Loading...
HomeMy WebLinkAbout20130220 Ver 1_Certification of Completion_20140925kDEAW @ North Carolina Department of Environment and Natural Resources Division of Water Resources D Water Quality Programs s+ c C P 2 5 f4 Pat McCrory Thomas A. Reeder John E. Skvaria, III 14 Governor Director Seery A 401$ BUFFER PEER? Rces DWR Project No: DWQ#i 13 -0220 County: Wake TTING Applicant: Oberlin Investors, LLC Project Name: Auction Direct Storm Drain Replacement 401 Water Quality Certification Issued Date: March 13, 2013 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Appllcont's Certification 1, . hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and Intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used In the observation of the construction such that the construction was observed to be built within substantial compliance and Intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: if this project was designed by a Certified professional I, Edwin F Sconfienza, as a duly registered Professional Engineer (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe eriodicall weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used In the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature:_`4MA : Date: 401 & Buffer Permitting Unit 1650 Mail Service Center, Ralegh, North Carolina 27699.1650 Location: 512 N Salisbury SL Releoh, North Carolina 27604 Phone 919$0763001 FAX: 9198076494 Internet www ric"teroualb.oro An Equal Oppodumly 1 Affirmative Action Employer Colliers International 702 Oberlin Road MAIN +1 919 832 1110 Raleigh — Durham Suite 400 FAX +1 919 834 4488 Eastern North Carolina Raleigh, NC 27605 www.colliers.com September 24, 2014 NCDENR 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 Re: DWQ -13 -0220 Dear Sir or Madam: Attached is the completed Certification of Completion form for the above project. This project is completed and to the best of our abilities, due care and diligence was built within the substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules. If you have any questions, I can be reached at (919) 582 -3124 or via e -mail at donald.hyneman @colliers.com Sincerely, I 0"44f Donald J. Hyneman Vice President of Operations Enclosure: DCDENR Form cc: Building Exterior Repairs - #1150 Colliers International Raleigh — Durham I Eastern North Carolina (formerly Anthony & Cc ) and certain of its subsidiaries, is an independently owned and operated business and a member firm of Colliers International Property Consultants, an affiliation of independent companies with over 480 offices throughout more than 61 countries worldwide