Loading...
HomeMy WebLinkAbout20140650 Ver 1_Modifications_20141006Homewood, Sue From: Crystal Fox <[Fox@smeinc.com> Sent: Monday, October U6'ZUl4ll:ZlAK4 To: Homewood, Sue; Brown, Craig ]SAW Cc: VVALDROP'K4AEGAN WHITNEY (K4AEGAN.VVALDROP0)scana.com) Subject: RE: LIne T021B Attachments: ZUl4'lU'U3'Dn pact K4aps.pdf,ZUl4lUU3_8ufferDnpactTab|e.pdf,ZUl4lUU3 _VVet|andImpactTab|e.pdf 'WeTerSENEGM M-- to send you one —just let me know. From: Homewood, Sue Sent: Tuesday, September ]O,2O148:O4AM To: Crystal Fox; Brown, Craig ] SAW Subject: RE: Une T021B Thanks Crystal, |'d like to come see one of the large crossings during construction ifatall possible. It will certainly give me a better idea of how it's done for future permitting. My Oct. is fairly open if you think you can manage to coordinate that with me. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed tothird parties. From: Crystal Fox Sent: Tuesday, September ]O, 20147:02AM To: Brown, Craig SAW; Homewood, Sue Sue and Craig, Good morning. | hope you are doing well this rainy day! | wanted to touch base with you and let you know how things are progressing a|ongT0Z1B. Clearing, grading, pot holing, matting crews, and stringing are currently in progress along Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project 16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 1 of 5 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Total Area of sting Area Within Existing Area of Temporary Area of Permanent Total Area of Area Within Existing Area of Temporary Area of Permanent Adjusted Total Area For Mitigation (Zone 1 + Zone 2) Stream ID Drawing No Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes /Justification Crossing Greater 401f 3 Maintained s Clearing Impact ** Maintenance Impact Disturbance s Maintained Clearing Maintenance (sf)- Forested Wetland than Easement' Easement' Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer ROW aligned to parallel existing maintained ROW. Portions of new ROW within Existing maintained Cardinal easement. Permanent impacts depicted are included in mitigation S1 (SL1) 301 No No HDD totals. 3,209 783 2,426 1,724 552 1,172 3,598 S2 (SL2) NA NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 Exempt from Jordan Lake Riparian S3 (SF1) 302 Yes Yes Open cut Buffers- Existing Maintained Easement 3,062 3,062 0 2,069 2,069 0 0 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S4 (SF2) 303 No Yes Open cut allowed to re-vegetate naturally. 3,547 1,562 521 1,464 2,161 1,011 268 882 1 3,135 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S5 (SF3) 304 Yes Yes Open cut allowed to re-vegetate naturally. 3,205 2,065 736 404 2,146 1,697 251 198 161 1,428 Primarily Existing Maintained Easement. Temporary impacts due to clearing are included in mitigation totals. Pipeline has been realigned at property owner's S6 (SF19) 305 No Yes Open cut request. 4,296 4,210 86 0 2,711 2,623 88 0 174 Current route avoids direct impacts to S7. Parallel Zone 2 Impacts of 429 sf not included in permaintenance totals or mitigation totals. New temporary impacts depicted on 307 are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S7 (SF20) 305 -307 NA NA Avoided naturally. 1,456 0 21 1,435 2,632 3,061 1,301 1,760 1 77 4,440 Small area of Zone 2 conversion. NOTE: 20140822 Impact Map Depicts neck down to 30 -foot permanent S8 (SS4) 306 NA NA Avoided maintained corridor. 0 0 0 1,148 0 1,148 1,071 S9 (SC22) 307 NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 S10 (SC24) NA NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 Exempt from Jordan Lake Riparian S11 (SF6) 308 Yes Yes Open cut Buffers - Existing Maintained Easement 2,321 2,321 0 3,301 3,301 0 0 Temporary and permanent impacts depicted on 309 are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S12 (SF7) 309 Yes Yes Open cut naturally. 3,088 2,482 528 78 2,095 1,606 414 75 1,095 S13 (SF8) 309 NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 1 0 0 Primarily Existing Maintained Easement. Temporary impacts due to clearing are S14 (SC6) 311 Yes Yes Open cut included in mitigation totals. 2,950 2,588 362 0 2,166 1,936 230 0 592 Current route avoids direct impacts to S15 (SC8) 311 NA NA Avoided 315. 9 9 0 1,967 1,967 0 0 Temporary impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S16 (SC5) 312 Yes Yes Open cut I naturally. 1 3,719 1 3,512 1 207 1 0 1 2,613 1 2,523 1 90 1 0 1 1 1 297 Page 1 of 5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project 16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 2of5 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Stream ID Drawing No. Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes/Justification Total Area of Area Within Existing Area of Temporary Area of Permanent Total Area of Area Within Existing 9 Area of Temporary P rY Area of Permanent Adjusted Total Area For Mitigation Zone 1 + Zone 2 9 ( ) Crossing Greater 401f Disturbance 3 Maintained 3 Clearing Impact ** Maintenance Impact 3 Disturbance Maintained Clearing Maintenance (sf)- Forested Wetland than Easement 3 Easement Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S17 (SC4) 313 No Yes Open cut allowed to re-vegetate naturally. 5,434 2,371 2,052 1,011 4,878 2,671 875 1,332 1 5,270 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S18 (SC1) 315 Yes Yes Open cut allowed to re-vegetate naturally. 3,083 2,106 610 367 2,053 1,375 407 271 1,655 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S18A (SC1) 315 Yes Yes Open cut allowed to re-vegetate naturally. 3,162 2,183 466 513 2,011 1,527 387 97 1 1,463 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Culvert is within Existing Maintained S20 (SC20) 316 Yes Yes Open cut Easement. 5,755 5,755 0 5,429 5,429 0 0 30 -foot permanent maintained corridor S21 (SC21) 317 Yes Yes Open cut neckdown depicted. 3,434 3,434 0 2,281 2,281 0 0 0 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S22 (SF9) 321 No Yes Open cut allowed to re-vegetate naturally. 6,082 4,456 971 655 3,091 1,886 790 415 1 64 2,767 Existing gas line to the north limits crossing angle. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S23 (SF10) 322 No Yes Open cut naturally. 5,120 3,469 935 716 3,135 2,366 421 348 434 1,986 Located primarily within Existing Maintained Easement. ROW aligned to parallell and south of existing maintained ROW to avoid further impact with Stream S24. Existing gas line to the north limits crossing angle. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to S24 (SC12) 323 No Yes Open cut re-vegetate naturally. 3,531 2,422 694 415 2,144 2,144 0 1,109 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S25 (SC11) 324 Yes Yes Open cut allowed to re-vegetate naturally. 3,339 3,243 96 0 2,236 2,036 200 0 296 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S26 (SC10) 326 Yes Yes Open cut allowed to re-vegetate naturally. 3,140 2,333 807 0 2,091 1,631 460 0 1,267 Exempt from Jordan Lake Riparian S27 (SC14) 328 Yes Yes Open cut Buffers - Existing Maintained Easement 3,669 3,669 0 2,515 2,515 0 0 Page 2of5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project 16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 3 of 5 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Stream ID Drawing No. Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes /Justification Total Area of Area Within Existing Area of Temporary Area of Permanent Total Area of Area Within Existing 9 Area of Temporary P Y Area of Permanent Adjusted Total Area For Mitigation Zone 1 + Zone 2 9 ( ) Crossing Greater 401f Disturbance 3 Maintained s Clearing Impact ** Maintenance Impact Disturbance s Maintained Clearing Maintenance (sf)- Forested Wetland than Easement Easement' Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Existing gas line north and south of proposed line limit crossing angle. Temporary workspace will impact forested areas outside of the existing maintained easement. The total are impacted by temporary workspace is reflected in mitigation totals. This area S28 (SC15) ** 329 No Yes Open cut will not be permanently maintained. 5,026 4,564 462 4,139 3,601 538 1,000 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S29 (SC13) 330 Yes Yes Open cut allowed to re-vegetate naturally. 2,759 2,584 175 0 2,078 1,788 290 0 465 Located primarily within Existing Maintained Easement. Portions of buffer will be cleared and permanently maintained and are reflected in mitigation totals. Gas line to the north limits crossing angle. 30 -foot neckdown for permanent maintained easement depicted, Permanent and temporary impacts resulting from clearing are S30 (SF11) 331 No Yes Open cut included in mitigation totals. 3,395 2,118 521 1,277 2,936 2,532 404 1,419 3,621 Current alignment avoids direct impacts to S31. The alignment is located primarily within existing maintained easement. Permanent and temporary impacts resulting from clearing are S31 (SC17) 337 NA Yes Avoided included in mitigation totals. 1,667 706 797 164 2,612 1,887 668 57 23 1,663 Located primarily within Existing Maintained Easement. Temporary and permanent clearing impacts depicted S32 (SC18) 337 Yes Yes Open cut are included in mitigation totals. 3,038 2,082 956 0 2,024 1,390 634 48 1,638 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S33 (SC19) 338 Yes Yes Open cut allowed to re-vegetate naturally. 11,028 6,745 2,547 1,736 5,814 4,118 1,169 527 5,979 Gas line to the north limits crossing angle. 30 -foot permanent maintained corridor depicted. Temporary impacts to clearing of TWS are included in S34 (SF13) 339 No Yes Open cut mitigation totals. 2,654 2,052 602 0 2,723 2,098 625 0 0 0 1,227 S35 (SP1) 339 No Yes Open cut Not Subject to Jordan Lake Buffers 0 0 0 0 0 0 0 Primarily within Existing Maintained Easement. Gas line to the north limits crossing angle. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S36 (SF14) 340 No Yes Open cut naturally. 3,409 2,445 644 320 2,343 1,427 740 176 161 1,719 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S37 (SF15) 341 Yes Yes Open cut allowed to re-vegetate naturally. 1 3,436 1 2,634 1 662 1 140 1 2,320 1 1,679 1 505 136 1 1 1,443 Page 3 of 5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project 16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 4 of 5 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Stream ID Drawing No. Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes /Justification Total Area of Area Within Existing Area of Temporary Area of Permanent Total Area of Area Within Existing 9 Area of Temporary P Y Area of Permanent Adjusted Total Area For Mitigation Zone 1 + Zone 2 9 ( ) Crossing Greater 401f Disturbance 3 Maintained 3 Clearing Impact ** Maintenance Impact 3 Disturbance Maintained Clearing Maintenance (sf)- Forested Wetland than Easement 3 Easement Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Located mostly within Existing Maintained Easement. ROW aligned to parallell and south of existing maintained ROW to avoid further impact with Stream S38 and Wetland W49. 30 -foot permanent maintained corridor depicted. Temporary impacts to clearing of TWS S38 (SF16) 342 No Yes Open cut are included in mitigation totals. 1,674 1,318 356 343 1,388 1,011 377 40 1,116 Not Subject to Jordan Lake Buffers. Small area will be included in new S39 (SF17) 342 NA NA Avoided maintained 15 -foot right of way. 0 0 0 0 0 0 0 Located within Existing Maintained Easement. Crossing angle limited by gas line to the north. 30 -foot permanent maintained corridor depiicted. Temporary impacts to clearing of TWS S40 (SF18) 343 Yes Yes Open cut are included in mitigation totals. 3,342 2,278 1,064 0 3,208 2,338 870 0 1,934 Primarily Existing Maintained Easement. Crossing angle at stream limited by gas line to the north. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S41 (SM1) 344 No Yes Open cut naturally. 3,415 2,027 668 720 2,327 1,844 210 273 1 1,871 Primarily Existing Maintained Easement. Crossing angle at stream limited by gas line to the north. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S42 (SM2) 345 Yes Yes Open cut naturally. 3,044 1,985 622 437 2,109 1,487 472 150 1 1,681 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Crossing angle limited by gas line to the S43 (SM3) 345 No Yes Open cut north. 0 0 0 0 0 0 0 Not subject to Jordan Lake Riparian Buffers. Crossing located completely S44 (SF22) 346 No Yes Open cut within existing maintained easement. 0 0 0 0 0 0 0 Not subject to Jordan Lake Riparian Buffers. Crossing located completely S45 (SF23) 346 Yes Yes Open cut within existing maintained easement. 0 0 0 0 0 0 1 0 No mitigation required for Zone 2 S46 (SF21) 346 NA NA Avoided parallel impacts. 0 0 0 851 68 0 Primarily Existing Maintained Easement. Crossing angle limited by gas line to the north. Current alignement avoids impacts to wetlands to the north and additional buffer impacts to the south. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S47 (SF24) 347 No Yes Open cut allowed to re- vegetate naturally. 3,416 2,063 809 544 2,567 1,544 700 323 35 145 2,196 S48 (SF25) 347 NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 Exempt from Jordan Lake Riparian S49 (SF26) 350 Yes Yes Open cut Buffers - Existing Maintained Easement. 2,170 2,170 0 2,725 2,725 0 0 Not subject to Jordan Lake Riparian Buffers. Crossing located completely within existing maintained easement. Crossing angle limited by gas line to the S50 (SF27) 351 No Yes Open cut north. 0 0 0 0 0 0 0 Page 4 of 5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021B Pipeline Project 16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 5 of 5 Forested Wetland within Zone 1 Impacts (sf) Zone 2 Impacts (sf) Buffer Zone Stream ID Drawing Perpendicular Crossing? Disturbance at 2 Crossing Type Crossing Notes /Justification Area Within Existing Area of Permanent Area Within Area of Area of Adjusted Total Area For No Total Area of Area of Temporary Total Area of Existing Temporary Permanent Mitigation (Zone 1 + Zone 2) Crossing Greater Disturbance 3 Maintained 3 Clearing Impact ** Maintenance 3 Disturbance Maintained Clearing Maintenance (sf)- Forested Wetland than 401f Easement Impact 3 Easement Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Totals: 113,023 19,515 13,583 85,586 13,846 10,599 50,398 Please note, the drawing numbers depicted cores and to the last three digits of the drawing number as shown on APPROXIMATE JURISDITIONAL BOUNDARIES IMPACT DRAWINGS. 2HDD (horizontal directional drill)- will not impact the jurisdictional feature. 3 Areas denoted for informational purposes only. Areas within Existing Maintained Easements, are not subject to Jordan Lake Buffer Requirements or Mitigation. ** Temporary Workspace cleared will not be permanently maintained, however temporary impacts are reflected in mitigation totals. Area will be restored in accordance with the Restoration plan and allowed to re-vegetate naturally. Change previously submitted to DWR via email on July 28, 2014 ,August 7, 2014- Change submitted August 11, 2014, reroute Change associated with neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW, August 22,2014. Change associated with neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,2014 Change October 3,2014. Recalculation of pertinent impact areas. Page 5 of 5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project WETLAND IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 1 of 2 Classification Impacts Wetland ID Sheet No.' Vegetative Type Relation to Waterbody Temporary Impacts Conversion Crossing Type* sf ac sf ac W1 (WL1) NA NA Scrub Shrub- ent Riparian 0 0 0 0.000 Avoided W2 (WF1) 302 Forested /Emergent Riparian 1,516 0.035 0 0.000 Open cut W3 (WF2) 304 Emergent Riparian 12,386 0.284 161 0.004 Open cut W4 (WF14) 305 Forested /Emergent Riparian 780 0.018 0 0.000 Open cut W5 (WF15) NA Forested Riparian 0 0.000 0 0.000 Avoided W6 (WF16) NA Forested Riparian 0 0.000 0 0.000 Avoided W7 (WS1) 306 Forested Riparian 0 0.000 9 0.000 Conversion W8 (WS2) 307 Forested Riparian 0 0.000 0 0.000 Avoided W9 (WC27) 307 Forested Riparian 0 0.000 0 0.000 Avoided W10 (WC28) 307 Forested Riparian 0 0.000 77 0.002 Conversion W11 (WC29) NA Forested Riparian 0 0.000 0 0.000 Avoided W12 (WF3) 308 Forested /Emergent Riparian 23,950 0.550 0 0.000 Open cut W13 (WF4) 309 Forested Riparian 0 0.000 0 0.000 Avoided W14 (WF5) 310 Forested /Emergent Non - riparian 3,751 0.086 0 0.000 Open cut W15 (WC5) 311 Forested /Emergent Riparian 3,156 0.072 600 0.014 Open cut W16 (WC4) 311 Forested /Emergent Riparian 9,804 0.225 775 0.018 Open cut W17 (WC2) NA Forested Non - riparian 0 0.000 0 0.000 Avoided W18 (WC1) 314 Forested /Emergent Non - riparian 14,481 0.332 1,127 0.026 Open cut W19 (WC25) 316 Open Water Non - riparian 0 0.000 0 0.000 Avoided W20 (WC26) 317 Forested /Emergent Riparian 2,917 0.067 0 0.000 Open cut W21 (WFA) 318 Shrub -Scrub Non - riparian 0 0.000 0 0.000 Avoided W22 (WC6A) 318 Open Water Non - riparian 0 0.000 0 0.000 Avoided W23 (WC6) 319 Forested /Shrub- Scrub /Emergent Non - riparian 1,612 0.037 0 0.000 Open cut W24 (WC27) 320 Shrub -scrub Non - riparian 0 0.000 0 0.000 Avoided W25 (WF6) 321 Forested /Emergent Riparian 301 0.007 278 0.006 Conversion W26 (WP1) 322 Forested /Emergent Riparian 1,002 0.023 0 0.000 Open cut W27 (WF34) NA Forested Riparian 0 0.000 0 0.000 Avoided W28 (WF33) 324 Forested Riparian 0 0.000 0 0.000 Avoided W29 (WC11) 325 Forested Riparian 0 0.000 333 0.008 Open cut W30 (WC11A) 325 Open Water Non - riparian 0 0.000 0 0.000 Avoided W31 (WC9) 326 Forested /Emergent Riparian 2,928 0.067 0 0.000 Open cut W32 (WC 10) 326 Forested Riparian 0 0.000 0 0.000 Avoided Page 1 of 2 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project WETLAND IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 2 of 2 Classification Impacts Wetland ID Sheet No.' Vegetative Type Relation to Waterbody Temporary Impacts Conversion Crossing Type* sf ac sf ac W33 (WC 13) 327 Forested /Emergent Non - riparian 4,476 0.103 0 0.000 Open cut W34 (WC 12) 330 Forested /Emergent Riparian 8,059 0.185 861 0.020 Open cut W35 (WF7) 332 Emergent Non - riparian 435 0.010 0 0.000 Open cut W36 (WF8) NA Open Water Non - riparian 0 0.000 0 0.000 Avoided W37 (WC14A) NA Open Water Non - riparian 0 0.000 0 0.000 Avoided W38 (WC14) 334 Emergent Riparian 6,349 0.146 0 0.000 Open cut W39 (WC15) 335 Forested /Emergent Riparian 3,331 0.076 264 0.006 Open cut W40 (WC16) 336 Emergent Non - riparian 852 0.020 0 0.000 Open cut W41 (WC 17) 337 Forested /Emergent Riparian 434 0.010 23 0.001 Open cut W42 (WC 18) 337 Forested /Emergent Riparian 12 0.000 0 0.000 Open cut W43 (WC20) 337 Forested Riparian 0 0.000 0 0.000 Avoided W44 (WC22) 337 Forested /Emergent Riparian 643 0.015 0 0.000 Open cut W45 (WC21) 337 Forested /Emergent Riparian 0 0.000 18 0.000 Open cut W46 (WF9) 339 Forested /Emergent Riparian 4,041 0.093 0 0.000 Open cut W47 (WF10) 340 Forested /Emergent Riparian 1,869 0.043 161 0.004 Open cut W48(WF11) 341 Forested Riparian 0 0.000 0 0.000 Avoided W49 (WF12) 342 Emergent Riparian 685 0.016 0 0.000 Open cut W50 (WF17) 346 Forested Riparian 0 0.000 0 0.000 Avoided W51 (WF20) 347 Forested /Emergent Riparian 4,484 0.103 2,065 0.047 Open cut W52 (WF19) 347 Forested Riparian 0 0.000 0 0.000 Avoided W53 (WF21) 348 Forested /Emergent Non - riparian 2,608 0.060 1,836 0.042 Open cut W54 (WF22) 349 Forested /Emergent Non - riparian 236 0.005 170 0.004 Open cut W55 (WF24) 350 Forested /Emergent Riparian 4,977 0.114 0 0.000 Open cut W56 (WF23) 350 Open Water Non - riparian 0 0.000 0 0.00-0--T- .000 Avoided Totals: 122,075 2.802 8,758 0.201 Horizontal directional drill (HDD) that will not impact the wetland. 1 Please note, the drawing numbers depicted corespond to the last three digits of the drawing number as shown on Approximate Jurisdictional Boundaries Drawings Indicates change attibutable to re- routing. Change associated with DWR requested neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,201, Change October 3, 2014. Recalculation of pertinent impacts. Page 2 of 2 vo STREAM S1 '�A 0 L. F. xn�o' \ _ EXISTING MAINTENANCE EASEMENT— — — — — — — — — ) .�G—�G G G G G EXISTING 10" PSNC T -021 PIPELINE G _ N N � _ _EXISTING CARDINAL EASEMENT - - — — — — — — — GIG G c c EXISTINGG 24" CARDINAL PIPELINE GAG � N / � ----------------- EXISTING CARDINAL EASEMENT S0 LEGEND: �G / T / EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA / NOTE: 1. PIPELINE TO BE INSTALLED BY HDD METHOD ti Z7 - - -- z2 �2 G o v - - -I_— -- --- - - - - -- G G ---j— / No I �1 �G�G G G NEW PERMANENT EASEMENT PROPOSED 16" T -021 B PIPELINE NEW PERMANENT EASEMENT 7 STREAM S1 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 2,426 SQ. FT. 1,172 SQ. FT. TEMP. IMPACT 783 SQ. FT. 552 SQ. FT. 50 25 0 50 SCALE IN FEET X13 PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 STREAM CROSSING S1 ALIGNMENT SHT: 58701101 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 9 +37, M.P 0.18 58703301 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S4 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 / PERM. IMPACT 1,464 SO. FT. 882 SQ. FT- A� TEMP. IMPACT -.083 SO. FT. 1,279 SQ. FT. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. 30' LIMIT OF PERMANENT MAINTENANCE TEEMMPORARY WORKSPACE 77 G G G G O M LEGEND: DISTANCE VARIES EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD G Ii 50' BUFFER i i � N N N -1G jp , STREAM S4 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 776 SQ. FT.. 0.019 AC. �o TA v-A 01 ZpNF 2 2 TEMPORARY WORKSPACE 7-/ 7 1/777 TH EXISTING 24" CARDINAL PIPELINE 'EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G G G J /) is _m� I PR(1P( QFn 1 F" T_ EXISTING MAINTENANCE EASEMENT ---------- - - - - -- \ TEMPORARY WORKSPACE EASEMENT - DISTANCE VARIES. PERMANENT CLEARING OF FORESTED AREA, ZONE 1 - 521 SQ. FT. ZONE 2 - 268 SQ. FT. N I STREAM S4 77 L. F. NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET aKs PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 ALIGNMENT sHT: 58701102 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 47 +67, M.P 0.90 58703303 HOUSTON, TX DETROIT, MI CHARLESTON • TULSA, OK ALAMANCE COUNTY NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com ' SHEET 1 OF 1 IDATE OF PLOT: 09/05/2014 �O IZ \ �? 'J 30' LIMIT OF PERMANENT MAINTENANCES TEMPORARY WORKSPACE TEMPORARY WORKSPACE EASEMENT, DISTANCE N VARIES. NO MITIGATION REQUIRED. N G G G GEXISTING 24" " CARDG G CARDINAL PIPELINE c c c N — EXISTING MAINTENANCE EASEMENT — — — — — — — — G — G G G G G G G Akii- - — - - -- — ----- - - - - -- N EXISTING MAINTENANCE EASEMENT i- STREAM S5 3 L. F. I N LEGEND: N EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 736 SQ. FT. ZONE 2 — 251 SQ. FT. FORESTED WETLAND WITHIN ZONE 1 — 161 SQ. FT. WETLAND W3 G G G 2 7 TA 0 Z v G G ----------------- EXISTING 10" PSNC T -021 PIPELINE G G G G —G —G- PROPOSED 16" T -021 B PIPELINE STREAM S5 TOTAL JORDAN LAKE BUFFER IMPACTS WETLAND W3 TOTAL IMPACTS ZONE 2 PERM. IMPACT PERM. IMPACT 161 SQ. FT. 0.004 AC. TEMP. IMPACT 12,386 SO. FT. 0.284 AC. STREAM S5 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 181 SO. FT. 0.007 AC. WETLAND W3 G G G 2 7 TA 0 Z v G G ----------------- EXISTING 10" PSNC T -021 PIPELINE G G G G —G —G- PROPOSED 16" T -021 B PIPELINE STREAM S5 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 404 SO. FT. 198 SQ. FT. TEMP. IMPACT 2,801 SO. FT. 1,948 SQ, FT. 50 25 0 50 SCALE IN FEET i PSNC ENERGY DRAWN BY: CAC °5'28'1. ENERGY MANAGEMENT DRAFTING CK: SFS 05/29/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 ALIGNMENT sHT: 58701103 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 64 +42, M.P 1.22 58703304 HOUSTON, TX DETROIT, MI CHARLESTON, NM TULSA, OK SCALE: 1 " = 50' REV. A 6AY CITY. MI ALAMANCE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 O- �2 \/ ti w N STREAM S7 ' / 1 T2 F NOTE: Z WETLAND W4 MITIGATION FOR TEMPORARY WORKSPACE v �ID c� 30' LIMIT OF PERMANENT c MAINTENANCE \ \ — c�c-�c- LEGEND: EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD V, \ \ IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. STREAM S6 73 L.F. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 86 SQ. FT. ZONE 2 - 88 SQ. FT. —c c STREAM S6 TOTAL JORDAN LAKE BUFFER IMPACTS WETLAND W4 TOTAL IMPACTS ZONE 1 PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 780 SO. FT. 0.018 AC. STREAM S6 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 402 SQ. FT. 0.009 AC. O- �2 \/ ti w N STREAM S7 ' / 1 T2 F NOTE: Z WETLAND W4 MITIGATION FOR TEMPORARY WORKSPACE v �ID c� 30' LIMIT OF PERMANENT c MAINTENANCE \ \ — c�c-�c- LEGEND: EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD V, \ \ IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. STREAM S6 73 L.F. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 86 SQ. FT. ZONE 2 - 88 SQ. FT. —c c STREAM S6 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 4,296 SQ. FT. 2,711 SQ. FT. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. EXISTING 10" PSNC T -021 PIPELINE c _ c c-4 —c�c PROPOSED ROPOSED 16" T -021 B PIPELINE EXISTING 24" CARDINAL PIPELINE — cc c 50 25 0 50 SCALE IN FEET s P S N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.O. BOX 1007 4 0383 WETLAND CROSSING W4, STREAM CROSSING S6 ALIGNMENT sHT: 5801103 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 70 +14, M.P 1.33 58703305 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A BAY GITY. MI ALAMANCE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W12 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 23,950 SQ. FT. 0.550 AC. _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ENERGY MANAGEMENT & SERVICES CO. CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 BRANCH OFFICES: HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK BAY CITY, MI www.emseng.com STREAM S16 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT WETLAND W12 ZONE 2 PERM. IMPACT 0 SQ. FT. STREAM S11 TEMP. IMPACT 2,321 SQ. �T 3,301 S0. FT. 52 L.F. EXISTING (MAINTAINED) 50' ROW PROPOSED 16" N EXISTING 10" PSNC T -021 T -021 B PIPELINE N PIPELINE G G G G �Z G G G G G — G TEMPp� RARY I - - WORKSPACE EXISTING 24" CARDINAL 0' PIPELINE BUFF R N / (1 N Zp `30 • NF LEGEND: EXISTING TREE LINE i _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ENERGY MANAGEMENT & SERVICES CO. CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 BRANCH OFFICES: HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK BAY CITY, MI www.emseng.com STREAM S16 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 S0. FT. TEMP. IMPACT 2,321 SQ. �T 3,301 S0. FT. 2 �o s� 7A .Z �3 0 v EXISTING MAINTENANCE EASEMENT G =7=- G— G G—G- TEMPORARYI WORKSPACE STREAM S11 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 240 SO. FT. 0.006 AC. 100 50 0 100 SCALE IN FEET DRAWN BY: CAC 06/02/14 PS N C ENERGY DRAFTING CK: SFS 06/03/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: WETLAND CROSSING W12 & STREAM CROSSING S11 ALIGNMENT SHT: 5801105,06 DRAWING NO.: @ STATION 127 +54, M.P 2.42 58703308 ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1° = 100' 1 REV. A SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 I� STREAM S12 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 247 SQ. FT. 0.006 AC. STREAM S12 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 78 SQ. FT. 75 SQ. FT. TEMP. IMPACT 3,010 SQ. FT. 2,020 SQ. FT. STREAM S13 WETLAND W13- / 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 528 SQ. FT. 30' LIMIT OF PERMANENT � / N ZONE 2 - 414 SQ. FT. MAINTENANCE - - -- I / ��T / TT-T �T--- - - - - -- EXISTING MAINTENANCE EASEMENT — — JAL — — — — z �o W N� m '2 0 0 v ,.EXISTING 10" PSNC T -021 PIPE G G G G G —G —G N G G \ \ G G G G G G G G PROPOSED 16" T -021 B PIPELINE EXISTING 24" CARDINAL PIPELINE G G G G G G G G G G G G G- • — — — — — — — — — — — — — — — — — — — — — — — EXISTING MAINTENANCE EASEMENT N N STREAM S12 `A w N z 50 L. F. \ �1 \ \ TEMPORARY WORKSPACE TEMPORARY WORKSPACE EASEMENT, DISTANCE LEGEND: ONE _ VARIES. NO MITIGATION REQUIRED. EXISTING TREE LINE 20 2 �FFE� \ NOTE: OBE 0 r MITIGATION FOR TEMPORARY WORKSPACE TEMPORARY IMPACT AREA �� \ IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL PERMANENT IMPACT AREA BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.O. Box 1007 ALIGNMENT SHT: 58701106 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 146 +89, M.P 2.78 58703309 HOUSTON, TX MI DETROIT, CHARLESTON, WV • TULSA, DI( ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S14 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 990 SQ. FT. 0.022 AC. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF IMPACT FOR ZONE 1 — 362 SQ. FT. ZONE 2 — 230 SQ. FT. PROPOSED 16" WETLAND 15 T -021 B PIPELINE ---- EXISTING MAINTENANCE EASEMENT G G G G r /T /T /T /T /T /TAT/ TEMPORARY WORKSPACE 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. - - - -- LEGEND: STREAM S15 EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD WETLAND W15 TOTAL IMPACTS PERM. IMPACT 600 SQ. FT. 0.014 AC. TEMP. IMPACT 2,556 SQ. FT. 0.059 AC. ZpN STREAM 14 --� 50 L.F. 50, B� FF I N 2% ZONE WETLAND W16 TOTAL IMPACTS PERM. IMPACT 775 SO. FT. 0.018 AC. TEMP. IMPACT 9,029 S0: FT. 0.207 AC. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. 30' LIMIT OF PERMANENT N MAINTENANCE G G G G 1> \ ��� T - -rte, Q � N �z1 ?2� �Z1 z2 2 —z2 �o s� vA .Z C) )3 G v EXISTING 24" CARDINAL PIPELINE EXISTING 10" PSNC T -021 PIPELINE G G G G U/7TEMPORARY � ? /T /i /7— i WORKSPACE N EXISTING MAINTENANCE EASEMENT WETLAND W16 STREAM S14 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 2,950 SO. FT. 2,166 SO. FT. STREAM S15 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ, FT_ 0 SC. FT. TEMP. IMPACT 9 SO. FT. 1,967 SQ. FT. 100 50 0 100 SCALE IN FEET OP-11 PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 LES, KY DRIVE WETLAND CROSSING W15 & W16 & STREAM CROSSING S14 & S15 P.O. BOX 1007 ALIGNMENT SHT: 58701107 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 173 +20, M.P 3.28 58703311 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" _ ,00' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S16 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 831 SQ. FT. 0.019 AC. N — — EXISTING MAINTENANCE EASEMENT — EXISTING 10" PSNC T -021 PIPELINE G G G G— EXISTING 24" CARDINAL PIPELINE G EXISTING MAINTENANCE EASEMENT TEMPORARY WORKSPACE LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD 0'\ gUF 20, 30' ZONE 2 ZONE 1 \ N \ N \ STREAF S 1 6 \ \ 1 \ N G STREAM S16 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 3,719 SQ. FT. 2,613 SO. FT. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 – 207 SQ. FT. ZONE 2 – 90 SO. FT. 2 �a s� -L-30' LIMIT OF PERMANENT MAINTENANCE - — — — — — — — — — — — — — — — — — G G G O G G G G� G \cam TEMPORARY WORKSPACE \ \ 9' TEMPORARY WORKSPACE EASEMENT. \ NO MITIGATION REQUIRED. NOTE: L2__\ \ \ \ \ MITIGATION FOR TEMPORARY WORKSPACE \ IMPACTS WILL BE PROVIDED FOR\ RIPARIAN BUFFER ZONES. AREAS WILL \ BE RE– SEEDED IN ACCORDANCE WITH, THE RESTORATION PLAN AND ALLOWED\ TO RE– VEGETATE NATURALLY. \ \ 50 25 0 50 SCALE IN FEET OP-11 PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S16 AALIGNMENT sHT: 58701108 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 187 +76, M.P 3.56 58703312 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 7 DATE OF PLOT: 09/05/2014 I� STREAM S17 TOTAL IMPACTS 10' 1 PERM. IMPACT 0 SQ. FT. 0.00 AC. EASE ZONE TEMP. IMPACT 1,195 SQ. FT. 0.027 AC. ZONE STREAM S17 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 1 ,01 1 SQ. FT. 1,332 SQ. FT. TEMP. IMPACT 4,423 SQ. FT. 3,546 SQ. FT. Ep,SEM ENT TENANCE EXISTI�`NG MPIN� C x_021 �p1P NG 1I NI ✓� 1B pROpOSEO 16 �_p2 p�pE�-1NE ME EMPORARY WORKSPACE SENT. AREA OF IMPACT FOR 1 — 309 SQ. FT. (TEMPORARY) 2 — 262 SQ. FT. (TEMPORARY) _cam a Al E)o / / / 10' TEMPORARY WORKSPACE N / / EASEMENT. AREA OF IMPACT FOR / ZONE 1 — 1.743 SO. FT. (TEMPORARY) Fz_x�a N ZONE 2 — 613 SQ. FT. (TEMPORARY) TEMPORARY WORKSPACE STREAM S17 /cam / 90 L. F. tit c LEGEND: EXISTING TREE LINE ' GP� MITIGATION FOR TEMPORARY WORKSPACE TEMPORARY IMPACT AREA / LNG 2�c IMPACTS WILL BE PROVIDED FOR I E� \`'� RIPARIAN BUFFER ZONES. AREAS WILL G —�_G _1 �G BE RE— SEEDED IN ACCORDANCE WITH PERMANENT IMPACT AREA GAG THE RESTORATION PLAN AND ALLOWED 30, TO RE— VEGETATE NATURALLY. NOTE: ONE 1 20' ZONE 2 50 25 0 50 � 1. PIPELINE TO BE INSTALLED NN BY OPEN CUT METHOD L _ SCALE IN FEET �1 i 9 O cl '�A 7 C7 2 v� 0 � � v Z2 G —i G G 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. Box 1007 ALIGNMENT SHT: 58701108 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 197 +87, M.P 3.75 58703313 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, DI( ALAMANCE COUNTY NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com ' SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W18 TOTAL IMPACTS PERM. IMPACT 1,127 SQ. FT. 0.026 AC. TEMP. IMPACT 13,354 SO. FT. 0.307 AC. G G G G G G — — — — — — — — — — LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD EXISTING MAINTENANCE EASEMENT EEWr--G G G G G EXISTING 10" PSNC T -021 PIPELINE PROPOSED 16" T -021 B PIPELINE EXISTING 24" CARDINAL PIPELINE .G G G G G EXISTING MAINTENANCE EASEMENT G .G G G Z �a s� 7A �a �Z 0 Z G G G c G— TEMPORARY WORKSPACE WETLAND W18 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 09/22/14 ENERGY MANAGEMENT DRAFTING CK: SFS 09/22/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.o' BOX 1007 WETLAND CROSSING W18 ALIGNMENT SHT: 58701108 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 206 +07, M. P 3.90 58703314 HOUSTON, TX DETROIT, MI CHARLESTON, TULSA, OK WV TU SCALE: 1 = 50' REV. A BAY CITY, MI ALAMANCE COUNTY, NORTH CAROLINA www.emseng.COM SHEET 1 OF I DATE OF PLOT: 09/05/2014 STREAM S18 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 1,072 SQ. FT. 0.025 AC. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR \ ZONE 1 — 610 SQ. FT. ZONE 2 — 407 SQ. FT. \ IG G N STREAM S18A TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 1,252 SQ. FT. 0.032 AC. \ 10' TEMPORARY WORKSPACE EASEMENT. N N AREA OF TEMPORARY IMPACT FOR L 1 — 466 SQ. FT. 2 — 387 SQ. FT. LIMIT OF PERMANENT NTENANCE XISTING MAINTENANCE ASEMENT - - - - - - - -XISTING 10" SNC T -021 PIPELINE G G I / __' 1 1-1 STREAM S18 LEGEND: 50 L.F. EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD In F G G G XISTING MAINTENANCE EASEMENT TEMPORARY �- .WORKSPACE N X22 / l l NOTE: / ZONE 2 PERM. IMPACT 367 SQ. FT. r Q j MITIGATION FOR TEMPORARY WORKSPACE L� IMPACTS WILL BE PROVIDED FOR / RIPARIAN BUFFER ZONES. AREAS WILL > TEMPORARY BE RE— SEEDED IN ACCORDANCE WITH��� WORKSPACE THE RESTORATION PLAN AND ALLOWED RE— VEGETATE NATURALLY. NO I / __' 1 1-1 STREAM S18 LEGEND: 50 L.F. EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD In F G G G XISTING MAINTENANCE EASEMENT TEMPORARY �- .WORKSPACE N X22 / l l ZONE 1 ZONE 2 PERM. IMPACT 367 SQ. FT. r Q 2,716 SQ. FT. 1,782 SQ. FT. s� v� I N N 2 v� O� I N N G EXISTING 24" c G CARDINAL PIPELINE LZ —G G— N I I / N 1 N N TEMPORARY WORKSPACE, DISTANCE VARIES /7/// EASEMENT. NO MITIGATION REQUIRED. TEMPORARY / NOTE: /I WORKSPACE�� N / STREAM S18 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 367 SQ. FT. 271 SQ. FT. TEMP. IMPACT 2,716 SQ. FT. 1,782 SQ. FT. STREAM S18A TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 513 SQ. FT. 97 SQ. FT. TEMP. IMPACT 2,649 SQ. FT. 1,914 SQ. FT. 30, / ONE 20' / 50, ZONE 2 / BUFFER N STREAM S18A 50 L.F/ / / A^ n, / 50 25 0 50 .�1 SCALE IN FEET 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S18 & S18A AALIGNMENT sHT: 58701109 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 214 +60, M.P 4.06 58703315 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, DI( ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 IDATE OF PLOT: 09/05/2014 / STREAM S22 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 674 SQ. FT. 0.015 AC. WETLAND W25 TOTAL IMPACTS PERM. IMPACT 278 SO. FT. 0.006 AC. TEMP. IMPACT 230 SQ. FT. 0.005 AC. 10' TEMPORARY WORKSPACE EASEMENT. TEMPORARY NO MITIGATION REQUIRED. _ WORKSPACE 30' LIMIT OF PERMANENT EXISTING 24" CARDINAL PIPELINE MAINTENANCE G G G G 7�` N / EXISTING MAINTENANCE EASEMENT in y— — — — — — — — — — — — — — — — — — — — — — EXISTING 10" PSNC T -021 PIPELINE - G G G G G G G 0 PROPOSED 16" T -021 B PIPELINE '? LEGEND: EXISTING MAINTENANCE EASEM WETLAND W25 EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD U) w ;—G— 6 N f 50' / -UPPER f I ZONE � 30' ONE � I � NOTE: 9 MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL s BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 4Z 'Z 0- / � Z .z2 STREAM S22 TEMPORARY z / WORKSPACE G / G G- / G TG G G G G G 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 971 SQ. FT. ZONE 2 — 790 SQ. Fr. STREA M S22 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PER M. IMPACT 655 SQ. FT. 415 SQ. FT. TEMP. IMPACT 5,427 SO. FT. 2,676 SO. FT. FORESTED WETLAND WITHIN ZONE 1 — 64 SQ. FT. 50 25 0 50 SCALE IN FEET X13 PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIRONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 4 0383 WETLAND CROSSING W25 & STREAM CROSSING S22 ALIGNMENT sHr: 5801,14 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 359 +63, M.P 6.81 58703321 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK SCALE: 1 = 50' REV. A BAY GITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 TEMPORARY WORKSPACE \ \ F21/ \\ \ N G L G G- _ GAG --- G LEGEND: 1�1 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S23 TOTAL JORDAN LAKE BUFFER IMPACTS STREAM S23 TOTAL IMPACTS PERM. IMPACT PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 993 SQ. FT: 0.022 AC. WETLAND W26 TOTAL IMPACTS PERM. IMPACT 790 SO. FT. 0.018 AC. TEMP. IMPACT 213 SO. FT. 0.005 AC. TEMPORARY WORKSPACE \ \ F21/ \\ \ N G L G G- _ GAG --- G LEGEND: 1�1 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S23 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 716 SQ, FT. 348 SO. FT. TEMP. IMPACT 4,404 SQ. FT. 2,787 SQ. FT. STREAM S23 48 L.F. EXISTING (MAINTAINED) 30' ROW G EXISTING 24" CARDINAL PIPELINE \ Z2 c O \ \22 20' �F \ ZONE 2 NOTE: � MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 30' LIMIT OF PERMANENT MAINTENANCE a �o w a .z 0 v TEMPORARY WORKSPACE G G G EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G--�G- .o PROPOSED 16" T -021 B PIPELINE G M EXISTING MAINTENANCE EASEMENT — — NEW PERMANENT EASEMENT \ 10' TEMPORARY WORKSPACE EASEMENT. TEMPORARY CLEARING OF FORESTED AREA, ° ZONE 1 - 935 SQ. FT., ZONE 2 - 421 SQ. FT. FORESTED WETLAND AREA WITHIN ZONE 1 - 434 SQ. FT. WETLAND W26 50 25 0 50 SCALE IN FEET o PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O' BOX 1007 4 0383 WETLAND CROSSING W26 & STREAM CROSSING S23 ALIGNMENT sHT: 5801115 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 374 +57, M.P 7.12 58703322 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S24 TOTAL JORDAN LAKE BUFFER IMPACTS STREAM S24 TOTAL IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SO. FT. 0.00 AC. PERM. IMPACT 694 SQ. FT. 0 SQ. FT. TEMP. IMPACT 905 SO. FT. 0.021 AC. TEMP. IMPACT 2,837 SQ. FT. 2,144 SO. FT. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. T T /777 �l EXISTING 24 CARDINAL INE EXISTING MAINTENANCE EASEMENT EXISTING 10" PSN G T -021 PIPELINE G_ _G G G PROPOSED 16" T -021 B PIPELINE 7 EXISTING MAINTENANCE EASEMENTS j / /PACE TEMPORARY WORKSPACE / N N � N N N N I I 30' 20' ZONE 2 OZONE 1 LEGEND: 45 L.F.JET � I —� G c G G 1 N EXISTING (MAINTAINED ) 30' ROW EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD / � o N� N N N N I I50' BUFFER 30' LIMIT OF PERMANENT MAINTENANCE vo s� F C) v� /-7-/-7- G / ^/ T TEMPORARY WORKSPACE G G G G 10" TEMPORARY WORKSPACE EASEMENT. AREA OF IMPACT FOR ZONE 1 - 415 SQ. FT. (TEMPORARY) NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET o PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S24 AALIGNMENT sHT: 5801115 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 398 +18, M.P 7.55 58703323 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S25 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 0 SO. FT. 0 SQ. FT. TEMP. IMPACT 3,339 SO, FT. 2,236 SQ. FT. STREAM S25 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 325 SO. FT. 0.007 AC. EXISTING 24" CARDINAL PIPELINE c EXISTING 10" PSNC T -021 PIPELINE —G G G G G PROPOSED 16" T -021 B PIPELINE LEGEND: TEMPORARY WORKSPACE EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD c G- I G G G 1 i D +G 0 _i N G G 1 TEMPORARY WORKSPACE o � I WETLAND W28 , EXISTING /ti / CULVERT NOTE: , MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL tit BE RE- SEEDED IN ACCORDANCE WITH i THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 10' TEMPORARY WORKSPACE v mow' EASEMENT. NO MITIGATION REQUIRED. I I 50 2 0 50 SCALE IN FEET o PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S25 AALIGNMENT sHT: 5801116 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 407 +05, M.P 7.72 58703324 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A BAY CIN, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 2020' F2 �> N V 9 30 N ti ONF 10' TEMPORARY WORKSPACE / SO' 6UFFFR EASEMENT. AREA OF IMPACT FOR / ZONE 1 - 96 SQ. FT. (TEMPORARY) r ZONE 2 - 200 SQ. FT. (TEMPORARY) / ti STREAM S25 /// 30' LIMIT OF PERMANENT 56 L.F. / / /MAINTENANCE (MAINTAINED) EXISTING MAINTENANCE N I o /I 0' ROOW "-EASEMENT C c G- I G G G 1 i D +G 0 _i N G G 1 TEMPORARY WORKSPACE o � I WETLAND W28 , EXISTING /ti / CULVERT NOTE: , MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL tit BE RE- SEEDED IN ACCORDANCE WITH i THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 10' TEMPORARY WORKSPACE v mow' EASEMENT. NO MITIGATION REQUIRED. I I 50 2 0 50 SCALE IN FEET o PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S25 AALIGNMENT sHT: 5801116 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 407 +05, M.P 7.72 58703324 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A BAY CIN, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S26 TOTAL JORDAN LAKE BUFFER IMPACTS STREAM S26 TOTAL IMPACTS WETLAND W31 TOTAL IMPACTS o ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0.000 AC. PERM. IMPACT 0 S0. FT. 0.000 AC. 1 PERM. IMPACT 0 SC. FT. 0 SQ. FT. TEMP. IMPACT 326 SQ. FT. 0.007 AC. TEMP. IMPACT 2,928 SQ. FT. 0.067 AC. TEMP. IMPACT 3,140 SO. FT. 2,091 SO. FT. v TEMPORARY WORKSPACE EASEMENT, DISTANCE ?^ VARIES. AREA OF TEMPORARY IMPACT FOR FFER ZONE 1 - 807 SQ. FT. 5� 6v ZONE 2 - 460 SQ. FT. )3 0 2 3p TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. 7 NO MITIGATION REQUIRED. \\ \\ NE 2 30' LIMIT OF PERMANENT MAINTENANCE ------ EXISTING MAINTENANCE EASEMENT — EXISTING 10" PSNC T -021 PIPELINE G G G —G —G G G G \ o \ PROPOSED 16" T -021 B PIPELINE 1 EXISTING 24" CARDINAL PIPELINE EXISTING MAINTENANCE EASEMENT I N Lo 1 I W N N II WETLAND W31 TEMPORARY WORKSPACE TEMPORARY WORKSPACE N N WETLAND W32 1 j LEGEND: r i EXISTING TREE LINE i NOTE: MITIGATION FOR TEMPORARY WORKSPACE TEMPORARY IMPACT AREA IMPACTS WILL BE PROVIDED FOR STREAM S26 RIPARIAN BUFFER ZONES. AREAS WILL 52 L.F. BE RE- SEEDED IN ACCORDANCE WITH / PERMANENT IMPACT AREA THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET OP-11 PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 WETLAND CROSSING W31 & STREAM CROSSING S26 ALIGNMENT sHT: 580,1, 7 4 0383 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 430 +22, M.P 8.15 58703326 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA [SCALE: 1" = 50 REV. A www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W34 TOTAL IMPACTS PERM. IMPACT 861 SQ_ FT. 0.020 AC. TEMP. IMPACT 7,198 SQ. FT. 0.165 AC. STREAM S29 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 813 SQ. FT. 0.019 AC. STREAM S29 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 S0. FT. 0 SQ. FT. TEMP. IMPACT 2,759 SO. FT. 2,078 SQ. FT. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 175 SQ. FT. ZONE 2 - 290 SQ. FT. — EXISTING MAINTENANCE EASEMENT _ _ _ _ "EXISTING 10" PSNC T -021 PIPELINE -M- G PROPOSED 16" T -021 B PIPELINE G WETLAND W34 G v 0 WETLAND W34 �7 v� 0 v ZO 3o 20 I / 30' LIMIT OF PERMANENT MAINTENANCE T r°� ti ------ - - - - -- G' G G G EXISTING 24" CARDINAL PIPELINE AL G G G G G G G G G G G— EXISTING MAINTENANCE EASEMENT— — _ _ _ — _ _ — — — — — — — _ tit / w in Z, vTEMPORARY WORKSPACE ZZ / N > TEMPORARY WORKSPACE LEGEND: /2 I TEMPORARY WORKSPACE, DISTANCE VARIES / EASEMENT. NO MITIGATION REQUIRED. EXISTING TREE LINE NOTE: / N N MITIGATION FOR TEMPORARY WORKSPACE TEMPORARY IMPACT AREA IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL PERMANENT IMPACT AREA 50' BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED BUFFER TO RE- VEGETATE NATURALLY. NOTE: STREAM S29 50 25 0 50 1. PIPELINE TO BE INSTALLED 50 L.F. BY OPEN CUT METHOD SCALE IN FEET 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 4 0383 WETLAND CROSSING W34 & STREAM CROSSING S29 ALIGNMENT sHT: 58701120 VERSAILLES, KY 4 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 517 +70, M.P 9.80 58703330 HOUSTON, TX DETROIT, MI CHARLESTON, WV C- , • TULSA, DI( ORANGE COUNTY NORTH CAROLINA SCALE: 1" = 50' BAY ITY MI REV. A www.emseng.com ' SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM WETLAND W44 TOTAL IMPACTS 0.000 AC. PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 643 SQ. FT. 0.015 AC. 1,503 SQ. FT. STREAM S32 TOTAL IMPACTS WETLAND W41 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 339 SQ. FT. 0.008 AC. /STREAM STREAM WETLAND W42 TOTAL IMPACTS - 482 PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 12 SQ. FT. 0.0002 AC. STREAM S31 TOTAL JORDAN LAKE BUFFER IMPACTS 0.000 AC. TEMP. IMPACT 18 SQ. FT. ZONE 1 EASEMENT. ZONE 2 PERM. IMPACT 164 SQ. FT. AREAS: 57 SQ. FT. TEMP. IMPACT 1,503 SQ. FT. 2,555 SQ. FT. 31, WETLAND W41 TOTAL IMPACTS - 797 PERM. IMPACT 23 S0. FT. 0.000 AC. - 486 TEMP. IMPACT 434 SQ. FT. 0.010 AC. 30' 30' LIMIT OF PERMANENT MAINTENANCE EXISTING MAINTENANCE EASEMENT EXISTING PSNC 10" T -021 PIPELINE —G G G G G G— PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT FORESTED WETLAND WITHIN ZONE 1 - 23 SQ. FT. LEGEND: EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD O M 0 WETLAND W43 ,,� WETLAND W43- WETLAND W42- STREAM S31- 0 L. F. WETLAND W44 WETLAND W41---� N tiN �N WETLAND W45 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 18 SQ. FT. 0.0004 AC. ZONE 1 N II G NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. WETLAND W45 / ti STREAM S32 51 L.F. 20' ZONE 2 v 0 01, s� YA 2� 7 o� 8' TEMPORARY WORKSPACE EASEMENT. v TEMPORARY CLEARING OF FORESTED N AREAS: N STREAM 31, ZONE 2 - 182 SQ. FT. I STREAM 32, ZONE 1 - 232 SQ. FT. STREAM 32, ZONE 2 - 152 SQ. FT. G G G G G - 7� ----------- ZONE 1 ZONE 2 - - - - -- 10' TEMPORARY WORKSPACE 48 SQ. FT. EASEMENT. TEMPORARY CLEARING OF FORESTED AREAS: STREAM 31, ZONE 1 - 797 SQ. FT. ti STREAM 31, ZONE 2 - 486 SO. FT. 32, ZONE 1 - 724 SQ. FT. /STREAM STREAM 32, ZONE 2 - 482 SQ. FT. STREAM S32 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 48 SQ. FT. TEMP. IMPACT 3,038 SQ. FT. 1,976 SQ. FT. 50 25 0 50 SCALE IN FEET i PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 VERSAILLES, KY ES, KY 40383 DRIVE WETLAND CROSSING W41, W42, W44 & W45 & STREAM CROSSINGS S31 & S32 P.O. BOX 1007 ALIGNMENT SHT: 58701124 VERSAIL TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 631 +95, M.P 12.06 58703337 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CI TY MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 '__F E_'.% S33 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 1,736 SQ. FT. 527 SQ. FT. TEMP. IMPACT 9,292 SO. FT. 5,287 SQ. FT. TEMPORARY WORKSPACE EASEMENT, DISTANCE------. VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 563 SQ. FT. ZONE 2 - 279 SQ. FT. /tie 12 �7 N G -_ � _72- 2 30' LIMIT OF PERMANENT MAINTENANCE / Z2 j o G GG G G 7o s� F n v� O/ v G STREAM S33 �Z2 / DISTANCE VARIES 1 135 L. F. \ 1 — - TEMPORARY WORKSPACE EASEMENT, DISTANCE EXISTING 10" PSNC T -021 PIPELINES \2 VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 1984 SQ. FT. ZONE 2 - 890 SQ. FT. PROPOSED 16" T -021 B PIPELINE z� \N EXISTING TREE LINE N EXISTING MAINTENANCE EASEMENT TEMPORARY IMPACT AREA NOTE: PERMANENT IMPACT AREA MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S33 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 694 SQ. FT. 0.002 AC. BE RE- SEEDED IN ACCORDANCE WITH 50 25 0 50 THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. SCALE IN FEET Ql PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENGINEERING KCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S33 AALIGNMENT sHT: 5801124 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 646 +15, M.P 12.24 58703338 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK SCALE: 1 = 50' REV. A BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S36 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 320 SO. FT. 176 SQ. FT. TEMP. IMPACT 3,089 SQ. FT. 2,167 SO. FT. WETLAND W47 TOTAL IMPACTS PERM. IMPACT 161 SO. FT. 0.004 AC. TEMP. IMPACT 1,708 SQ. FT. 0.039 AC. 30' LIMIT OF PERMANENT MAINTENANCE o EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G G EXISTING MAINTENANCE EASEMENT --------------- LEGEND: SO 60F'�F R k o / G G G G ti^ DISTANCE VARIES IV TEMPORARY WORKSPACE EASEMENT, DISTANCE WETLAND W47 / / VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 2 - 299 SQ. FT. FORESTED WETLAND WITHIN ZONE 1 - 161 SQ. FT. TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. AREA OF TEMPORARY IMPACT FOR EXISTING TREE LINE ZONE 1 - 644 SQ. FT. ZONE 2 - 441 SO. FT. TEMPORARY IMPACT AREA STREAM S 56 L.F. PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD NOTE: � r rnlm rra'llrslamiri MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 7� s� 7A 2� 2 0 7 STREAM S36 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 364 SQ. FT. 0.008 AC. 50 25 0 50 SCALE IN FEET is PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE °. LES, S, KY 4 4 0383 WETLAND CROSSING W47 & STREAM CROSSING S36 ALIGNMENT sHT: 5801126 VERSAILLES, TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 697 +94, M. P 13.22 58703340 HOUSTON, TX MI DETROIT, CHARLESTON, WV • TULSA, DI( ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S37 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 140 SQ. FT. 136 SQ. FT. TEMP. IMPACT 3,296 SQ. FT, 2,184 SQ. FT. STREAM S37 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 267 SO. FT. 0.006 AC. G MAINTENANCE El'sEMENT TEMPORARY WORKSPACE EASEMENT, DISTANCE ,/ VARIES. AREA OF TEMPORARY IMPACT FOR F� ZONE 1 - 81 SO. FT. ZONE 2 — 127 SQ. FT. 30' LIMIT OF PERMANENT MAINTENANCE 0 ro _EXISTIN _ 7 — c T -02111 c c _ 10 pS�G TIN�c T_021,3 PIPELINE G------ 16 EASEMENT_------ - - -- � PROPOSED NANCE �a c s� Yj / STREAM S37 55 L.F. — — � — — — — — — — — — -- -( G G G G EXISTING _ DISTANCE VARIES- 0 3p / TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. AREA OF TEMPORARY IMPACT FOR LEGEND: 2 ZONE 1 — 581 SQ. FT. ZONE 2 — 378 SQ. FT. EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD NOTE: WETLAND W48 MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET Y m PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S37 AALIGNMENT sHT: 58701127 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 718 +61, M.P 13.61 58703341 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S41 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 344 SQ. FT. 0.008 AC. LEGEND: 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. 30' LIMIT OF PERMANENT MAINTENANCE 0 EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G G G G PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT --------------- -- DISTANCE VARIES - EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD I'D' N 20, r 30' ZONE 2 ONE r 1- 70 / 011 s ti� 2� Z STREAM S41 58 L. F. o� N , ti G� i I I N I I I I N I I I I I i I 50' BUFFER G G G G G TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 668 SO. FT. ZONE 2 — 210 SQ. FT. STREAM S41 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 720 SQ. FT, 273 SQ. FT. TEMP. IMPACT 2,695 SO. FT. 2,054 SO. FT. NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S41 AALIGNMENT sHT: 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 765 +25, M.P 14.49 58703344 HOUSTON, TX DETROIT, MI CHARLESTON, WV- TULSA, DI( ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 IDATE OF PLOT: 09/05/2014 30' 50' 20 BUFFER ZONE 2 ONE 1 N STREAM S42 N \ 50 L.F. N S ING M IN EN N E AS M NT N 1 0 EXISTING 10" PSNC I� G T -021 ffELINE c c G 1 G— nDnCCn 1 F" T —n71 R oIDCI INIC N _EXISTING MAINTENANCE EASEMENTr�1/��1' LEGEND: / EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ENERGY & SERVICES CO. CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 BRANCH OFFICES: HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK BAY CITY, MI www.emseng.com STREAM S42 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 322 SQ. FT. 0.007 AC. STREAM S43 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 959 SQ. FT. 0.022 AC. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. —G G G G G G G N T _ O ti� 1 ti^ ti 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 622 SQ. FT. ZONE 2 — 472 SO. FT. STREAM S43 142 L.F. STREAM S42 TOTAL JORDAN LAKE BUFFER IMPACTS 50 25 0 50 ZONE 1 ZONE 2 PERM. IMPACT 437 SQ. FT. PSNC ENERGY 150 SQ. FT. TEMP. IMPACT 2,607 SQ. FT. APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE 1,959 SQ. FT. �o s� 9� q v� o� G G NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET PSNC ENERGY DRAWN BY: CAC 06/02/14 DRAFTING CK: SFS 06/03/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: STREAM CROSSINGS S42 & S43 ALIGNMENT SHT: 58701129 DRAWING NO.: @ STATION 776 +00, M.P 14.70 58703345 ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A SHEET 1 OF 1 JDATE OF PLOT: 09/05/2014 STREAM S44 TOTAL IMPACT PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 183 SQ. FT. 0.004 AC. STREAM S44 54 L. F. EXISTING MAINTENANCE EASEMENT `EXISTING 10" PSNC T -021 PIPELINE —G G G G PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT N 1 LEGEND: Z2 tit EXISTING TREE LI TEMPORARY IMPA, PERMANENT IMPA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S45 TOTAL IMPACT PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 146 SQ. FT. 0.003 AC. U-1 w v z Q AIE STREAM S46 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 68 SQ. FT. TEMP. IMPACT 0 SQ. FT. 783 SQ. FT. TEMPORARY WORKSPACE, DISTANCE VARIES EASEMENT. NO MITIGATION REQUIRED. G G G G G o � I ' I Z1� -z1 STREAM S45 50 L. F. a �o w A?A m 1Z m ti 0 y G G G WETLAND W50 j ZONE 2 PARALLEL, NO MITIGATION REQUIRED N \ Z WETLAND W50A Z� 0 L. F. S46 50 25 0 50 L / SCALE IN FEET ass PSNC ENERGY DRAWN BY: CAC 06/ 02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINOERING AL CK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSINGS S44, S45 & S46 ALIGNMENT sHT: 5801130 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 799 +35, M.P 15.14 58703346 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A BAY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S47 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 544 SQ. FT. 323 SQ. FT. TEMP. IMPACT 2,872 SQ. FT. 2, 244 SQ. FT. WETLAND W52 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G G PROPOSED 16" T -021 B PIPELINE CA 0 OvFF�R 20E 2 tioN 30' LIMIT OF PERMANENT MAINTENANCE -- EXISTING MAINTENANCE EASEMENT Ll ti D Tl1 \ LEGEND: STREAM S47— 54 L. F. EXISTING TREE LINE F7TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD G­-TI—G STREAM S48 NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. STREAM S47 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 384 SQ. FT. 0.008 AC. WETLAND W51 TOTAL IMPACTS PERM. IMPACT 2,065 S0. FT. 0.047 AC. TEMP. IMPACT 4,484 SQ. FT. 0.103 AC. z 0 w ul l v� 0 Z v G G G G FORESTED WETLAND WITHIN ZONE 1 - 35 SO. FT. WITHIN ZONE 2 - 145 SQ. FT. WETLAND W51 TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 809 SQ. FT. ZONE 2 - 700 SQ. FT. 50 25 0 50 SCALE IN FEET P S N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 4 0383 WETLAND CROSSING W51 STREAM CROSSING S47 ALIGNMENT sHT: 5801130,31 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 809 +73, M.P 15.34 58703347 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK SCALE: 1 = 50' REV. A BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 08/05/2014 WETLAND W53 TOTAL IMPACTS PERM. IMPACT 1,836 SQ. FT. 0.042 AC. TEMP. IMPACT 2,608 SO. FT. 0.060 AC. EXISTING MAINTENANCE EASEMENT EXISTING 10 PSNC T -021 PIPELINE —G G G G G G G- PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — — — — — — — — — — — — LEGEND: EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD Z 0 W v� 2 WETLAND W53 0 Z v —G G G G G G G- - — — — — — — — — — — — — — — — — — — — — 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINOEERING NMENTAL CK: 109 FIELDVIEW DRIVE °. BOX 1007 WETLAND CROSSING W53 ALIGNMENT sHT: 5801,3, 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 814 +29, M.P 15.42 58703348 HOUSTON, TX DETROIT, MI CHARLESTON, TULSA, OK WV TU SCALE: 1 ° = 50' REV. A BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.COM SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W54 TOTAL IMPACTS PERM. IMPACT 170 SO, FT. 0.004 AC. TEMP. IMPACT 236 SO. FT. 0.005 AC. Z v 0 cp w ln� P� v �Z 0 Z EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — — — EXISTING 10" PSNC T -021 PIPELINE G G G G c c c G c G- G G G G G G G PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT — — — — — — — LEGEND: EXISTING TREE LINE - - - -- TEMPORARY IMPACT AREA PERMANENT IMPACT AREA WETLAND W54 NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE °. S, 4 WETLAND CROSSING W54 ALIGNMENT sHT: 5801,3, LES, VERSAIL KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 818 +37, M.P 15.50 58703349 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A 6AY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.COM SHEET 1 OF 1 DATE OF PLOT: 09/05/2014