Loading...
HomeMy WebLinkAboutNCG020045_Compliance Inspection_20220803K ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLNA Enviranmental Quality August 3, 2022 Martin Marietta Materials Inc. Attention: Jay Nivens 8701 Red Oak Blvd. Suite 540 Charlotte, NC 28217 Subject: Compliance Evaluation Inspection Martin Marietta Materials Inc NPDES Certificate of Coverage — NCG020045 Mecklenburg, North Carolina Dear Mr. Nivens, Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Arrowwood Quarry on June 1, 2022. Review the stormwater inspection report summary section for any corrective action or recommendations for the facility. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at jeffrey.chandler@ncdenr.gov. Enclosure c: Laserfiche Sincerely, �I I 4-t-r* Michael MacIntyre, PE Assistant Regional Engineer II Land Quality Section North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 704-663-1699 Compliance Inspection Report Permit: NCG020045 Effective: 07/01/21 Expiration: 06/30/25 Owner: Martin Marietta Materials Inc SOC: Effective: Expiration: Facility: Martin Marietta-Arrowwood County: Mecklenburg 11325 Texland Blvd Region: Mooresville Charlotte NC 28217 Contact Person: Jay Nivens Title: Phone: 704-409-1475 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/01/2022 Entry Time 11:30AM Primary Inspector: Jeffrey A Chandler Secondary Inspector(s): Certification: Phone: Exit Time: 12:30 PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 M permit: NCG020045 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 06/01/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Mine is in compliance with the NCG020045 permit and no stormwater issues were observed onsite. Page 2 of 3 Permit: NCG020045 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 06/01/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? N ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? N ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The SWPPP has not been updated annually (last updated 9/112021). Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 1111 ❑ Comment: Qualitative monitoring has been completed for the first quarter of 2022 on (3/25/22). Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 1111110 Comment: Analytical monitoring has been completed for the first quarter of 2022. Samples collected on 3/22/22, 3/25/22, 6/16/22 & 6/17/22. Monitoring reports were shared via email after the inspection was performed. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? No ❑ ❑ # Were all outfalls observed during the inspection? 0❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ N ❑ Comment: No stormwater issues were observed onsite. Page 3 of 3