HomeMy WebLinkAbout20121074 Ver 1_Certification of Completion_20130929NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Resources
Water Quality Programs
Pat McCrory Thomas A. Reeder John E. Skvarla, III
Governor Director Secretary
DWR Project No: DWQ #: 12 -1074 County: Davie, NC
Applicant: Ashley Furniture Ind. Inc.
Project Name: Ashley Mid - Atlantic Manufacturing and' Distribution Center
401 Water Quality Certification Issued Date: 2/1/2013
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, Michael J. Moran on behalf of Ashley Furniture Ind. Inc., hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the construction such that the construction was
observed to be built within substantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: Date: �/Z/ 'e
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee her state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date:
401 & Buffer Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699 -1650
Location• 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919- 807 -63001 FAX: 919 - 807 -6494
Internet: www.ncwateraualb.oro
An Equal Opportunity l Affirmative Action Employer
G6 In� �
qv f �LIACCY-