HomeMy WebLinkAbout20141006 Ver 1_Approval Letter_20141006ALT4v'-wKAywA
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Gn\eNlOr
October 6,2Q14
Earl Mahone, Jr.
437 Tranquil Bay Circle
Norwood, N[28l28
John E. SkVarl3. @I
Secretary
QVVR#14-1006
Stanly County
Subject: Approval of 401 Water Quality Certification with Additional Conditions,- Shoreline
Stabilization, 437 Tranquil Bay Circle, Norwood, Lake Tillery
Dear Mr. Mahone,
You have our approval for the impacts listed below for the purpose described in your application dated
September 9, 2014 and received by the Division of Water Resources (Division) on September 22, 2014.
These impacts are covered by the Water Quality General Certification Number 3898 (attached) and the
additional conditions listed below. This certification is associated with the use of General Permit
Number GP198200030 issued by the U.S. Army Corps of Engineers and expires on the same day.
Please note that you should obtain any other applicable federal, state or local permits before
proceeding with your project, including those required by (but not limited to) the local lake
management authority, erosion and sediment control, non-discharge, and water supply watershed
negu|atiuns.
This approval requires you to follow the conditions listed in the enclosed certification, the general
permit and the following additional conditions.-
1. The following impacts are hereby approved provided that all of the other specific and
general conditions of the Certification are met. No other impacts are approved,
including incidental impacts. Please note that this approval 1s for the repair and
stabilization of the existing shoreline but this approval does not allow any extension
of the shoreline into the lake. [15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c)]
Type of Impact
Amount Approved (sq. ft.) permanent
Open Waters - above normal pool
Open Waters - below normal pool
300 sq. ft.
300 sq. ft,
Division of Water Resources -4O1&Buffer Permitting Unit
1O17 Mail Service Center, Raleigh, North Carolina 27688-107
Location: 512N. Salisbury St. Raleigh, North Carolina 27604
Phone: 0108U7-63QU\ FAX: 81A-887-6444
|ntorriet:nwmocwatenqua|itymrg
An Equal Opportunity r, Affirma!�ve Action Employer — Made �n part by recycled paper
Earl Mahone, Jr
ovvmw14-1ons
401 APPROVAL
Page Zof3
This approval b for the purpose and design desrhbedimynurapp|icatiom. The plans
and specifications for this project an2in0orporated6mrefenemmeanAaMLufthe
Certification/Authorization. |f you change your project, yournustnotifvtheDiwisiQn
and you may be required to submit a new application package with the appropriate
fee. If the property is sold, the new owner must be given a copy of this approval letter
and Certification/Authorization and is responsible for complying with all conditions.
[I5A0C4CO2H.0502,.0506,and.05071
3. The Division Mooresville Reg,ional Office (51O East Center Avenue, Suite 3O1
Mooresville, NC2Dll5)shall be notified in writing once construction a1 the approved
impact areas has commenced. |154 NCAC82H .0502 (g)l
4. Work is to be conducted from land as indicated in your application. [15A NCAC 02H
__-_]
The applicant and/or authorized agent shall provide a completed Certificate nf
Completion Form to the DWR 401 and Buffer Permitting Unit within ten days of project
completion. See attached form or this form is available et:
\/15A
This approval and its conditions are final and binding unless contested.
This Certification Authorization can be contested es provided inArticles 3 and 4nf General Statute
l5OBbv filing awritten petition for an administrative hearing to the Office ofAdministrative Hearings
(hereby known as{}/\H\. A petition form may be obtained from the QAH at nr
by calling the QAH Clerk's Office at (9I9) 431-3000 for information.
Within sixty (6Q) calendar days of receipt of this notice, a petition must be filed with the OAH. /\
petition is considered filed when the original and one (1) copy along with any applicable [}AH filing fee
is received in the OAH during normal office hours (Monday through Friday between 8:00am and
5:00pm, excluding official state holidays).
The petition may be faxed to the DAHnt(91g) 431-31OO, provided the original andonecopyofthe
petition along with any applicable O4H filing fee is received by the OAH within five (5) business days
following the faxed transmission,
Mailing address for the CAH:
if sending via US Postal Service: B sending via delivery service (UPlFedEx,etc):
Office of Administrative Hearings Office of Administrative Hearings
67I4 Mail Service Center 2713 New Hope Church Road
Raleigh, NC27G99-G714 Raleigh, N[27§Q8-G285
Earl Mahone, Jr.
oxxnw14-znos
401AppnOvxL
Page 3 of 3
One (1) copy of the petition must also be served to DENR:
John Evans, General Counsel
Department nf Environment and Natural Resources
16O1 Mail Service Center
Raleigh, NCZ7699-l6O1
This letter completes the review of the Division under section 401 of the Clean Water Act. Please
contact Shelton Sullivan a19l9-8U7-h381o/ if you have any questions or
concerns.
Enclosures- G[3898, Cert. of Completion Form
cc Robert Gallagher, Lakeside Contractors, 1OG79 Willow Oak Rd, Norwood, NCZ812B
Eric Rouse, Duke Energy, P.O. Box IS51,N[RH1G, Raleigh, NC 27602
USACE/\shevi||e Regulatory Field Office
DVVRK4RO4O1— file copy
DVVR4O18i Buffer Permitting Unit —file copy
Filename: 142006�Mahone437Tranqui|8ayQ^deNurwmodLakeTi|Yery(Stanly[_401