTION: The Homeowner's Association of Forest Sound S/D are requesting to replace the existing bulkhead around the marina basin. Also, they are proposing to maintenance dredge the existing basin and connecting channel of the AIWW. WATER QUALITY CERT. (401) CERT. REQ'D: Yes IF YES, TYPE: General Certification #3112 for CAMA Permits SEWAGE DISPOSAL TYPE OF DISPOSAL PROPOSED: N/A TO BE PERMITTED BY: N/A IF BY DWQ, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE: N/A WATER/WETLAND FIL L AREA OF FILL - WATER: N/A WETLAND: N/A IS FILL ELIMINATING A SIGNIFICANT USE? N/A DREDGIN G IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF RESOURCE? Maybe this is unknown, but has been previously dredged. IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? Yes 991035.oct Page Two MARINA ARE THE FOLLOWING ADEQUATELY ADDRESSED? SEWAGE DISPOSAL: N/A MARINA SERVICES: N/A OXYGEN IN BASIN: N/A CLOSURE OF SHELLFISHING WATERS: N/A (ATTACH A MARINA USE ATTAINABILITY EVAL.) RECONEUE.NDED CONDITIONS OR PERMIT RESTRICTIONS: That the project be done in such a manner so as to not cause turbidity outside the immediate construction area to exceed 25 NTU. That the project be completed within the dredging window due to the area being a PNA. cc: Central Files - John Dorney Wilmington Regional Office Files DCM -Janet Russell Doug Huggett