HomeMy WebLinkAbout20130220 Ver 1_Certification of Completion_20140925kDEAW @
North Carolina Department of Environment and Natural Resources
Division of Water Resources D
Water Quality Programs s+ c C P 2 5 f4
Pat McCrory Thomas A. Reeder John E. Skvaria, III 14
Governor Director Seery A
401$ BUFFER PEER? Rces
DWR Project No: DWQ#i 13 -0220 County: Wake TTING
Applicant: Oberlin Investors, LLC
Project Name: Auction Direct Storm Drain Replacement
401 Water Quality Certification Issued Date: March 13, 2013
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Appllcont's Certification
1, . hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and Intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Date:
Agent's Certification
1, hereby state that, to the best of my abilities, due care and
diligence was used In the observation of the construction such that the construction was observed to be
built within substantial compliance and Intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Date:
if this project was designed by a Certified professional
I, Edwin F Sconfienza, as a duly registered Professional Engineer (i.e., Engineer, Landscape Architect,
Surveyor, etc.) in the State of North Carolina, having been authorized to observe eriodicall weekly, full
time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due
care and diligence was used In the observation of the construction such that the construction was
observed to be built within substantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:_`4MA : Date:
401 & Buffer Permitting Unit
1650 Mail Service Center, Ralegh, North Carolina 27699.1650
Location: 512 N Salisbury SL Releoh, North Carolina 27604
Phone 919$0763001 FAX: 9198076494
Internet www ric"teroualb.oro
An Equal Oppodumly 1 Affirmative Action Employer
Colliers International 702 Oberlin Road MAIN +1 919 832 1110
Raleigh — Durham Suite 400 FAX +1 919 834 4488
Eastern North Carolina Raleigh, NC 27605
www.colliers.com
September 24, 2014
NCDENR
401 & Buffer Permitting Unit
1650 Mail Service Center
Raleigh, NC 27699 -1650
Re: DWQ -13 -0220
Dear Sir or Madam:
Attached is the completed Certification of Completion form for the above project.
This project is completed and to the best of our abilities, due care and diligence was
built within the substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules.
If you have any questions, I can be reached at (919) 582 -3124 or via e -mail at
donald.hyneman @colliers.com
Sincerely,
I 0"44f
Donald J. Hyneman
Vice President of Operations
Enclosure: DCDENR Form
cc: Building Exterior Repairs - #1150
Colliers International Raleigh — Durham I Eastern North Carolina (formerly Anthony & Cc ) and certain of its subsidiaries, is an
independently owned and operated business and a member firm of Colliers International Property Consultants, an affiliation of
independent companies with over 480 offices throughout more than 61 countries worldwide