Loading...
HomeMy WebLinkAboutNCG020201_Compliance Inspection_20220803ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Vulcan Construction Materials LLC Attention: Tony Johnson 11020 David Taylor Drive Charlotte, NC 28262 ^�•r'"� SFf1 ae�aS NORTH CAROL NA Environmental Quality August 3, 2022 Subject: Compliance Evaluation Inspection Vulcan Construction Materials LLC NPDES Certificate of Coverage — NCG020201 Mecklenburg, North Carolina Dear Mr. Johnson, Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Clear Creek Quarry on May 26, 2022. Review the stormwater inspection report summary section for any corrective action or recommendations for the facility. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663 -1699 or by E-mail at Jeffrey.chandler@ncdenr.gov. Sincerely, r Michael MacIntyre, PE Assistant Regional Engineer II Land Quality Section Enclosure c: Laserfiche North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 704-663-1699 *AW Compliance Inspection Report Permit: NCG020201 Effective: 07/01/21 Expiration: 06/30/25 Owner: Vulcan Construction Materials LLC SOC: Effective: Expiration: Facility: Vulcan Construction Materials -Clear Creek County: Mecklenburg 14135 Brooks Mill Rd Region: Mooresville Charlotte NC 28227 Contact Person: Tony Johnson Title: Phone: 704-547-7076 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/26/2022 Entry Time 01:OOPM Primary Inspector: Jeffrey A Chandler Secondary Inspector(s): Certification: Phone: Exit Time: 02:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG020201 Owner - Facility: Vulcan Construction Materials LLC Inspection Date: 05/26/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Mine is in compliance with the NCG020201 permit and no stormwater issues were observed onsite. Page 2 of 3 a permit: NCG020201 Owner - Facility: Vulcan Construction Materials LLC inspection Date: 05/26/2022 Inspection Type: Compliance Evaluation Reason for visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ ■ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ ■ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Employee training has not been completed in 2022. The Facility should provide and document all employee trainings annually. Spills have been properly documented onsite including a fuel line rupture near the oil water severator in May 2022. The spill site was observed cleaned up and stabilized. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ■ ❑ ❑ ❑ Comment: Monitoring reports have been properly documented for the first Quarter of 2022. Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 1111110 Comment: Monitoring reports have been properly documented for the first quarter of 2022. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ■ ❑ Comment: No stormwater issues were observed at the outfalls onsite. Page 3 of 3