HomeMy WebLinkAboutNCC203412_Annual Fee Unpaid Email with NOD_20220916Holloman, Tevye L
From: laserfiche@ncdenr.gov
Sent: Friday, September 16, 2022 8:11 AM
To: jfrey@ci.charlotte.nc.us
Cc: Holloman, Tevye L; Georgoulias, Bethany; Tran, Kieu M;jfrey@ci.charlotte.nc.us
Subject: Notice of Deficiency: Unpaid Permit Fee for NCC203412
Attachments: Notice of Deficiency.pdf
This email is to convey a Notice of Deficiency for failure to pay the 2022 annual permit fee per the requirements of NC
General Statute 143-215.3D(a)(4). Please be sure to coordinate payment with other parties copied on this e-mail to
avoid duplicate payments.
Your Certificate of Coverage (COC) under the Construction Stormwater NPDES General Permit was not renewed because
the annual fee payment (Invoice No. NCC203412-2022) was not received. The payment is 15 day(s) overdue. A Notice of
Deficiency is attached.
Please contact the Stormwater Program at tev.holloman@ncdenr.gov or (919) 707-3649. Please reference:
COC no. NCC203412
This COC is for Cross Charlotte Trail 7th Street to 10th Street Connector in Mecklenburg County, issued to City of
Charlotte.
Annual fee payment can be made through this website:
https://deq.nc.gov/sw-epayments
If this project has been closed -out, it is important that you submit a Notice of Termination request here:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination
Please visit https://deg.nc.gov/NCG01 for more information about this permit.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.