HomeMy WebLinkAbout20200021 Ver 1_IRT Review Request: As-Built Baseline Monitoring Report (MY0)_20220810
Hamilton, Ryan
From:Davis, Erin B
Sent:Wednesday, September 7, 2022 1:06 PM
To:Hamilton, Ryan
Subject:FW: IRT Review Request: As-Built Baseline Monitoring Report (MY0) – Bull Chute Site
(DMS#100137) - (SAW-2020-00049) (DWR#2020-0021 v1) - Yadkin 03040103 -
Randolph County
Attachments:Bull Chute_100137_YD 103_STR_RW_Initial Release.pdf
Follow Up Flag:Follow up
Flag Status:Flagged
Laserfiche Upload: Email & Attachment
DWR#: 20200021 v.1
Doc Date: 8/10/22
Doc Type: Mitigation Information
Doc Name: Same as email subject
From: Wiesner, Paul <paul.wiesner@ncdenr.gov>
Sent: Wednesday, August 10, 2022 3:07 PM
To: Davis, Erin B <erin.davis@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV
USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Cc: Reid, Matthew <matthew.reid@ncdenr.gov>; Allen, Melonie <melonie.allen@ncdenr.gov>; Stanfill, Jim
<jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Kevin Yates
<clearwatermitigation@gmail.com>; Grant Lewis - Axiom Environmental (glewis@axiomenvironmental.org)
<glewis@axiomenvironmental.org>; Haywood, Casey M CIV USARMY CESAW (USA)
<Casey.M.Haywood@usace.army.mil>
Subject: IRT Review Request: As-Built Baseline Monitoring Report (MY0) – Bull Chute Site (DMS#100137) - (SAW-2020-
00049) (DWR#2020-0021 v1) - Yadkin 03040103 - Randolph County
Good afternoon Erin, Kim and Todd;
The FINAL As-Built Baseline Monitoring Report (MY0) and Record Drawings for the Bull Chute Site (DMS# 100137) were
received by DMS on August 8, 2022, and posted to the IRT SharePoint site and DWR Laserfiche on August 8, 2022 for
your review.
2022 is Monitoring Year 1 for this project. The credit ledger for the 30% release is attached for your review.
Project information and location of the FINAL As-Built Baseline Monitoring Report (MY0):
Bull Chute Site
DMS Project # 100137
RFP# 16-007878 – Issued 5/6/2019
Institution Date: 11/13/2019 – Full Delivery
SAW-2020-00049
DWR# 2020-0021
Yadkin River Basin
Cataloging Unit 03040103
Randolph County, North Carolina
1
Mitigation Plan Project Credits:
7,742.933 SMUs (warm)
3.937 WMUs (riparian)
As-Built-MY0 Project Credits:
7,742.933 SMUs (warm)
3.937 WMUs (riparian)
Mitigation Plan Lengths/ Acreages:
9,106 ft
4.706 ac
As-Built-MY0 Lengths/ Acreages:
9,105 ft
4.706 ac
Please Note: There were just a few structure changes, a short alignment adjustment to avoid trees on UT4 and culverts
were replaced with bridges. These changes are shown as redlines and are discussed in section 2.0 of the report. Other
than these minor changes, the project was constructed as designed.
FD Provider: Clearwater Mitigation Solutions – Contact: Kevin Yates, clearwatermitigation@gmail.com, (919) 624-6901
NCDEQ - DMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828) 231-7912
FINAL As-Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site
here:
IRT-DMS SharePoint Page :
https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx
BullChute_100137_MY0_2022
BullChute_100137_MY0_2022.pdf
BullChute_100137_AB_2022
BullChute_100137_AB_2022.pdf
Please let me know if you have questions or call to discuss.
Thanks
Paul Wiesner
Western Regional Supervisor
North Carolina Department of Environmental Quality
Division of Mitigation Services
828-273-1673 Mobile
paul.wiesner@ncdenr.gov
Western DMS Field Office
5 Ravenscroft Drive
Suite 102
Asheville, N.C. 28801
2
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
3
Mitigation Project Name USACE Action ID
DMS ID DWR Permit100137
Bull Chute Site
2020-0021
2020-00049
County Stream/Wet. Service AreaRandolph Yadkin 03040103
River Basin Date Project Instituted
Cataloging Unit Date Prepared03040103
Yadkin
8/8/2022
11/13/2019
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as-built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Signature of Official Approving Credit Release
Credit Release Milestone Warm Stream Credits
Project Credits Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Approved
Release
Date
N/A N/A N/A
2 - Year 0 / As-Built 30.00%2,322.881 2,322.881 0.000 2,322.881 2022 8/8/2022
1 - Site Establishment N/A N/A N/A N/A
2023
4 - Year 2 Monitoring 10.00%774.293 2024
3 - Year 1 Monitoring 10.00%774.293
2025
6 - Year 4 Monitoring 5.00%387.147 2026
5 - Year 3 Monitoring 10.00%774.293
2027
8 - Year 6 Monitoring 5.00%387.147 2028
7 - Year 5 Monitoring 10.00%774.293
2029
Stream Bankfull Standard 10.00%774.293 2026
9 - Year 7 Monitoring 10.00%774.293
Totals 2,322.881
Total Unrealized Credits to Date 0.000
Total Gross Credits 7,742.933
Total Percentage Released 30.00%
Total Released Credits to Date 2,322.881
Remaining Unreleased Credits 5,420.052
Credit Release Milestone Riparian Credits
Project Credits Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Approved
Release
Date
N/A N/A N/A
2 - Year 0 / As-Built 30.00%1.177 1.177 0.000 1.177 2022 8/8/2022
1 - Site Establishment N/A N/A N/A N/A
2023
4 - Year 2 Monitoring 10.00%0.394 2024
3 - Year 1 Monitoring 10.00%0.394
2025
6 - Year 4 Monitoring 5.00%0.198 2026
5 - Year 3 Monitoring 15.00%0.591
20299 - Year 7 Monitoring 10.00%0.394
2027
8 - Year 6 Monitoring 5.00%0.198 2028
7 - Year 5 Monitoring 15.00%0.591
Totals 1.177
Total Unrealized Credits to Date 0.000
Total Gross Credits 3.937
Total Released Credits to Date 1.177
Bull Chute
Yadkin 03040103
Mitigation Project Name USACE Action ID
DMS ID DWR Permit100137
Bull Chute Site
2020-0021
2020-00049
County Stream/Wet. Service AreaRandolph Yadkin 03040103
River Basin Date Project Instituted
Cataloging Unit Date Prepared03040103
Yadkin
8/8/2022
11/13/2019
Riparian
Restoration
Equivalent
Credits
0.731
0.218
0.000
0.000
Owning Program
0.218
0.513
0.731
Total Percentage Released 29.90%
Remaining Unreleased Credits 2.760
Contingencies (if any)
Project Quantities
Mitigation Type Restoration Type Physical Quantity
Notes
Warm Stream Enhancement II 1,207.000
Riparian Restoration 3.244
Warm Stream Restoration 6,944.000
Warm Stream Enhancement I 617.000
Beginning Balance (mitigation credits)7,742.933 3.206
Released Credits 2,322.881 0.959
Riparian Enhancement 1.462
Debits
Warm
Stream
Restoration
Credits
Riparian
Restoration
Credits
Project Name USACE
Permit #
DWR
Permit #
Unrealized Credits 0.000 0.000
Converted Credits 0.000 0.000
Remaining Balance (Unreleased credits)5,420.052 2.247
Total Remaining Balance (Released and Unreleased credits)7,742.933 3.206
DCM
Permit #
Remaining Balance (Released credits)2,322.881 0.959
Req. Id TIP #
Bull Chute
Yadkin 03040103