Loading...
HomeMy WebLinkAbout20141006 Ver 1_Approval Letter_20141006ALT4v'-wKAywA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Gn\eNlOr October 6,2Q14 Earl Mahone, Jr. 437 Tranquil Bay Circle Norwood, N[28l28 John E. SkVarl3. @I Secretary QVVR#14-1006 Stanly County Subject: Approval of 401 Water Quality Certification with Additional Conditions,- Shoreline Stabilization, 437 Tranquil Bay Circle, Norwood, Lake Tillery Dear Mr. Mahone, You have our approval for the impacts listed below for the purpose described in your application dated September 9, 2014 and received by the Division of Water Resources (Division) on September 22, 2014. These impacts are covered by the Water Quality General Certification Number 3898 (attached) and the additional conditions listed below. This certification is associated with the use of General Permit Number GP198200030 issued by the U.S. Army Corps of Engineers and expires on the same day. Please note that you should obtain any other applicable federal, state or local permits before proceeding with your project, including those required by (but not limited to) the local lake management authority, erosion and sediment control, non-discharge, and water supply watershed negu|atiuns. This approval requires you to follow the conditions listed in the enclosed certification, the general permit and the following additional conditions.- 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. Please note that this approval 1s for the repair and stabilization of the existing shoreline but this approval does not allow any extension of the shoreline into the lake. [15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c)] Type of Impact Amount Approved (sq. ft.) permanent Open Waters - above normal pool Open Waters - below normal pool 300 sq. ft. 300 sq. ft, Division of Water Resources -4O1&Buffer Permitting Unit 1O17 Mail Service Center, Raleigh, North Carolina 27688-107 Location: 512N. Salisbury St. Raleigh, North Carolina 27604 Phone: 0108U7-63QU\ FAX: 81A-887-6444 |ntorriet:nwmocwatenqua|itymrg An Equal Opportunity r, Affirma!�ve Action Employer — Made �n part by recycled paper Earl Mahone, Jr ovvmw14-1ons 401 APPROVAL Page Zof3 This approval b for the purpose and design desrhbedimynurapp|icatiom. The plans and specifications for this project an2in0orporated6mrefenemmeanAaMLufthe Certification/Authorization. |f you change your project, yournustnotifvtheDiwisiQn and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and Certification/Authorization and is responsible for complying with all conditions. [I5A0C4CO2H.0502,.0506,and.05071 3. The Division Mooresville Reg,ional Office (51O East Center Avenue, Suite 3O1 Mooresville, NC2Dll5)shall be notified in writing once construction a1 the approved impact areas has commenced. |154 NCAC82H .0502 (g)l 4. Work is to be conducted from land as indicated in your application. [15A NCAC 02H __-_] The applicant and/or authorized agent shall provide a completed Certificate nf Completion Form to the DWR 401 and Buffer Permitting Unit within ten days of project completion. See attached form or this form is available et: \/15A This approval and its conditions are final and binding unless contested. This Certification Authorization can be contested es provided inArticles 3 and 4nf General Statute l5OBbv filing awritten petition for an administrative hearing to the Office ofAdministrative Hearings (hereby known as{}/\H\. A petition form may be obtained from the QAH at nr by calling the QAH Clerk's Office at (9I9) 431-3000 for information. Within sixty (6Q) calendar days of receipt of this notice, a petition must be filed with the OAH. /\ petition is considered filed when the original and one (1) copy along with any applicable [}AH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the DAHnt(91g) 431-31OO, provided the original andonecopyofthe petition along with any applicable O4H filing fee is received by the OAH within five (5) business days following the faxed transmission, Mailing address for the CAH: if sending via US Postal Service: B sending via delivery service (UPlFedEx,etc): Office of Administrative Hearings Office of Administrative Hearings 67I4 Mail Service Center 2713 New Hope Church Road Raleigh, NC27G99-G714 Raleigh, N[27§Q8-G285 Earl Mahone, Jr. oxxnw14-znos 401AppnOvxL Page 3 of 3 One (1) copy of the petition must also be served to DENR: John Evans, General Counsel Department nf Environment and Natural Resources 16O1 Mail Service Center Raleigh, NCZ7699-l6O1 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Shelton Sullivan a19l9-8U7-h381o/ if you have any questions or concerns. Enclosures- G[3898, Cert. of Completion Form cc Robert Gallagher, Lakeside Contractors, 1OG79 Willow Oak Rd, Norwood, NCZ812B Eric Rouse, Duke Energy, P.O. Box IS51,N[RH1G, Raleigh, NC 27602 USACE/\shevi||e Regulatory Field Office DVVRK4RO4O1— file copy DVVR4O18i Buffer Permitting Unit —file copy Filename: 142006�Mahone437Tranqui|8ayQ^deNurwmodLakeTi|Yery(Stanly[_401