Loading...
HomeMy WebLinkAboutNCS000140_Inspection Report_20220907Compliance Inspection Report Permit: NCS000140 Effective: 01/01/11 Expiration: 12/31/15 Owner: Certainteed LLC SOC: Effective: Expiration: Facility: Certainteed LLC County: Granville 200 Certainteed Rd Region: Raleigh Oxford NC 27565 Contact Person: Robert Yurek Title: Phone: 919-693-1141 Ext.2221 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/07/2022 Entry Time 02:30PM Primary Inspector: Lauren Garcia Secondary Inspector(s): Brittany D Carson Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Phone: Exit Time: 03:15PM Phone: 919-707-3648 Phone : Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000140 Owner - Facility: Certainteed LLC Inspection Date: 09/07/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Certainteed Corporaton manufactures shingles. The company has recently recieved approved erosion control plans to build a seperate building where the fiberglass sheeting used to make the shingles will be manufactured. The shingle manufacturing processes are all performed inside the facility. At the front and rear of the facility there are several asphalt tanks. Heated asphalt is stored in the tanks. There are additional tanks at the rear of the facility that contain oil. There is a railyard in this area as well. Certainteed has had to register as an oil terminal because of the amount of oil stored/used onsite. Packaged product is stored outsidearound the western side of the facility. Pallets, some scrap metal, and ground roofing product. The ground roofing product was stockpiled away from drop inlets and with concrete containment walls around three sides. This material is recyled and used onsite. All ashpahlt and oil tanks have secondary containment. The SWPPP was reviewed during the inspection. The responsible party should make sure the SWPPP is reviewed annually. Even if there are no changes, the date can be updated on the cover. There were no issues noted during the inspection. The facility appears to be well maintained, there were no spills or evidence of residue in the areas observed outside. Page 2 of 3 Permit: NCS000140 Owner - Facility: Certainteed LLC Inspection Date: 09/07/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Page 3 of 3