HomeMy WebLinkAboutNCC203412_Annual Fee NOD Letter_20220916RCY COOPER
Gownx
ELIZABETH S. BISER
5 , f-Y
BRIAN WRENN
rxrq�-Xr
9/16/2022
City of Charlotte
Attn: Joe Frey
600 East 4th Street
Charlotte, NC 28202
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC203412-2022
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 8/1/2022 and was due on 9/1/2022. The annual fee applies to the following construction site:
Cross Charlotte Trail 7th Street to 10th Street Connector
601 Seigle Avenue (project covers multiple addresses, lot near middle of project used), Charlotte, NC
Mecklenburg County
Certificate of Coverage No. NCC203412
NC Reference No. NCG01-2020-3412
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Danny Smith at danny.smith@ncdenr.gov or me at toby.vinson@ncdenr.gov.
Sincerely,
William E. Vinson, Jr.
Chief of Program Operations
Division of Energy, Mineral, and Land Resources
Yu„ NIria Utpaffmemor @WVMffleMCd1Qohlity I ❑IVISICM^&gWeal BnALand Rteartes11E 512 NanhSalin6ury &rEI1612 AfH5rVioC&mI "Amigh.1orthCErolin92764-1h12 914.707.9200