Loading...
HomeMy WebLinkAboutGW1-2022-08366_Well Construction - GW1_20220517 WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.W [Ctractor Information: r 14.WATER ZONES Well Contractor Name FROM TO DESCRIPTION ft. a L,ft. tAA Sex K ��V`�� I•J ft. ft. NC�Well Contractor iC�eertifiyation�Nuummb�er d 15.OUTER CASING(for multi-cased wells)OR LINER(if a livable) FRO ,/ I{v t 1 `C ' :5 �1.er 1\ I l i- X -if-IM fL TO DIAMETER in. THICKNESSMATERIAL Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State,Variance,etc.) ft. fL in. 3.Well Use(check well use): ft. ft. in. Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipa"ublic 01 `ft- a t. in- sul 40 pvC-, ❑Geothermal(Heating/Cooling Supply) >6sidential Water Supply(single) ft. ft. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Irrigation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: O ft. • aft. ❑Monitoring ❑Recovery Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK(if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD []Aquifer Test ❑Stormwater Drainage ft, n ft. ❑Experimental Technology ❑Subsidence Control ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG(attach additional sheets if necessary) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION(color,hardness,soil/rock type,grain size,etc.) 1 0 ft. o, ft. -kas Q 1 4.Date Well(s)Completed: V�J'tR?-VVell ID# ft. ft. -51 1 nd Oa 5a.Well Location: S O- to �° , ft. AV 14-ekA , Facility/Owner Name Facility ID#(if applicable) ft. ft. b o n n W, z9 734 Physical Address,City,and Zip \^L I ob�v«'N 21.REMARKS MAY 17 ` County Parcel Identification No.(PIN)i3(J 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one]at/long is sufficient) 22.Certification: r� y -, ,� p N 4A W r 1� �iC7c(�( �.✓M�/ ` ID d J 6.Is(are)the well(s)• Aermanent or ❑Temporary Signature ofCe ' ed Well Contr ctor Date s�r By signing this form,l hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or 00 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: ��O (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-3@200''and 2@100') p 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft*) Information Processing Unit, 1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+"II -- 11.Borehole diameter: 1 (in,) 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) Program, 1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: V8 J- 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test: Permit Program, 1611 MSC,Raleigh,NC 27699-1 6 1 1 ��I 'l1\D 1'(� 13b.Disinfection type: t-i�Ci Amount: Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018