HomeMy WebLinkAbout20181034 Ver 1_IRT Review Request: As-Built Baseline Monitoring Report (MY0)_20220826
Hamilton, Ryan
From:Davis, Erin B
Sent:Wednesday, September 7, 2022 1:17 PM
To:Hamilton, Ryan
Subject:FW: IRT Review Request: As-Built Baseline Monitoring Report (MY0) - UT to Rush
Fork Stream Mitigation Project (DMS#100068) - (SAW-2018-01171) (DWR#2018-1034
v1) - French Broad 06010106 - Haywood County
Attachments:UT to Rush Fork_100068_FB 06_STR_Initial Release.pdf
Follow Up Flag:Follow up
Flag Status:Flagged
Laserfiche Upload: Email & Attachment
DWR#: 20181034 v.1
Doc Date: 8/26/22
Doc Type: Mitigation Information
Doc Name: Same as email subject
From: Wiesner, Paul <paul.wiesner@ncdenr.gov>
Sent: Friday, August 26, 2022 11:47 AM
To: Davis, Erin B <erin.davis@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV
USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Cc: Clemmons, Micky <Mclemmons@mbakerintl.com>; York, Jason <Jason.York@mbakerintl.com>; McKeithan, Katie
<Katie.McKeithan@mbakerintl.com>; Allen, Melonie <melonie.allen@ncdenr.gov>; Stanfill, Jim
<jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>
Subject: IRT Review Request: As-Built Baseline Monitoring Report (MY0) - UT to Rush Fork Stream Mitigation Project
(DMS#100068) - (SAW-2018-01171) (DWR#2018-1034 v1) - French Broad 06010106 - Haywood County
Erin, Kim and Todd;
The FINAL As-Built Baseline Monitoring Report and Record Drawings for the UT to Rush Fork Stream Mitigation
Project (DMS# 100068) were received by DMS on August 18, 2022 and posted to the IRT SharePoint site and DWR
Laserfiche on August 23, 2022 for your review.
2022 is Monitoring Year 1 for this project. The credit ledger for the 30% release is attached for your review.
Project information and location of the FINAL As-Built Baseline Monitoring Report (MY0):
UT to Rush Fork Stream Mitigation Project
DMS Project # 100068
RFP# 16-007335 – Issued 9/8/2017
Institution Date: 4/23/2018 – Full Delivery
SAW-2018-01171
DWR# 2018-01171 v1
French Broad River Basin
Cataloging Unit 06010106
Haywood County, North Carolina
Mitigation Plan Project Credits:
3,533.610 SMUs (cold)
1
As-Built-MY0 Project Credits:
3,533.610 SMUs (cold)
Mitigation Plan Lengths/ Acreages:
4,023.12 ft
As-Built-MY0 Lengths/ Acreages:
4,004.23 ft
FD Provider: Michael Baker International – Contact: Micky Clemmons, mclemmons@mbakerintl.com, (828) 734-7445
NCDEQ - DMS PM: Paul Wiesner, paul.wiesner@ncdenr.gov, (828) 273-1673
FINAL As-Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site
here:
IRT-DMS SharePoint Page:
https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx
UT to Rush Fork_100068_MY0_2022
UT to Rush Fork_100068_MY0_2022.pdf
UT to Rush Fork_100068_AB_2022
UT to Rush Fork_100068_AB_2022.pdf
Please let me know if you have questions or call to discuss.
Thanks
Paul Wiesner
Western Regional Supervisor
North Carolina Department of Environmental Quality
Division of Mitigation Services
828-273-1673 Mobile
paul.wiesner@ncdenr.gov
Western DMS Field Office
5 Ravenscroft Drive
Suite 102
Asheville, N.C. 28801
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
2
River Basin Date Project Instituted
Cataloging Unit Date Prepared06010106
French Broad 4/23/2018
8/23/2022
Mitigation Project Name USACE Action ID
DMS ID DWR Permit100068
UT to Rush Fork
2018-1034
2018-01171
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as-built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Signature of Official Approving Credit Release
County Stream/Wet. Service AreaHaywood French Broad 06010106
Credit Release Milestone Cold Stream Credits
Project Credits Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Approved
Release
Date
N/A N/A N/A
2 - Year 0 / As-Built 30.00%1,060.083 1,060.076 0.000 1,060.076 2022 8/23/2022
1 - Site Establishment N/A N/A N/A N/A
2023
4 - Year 2 Monitoring 10.00%353.361 2024
3 - Year 1 Monitoring 10.00%353.361
2025
6 - Year 4 Monitoring 5.00%176.681 2026
5 - Year 3 Monitoring 10.00%353.361
2027
8 - Year 6 Monitoring 5.00%176.681 2028
7 - Year 5 Monitoring 10.00%353.361
2029
Stream Bankfull Standard 10.00%353.361 2026
9 - Year 7 Monitoring 10.00%353.361
Totals 1,060.076
Total Unrealized Credits to Date 0.000
Total Gross Credits 3,533.610
Total Percentage Released 30.00%
Total Released Credits to Date 1,060.076
Notes
Remaining Unreleased Credits 2,473.534
Cold Stream Restoration 2,843.580
Cold Stream Enhancement I 818.300
Contingencies (if any)
Project Quantities
Mitigation Type Restoration Type Physical Quantity
Cold Stream Enhancement II 361.240
UT to Rush Fork
French Broad 06010106 1 of 2
River Basin Date Project Instituted
Cataloging Unit Date Prepared06010106
French Broad 4/23/2018
8/23/2022
Mitigation Project Name USACE Action ID
DMS ID DWR Permit100068
UT to Rush Fork
2018-1034
2018-01171
County Stream/Wet. Service AreaHaywood French Broad 06010106
Owning Program
Beginning Balance (mitigation credits)3,533.610
Released Credits 1,060.076
Unrealized Credits 0.000
Debits
Cold Stream
Restoration
Credits
Remaining Balance (Released credits)1,060.076
Remaining Balance (Unreleased credits)2,473.534
Total Remaining Balance (Released and Unreleased credits)3,533.610
Converted Credits 0.000
Req. Id TIP #Project Name USACE Permit
#
DWR
Permit #
DCM Permit
#
UT to Rush Fork
French Broad 06010106 2 of 2