Loading...
HomeMy WebLinkAboutR1015 Wetland Impact Summary Sheet 3_20220808.xlsx WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTSSURFACE WATER IMPACTS Hand Existing Existing PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural SiteStationStructureFill InFill Inin Clearingin SW SWImpactsImpactsStream No.(From/To)Size / TypeWetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 38A489+64 TO 493+80 -L- LT/RTROADWAY FILL0.49 0.03 38B496+92 TO 498+23 -L- LT/RTROADWAY FILL0.30 0.06 39507+39 TO 518+70 -L- LT/RT 2 @ 10'X8' RCBC3.00 0.080.21 0.220.03984.87116.37 40RP2AC/RP2A/LP2AROADWAY FILL5.38 0.120.78 4141+40 TO 47+97 -RP2AC- LT/RTEXTEND 3@ 9'X7' RCBC0.03 0.010.11 0.050.0848.7156.79 4234+08 TO 37+91 -Y4- LT72" RCP, BURIED 1'0.01 0.040.06 < 0.01< 0.0120.4311.6 4333+80 TO 35+02 -Y4- RT72" RCP, BURIED 1'< 0.01 0.010.04 < 0.01< 0.0141.7510.35 4451+17 TO 53+70 -Y4- LT2 @ 84" RCP, BURIED1'0.24 0.020.09 0.02< 0.01121.510.7 4550+49 TO 57+08 -Y4DET- LT/RT2 @ 84" RCP, BURIED1'0.35 0.12 0.040.02116.498.9 45A50+47 TO 57+03 -Y4DET-TEMP DETOUR 0.51 0.19 46533+11 -L- RT30" RCP < 0.01< 0.0110.016.0 47563+36 -L- RT36" RCP < 0.01 12.0 SUB TOTAL THIS SHEET:9.800.510.291.490.190.340.131356321 SUB TOTAL SHEET 1:67.240.362.557.413.950.160.04930248 SUB TOTAL SHEET 2:21.890.250.812.493.770.050.01584610 TOTALS*:98.931.123.6511.397.910.550.1828696300 *Rounded totals are sum of actual impacts NOTES: At Site 45/45A, 0.03 acre of Temporary Fill in Wetlands in the Hand Clearing area for erosion control measures. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 8/8/2022 CRAVEN COUNTY R-1015 34360.1.2 SHEET OF 167 167 Revised 2016 09 09