Loading...
HomeMy WebLinkAbout20050732 Ver 40_Certification of Completion_20220913ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NCDWR Project No.: 05-0732v40 Applicant: NNP — Briar Chapel LLC Project Name: Briar Chapel Phase 13 Section 1&2 — SCM #34 Date of Issuance of 401 Water Quality Certification: 08/23/2017 NORTH CAROLINA Environmental Quality County: Chatham Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification Agent's Certification Engineer's Certification Partial Final I, Gram Livengood, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodically the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the appro ed plans and specifications, a d other supporting materials. Signature Registration No. tL®`f 1 7 Date 6-- 3 1 - ZZ Completed hard copies can be emailed to kristilynn.carpenter@ncdenr.gov ncdenr.gov or mailed to: NCDEQ Transportation Permitting 1617 Mail Service Center Raleigh NC 27699-1617 North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000