HomeMy WebLinkAbout20190866 Ver 1_IRT Review Request: As-Built Baseline Monitoring Report (MY0)_20220822
Hamilton, Ryan
From:Davis, Erin B
Sent:Wednesday, September 7, 2022 1:10 PM
To:Hamilton, Ryan
Subject:FW: IRT Review Request: As-Built Baseline Monitoring Report (MY0) - Huntsman Site
(DMS#100123) - (SAW-2019-00836) (DWR#2019-0866 v1) - Yadkin 03040102 -
Wilkes County
Attachments:Huntsman_100123_YD 102_STR_Initial Release.pdf
Follow Up Flag:Follow up
Flag Status:Flagged
Laserfiche Upload: Email & Attachment
DWR#: 20190866 v.1
Doc Date: 8/22/22
Doc Type: Mitigation Information
Doc Name: Same as email subject
From: Wiesner, Paul <paul.wiesner@ncdenr.gov>
Sent: Monday, August 22, 2022 4:58 PM
To: Davis, Erin B <erin.davis@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV
USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Cc: Reid, Matthew <matthew.reid@ncdenr.gov>; Allen, Melonie <melonie.allen@ncdenr.gov>; Stanfill, Jim
<jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Shawn Wilkerson
<swilkerson@wildlandseng.com>; Aaron Earley <aearley@wildlandseng.com>
Subject: IRT Review Request: As-Built Baseline Monitoring Report (MY0) - Huntsman Site (DMS#100123) - (SAW-2019-
00836) (DWR#2019-0866 v1) - Yadkin 03040102 - Wilkes County
Erin, Kim and Todd;
The FINAL As-Built Baseline Monitoring Report and Record Drawings for the Huntsman Site (DMS# 100123) were
received by DMS on August 11, 2022 and posted to the IRT SharePoint site and DWR Laserfiche on August 15, 2022 for
your review.
2022 is Monitoring Year 1 for this project. The credit ledger for the 30% release is attached for your review.
Project information and location of the FINAL As-Built Baseline Monitoring Report (MY0):
Huntsman Site
DMS Project # 100123
RFP# 16-007728 – Issued 11/13/2018
Institution Date: 5/21/2019 – Full Delivery
SAW-2019-00836
DWR# 2019-0866 v1
Yadkin River Basin
Cataloging Unit 03040102
Wilkes County, North Carolina
Mitigation Plan Project Credits:
5,816.953 SMUs (warm)
1
As-Built-MY0 Project Credits:
5,816.952 SMUs (warm)
Mitigation Plan Lengths/ Acreages:
5,991.288 ft
As-Built-MY0 Lengths/ Acreages:
5,985.000 ft
Please Note: The Huntsman site had a few structure changes or replacements and some constructed riffles were added
for stability. No deviations to the pattern were documented. All changes are discussed in Section 2 of the report. A
.001 credit difference is noted from Mitigation Plan to MY0. This was due to rounding differences and has been
corrected moving forward. The 5,816.952 credits shown in the MY0 report matches the attached credit ledger.
FD Provider: Wildlands Engineering, Inc. – Contact: Aaron Earley, aearley@wildnadseng.com, (704) 819-0848
NCDEQ - DMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828) 231-7912
FINAL As-Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site
here:
IRT-DMS SharePoint Page:
https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx
Huntsman_100123_MY0_2022
Huntsman_100123_MY0_2022.pdf
Huntsman_100123_AB_2022
Huntsman_100123_AB_2022.pdf
Please let me know if you have questions or call to discuss.
Thanks
Paul Wiesner
Western Regional Supervisor
North Carolina Department of Environmental Quality
Division of Mitigation Services
828-273-1673 Mobile
paul.wiesner@ncdenr.gov
Western DMS Field Office
5 Ravenscroft Drive
Suite 102
Asheville, N.C. 28801
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
2
River Basin Date Project Instituted
Cataloging Unit Date Prepared03040102
Yadkin
8/17/2022
5/21/2019
Mitigation Project Name USACE Action ID
DMS ID DWR Permit100123
Huntsman Site
2019-0866
2019-00836
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as-built report (baseline monitoring report) has been approved by the
NCIRT and posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Signature of Official Approving Credit Release
County Stream/Wet. Service AreaWilkes Yadkin 03040102
Credit Release Milestone Warm Stream Credits
Project Credits Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not
Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Approved
Release
Date
N/A N/A N/A
2 - Year 0 / As-Built 30.00%1,745.082 1,745.082 0.000 1,745.082 2022 8/17/2022
1 - Site Establishment N/A N/A N/A N/A
2023
4 - Year 2 Monitoring 10.00%581.696 2024
3 - Year 1 Monitoring 10.00%581.696
2025
6 - Year 4 Monitoring 5.00%290.847 2026
5 - Year 3 Monitoring 10.00%581.696
2027
8 - Year 6 Monitoring 5.00%290.847 2028
7 - Year 5 Monitoring 10.00%581.696
2029
Stream Bankfull Standard 10.00%581.696 2026
9 - Year 7 Monitoring 10.00%581.696
Totals 1,745.082
Total Unrealized Credits to Date 0.000
Total Gross Credits 5,816.952
Total Percentage Released 30.00%
Total Released Credits to Date 1,745.082
Notes
Remaining Unreleased Credits 4,071.870
Warm Stream Restoration 5,397.862
Warm Stream Enhancement II 593.426
Contingencies (if any)
Project Quantities
Mitigation Type Restoration Type Physical Quantity
Huntsman Site
Yadkin 03040102
River Basin Date Project Instituted
Cataloging Unit Date Prepared03040102
Yadkin
8/17/2022
5/21/2019
Mitigation Project Name USACE Action ID
DMS ID DWR Permit100123
Huntsman Site
2019-0866
2019-00836
County Stream/Wet. Service AreaWilkes Yadkin 03040102
Owning Program
Beginning Balance (mitigation credits)5,816.952
Released Credits 1,745.082
Unrealized Credits 0.000
Debits
Warm Stream
Restoration
Credits
Remaining Balance (Released credits)1,745.082
Remaining Balance (Unreleased credits)4,071.870
Total Remaining Balance (Released and Unreleased credits)5,816.952
Converted Credits 0.000
Req. Id TIP #Project Name USACE
Permit #
DWR
Permit #
DCM
Permit #
Huntsman Site
Yadkin 03040102