Loading...
HomeMy WebLinkAboutNCG020049_Compliance Inspection_20220803ROY COOPER Governor .:.1. ELIZABETH S. BISER -�,. -' ` iM Secretaryi ? ' , BRIAN WRENN Director NORTH CAROLINA Environmental Quality August 3, 2022 Vulcan Materials Company LLC Attention: Tony Johnson 11020 David Taylor Drive Charlotte, NC 28262 Subject: Compliance Evaluation Inspection Vulcan Materials Company LLC NPDES Certificate of Coverage NCG020049 Mecklenburg, North Carolina Dear Mr. Johnson, Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Pineville Quarry on May 26, 2022. Review the stormwater inspection report summary section for any corrective action or recommendations for the facility. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at Jeffrey.chandler@ncdenr.gov. Enclosure c: Laserfiche Sincerely, Michael MacIntyre, PE Assistant Regional Engineer II Land Quality Section e4peDw.E - 1 M;95 North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Compliance Inspection Report Permit: NCG020049 Effective: 07/01/21 Expiration: 06/30/25 Owner: Vulcan Construction Materials LLC SOC: Effective: Expiration: Facility: Vulcan Construction Materials -Pineville County: Mecklenburg 10526 Nations Ford Rd Region: Mooresville Charlotte NC 28273 Contact Person: Tony Johnson Title: Phone: 704-547-7076 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/26/2022 Entry Time 10:OOAM Primary Inspector: Jeffrey A Chandler Secondary Inspector(s): Certification: Phone: Exit Time: 11:30AM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG020049 Owner - Facility: Vulcan Construction Materials LLC Inspection Data: 05/26/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Mine is in compliance with the NCG020049 permit and no stormwater issues were observed onsite. Page 2 of 3 E Permit: NCG020049 Owner - Facility: Vulcan Construction Materials LLC Inspection Date: 05/26/2022 Inspection Type: Compliance Evaluation Reason for visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? N ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ 130 # Does the Plan include a list of significant spills occurring during the past 3 years? N ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? N ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? N ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? N ❑ ❑ ❑ Comment: Employee training has been provided for 2021 but needs to be performed and documented in 2022. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Monitoring reports have been documented for the first quarter of 2022. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? N 110 ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Monitoring reports have been documented for the first Quarter of 2022. Permit and Autfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ 1:10 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 1111011 Comment: No stormwater issues were observed onsite. Page 3 of 3