Loading...
HomeMy WebLinkAboutNCG060426_Cover Letter (Signed)_20220919ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Next Century Spirits Attn: Marvin Hood 8601 Six Forks Road Suite 260 Raleigh, NC 27615 Dear Marvin Hood: NORTH CAROLINA Environmental Q=11ty September 19, 2022 Subject: General Permit No. NCG060000 Next Century Spirits Zebulon Facility COC No. NCG060426 Wake County In accordance with your application for a discharge permit received on December 7, 2021, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). In order to comply with the conditions of NCG060000 to which you are now subject, you are required to do the following: . ➢ Develop and Implement a SWPPP within 12 months of permit issuance. ➢ Download and print a copy of the NCG060000 Permit from the General Permits page on the NPDES Industrial Stormwater Program web site, which can be reached by typing "deq.nc.gov/SW-industrial" into your browser and hitting enter. ➢ When you receive an invoice for your annual permit fee each year, pay it promptly. Electronic payment is convenient and quick, you can access the ePayment web site by typing "deq.nc.gov/SW-ePayments" into your browser and hitting enter. ➢ If you have not already enrolled in electronic Data Monitoring Reports (eDMR), view the six step process and complete the registration by typing "deq.nc.gov/SW-eDMR" into your browser and hitting enter. ➢ Keep information about your facility name, ownership, legally responsible person, address, and stormwater outfalls up to date. See the Industrial Stormwater Program web site for instructions. ➢ Per the requirements of the Neuse Riparian (streamside) Buffer Rule (15A NCAC 02B .0714), all stormwater runoff into the riparian buffer shall meet dispersed flow requirements of 15A NCAC 02H .1002 for portions of the project built after July 22, 1997. Also, drainage conveyances (drainage ditches, roadside ditches, and stormwater awumwmmo�� North Carolina Department of Environmental Quality I; Division of Energy, Mineral and Land Resources 512 North Salisbury Street 11612Mail Service Center I Raleigh, North Carolina 27699-1612 919:707,9200 conveyances) through riparian buffer must meet requirements of the Neuse Riparian buffer rules, per 15A NCAC 02B .0714. Please take notice that this certificate of coverage is not transferable except upon approval from the Division of Energy, Mineral, and Land Resources (Division). The Division may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Resources, the Coastal Area Management Act, or any other federal or local government permit that may be required. If you have any questions concerning this permit, please contact Brittany Carson at (919) 707-3648 or by email at brittany.carsonOncdenr.gov. Sincerely, for Brian Wrenn, Director Division of Energy, Mineral, and Land Resources cc: Raleigh Regional Office / T. Valentine North Carolina Department. of Environmental Quality I Division of Energy, Mineral and Land Resources 'PUF WE) 512 North Salisbury Street1612 Mail Service Center I Raleigh, North Carolina27699-1612 �^a 979.1O7.9200