HomeMy WebLinkAbout17BP_9_R_82 additional bank stabilization
Wanucha, Dave
From:Euliss, Amy
Sent:Friday, September 9, 2022 3:22 PM
To:Wanucha, Dave; Alsmeyer, Eric C CIV USARMY CESAW (USA)
Cc:Marciniak, Katherine J; Miller, Joshua A
Subject:17BP.9.R.82 additional bank stabilization
Attachments:20201818_Bridge 248_Rowan Co.pdf; RGP50-2020-05-26print.pdf;
SAW-2022-00586permitverification1x.pdf
Eric and Dave,
We need to extend our bank stabilization on the upstream side of the culvert along the inside bank to stabilize after the
waterline installation. The area is hatched in orange on the inset below (see red arrows). The outside bank of both
channels was permitted to be stabilized. The current slope is steeper than 2:1 so rock is needed.
For reference, I have attached copies of the 404 and 401 permits. Please let me know if you have any objections.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
1
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2