Loading...
HomeMy WebLinkAbout17BP_9_R_82 additional bank stabilization Wanucha, Dave From:Euliss, Amy Sent:Friday, September 9, 2022 3:22 PM To:Wanucha, Dave; Alsmeyer, Eric C CIV USARMY CESAW (USA) Cc:Marciniak, Katherine J; Miller, Joshua A Subject:17BP.9.R.82 additional bank stabilization Attachments:20201818_Bridge 248_Rowan Co.pdf; RGP50-2020-05-26print.pdf; SAW-2022-00586permitverification1x.pdf Eric and Dave, We need to extend our bank stabilization on the upstream side of the culvert along the inside bank to stabilize after the waterline installation. The area is hatched in orange on the inset below (see red arrows). The outside bank of both channels was permitted to be stabilized. The current slope is steeper than 2:1 so rock is needed. For reference, I have attached copies of the 404 and 401 permits. Please let me know if you have any objections. Amy Euliss Division 9 PDEA Engineer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov 1 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2