Loading...
HomeMy WebLinkAbout20200021 Ver 1_Notice of As-Built Review_20220812 Hamilton, Ryan From:Davis, Erin B Sent:Wednesday, September 7, 2022 1:05 PM To:Hamilton, Ryan Subject:FW: \[External\] FW: Notice of As-Built Review/ NCDMS Bull Chute Mitigation Site/ SAW-2020-00049/ Randolph County Follow Up Flag:Follow up Flag Status:Flagged Laserfiche Upload: Email DWR#: 20200021 v.1 Doc Date: 8/12/22 Doc Type: Mitigation Information Doc Name: Same as email subject From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Friday, August 19, 2022 10:34 AM To: Davis, Erin B <erin.davis@ncdenr.gov> Subject: \[External\] FW: Notice of As-Built Review/ NCDMS Bull Chute Mitigation Site/ SAW-2020-00049/ Randolph County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Kim (Browning) Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers l 919.946.5107 -----Original Message----- From: Browning, Kimberly D CIV USARMY CESAW (USA) Sent: Thursday, August 18, 2022 10:43 AM To: erin.davis@ndenr.gov Subject: FW: Notice of As-Built Review/ NCDMS Bull Chute Mitigation Site/ SAW-2020-00049/ Randolph County Kim (Browning) Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers l 919.946.5107 -----Original Message----- From: Browning, Kimberly D CIV USARMY CESAW (USA) Sent: Friday, August 12, 2022 4:23 PM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; erin.davis@ndenr.gov; Haywood, Casey M CIV MVP <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Matthews, Kathryn (kathryn_matthews@fws.gov) <kathryn_matthews@fws.gov>; Bowers, Todd <bowers.todd@epa.gov>; Merritt, Katie <katie.merritt@ncdenr.gov> 1 Cc: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Fennel, Tommy E CIV USARMY CESAW (USA) <Tommy.E.Fennel@usace.army.mil>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Kevin Yates <clearwatermitigation@gmail.com>; Reid, Matthew <matthew.reid@ncdenr.gov>; Grant Lewis (glewis@axiomenvironmental.org) <glewis@axiomenvironmental.org>; Melonie Allen <melonie.allen@ncdenr.gov> Subject: Notice of As-Built Review/ NCDMS Bull Chute Mitigation Site/ SAW-2020-00049/ Randolph County Good afternoon IRT, The below referenced FINAL As-Built Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. Please note, if a site visit is requested by the IRT, comments will be due 15-days following the visit. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: August 18, 2022 15-Day Comment Deadline: September 2, 2022 45-Day Credit Release Approval Deadline: October 2, 2022 Project information and location of the FINAL As-Built Baseline Monitoring Report (MY0): Bull Chute Site DMS Project # 100137 RFP# 16-007878 – Issued 5/6/2019 Institution Date: 11/13/2019 – Full Delivery SAW-2020-00049 DWR# 2020-0021 Yadkin River Basin Cataloging Unit 03040103 2 Randolph County, North Carolina Mitigation Plan Project Credits: 7,742.933 SMUs (warm) 3.937 WMUs (riparian) As-Built-MY0 Project Credits: 7,742.933 SMUs (warm) 3.937 WMUs (riparian) Mitigation Plan Lengths/ Acreages: 9,106 ft 4.706 ac As-Built-MY0 Lengths/ Acreages: 9,105 ft 4.706 ac Please Note: There were just a few structure changes, a short alignment adjustment to avoid trees on UT4 and culverts were replaced with bridges. These changes are shown as redlines and are discussed in section 2.0 of the report. Other than these minor changes, the project was constructed as designed. FD Provider: Clearwater Mitigation Solutions – Contact: Kevin Yates, clearwatermitigation@gmail.com <mailto:clearwatermitigation@gmail.com> , (919) 624-6901 NCDEQ - DMS PM: Matthew Reid, matthew.reid@ncdenr.gov <mailto:matthew.reid@ncdenr.gov> , (828) 231-7912 3 FINAL As-Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page : https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx <Blockedhttps://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx> BullChute_100137_MY0_2022 BullChute_100137_MY0_2022.pdf <Blockedhttps://ncconnect.sharepoint.com/sites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Forms/AllItems.aspx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20Report%20% 20Drawing%2FBull%20Chute%20%28100137%29%2FBullChute%5F100137%5FMY0%5F2022%2Epdf&parent=%2Fsites% 2FIRT%2DDMS%2FAsBuilt%20Report%20%20Drawing%2FBull%20Chute%20%28100137%29> BullChute_100137_AB_2022 BullChute_100137_AB_2022.pdf <Blockedhttps://ncconnect.sharepoint.com/sites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Forms/AllItems.aspx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20Report%20% 20Drawing%2FBull%20Chute%20%28100137%29%2FBullChute%5F100137%5FAB%5F2022%2Epdf&parent=%2Fsites%2F IRT%2DDMS%2FAsBuilt%20Report%20%20Drawing%2FBull%20Chute%20%28100137%29> RIBITS Link to documents: https://ribits.ops.usace.army.mil/ords/f?p=107:278:17112313694932::::P278_BANK_ID:5581 Thanks for your participation, Kim Kim (Browning) Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers l 919.946.5107 4