From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>
Sent: Friday, August 19, 2022 10:34 AM
To: Davis, Erin B <erin.davis@ncdenr.gov>
Subject: \[External\] FW: Notice of As-Built Review/ NCDMS Bull Chute Mitigation Site/ SAW-2020-00049/ Randolph
County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Kim (Browning) Isenhour
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers l 919.946.5107
-----Original Message-----
From: Browning, Kimberly D CIV USARMY CESAW (USA)
Sent: Thursday, August 18, 2022 10:43 AM
To: erin.davis@ndenr.gov
Subject: FW: Notice of As-Built Review/ NCDMS Bull Chute Mitigation Site/ SAW-2020-00049/ Randolph County
Kim (Browning) Isenhour
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers l 919.946.5107
-----Original Message-----
From: Browning, Kimberly D CIV USARMY CESAW (USA)
Sent: Friday, August 12, 2022 4:23 PM
To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; erin.davis@ndenr.gov; Haywood,
Casey M CIV MVP <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer,
Olivia <olivia.munzer@ncwildlife.org>; Matthews, Kathryn (kathryn_matthews@fws.gov)
<kathryn_matthews@fws.gov>; Bowers, Todd <bowers.todd@epa.gov>; Merritt, Katie <katie.merritt@ncdenr.gov>
1
Cc: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Fennel, Tommy E CIV USARMY
CESAW (USA) <Tommy.E.Fennel@usace.army.mil>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Kevin Yates
<clearwatermitigation@gmail.com>; Reid, Matthew <matthew.reid@ncdenr.gov>; Grant Lewis
(glewis@axiomenvironmental.org) <glewis@axiomenvironmental.org>; Melonie Allen <melonie.allen@ncdenr.gov>
Subject: Notice of As-Built Review/ NCDMS Bull Chute Mitigation Site/ SAW-2020-00049/ Randolph County
Good afternoon IRT,
The below referenced FINAL As-Built Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008
Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar
days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown
below. When providing comments please indicate if your concerns are great enough that you recommend not issuing
the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered.
Please note, if a site visit is requested by the IRT, comments will be due 15-days following the visit.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: August 18, 2022
15-Day Comment Deadline: September 2, 2022
45-Day Credit Release Approval Deadline: October 2, 2022
Project information and location of the FINAL As-Built Baseline Monitoring Report (MY0):
Bull Chute Site
DMS Project # 100137
RFP# 16-007878 – Issued 5/6/2019
Institution Date: 11/13/2019 – Full Delivery
SAW-2020-00049
DWR# 2020-0021
Yadkin River Basin
Cataloging Unit 03040103
2
Randolph County, North Carolina
Mitigation Plan Project Credits:
7,742.933 SMUs (warm)
3.937 WMUs (riparian)
As-Built-MY0 Project Credits:
7,742.933 SMUs (warm)
3.937 WMUs (riparian)
Mitigation Plan Lengths/ Acreages:
9,106 ft
4.706 ac
As-Built-MY0 Lengths/ Acreages:
9,105 ft
4.706 ac
Please Note: There were just a few structure changes, a short alignment adjustment to avoid trees on UT4 and culverts
were replaced with bridges. These changes are shown as redlines and are discussed in section 2.0 of the report. Other
than these minor changes, the project was constructed as designed.
FD Provider: Clearwater Mitigation Solutions – Contact: Kevin Yates, clearwatermitigation@gmail.com
<mailto:clearwatermitigation@gmail.com> , (919) 624-6901
NCDEQ - DMS PM: Matthew Reid, matthew.reid@ncdenr.gov <mailto:matthew.reid@ncdenr.gov> , (828) 231-7912
3
FINAL As-Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site
here:
IRT-DMS SharePoint Page :
https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx
<Blockedhttps://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx>
BullChute_100137_MY0_2022
BullChute_100137_MY0_2022.pdf <Blockedhttps://ncconnect.sharepoint.com/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Forms/AllItems.aspx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20Report%20%
20Drawing%2FBull%20Chute%20%28100137%29%2FBullChute%5F100137%5FMY0%5F2022%2Epdf&parent=%2Fsites%
2FIRT%2DDMS%2FAsBuilt%20Report%20%20Drawing%2FBull%20Chute%20%28100137%29>
BullChute_100137_AB_2022
BullChute_100137_AB_2022.pdf <Blockedhttps://ncconnect.sharepoint.com/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Forms/AllItems.aspx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20Report%20%
20Drawing%2FBull%20Chute%20%28100137%29%2FBullChute%5F100137%5FAB%5F2022%2Epdf&parent=%2Fsites%2F
IRT%2DDMS%2FAsBuilt%20Report%20%20Drawing%2FBull%20Chute%20%28100137%29>
RIBITS Link to documents:
https://ribits.ops.usace.army.mil/ords/f?p=107:278:17112313694932::::P278_BANK_ID:5581
Thanks for your participation,
Kim
Kim (Browning) Isenhour
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers l 919.946.5107