HomeMy WebLinkAbout20221258 Ver 1_Design_Plan_Sheets_20220831_20220908STATE PROJECT REFERENCE NO. SHLNOL I SHEE O I AC, TS TOWN OF PILOT MOUNTAIN c 1 1 6 1 43 f N r DESIGN DATA 1 REACH 1 REACH 2 REACH 3 A STA. 7 0+00 TO STA.27+03 STA. 27+03 TO STA.37+53 STA. 37+53 TO STA.52+29 L s U l� l�Y COUNTY �LTYPE B703' DDESIGN ESIGN REACH ENGTH 1 7 050' 1B7 6' m ttea-�_ �_ BANKFULL XSEC AREA 4.5 6.0 8.0 111 e ♦ " �,`'/ BANKFULL WIDTH 7.65 8.83 10.20 l `-� 1R j1� w ) PiI • LOCATION: SOUTH OF SR 1856 (OLD US 52) TO BAN KFULL DEPTH 0.8 0.9 1.0 G; �. EAST OF CARSON ST. THROUGH 13 13 13 S� p-pig Q Le`�""T f DOWNTON PILOT MOUNTAIN �W/DRATIO PROJECT LENGTH IXI { TYPE OF WORK: STREAM RESTORATION EXISTING STREAM LENGTH = 4,841 FEET (.0)-- -- .. ' AND ENHANCEMENT PROPOSED DESIGN STREAM LENGTH = 4,229 FEET VICINITY MAP ACADEMY ST. _ 11 Z ,...-------- �-(6 HFT• SNEc . NDEXOFSHEETS piii o_.I CARBONST. 1... TITLE SHEET� 1 A STREAM CONVENTIONAL SYMBOLS GENERAL NOTES CONTROL POINTS S Fe B Q 4 z p /� &tiFF END REACH 1 DEPOT ST. Ilf 1 B- 10... CONSTRUCTION SEQUENCE � � BEGIN REACH 2 D 2 • • • TYPICAL SECTIONS �� _ , S A. 2 t03.00 2A-21• • • DETAILS 3-3C• • • TABLES 4-13 . . . PLAN VIEW �..+�I I ,.. i .-'-'_ �.�:_:::2: •_._. f • _. ._.: •_.�._.-. l®� eF>' I Z 74- 18... VEGETATION PLAN 19-23... GRADING PLAN ,. �.. 24 - 28 ... EROSION & SEDIMENTATION CONTROL PLAN END REACH 2 BEGIN REACH 33 BEGIN REACH 1 y� CHINQUAPIN oTO 0 STA. 10+00.00 i ilif © 4u s �F 11/ ISi END REACH 3 l UT TO CHINQUAPIN lift z STA. 52+29.46 / W S2 BYPASS • • ft•iitzmilip• (...) Mill * T GRAPHIC SCALES e 1 REVISIONS PREPARED FOR: PREPARED IN THE OFFICE OF: r 1 PROJECT ENGINEER W NO. DESCRIPTION ENGR. APPROV. DATE ECOSYSTEM 204 STONE RIDGE BLVD. 1 ISSUED FOR BID JB KT 8730/22 PLANNING & ASHEVILLE, NC 28804 20 10 0 20 40 RESTORATION TOWN OF PILOT MOUNTAIN PLANS 124 W. MAIN STREET PROGRESS DRAWING O PILOT MOUNTAIN, NC 27041 FOR REVIEW PURPOSES ONLY 2`0 10 0 20 40 DO NOT USE FOR CONSTRUCTION ■ FALL 2022 JACOB M. BYERS, PE IX PROFILE (HORIZONTAL) LETTING DATE: PROJECT ENGINEER s Zs o s 1oMICHAEL 0... PROJECT CONTACT P.E. (VERTICAL) ofPROFILE `SIGNATURE: STREAM CONVENTIONAL SYMBOLS GENERAL NOTES PROJECT # 116 (SHEET NO. 1A 0 0 9 0_ i z ❑ u w 0 0 0 z z 1 co 0- NIT Ow NQ tol roL ♦• i .. I.. r ROCK VANE RV OFFSET ROCK CROSS VANE OV ROCK CROSS VANE Xv TEMPORARY SILT CHECK ROOTWAD 0 GRADE CONTROL LOG J-HOOK VANE LOG VANE LOG STEP 1 Z 1 1 ROCK STEP ° \/ LOG CROSS VANE XV CONSTRUCTED CASCADE cc CONSTRUCTED RIFFLE CR BOULDER CLUSTER LOG ROLLER LR GRADE CONTROL WOODY RIFFLE 0 TOEWOOD WITH GEOLIFT Tw SOD MATS sM SINGLE WING DEFLECTOR 0 DOUBLE WING DEFLECTOR °e ROCK STEP POOL ezissEff STACKED BOULDER WALL A GEOLIFT CHANNEL FILL / DITCH PLUG GRADE BANK 2.5 : 1 OR FLATTER EXISTING WETLANDS SURVEYED EXISTING RIFFLE ® TRANSPLANTED VEGETATION 11. iry TREE REMOVAL TREE PROTECTION FOOT BRIDGE - SF - SAFETY FENCE - TP - TAPE FENCE - I I I - TEMPORARY SILT FENCE FENCE CONSERVATION EASEMENT - - 20 - - EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR - SEWER LINE RIGHT OF WAY LIMITS OF DISTURBANCE BANKFULL BENCH (GRADE) PROPERTY LINE ACCESS ROAD STREAM THALWEG STREAM TOP OF BANKS - - - FEMA FLOOD BOUNDARY ZONE AE - SEWER LINE 10+00 I-J I - 1 u TEMPORARY STREAM CROSSING PERMANENT FORD STREAM CROSSING NOTE: ALL ITEMS ABOVE MAY NOT BE USED ON THIS PROJECT CONTROL POINTS Control Point Northing Easting Elevation 300 962180.5441 1568814.4630 1114.6570 301 962189.7420 1569017.6250 1119.5809 302 962020.0720 1569215.8520 1125.0959 303 961916.9050 1569468.7350 1132.6538 304 961862.9303 1569749.7200 1133.8053 305 961817.2966 1569986.4900 1140.0871 306 961866.0862 1570289.8970 1152.3994 307 961867.7737 1570654.5380 1163.0197 500 962649.0604 1568557.7440 1104.7615 501 962344.6863 1568638.3870 1112.9951 502 961984.9636 1570823.0330 1179.4213 503 962239.3160 1570931.3360 1187.8880 601 962710.2719 1568402.6060 1100.5875 602 963139.2569 1568192.7239 1087.6349 603 963354.4371 1568083.7850 1084.6629 604 963583.0905 1568034.8030 1086.8142 605 963937.6969 1567967.4576 1077.4052 606 963159.0481 1567578.8497 1140.5815 700 964211.8553 1568121.1656 1073.2907 NOTE: CP 300 - 503 ESTABLISHED 4/ 13/ 18. CONTRACTOR TO VERIFY. 1. THE CONTRACTOR IS REQUIRED TO INSTALL INSTREAM STRUCTURES USING A TRACK HOE WITH A HYDRAULIC THUMB OF SUFFICIENT SIZE TO PLACE BOULDERS, AND LOGS. 2. WORK IS BEING PERFORMED AS AN ENVIRONMENTAL RESTORATION PLAN. THE CONTRACTOR SHOULD MAKE ALL REASONABLE EFFORTS TO REDUCE SEDIMENT LOSS AND MINIMIZE DISTURBANCE OF THE SITE WHILE PERFORMING THE CONSTRUCTION WORK. 3. CONSTRUCTION IS SCHEDULED TO BEGIN WINTER 2022. 4. ALL DISTURBED STREAM BANKS SHALL BE SEEDED, MULCHED, MATTED AND LIVE STAKED UNLESS OTHERWISE NOTED. SYMBOLOGY / NOTES 5. STONE BACKFILL FOR INSTREAM STRUCTURES SHALL INCLUDE AN EVEN MIX OF WASHED CLASS A, CLASS B AND ONSITE ALLUVIUM IF AVAILABLE. IF ONSITE ALLUVIUM IS NOT AVAILABLE WASHED CLASS A, CLASS B AND #57 STONE. 6. PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES, NOTIFICATION AND APPROVAL MUST BE GRANTED FROM THE US ARMY CORP OF ENGINEERS, AND NC DIVISION OF WATER RESOURCES. 7. THE CONTRACTOR SHALL CONTACT NORTH CAROLINA "ONE CALL"CENTER (1.800.632.4949) BEFORE ANY EXCAVATION. 8. THE CONTRACTOR WILL MOBILIZE EQUIPMENT AND MATERIALS TO THE SITE USING TEMPORARY GRAVEL CONSTRUCTION ENTRANCES OFF N. DEPOT ST, N. ACADEMY ST, AND CARSON ST. 9. THE CONTRACTOR WILL UTILIZE EXISTING ENTRANCES, PATHS, AND ROADS TO THE EXTENT POSSIBLE. ANY NECESSARY STREAM CROSSINGS SHALL CONSIST OF TIMBER MAT CROSSINGS AND BE BORDERED BY SILT FENCE. ALL DISTURBED AREAS WILL BE REPAIRED TO THE PRE -CONSTRUCTION CONDITION OR BETTER. 10. CONTRACTOR WILL STORE ALL EQUIPMENT AND MATERIALS IN STAGING AND STOCKPILE AREAS. 1 1 . ANY STOCKPILED SOIL MATERIAL SHALL BE BORDERED ON THE DOWNHILL SIDE BY SILT FENCE SO THAT ANY WASHED SEDIMENT 1S TRAPPED. 12. A PUMP -AROUND OPERATION SHALL BE UTILIZED FOR ALL STREAM RESTORATION WORK. 13. IMMEDIATELY UPON COMPLETION OF BANK GRADING, THE SLOPE WILL BE SEEDED, MULCHED, AND MATTED WITH EROSION CONTROL MATTING UNLESS ANOTHER TREATMENT IS SHOWN IN THE DESIGN PLANS. 14. UPON COMPLETION OF EACH SECTION OF THE CHANNEL CONSTRUCTION, ALL DISTURBED FLOODPLAIN AREAS INCLUDING STAGING AREAS AND HAUL ROADS, SHALL BE SEEDED AND MULCHED. TREES SHALL BE PLANTED IN ACCORDANCE WITH THE VEGETATION SELECTION AND THE PLANS. PERMANENT SEEDING MIXTURES SHALL BE APPLIED AS SHOWN ON THE PLANS. SEEDING SHALL BE APPLIED IN ALL DISTURBED AREAS AND AREAS WITHIN THE WORK AREA SUSCEPTIBLE TO EROSION (I.E. DISTURBED DITCH BANKS, STEEP SLOPES, AND SPOIL AREAS). 15. ALL AREAS SHOULD BE SEEDED AND MULCHED BEFORE LEAVING THE PROJECT REACH. REMOVE TEMPORARY STREAM CROSSINGS AND ANY IN -STREAM TEMPORARY ROCK DAMS. ALL WASTE MATERIAL MUST BE REMOVED FROM THE PROJECT SITE. 16. THE CONTRACTOR SHALL PLANT WOODY VEGETATION AND LIVE STAKES, ACCORDING TO PLANTING DETAILS AND SPECIFICATIONS. THEY SHOULD COMPLETE THE REFORESTATION (BARE ROOT PLANTING) PHASE OF THE PROJECT AND APPLY PERMANENT SEEDING AT THE APPROPRIATE TIME OF THE YEAR. 17. THE CONTRACTOR SHALL ENSURE THAT THE SITE IS FREE OF TRASH AND LEFTOVER CONSTRUCTION MATERIALS BEFORE DEMOBILIZATION. 18. CONTRACTOR SHALL NOT CONDUCT EARTH MOVING ACTIVITIES DURING EXCESSIVELY WET CONDITIONS. NO MORE CHANNEL SHALL BE DISTURBED THAN CAN BE STABILIZED IN THE SAME DAY. 19. CHINQUAPIN CREEK IS THE RECIEVING STREAM AND IS CLASSIFIED AS WS-II; HQW WATER. 20. DO NOT DISTURB EXISTING UTILITIES. ANY DAMAGE TO EXISTING UTILITIES WILL BE THE CONTRACTOR'S RESPONSIBILITY. 21. ALL CUT SLOPES STEEPER THAN 2:1 SHALL BE SEEDED, MULCHED, AND MATTED. REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 1 CONSTRUCTION SEQUENCE (PROJECT # 116 SHEET NO. 1B 0 m 9 0 0 0 0 u) 0 z a d 0 z J d O 0 ll Ui a a 0 0 z U F co 0 Er NIT Ow NNIT �C rot PHASE 1 - ENTIRE PROJECT MOBILIZATION AND GENERAL EROSION CONTROL 1 . LIMITS OF DISTURBANCE IS 7.06 ACRES. 2. IDENTIFY AND LOCATE STAGING AREAS, STOCKPILE AREAS, CONSTRUCTION ENTRANCES, STREAM CROSSINGS REQUIRED FOR CONSTRUCTION ACCESS; LIMITS OF SILT FENCING, AND CONSTRUCTION ACCESS AND HAUL ROADS AS SHOWN ON PLANS. 3. INSTALL CONSTRUCTION ENTRANCES. 4. INSTALL CROSSINGS REQUIRED FOR CONSTRUCTION ACCESS. 5. STOCKPILE MATERIALS IN DESIGNATED AREAS. 6. INSTALL SILT FENCING TO THE LIMITS SHOWN ON THE PLANS AND AT ANY OTHER LOCATIONS AS DIRECTED BY THE ENGINEER. SILT FENCING WILL BE INSTALLED ALONG THE DOWNSLOPE/STREAM SIDE LIMITS OF ALL STAGING AND STOCKPILE AREAS. 7. UPON THE COMPLETION OF PHASE 1, THE CONTRACTOR SHALL SCHEDULE AN INSPECTION OF THE PHASE BY THE ENGINEER. THE CONTRACTOR MUST HAVE WRITTEN APPROVAL FROM THE ENGINEER THAT THE PHASE HAS BEEN COMPLETED TO SATISFACTORY STANDARDS BEFORE BEGINNING ANOTHER PHASE. 8. EMERGENCY CONTACT FOR EROSION AND SEDIMENTATION CONTROL IS: JAKE BYERS, P.E. ECOSYSTEM PLANNING AND RESTORATION 828-989-5592 NOTE: EACH PHASE WILL BE COMPLETED PRIOR TO BEGINNING WORK ON ANOTHER PHASE. UPON THE COMPLETION OF EACH PHASE, THE CONTRACTOR SHALL SCHEDULE AN INSPECTION OF THE PHASE BY THE ENGINEER. THE CONTRACTOR MUST HAVE WRITTEN APPROVAL FROM THE ENGINEER THAT THE PHASE HAS BEEN COMPLETED TO SATISFACTORY STANDARDS BEFORE BEGINNING ANOTHER PHASE. ALL EXCAVATED SOIL MATERIALS NOT UTILIZED WILL BE STOCKPILED AND MAINTAINED ACCORDING TO THE PROJECT SPECIFICATIONS. WHILE ONSITE, UNUSED MATERIAL MUST BE LOCATED IN DESIGNATED STOCKPILE LOCATIONS AND MUST BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITHIN 14 DAYS OF PLACEMENT. AFTER THE COMPLETION OF CONSTRUCTION, ALL UNUSED SOIL MATERIALS SHALL BE SPREAD ONSITE, AT THE DIRECTION OF THE ENGINEER. SPREAD SOIL MUST BE STABILIZED USING SEEDING AND MULCH PER THE PROJECT SPECIFICATIONS WITHIN 14 DAYS OF PLACEMENT. IF ANY EXCAVATED SOIL MATERIALS NEED TO BE, ARE SPECIFIED TO, AND ACTUALLY ARE DISPOSED OF OFF -SITE BY THE CONTRACTOR, THE CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF SUCH SOIL MATERIALS IN A PERMITTED AREA, AS WELL AS FOR PROVIDING AND IMPLEMENTING AN EROSION AND SEDIMENTATION CONTROL PLAN AND PERMIT, OR ANY OTHER REQUIRED PERMIT(S), FOR THE LOCATION(S) OFF SITE WHERE SUCH MATERIALS ARE DISPOSED. PHASE 2 - UT CHINQUAPIN CREEK - REACH 1 - 10+00.00 TO 27+03.00 CHANNEL RESTORATION IN PLACE 1 . PERFORM CONSTRUCTION STAKING. 2. BEGIN PUMP -AROUND OPERATION AT UPSTREAM END OF EACH SECTION THAT CAN BE COMPLETED IN THE SAME WORK DAY. INSTALL AN IMPERVIOUS DIKE AT UPSTREAM AND DOWNSTREAM ENDS OF THE PROPOSED LIMITS OF THE AREA OF ACTIVE CONSTRUCTION IN ORDER TO ISOLATE ALL WORK FROM STREAM FLOW. PUMP -AROUND OPERATION SHOULD BE CONDUCTED IN ACCORDANCE WITH THE TYPICAL PUMP -AROUND OPERATION DETAIL AS SHOWN ON THE PLANS. TURBID WATER BETWEEN IMPERVIOUS DIKES MUST BE PUMPED WITH A SEPARATE PUMP INTO A SPECIAL STILLING BASIN TO BE DISCHARGED DOWNSTREAM OF THE IMPERVIOUS DIKES IN ACCORDANCE WITH THE TYPICAL PUMP -AROUND OPERATION DETAIL AS SHOWN ON THE PLANS. 3. PERFORM REQUIRED REMOVAL AND TREATMENT OF ANY EXOTIC VEGETATION WITHIN AND ADJACENT TO THE SPECIFIED REACH LIMITS. ALL REQUIRED REMOVAL AND TREATMENT (INITIAL TREATMENT) OF EXOTIC VEGETATION SHOULD BE COMPLETED PRIOR TO PROCEEDING WITH THE REMAINING ACTIVITIES IN THIS PHASE. 4. PERFORM REQUIRED CLEARING AND GRUBBING. SEGREGATE AND STOCKPILE TOPSOIL AND OTHER SOIL MATERIAL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. 5. BEGINNING AT THE UPSTREAM END OF THE AREA OF ACTIVE CONSTRUCTION, PROCEED IN THE DOWNSTREAM DIRECTION WITH FLOODPLAIN, CHANNEL, AND IN -STREAM STRUCTURE CONSTRUCTION AS SPECIFIED ON THE PLANS. 6. CONSTRUCT CONNECTION WITH UT 1 IN CONJUNCTION WITH CONSTRUCTION ON UT TO CHINQUAPIN CREEK REACH 1 . 7. PERFORM ALL TOPSOIL REPLACEMENT, VEGETATION TRANSPLANTING, SEEDING (TEMPORARY AND PERMANENT), SOIL AMENDMENT, MULCHING, AND INSTALLATION OF ALL COIR FIBER MATTING AS SPECIFIED ON THE PLANS AND THE PROJECT SPECIFICATIONS. ASSOCIATED DISTURBED STREAM BANKS WILL HAVE TEMPORARY AND PERMANENT SEED, SOIL AMENDMENTS, MULCH, AND COIR FIBER MATTING APPLIED TO THEM AS WORK PROGRESSES AND BY THE END OF EACH DAY. COIR FIBER MATTING WILL BE INSTALLED ON TOP OF THE SEEDED, AMENDED, AND MULCHED STREAM BANKS ACCORDING TO THE PROJECT SPECIFICATIONS. 8. REMOVE AND DISPOSE OF ALL UNUSED VEGETATION AND EXCAVATED MATERIALS. 9. ALL REMAINING DISTURBED AREAS ARE TO BE AMENDED, SEEDED, MULCHED AND MATTED ACCORDING TO THE PROJECT PLANS AND SPECIFICATIONS AND AT A MINIMUM WITHIN 14 DAYS OF DISTURBANCE. 10. UPON THE COMPLETION OF PHASE 2, THE CONTRACTOR SHALL SCHEDULE AN INSPECTION OF THE PHASE BY THE ENGINEER. THE CONTRACTOR MUST HAVE WRITTEN APPROVAL FROM THE OWNER THAT THE PHASE HAS BEEN COMPLETED TO SATISFACTORY STANDARDS BEFORE BEGINNING ANOTHER PHASE. CONSTRUCTION SEQUENCE PHASE 3 - UT CHINQUAPIN CREEK - REACH 2 - 27+03.00 To 37+53.30 CHANNEL RESTORATION IN PLACE 1 . PERFORM CONSTRUCTION STAKING. 2. BEGIN PUMP -AROUND OPERATION AT UPSTREAM END OF EACH SECTION THAT CAN BE COMPLETED IN THE SAME WORK DAY. INSTALL AN IMPERVIOUS DIKE AT UPSTREAM AND DOWNSTREAM ENDS OF THE PROPOSED LIMITS OF THE AREA OF ACTIVE CONSTRUCTION IN ORDER TO ISOLATE ALL WORK FROM STREAM FLOW. PUMP -AROUND OPERATION SHOULD BE CONDUCTED IN ACCORDANCE WITH THE TYPICAL PUMP -AROUND OPERATION DETAIL AS SHOWN ON THE PLANS. TURBID WATER BETWEEN IMPERVIOUS DIKES MUST BE PUMPED WITH A SEPARATE PUMP INTO A SPECIAL STILLING BASIN TO BE DISCHARGED DOWNSTREAM OF THE IMPERVIOUS DIKES IN ACCORDANCE WITH THE TYPICAL PUMP -AROUND OPERATION DETAIL AS SHOWN ON THE PLANS. 3. PERFORM REQUIRED REMOVAL AND TREATMENT OF ANY EXOTIC VEGETATION WITHIN AND ADJACENT TO THE SPECIFIED REACH LIMITS. ALL REQUIRED REMOVAL AND TREATMENT (INITIAL TREATMENT) OF EXOTIC VEGETATION SHOULD BE COMPLETED PRIOR TO PROCEEDING WITH THE REMAINING ACTIVITIES IN THIS PHASE. 4. PERFORM REQUIRED CLEARING AND GRUBBING. SEGREGATE AND STOCKPILE TOPSOIL AND OTHER SOIL MATERIAL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. 5. BEGINNING AT THE UPSTREAM END OF THE AREA OF ACTIVE CONSTRUCTION, PROCEED IN THE DOWNSTREAM DIRECTION WITH FLOODPLAIN, CHANNEL AND IN -STREAM STRUCTURE CONSTRUCTION AS SPECIFIED ON THE PLANS. 6. PERFORM ALL TOPSOIL REPLACEMENT, VEGETATION TRANSPLANTING, SEEDING (TEMPORARY AND PERMANENT), SOIL AMENDMENT, MULCHING, AND INSTALLATION OF ALL COIR FIBER MATTING AS SPECIFIED ON THE PLANS AND THE PROJECT SPECIFICATIONS. ASSOCIATED DISTURBED STREAM BANKS WILL HAVE TEMPORARY AND PERMANENT SEED, SOIL AMENDMENTS, MULCH, AND COIR FIBER MATTING APPLIED TO THEM AS WORK PROGRESSES AND BY THE END OF EACH DAY. COIR FIBER MATTING WILL BE INSTALLED ON TOP OF THE SEEDED, AMENDED, AND MULCHED STREAM BANKS ACCORDING TO THE PROJECT SPECIFICATIONS. 7. REMOVE AND DISPOSE OF ALL UNUSED VEGETATION AND EXCAVATED MATERIALS. 8. ALL REMAINING DISTURBED AREAS ARE TO BE AMENDED, SEEDED, MULCHED AND MATTED ACCORDING TO THE PROJECT PLANS AND SPECIFICATIONS AND AT A MINIMUM WITHIN 14 DAYS OF DISTURBANCE. 9. UPON THE COMPLETION OF PHASE 3, THE CONTRACTOR SHALL SCHEDULE AN INSPECTION OF THE PHASE BY THE ENGINEER. THE CONTRACTOR MUST HAVE WRITTEN APPROVAL FROM THE ENGINEER THAT THE PHASE HAS BEEN COMPLETED TO SATISFACTORY STANDARDS BEFORE BEGINNING ANOTHER PHASE. REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION CONSTRUCTION SEQUENCE (PROJECT # 116 SHEET NO. 1C z 0 0 9 0 1 0 0 0 u) 0 a d 0 z a J d 0 u W W ll 0 a a 0 0 z 0 F co 0 Cr NIT Ow NQ (01 /01 �C rot PHASE 4 - UT CHINQUAPIN CREEK - REACH 3 - 37+53.30 TO 52+29.46 CHANNEL RESTORATION IN PLACE 1 . PERFORM CONSTRUCTION STAKING. 2. BEGIN PUMP -AROUND OPERATION AT UPSTREAM END OF EACH SECTION THAT CAN BE COMPLETED IN THE SAME WORK DAY. INSTALL AN IMPERVIOUS DIKE AT UPSTREAM AND DOWNSTREAM ENDS OF THE PROPOSED LIMITS OF THE AREA OF ACTIVE CONSTRUCTION IN ORDER TO ISOLATE ALL WORK FROM STREAM FLOW. PUMP -AROUND OPERATION SHOULD BE CONDUCTED IN ACCORDANCE WITH THE TYPICAL PUMP -AROUND OPERATION DETAIL AS SHOWN ON THE PLANS. TURBID WATER BETWEEN IMPERVIOUS DIKES MUST BE PUMPED WITH A SEPARATE PUMP INTO A SPECIAL STILLING BASIN TO BE DISCHARGED DOWNSTREAM OF THE IMPERVIOUS DIKES IN ACCORDANCE WITH THE TYPICAL PUMP -AROUND OPERATION DETAIL AS SHOWN ON THE PLANS. 3. PERFORM REQUIRED REMOVAL AND TREATMENT OF ANY EXOTIC VEGETATION WITHIN AND ADJACENT TO THE SPECIFIED REACH LIMITS. ALL REQUIRED REMOVAL AND TREATMENT (INITIAL TREATMENT) OF EXOTIC VEGETATION SHOULD BE COMPLETED PRIOR TO PROCEEDING WITH THE REMAINING ACTIVITIES IN THIS PHASE. 4. PERFORM REQUIRED CLEARING AND GRUBBING. SEGREGATE AND STOCKPILE TOPSOIL AND OTHER SOIL MATERIAL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. 5. BEGINNING AT THE UPSTREAM END OF THE AREA OF ACTIVE CONSTRUCTION, PROCEED IN THE DOWNSTREAM DIRECTION WITH FLOODPLAIN, CHANNEL AND IN -STREAM STRUCTURE CONSTRUCTION AS SPECIFIED ON THE PLANS. 6. PERFORM ALL TOPSOIL REPLACEMENT, VEGETATION TRANSPLANTING, SEEDING (TEMPORARY AND PERMANENT), SOIL AMENDMENT, MULCHING, AND INSTALLATION OF ALL COIR FIBER MATTING AS SPECIFIED ON THE PLANS AND THE PROJECT SPECIFICATIONS. ASSOCIATED DISTURBED STREAM BANKS WILL HAVE TEMPORARY AND PERMANENT SEED, SOIL AMENDMENTS, MULCH, AND COIR FIBER MATTING APPLIED TO THEM AS WORK PROGRESSES AND BY THE END OF EACH DAY. COIR FIBER MATTING WILL BE INSTALLED ON TOP OF THE SEEDED, AMENDED, AND MULCHED STREAM BANKS ACCORDING TO THE PROJECT SPECIFICATIONS. 7. REMOVE AND DISPOSE OF ALL UNUSED VEGETATION AND EXCAVATED MATERIALS. 8. ALL REMAINING DISTURBED AREAS ARE TO BE AMENDED, SEEDED, MULCHED AND MATTED ACCORDING TO THE PROJECT PLANS AND SPECIFICATIONS AND AT A MINIMUM WITHIN 1 4 DAYS OF DISTURBANCE. 9. UPON THE COMPLETION OF PHASE 4, THE CONTRACTOR SHALL SCHEDULE AN INSPECTION OF THE PHASE BY THE ENGINEER. THE CONTRACTOR MUST HAVE WRITTEN APPROVAL FROM THE ENGINEER THAT THE PHASE HAS BEEN COMPLETED TO SATISFACTORY STANDARDS BEFORE BEGINNING ANOTHER PHASE. PHASE 5 - ENTIRE PROJECT DEMOBILIZATION AND PLANTING 1. COMPLETE REMAINING MINOR GRADING AND SITE PLANTING PREPARATION WORK, INCLUDING RIPPING AND/OR DISKING, AS SPECIFIED IN THE PROJECT SPECIFICATIONS. 2. ALL REMAINING DISTURBED AREAS, INCLUDING AREAS THAT HAVE BEEN RIPPED AND/OR DISKED ARE TO BE AMENDED, SEEDED, MATTED AND/OR MULCHED ACCORDING TO THE PROJECT SPECIFICATIONS AND AT A MINIMUM WITHIN 1 4 DAYS OF DISTURBANCE. 3. COMPLETE ALL REMAINING PROPOSED PERMANENT VEGETATION PLANTING PER THE PLANS AND PROJECT SPECIFICATIONS. 4. REMOVE AND DISPOSE OF ALL TRASH, METAL, DEBRIS, WOODY MATERIAL, AND EXCESS SOIL FROM THE SITE ACCORDING TO LOCAL, STATE, AND FEDERAL REGULATIONS. 5. RESTORE CONSTRUCTION ACCESS ROADS, STAGING AREAS, AND STOCKPILE AREAS. IMMEDIATELY REGRADE, REPLACE TOPSOIL, AND SEED, AMEND, AND MULCH AS SPECIFIED IN THE PROJECT SPECIFICATIONS. SILT FENCE SHALL BE REMOVED ONCE THE SITE HAS BEEN STABILIZED WITH VEGETATION. CONSTRUCTION SEQUENCE REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION TYPICAL SECTIONS (PROJECT # 116 (SHEET NO) 2 z 0 0 N 9 S 0 d 0 0 8 7 2 a d N z 0 d 0 u ll Ui a 0 0 0 z U F I co 0 CC NF Ow NQ 071 rot VARIES VARIES "B" AND "Bc" TYPE CHANNELS WBKF ABKF S1 VARIES ❑ W1 W2 .11 TYPICAL RIFFLE CROSS SECTION WPOOL ❑ SEE NOTES VARIES Sq APOOL S3 W3 W4 TYPICAL POOL RIGHT CROSS SECTION NOTES: THE BANKFULL BENCH LINE SHOWN ON THE PLAN SHEETS CORRESPONDS TO THE BACK OF THE BANKFULL BENCH/TOE OF TERRACE SLOPE. -THE BACK OF ALL BANKFULL BENCHES SHALL BE HIGHER THAN THE BANKFULL ELEVATION AT THE CORRESPONDING STREAM STATION TO ENSURE POSITIVE DRAINAGE BACK TO THE STREAM. 3 1 7 /i. /i. SEE NOTES TYPICAL SECTIONS "B" AND "Bc" STREAM TYPE TYPICAL CROSS SECTION DIMENSIONS ABKF WBKF W1 W2 D1 D2 51 52 APool WPooI W3 W4 D3 D4 53 54 Reach 1 10+00.00 to 17+03.00 4.50 7.65 2.45 1.37 0.08 0.69 31.2:1 2:1 8.68 9.94 1.74 3.24 0.00 1.29 N/A 2.5:1 Reach 2 17+03.00 - 37+53.33 6.00 8.83 2.83 1.59 0.09 0.79 31.2:1 2:1 12.29 11.48 1.49 4.25 0.00 1.70 N/A 2.5:1 Reach 3 37+53.33 - 52+29.46 8.00 10.20 3.27 1.83 0.10 0.92 31.3:1 2:1 16.38 13.26 1.73 4.90 0.00 1.96 N/A 2.5:1 REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION / ROCK CROSS VANE XV (PROJECT # 116 SHEET NO. 2A z 6 d 9 S 8 1 In 5 In 0) 0 z a 0 z J d Q U U z a a 0 U �I co 0- NIT Ow NQ COI 01 /C rot ROCK CROSS VANE SPECIFICATIONS MATERIALS: SPECIFICATIONS: BOULDER TYPE: GRANITE OR COMPARABLE SIZE: 2 FT X 2 FT X 1 FT NUMBER OF HEADER ROWS: 1 NUMBER OF FOOTER ROWS. 1 FILTER FABRIC TYPE: TYPE 2 NON -WOVEN WIDTH UPSTREAM: 6 FT MINIMUM STONE BACKFILL CLASS A, CLASS B AND ON -SITE ALLUVIUM (EVEN MIX) NOTES FOR CROSS VANE STRUCTURES: 1. DIG ATRENCH BELOW THE STREAM BED FOR FOOTER AND HEADER ROCKS, FILTER FABRIC AND STONE BACKFILL. 2. PLACE FOOTER ROCKS AND THEN HEADER ROCKS TO ACHIEVE DESIGN DIMENSIONS AND ELEVATIONS. 3. USE HAND PLACED STONE TO FILL GAPS AND VOIDS ON UPSTREAM SIDE OF THE HEADER AND FOOTER ROCKS. 4. PLACE FILTER FABRIC BEGINNING AT THE TOP OF THE HEADER ROCKS AND EXTENDING DOWN TO THE DEPTH OF THE FOOTER ROCKS, THEN OUTWARD THE DISTANCE SPECIFIED IN THE STRUCTURES TABLE SHEET. 5. INSTALL STONE BACKFILL AS SHOWN, TO THE TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. C BANKFULL BOTTOM WIDTH 5I 0.1 201. 30 I 1 /3 I —1.-I BOTTOM If WIDTH I y� A 4 3 ill il* 111: 111SCOUR I 1P I POOL % 6 irw4 1/I it _ s I HEAIDER I NO GAPSI RbCK (BETWEEN I A 1 ROCKS( FOOTER f� ROCK SILL 5 m B' PLAN VIEW BANKFULL v 7 - ELEVATION POINT (SEE STRUCTURES TABLE) BANKFULL FLOW �y STONE BACKFILL FILTER FABRIC PROFILE VIEW A - A' VANE ARM FLOW -____.- RIFFLE STONE BACKFILL FILTER FABRIC HEADER ROCK STONE BACKFILL DETAILS FOOTER ROCK INVERT FILTER FABRIC RIFF- \ RUN G//\/ PROFILE VIEW B - B' INVERT SCOUR POOL SECTION C - C' INVERT AND POOL HEADER ROCK FOOTER ROCK LOG J HOOK VANE SPECIFICATIONS MATERIALS: SPECIFICATIONS: BOULDER TYPE: GRANITE OR COMPARABLE SITE: 2 FT X 2 FT X 1 FT LOGS TYPE: HARDWOOD SIZE: 1 2 INCH G MIN. NUMBER OF HEADER LOGS: 1 NUMBER OF FOOTER LOGS: 1 FILTER FABRIC TYPE: TYPE 2 NON -WOVEN WIDTH UPSTREAM: 6 FT MINIMUM STONE BACKFILL CLASS A, CLASS B AND ON -SITE ALLUVIUM (EVEN MIX) NOTES FOR LOG J-HOOK VANE STRUCTURES: 1. STRUCTURE DIMENS ONS AND MEASUREMENTS ARE SHOWN ON THE STRUCTURE TABLES SHEET. 2. LOGS SHOULD BE STRAIGHT, HARDWOOD, AND NOT ROTTEN. 3. BOULDERS MUST BE OF SUFFICIENT SIZE TO ANCHOR LOGS. 4. SOIL SHOULD BE COMPACTED WELL AROUND BURIED PORTIONS OF LOGS. 5. BOULDER SHOULD BE PLACED ON TOP OF HEADER LOG FOR ANCHORING. 6. FILTER FABRIC SHOULD BE NAILED TO THE LOG BELOW THE BACKFILL. 7. INSTALL STONE BACKFILL AS SHOWN, TO THE ELEVATION OF THE TOP HEADER ROCK. INSTALL STONE BACKFILL BEHIND LOG. LOG BURIED BELOW STREAMBED 01 YZ G 8 \ 0\ GRADE CONTROL LOG J-HOOK VANE LJH PLAN VIEW 0- H z 0C b rn 02 0 zz xm 1RM AEG LF A LOGS BURIED IN STREAMBANK AT LEAST 5' STREAMBED BOULDER HEADER LOG HEADER LOG - ELEVATION POINT (SEE STRUCTURE TABLES) 2 FOOTER LOG PROFILE VIEW A - A' STONE BACKFILL FOOTER LOG FLOW FILTER FABRIC SECTION B - B' REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION / ���\��\�%//�//��/���/��//. \//\//\ /\\4\/\\////\\//\\ LOG STEP LS (PROJECT # 116 SHEET NO. 2B z 6 0 N 9 S 0 d 0 6 D 7 0) a d N z a d 0 u ll UI a a 0 0 z (1 0 Er NIT or, NQ col /01 �C rot - ELEVATION POINT (SEE STRUCTURES TABLE) LOG STEP SPECIFICATIONS MATERIALS: SPECIFICATIONS: LOGS TYPE: HARDWOOD SIZE: 12 INCH 0 MIN. NUMBER OF HEADER LOGS: 1 NUMBER OF FOOTER LOGS: 1 FILTER FABRIC TYPE: NON -WOVEN WIDTH UPSTREAM: 6 FT MINIMUM STONE BACKFILL CLASS A, CLASS B AND ON -SITE ALLUVIUM (EVEN MIX) NOTES FOR LOG STEP STRUCTURES: 1 LOGS SHOULD BE AT LEAST 12 INCHES IN DIAMETER, RELATIVELY STRAIGHT. HARDWOOD, AND RECENTLY HARVESTED. 2. LOGS >24 INCHES IN DIAMETER MAY BE USED ALONE WITHOUT AN ADDITIONAL LOG. 3. USE FILTER FABRIC TO SEAL GAPS BETWEEN LOGS. 4. INSTALL STONE BACKFILL AS SHOWN; TO THE DIMENSIONS INDICATED IN THE STRUCTURES TABLE SHEET. 5. PLACE TRANSPLANTS FROM TOE OF STREAMBANK TO TOP OF STREAMBANK. (IF AVAILABLE) 6 TRANSPLANTS CAN BE SUBSITUTED WITH COIR FIBER MATTING AT THE DIRECTION OF THE ENGINEER. C BI--- h 5' TOP OF BANK BOTTOM OF BANK POOL WIDTH (SEE TYP) RIFFLE WIDTH )SEE TYP) PLAN VIEW BOTTOM OF BANK TOP OF BANK C 5 LOG STEP TOP OF STREAMBANK HEADER LOG FOOTER LOG FLOW STREAMBED STONE BACKFILL FILTER FABRIC 6 MINIMUM — SECTION A -A' POOL WIDTH (SEE TYP) BASEFLOW RIFFLE WIDTH (SEE TYP) BASEFLOW DETAILS SECTION B-B' COIR FIBER MATTING ' — i COIR FIBER MATTING SECTION C-C' HEADER LOG FOOTER LOG REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION LOG ROLLER LR (PROJECT # 116 SHEET NO. 2C z 0 N 9 S O d LL1 5 D 7 2 a / 2 J d 0 6 0 0 z a a 0 0 z_ U Go 0— NIL) Ow NQ col rot TOE OF BANK BANKFULL 7o -so' B 12" DIAMETER OR GREATER 1.1 - 1.2X RIFFLE WIDTH IN POOL AREAS LOG ROLLER SPECIFICATIONS MATERIALS: SPECIFICATIONS: RIFFLE BED MATERIAL SEE CONSTRUCTED RIFFLE DETAIL LOGS TYPE: HARDWOOD SIZE: LENGTH = WBKF + 1 O' (MIN), 12" DIA. NUMBER OF HEADER LOGS: 1 NUMBER OF FOOTER LOGS: 1 FILTER FABRIC TYPE: NON -WOVEN WIDTH UPSTREAM. 6 FT MINIMUM NOTES FOR LOG ROLLER STRUCTURES: 1. STRUCTURE DIMENS ONS AND MEASUREMENTS ARE SHOWN ON THE STRUCTURE TABLES SHEET. 2. LOGS SHOULD BE STRAIGHT, HARDWOOD, AND NOT ROTTEN. 3. SOIL SHOULD BE COMPACTED WELL AROUND BURIED PORTIONS OF LOGS. 4. FILTER FABRIC SHOULD BE NAILED TO THE LOG BELOW THE BACKFILL. 5. RIFFLE STATIONS AND ELEVATIONS (1 & 5) ARE SHOWN ON BOTH THE STRUCTURE TABLES FOR LOG ROLLERS AND CONSTRUCTED RIFFLES IF APPLICABLE. 6. NUMBER OF LOGS MAY VARY. BANKFULL TOE OF BANK B' BURY INTO BED/BANK 5 FEET OR GREATER (TYPICAL) PROTECT BANK USING TOE WOOD (SEE DETAIL) BACKFILL WITH CONSTRUCTED RIFFLE MATERIAL (SEE DETAIL) BURY INTO BED/BANK 5 FEET OR GREATER (TYPICAL) FLOW PLAN VIEW 0 - ELEVATION POINT (SEE STRUCTURE TABLES) 4 BACKFILL WITH CONSTRUCTED RIFFLE MATERIAL (SEE DETAIL) BANKFULL RIFFLE MAX DEPTH SEE TYPICAL CROSS SECTION DIMENSIONS 4 FILTER FABRIC (TYPICAL) SECTION A - A' SECTION B - B' SECTION D - D' DETAILS THALWEG A' BANKFULL RIFFLE MAX DEPTH SEE TYPICAL CROSS SECTION DIMENSIONS BANKFULL RIFFLE MAX DEPTH SEE TYPICAL CROSS SECTION DIMENSIONS REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION / CONSTRUCTED RIFFLE GR SHEET NO. 2D z 5 o 0 N 9 S D d LL1 0 D 7 2 Z a d N z J d O 0 i 0 3 0 0 (1 DI co 0- NIT Ow NFL �C rot CONSTRUCTED RIFFLE SPECIFICATIONS MATERIALS: SPECIFICATIONS: RIFFLE BED MATERIAL TYPE: GRANITE OR COMPARABLE SIZE: CLASS A, CLASS B AND ON -SITE ALLUVIUM (EVEN MIX) THICKNESS: 18 INCHES MIN. COIR FIBER MATTING SEE DETAIL NOTES FOR CONSTRUCTED RIFFLE STRUCTURES: 1. GRADE STREAMBED AND BANKS TO PROPOSED DIMENSIONS PER TYPICAL CROSS-SECTION AND PROFILE. 2. EXCAVATE TRENCH BELOW PROPOSED STREAMBED ELEVATION EQUAL TO OR GREATER THAN RIFFLE THICKNESS. 3. INSTALL COIR FIBER MATTING ALONG STREAMBANKS ENSURING MATTING IS SUFFICIENTLY TRENCHED ALONG TOE OF BANK. 4. FILL TRENCH WITH RIFFLE BED MATERIAL TO FINAL DESIGN STREAM GRADE. TOP OF BANK Bf BOTTOM WIDTH PLAN VIEW TOE OF BANK B' RIFFLE BED MATERIAL - ELEVATION POINT (SEE STRUCTURE TABLES) HEAD OF RIFFLE FLOW RIFFLE BED MATERIAL COIR FIBER MATTING (SEE DETAIL) RIFFLE THICKNESS PROFILE A - A' BOTTOM WIDTH RIFFLE THICKNESS 2 COIR FIBER MATTING (SEE DETAIL) TOP OF BANK TOE OF BANK COIR FIBER MATTING SHOULD BE TRENCHED THROUGH RIFFLE BED MATERIAL RIFFLE BED MATERIAL SECTION B - B' (PROJECT # 116 DETAILS CONSTRUCTED CASCADE SPECIFICATIONS MATERIALS: SPECIFICATIONS: STONE BACKFILL TYPE: GRANITE OR COMPARABLE SIZE: CLASS A, CLASS B AND CLASS 2 (EVEN MIX) THICKNESS: 18 INCHES MIN. COIR FIBER MATTING SEE DETAIL NOTES FOR CONSTRUCTED CASCADE STRUCTURES: 1. GRADE STREAMBED AND BANKS TO PROPOSED DIMENSIONS PER TYPICAL CROSS-SECTION AND PROFILE. 2. EXCAVATE TRENCH BELOW PROPOSED STREAMBED ELEVATION EQUAL TO OR GREATER THAN RIFFLE THICKNESS. 3. INSTALL COIR FIBER MATTING ALONG STREAMBANKS ENSURING MATTING IS SUFFICIENTLY TRENCHED ALONG TOP OF BANK. 4.FILL TRENCH WITH STONE TO FINAL DESIGN STREAM GRADE. TOP OF BANK B RIFFLE WIDTH CONSTRUCTED CASCADE GG C PLAN VIEW TOE B' - ELEVATION POINT (SEE STRUCTURE TABLES) HEAD OF RIFFLE FLOW 1 RIFFLE THICKNESS RIFFLE THICKNESS PROFILE A - A' COIR FIBER MATTING (SEE DETAIL) TOE 0 SECTION B - B' TOP OF BANK COIR FIBER MATTING SHOULD BE TRENCHED THROUGH STONE BACKFILL REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION GRADE CONTROL WOODY RIFFLE WR (PROJECT # 116 SHEET NO. 2E z W N 9 O 1 2) 2) 2 Z a 5 a / 0 U i 32, a 0 0 z_ U 1_ 0I co 0- NIT Ow NQ 511 \C rot TOE OF BANK A TOP OF BANK-� '-1 BEGIN INVERT B / SECONDARY LOGS B' HEADER LOG PRIMARY LOGS SPACE EVERY 5' -7' TRANSPLANTS OR COIR MATTING WITH LIVE STAKES SEE TYPICAL SECTION FOR CHANNEL DIMENSIONS SET INVERT BASED ON DESIGN STREAM PROFILE BANKFULL A' END INVERT PLAN VIEW HEADER LOG 5' MINIMUM BURIED INTO BANK NOTES: 1. PRIMARY LOGS SHOULD BE AT LEAST 10" OR MORE IN DIAMETER. RELATIVELY STRAIGHT, AND RECENTLY HARVESTED AND EXTENDING INTO THE BANK 5' ON EACH SIDE. 2. SECONDARY LOGS SHOULD BE AT LEAST 1" IN DIAMETER AND NO LARGER THAN 6", AND EXTEND INTO THE BANK 3 FEET ON EACH SIDE. WOOD MATERIAL SHALL BE VARYING DIAMETER TO ALLOW MATERIAL TO BE COMPACTED. 3. COIR FIBER MATTING CAN BE USED INSTEAD OF TRANSPLANTS, PER DIRECTION OF ENGINEER. 4. AFTER TRENCH HAS BEEN EXCAVATED A LAYER OF SECONDARY LOGS AND WOODY DEBRIS SHOULD BE PLACED WITH MINIMAL GAPS. A LAYER OF ON -SITE ALLUVIUM SHOULD BE APPLIED TO FILL VOIDS BETWEEN SECONDARY LOGS BEFORE ADDITIONAL LAYERS ARE PLACED. 5. TYPE 2 NON -WOVEN FILTER FABRIC SHALL BE INSTALLED ON THE UPSTREAM AND DOWNSTREAM MOST PRIMARY LOGS AND EXTEND DOWN BELOW THE FOOTER LOGS AND UPSTREAM A MINIMUM OF 6 FEET. 6. GRADE CONTROL WOODY RIFFLES SHALL BE TOP DRESSED WITH ON -SITE ALLUVIUM TO FILL VOIDS. SECTION B - B' 5' MINIMUM BURIED INTO BANK BANKFULL ELEVATION HEADER LOG FOOTER LOG A S STONE BACKFILL `M FILTER FABRIC SANDY SOIL BACKFILL SECONDARY LOGS AND WOODY DEBRIS APPROX. 24" DEPTH DETAILS HEADER LOG PRIMARY LOGS FILTER FABRIC SECTION A - A' LENGTH (SEE STRUCTURE TABLE) CONSOLIDATED EARTH/ NATURAL GROUND COMPACTED FILL X/\\V / \/\".A• - � �ci` \\\/ /\\�am\�0�f: �•. 11 I r111111141 i G•'• . \ \,.\� W‘Srja‘ellifir la a I g 011110011111111.011110.1 45`j \i �/ 'j4 A PLAN VIEW BOULDER TOE SPECIFICATIONS MATERIALS: SPECIFICATIONS: BOULDER TYPE: GRANITE OR COMPARABLE SIZE: 2FTX2FTX2 FT NUMBER OF HEADER ROWS: VARIES NUMBER OF FOOTER ROWS: 1 FILTER FABRIC TYPE: TYPE 2 NON -WOVEN WIDTH UPSTREAM: 6 FT MINIMUM WOOD MATTING STAKES TYPE: UNTREATED WOOD SIZE: 1" BY 2", MIN. 1 8" LENGTH NOTES FOR BOULDER TOE STRUCTURES 1. FOOTER ROCKS SHALL BE BURIED A MINIMUM OF 2.0' BELOW STREAM BED. 2. TOP OF THE UPPER MOST BOULDER SHALL TIE TO STABLE GROUND. 3. THE NUMBER OF HEADER ROCKS CAN VARY BASED ON FIELD CONDITIONS, BOULDER DIMENSIONS AND AT THE DIRECTION OF THE ENGINEER. STACKED BOULDER WALL FOOTER ROCKS TOP OF STREAMBANK / BANKFULL \r\/\\r\ EXISTING TOP OF STREAMBANK COIR FIBER MATTING (- - ) ♦11 \44. f/j\/�\� j/ TIE BOULDER WALL TO STABLE GROUND FILTER FABRIC (- BOULDER BASE FLOW STREAMBED BOTTOM WIDTH OF STREAM CHANNEL SECTION A - A' -- 1.0 2.0 VARIES \ DEPTH (VARIES) A/ MATTING SECURED USING WOOD MATTING STAKES 7 CONSOLIDATED EARTH/ NATURAL GROUND COMPACTED FILL REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION TOEWOOD WITH GEOLIFT Tw (PROJECT # 116 SHEET NO. 2F 0 9 Lo D 11 0 Z Q d / 4 _d 0 U U z a a 0 z U ❑I m 0— NIT Ow NQ col rot PLAN VIEW- 1 TRENCH EXCAVATION TOE WOOD SPECIFICATIONS MATERIALS: SPECIFICATIONS: BRUSH MATERIAL TYPE: BRUSH MATERIAL SIZE: MIN. 4 FT LONG. 1 INCH DIAMETER. 25%OF BRUSH MATERIAL MUST BE 4" IN DIAMETER OR GREATER. COIR FIBER MATTING SEE DETAIL NOTES FOR TOE WOOD STRUCTURES WITHOUT ROOTWAD: 1. STRUCTURE DIMENSIONS AND MEASUREMENTS ARE SHOWN ON THE STRUCTURE TABLE SHEET. 2. DIG A TRENCH ALONG BANK WHERE TOE WOOD IS TO BE INSTALLED, TO THE DEPTH AND WIDTH SPECIFIED IN THE DETAILS AND STRUCTURE TABLE. IF TOE WOOD IS BEING PLACED IN A LOCATION WHERE THERE IS NOT EXISTING GROUND. PLACE FILL MATERIAL AND COMPACT TO FORM THE TRENCH FOR THE TOE WOOD MATERIALS. 3. INSTALL BRUSH MATERIAL INCLUDING BRANCHES, LOGS, AND BRUSH. AND AT LEAST 1 "IN DIAMETER. LARGE MATERIALS AND SMALL MATERIALS SHALL BE MIXED, PLACED IN LAYERS NO MORE THAN 1 FOOT DEEP, COVERED IN A THIN LAYER OF ONSITE ALLUVIUM, AND COMPACTED BEFORE PLACING THE NEXT LAYER OF TOE WOOD MATERIAL AT LEAST SO% OF THE WOOD MATERIAL SHALL HAVE A MINIMUM DIAMETER OF 4 INCHES. CONTINUE PLACING MATERIALS TO FORM A DENSE LAYER OF WOODY MATERIALS AND ONSITE ALLUVIUM TO THE DEPTH AND ELEVATIONS SPECIFIED (PLAN VIEW 2). 4. PLACE AN UNCONSOLIDATED LAYER OF SOIL AND COBBLE ON TOP OF BRUSH LAYER. 5. INSTALL LIVE CUTTINGS AT LEAST 4 FEET IN LENGTH, AND AT LEAST 1 INCH IN DIAMETER. 6. CONSTRUCT GEOLIFTS TO REBUILD THE STREAMBANK ABOVE THE TOE WOOD LAYER. I EXCAVATE CUT TRENCH (SEE NOTE 2) A UNDISTURBED EARTH /\/\\\ COMPACTED(/ f\ BACKFILL \\/\/�\ -. SEE STRUCTURE DEPTH j\ TABLES 2� INSTALL BRUSH MATERIAL 1SEE NOTE 3). AFTER BRUSH LAYER HAS BEEN COMPLETED INSTALL SOIL LAYER (NOTE 4) AND PLACE LIVE CUTTINGS IN LAYER ON TOP OF SOIL LAYER 1SEE NOTE 5). PLAN VIEW- 2 BRUSH LAYER INSTALLATION GEOLIFTS - 4 FT WIDE AND 1 FT THICK (MAX). (OR UP TO THE BANKFULL ELEVATION) ENCASE IN COIR FIBER MATTING (SEE SPECIFICATIONS) BUILD GEOLIFT TO THE BANKFULL ELEVATION NUMBER OF LIFTS MAY VARY LIVE CUTTINGS (SEE VEGETATION SELECTION TABLE FOR SPECIES) BASEFLOW V UNCONSOLIDATED BACKFILL: SOIL AND COBBLE �L" _ ) v r> �•�'F�_txli.. / / / /i //\ \\// DENSE BRUSH LAYER: CONSISTING OF LIMBS, BRANCHES, SMALL LOGS ON -SITE ALLUVIUM WIDTH SEE STRUCTURE TABLES SECTION VIEW BRUSH MATERIAL SHALL BE INSTALLED 1' (MIN) BELOW THE FINISHED BED ELEVATION FINISHED BED ELEVATION DETAILS REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION / LIVE STAKING (PROJECT # 116 SHEET NO. 2G Z 0 9 0 0 LL1 0 0 Z a a_ d N z a d 0 0 0 U U z a 0 0 1) m 0- NIT Ow NQ mL rot TOP OF STREAMBANK TOE OF STREAMBANK TOP OF STREAMBANK 3'-4' SPACING LIVE STAKE SPACING PLAN VIEW NOTES. 1. STAKES SHOULD BE CUT AND INSTALLED ON THE SAME DAY. 2. DO NOT INSTALL STAKES THAT HAVE BEEN SPLIT. 3. STAKES MUST BE INSTALLED WITH BUDS POINTING UPWARDS. 4. STAKES SHOULD BE INSTALLED PERPENDICULAR TO BANK. 5. STAKES SHOULD BE 1/2 TO 2 INCHES IN DIAMETER AND 2 TO 3 FT LONG. 6. STAKES SHOULD BE INSTALLED LEAVING 1 /5 OF STAKE ABOVE GROUND. 7. STAKES SHOULD BE INSTALLED ON B STREAM TYPES AT 3' - 4' SPACING ON BOTH BANKS LIVE STAKE TOE OF SLOPE SECTION A - A' TOP OF STREAMBANK LIVE STAKE TOE OF SLOPE BOTTOM OF CHANNEL A TOP OF STREAMBANK DETAILS PLANT STAKES FROM TOP OF BANK TO TOE OF BANK IN A DIAMOND SHAPED STAGGERED PATTERN TO SPECIFIED SPACING SQUARE CUT TOP ABUDS FACING UPWARD PLAN VIEW LIVE CUTTING MIN. 1 /2" DIA 2' - 3' LENGTH ANGLE CUT 30 - 45 DEGREES LIVE STAKE DETAIL NOTES: 1. IN AREAS TO BE MATTED, ALL SEEDING, SOIL AMENDMENTS, AND SOIL PREPARATION MUST BE COMPLETED PRIOR TO PLACEMENT OF COIR FIBER MATTING. SMALL ANCHORS ON 2' CENTERS COIR FIBER MATTING ANCHORS ON 2'- 3' CENTERS \\ /\\ ��\ 44\ STREAM BED BACKFILL WITH STREAMBED MATERIAL MATTING IN TRENCH SMALL ANCHOR TRENCH ON 1' CENTERS ANCHOR OVERLAP ON 1' CENTERS PLAN VIEW `— (TYP) —� BACKFILL GOIR FIBER MATTING LARGE ANCHORS ON 3' CENTERS ALONG CENTER LARGE ANCHORS ON 2' CENTERS ALONG TOE FLOODPLAIN/ EXISTING GROUND 6" MIN SMALL ANCHORS ON 1' CENTERS IN TRENCH MATTING SHALL BE PLACED IN TRENCH, BACKFILLED, AND COMPACTED —L 6" BURIED BELOW STREAMBED TYPICAL CROSS SECTION TOE OF STREAMBANK MATTING PLACEMENT TYPICAL MATTING PLAN VIEW TOP OF STREAMBANK ANCHOR OPTIONS '2"1 24" L LARGE ANCHORS 2" X 2" (NOMINAL) WOODEN STAKE 1.5 INCH ROOFING NAIL SMALL ANCHORS WOODEN STAKE 1.5" REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION z 0 0 S N 9 0 d 0 Z Q d N z J d O U UI z a 0 0 z_ U ❑I 0 01 1 / NF NU Ow NQ re �l 010 DIBBLE PLANTING METHOD TEMPORARY SILT FENCE (PROJECT ) 116 SHEET NO. 2H USING THE KBC PLANTING BAR N DETAILS { II 'II II I I 2INCH PLANTING NOTES: 6 MAXIMU-] M / __ WWWWW = W-W-W=W-7111— _ I ill, W WWWLL ICIII IIIIl W W W W=l1 W -W WWWWW WWWWWu __iii=- -W-W W W _Ill_ WWWW PLANTING BAG ��; ii — — — I II— II�II—II—II—IiJIIJIi-IhII- II. -II�IlAl1LlI�1I1II�11AlIAilAll 1II�II�II1II� li- = GEOTEXTILE FABRIC GEOTEXTILE FABRIC COMPACTED FILL 1. SHOWN TOWARD W-W—W—W lll� NSERT PLANTING AND PULL PLANTER. .' BAR AS 2 HANDLE PLACE DEPTH. II III III III 1p—W; REMOVEM—I11 PLANTING SEEDLING AT r,,vl BAR AND 3. INSERT CORRECT TOWARD PLANTINGII PLANTER DURING PLANTING. SEEDLINGS SHALL BAR 2 INCHES FROM SEEDLING. BE KEPT IN A MOIST CANVAS BAG OR SIMILAR CONTAINER TO PREVENT THE ROOT SYSTEMS FROM DRYING. KBC PLANTING BAR ```yyyppy I PLANTING BAR SHALL HAVE A BLADE IWITH A TRIANGULAR CROSS SECTION, AND SHALL BE 12 INCHES LONG,4 INCHES AND 1 INCH THICK _III —III B . — —I I I I� I I IJ I I_I I 11 11 I 1=1 IIIEIIE111=11=III=111 ITI 11 1_ -111-1 T I-11 I1=11 III= 111-11I1E1 11-1111E1111= =III=III=1 E I G I I= I1=11I1=11 111 11r irei 12 111=1 111-111- -11 11-111 11E111E111 I IE 11 E11 I I IEI I I= -1 11E111 1=111=111 1- 11I1 I11 _II I I=1 HE -1 T I1=11 I1=11 I -I I I=11I1=111 IEIIIEIIIEIIIEIIIEIIIE =1 11 11 Ell 1 11=I I I=11811-1I EllEllE111E111E111E11 — — — 1 EI11 11 1=11 =118 111E11 I1= 1 EI11 1E1111E11 IIIEI1 111E111= 1 EI11_ 11E111E11 I-1I IE AT CENTER.WIDE ROOT PRUNING NOTES: EXTENSIONOFGEOTEXTILE 1 4„ STEEL POST - 2,0" DEPTH 1 II 4. PULL HANDLE OF BAR TOWARD 5. PUSH HANDLE FORWARD 6. LEAVE COMPATION HOLE ALL SEEDLINGS SHALL BE ROOT PRUNED, PLANTER, FIRMING SOIL AT FIRMING SOIL AT TOP. OPEN. WATER THOROUGHLY. IF NECESSARY, SO THAT NO ROOTS BOTTOM. EXTEND MORE THAN 10 INCHES BELOW THE ROOT COLLAR. II 1. USE SILT FENCE A MINIMUM OF 36" IN WIDTH AND FASTEN FABRIC INTO TRENCH ADEQUATELY TO THE STEEL POSTS. 2. PROVIDE S' STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. 3. REMOVE ONCE AREA IS STABLE. GRAVEL CONSTRUCTION ENTRANCE CHANNEL PLUG /" PQ /" O ,0� / <2 / , / Ask 4 goo /:•• /"0 2 NOTES: / /" SO.' + R=40' '�j•1' o �ry �CX CHANNEL TO BE PLUGGED 9 WIDTH SHOWN ON PLAN SHEETS CHANNEL PLUG TOP OF BANK PLAN VIEW UNCOMPACTED BACKFILL COMPACTED BACKFILL 0.5' MINIMUM FINISH GRADE CHANNEL INVERT . SECTION A - A' 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE EXPECTED EQUIPMENT. 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION BY ALL CONSTRUCTION VEHICLES. 3. PLACE FILTER FABRIC FOR DRAINAGE BENEATH STONE. YCT MUD INTO STREETS. 4. MUST BE S. ANY MATERIAL TRACKIN THE KED ONTO THE RION WHICH WILL OADWAY MUST BEREVENT TRACKING OR CLEANED UP IMMEDIATELY. 6. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS TO THE ENTRANCE AND TIMELY MAINTENANCE. 7. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES AS SHOWN ON PLANS, OR AS DIRECTED BY THE ENGINEER. 8. USE CLASS "A" STONE OR OTHER COURSE AGGREGATE APPROVED BY THE ENGINEER. 9. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES LEAVING THE PROJECT SITE FROM BYPASSING CONSTRUCTION ENTRANCES. NOTE: COMPACT BACKFILL USING ON -SITE HEAVY EQUIPMENT IN 10 INCH LIFTS. REVISIONS PREPARED IN THE OFFICE OF: PROJECT ENGINEER NO. DESCRIPTION ENGR. APPROV. DATE PREPARED FOR: ECOSYSTEM ISSUED FOR BID JB KT B/30/22 TOWN OF PILOT MOUNTAIN UT TO CHINQUAPIN CREEK PLANNING & PROGRESS DRAWING i 24 W. MAIN STREET FOR REVIEW PURPOSES ONLY PILOT MOUNTAIN, NC z�o4 i SURRY COUNTY, NC EPR RESTORATION DO NOT USE FOR CONSTRUCTION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 J TEMPORARY PUMP AROUND OPERATION (PROJECT # 116 SHEET NO. 2I 0 N 9 S /n d 6) 4 u) 6) 7 2 a d 6 z a / Q U UI z a 0 0 z_ U F ❑I co 0 CC NIT Ow NQ rot STABILIZED INLET PUMP -AROUND PUMP TEMPORARY FLEXIBLE HOSE STABILIZED OUTLET: CONSTRUCT WITH CLASS B STONE TO STABILIZE STREAM AT PUMP AROUND OUTLET IMPERVIOUS DIKE ISEE PROJECT SPECIFICATIONS) W Q 0 z 2 0 0 2 EXISTING CHANNEL SEQUENCE OF CONSTRUCTION FOR TEMPORARY PUMP -AROUND OPERATION TEMPORARY FLEXIBLE HOSE DEWATERING PUMP SPECIAL STILLING BASIN (SEE PROJECT SPECIFICATIONS) 1. INSTALL STABILIZED OUTLET AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY FLEXIBLE HOSE THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK SITE TO THE SPECIAL STILLING BASIN OR STABILIZED OUTLET. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL FLOW INTO A SPECIAL STILLING BASIN. 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE SPECIAL STILLING BASIN AND STABILIZED OUTLET AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. rSPECIAL STILLING BASIN EXISTING GROUND 5..i.4x 6 Co Y.} 1Puaar lPuacpuo 5 FILTER FABRIC NOTES: 15 20 FT 1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS OF CHANNEL. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. 4. THE PUMP -AROUND PUMP SHOULD ADEQUATELY CONVEY BASEFLOW. INSTALL 2 INCH PAD OF WASHED #57 STONE BACKFILL BETWEEN SPECIAL STILLING BASIN AND FILTER FABRIC DETAILS FLOW Y I +II 0 W 6) CONSTRUCTION AREA UPSTREAM F- / STILLING BASIN (2 FT. MAX DEPTH) EXISTING CHANNEL PLAN VIEW TEMPORARY ROCK DAM STONE BACKFILL FILTER FABRIC RIP RAP FLOW -- 2 STONE BACKFILL FILTER FABRIC CROSS SECTION 1/2 BANKFULL MAXIMUM DEPTH TEMPORARY ROCK DAM SPECIFICATIONS MATERIALS: SPECIFICATIONS: BOULDER SIZE: CLASS B FILTER FABRIC TYPE: TYPE 2 NON -WOVEN WIDTH UPSTREAM: 6 FT MINIMUM STONE BACKFILL SIZE: No. 57 WASHED STONE NOTES: OF TRAPPED SEDIMENT PRIOR TO REMOVAL. CLEAN OUT STILLING BASIN REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION STRUCTURE TABLES PROJECT # 116 (SHEET NO) 3 0 ai 9 w d d z z d U ll 0 a 0 a z U co 0- NIT Nu NQ tol roL Rock Cross Vane Structures - UTC Reach 1 Structure # Arm Sill Invert Station (ft) Elevation (ft) Length (ft) Angle (deg) Slope (%) Length (ft) Length (ft) At Pt 4 Pt 1 Pt 2 Pt 3 Pt 4 Pt 5 Pt 6 Pt 7 CV-1 8.0 22 5.0% 5.0 1.6 10+00.00 1158.78 1158.78 1158.38 1158.38 1158.38 1158.78 1158.78 CV-2 8.0 22 5.0% 5.0 1.6 11+73.78 1153.65 1153.65 1153.25 1153.25 1153.25 1153.65 1153.65 CV-3 8.0 22 5.0% 5.0 1.6 14+27.77 1144.95 1144.95 1144.55 1144.55 1144.55 1144.95 1144.95 CV-4 8.0 22 5.0% 5.0 1.6 15+18.93 1141.51 1141.51 1141.11 1141.11 1141.11 1141.51 1141.51 CV-5 8.0 22 5.0% 5.0 1.6 16+26.96 1138.10 1138.10 1137.70 1137.70 1137.70 1138.10 1138.10 CV-6 8.0 22 5.0% 5.0 1.6 17+57.15 1134.57 1134.57 1134.17 1134.17 1134.17 1134.57 1134.57 CV-7 8.0 22 5.0% 5.0 1.6 21+17.40 1126.00 1126.00 1125.60 1125.60 1125.60 1126.00 1126.00 CV-8 8.0 22 5.0% 5.0 1.6 22+01.58 1123.85 1123.85 1123.45 1123.45 1123.45 1123.85 1123.85 CV-9 8.0 22 5.0% 5.0 1.6 24+19.98 1118.20 1118.20 1117.80 1117.80 1117.80 1118.20 1118.20 CV-10 8.0 22 5.0% 5.0 1.6 24+79.79 1116.70 1116.70 1116.30 1116.30 1116.30 1116.70 1116.70 CV-11 8.0 22 5.0% 5.0 1.6 25+07.94 1116.00 1116.00 1115.60 1115.60 1115.60 1116.00 1116.00 CV-12 8.0 22 5.0% 5.0 1.6 26+22.19 1113.00 1113.00 1112.60 1112.60 1112.60 1113.00 1113.00 Rock Cross Vane Structures - UTC Reach 2 Structure # Arm Sill Invert Station (ft) Elevation (ft) Length (ft) Angle (deg) Slope (%) Length (ft) Length (ft) At Pt 4 Pt 1 Pt 2 Pt 3 Pt 4 Pt 5 Pt 6 Pt 7 CV-13 9.2 22 4.9% 5.0 1.9 27+55.22 1110.05 1110.05 1109.60 1109.60 1109.60 1110.05 1110.05 CV-14 9.2 22 4.9% 5.0 1.9 27+80.87 1109.65 1109.65 1109.20 1109.20 1109.20 1109.65 1109.65 CV-15 9.2 22 4.9% 5.0 1.9 31+97.73 1102.80 1102.80 1102.35 1102.35 1102.35 1102.80 1102.80 CV-16 9.2 22 4.9% 5.0 1.9 34+67.48 1098.05 1098.05 1097.60 1097.60 1097.60 1098.05 1098.05 CV-17 9.2 22 4.9% 5.0 1.9 37+42.22 1090.45 1090.45 1090.00 1090.00 1090.00 1090.45 1090.45 Rock Cross Vane Structures - UTC Reach 3 Structure # Arm Sill Invert Station (ft) Elevation (ft) Length (ft) Angle (deg) Slope (%) Length (ft) Length (ft) At Pt 4 Pt 1 Pt 2 Pt 3 Pt 4 Pt 5 Pt 6 Pt 7 CV-18 10.7 22 4.7% 5.0 2.2 39+10.00 1087.80 1087.80 1087.30 1087.30 1087.30 1087.80 1087.80 CV-19 10.7 22 4.7% 5.0 2.2 42+11.00 1082.93 1082.93 1082.43 1082.43 1082.43 1082.93 1082.93 CV-20 10.7 22 4.7% 5.0 2.2 51+39.89 1067.33 1067.33 1066.83 1066.83 1066.83 1067.33 1067.33 Grade Control Log J-Hook Structures - UTC Reach 1 Structure # Sill Length (ft) Outside Arm Invert Length (ft) Inside Arm Station (ft) Elevation (ft) Length (ft) Angle (deg) Slope (%) Length (ft) Angle (deg) Slope (%) At Pt 2 Pt 1 Pt 2 Pt 3 LJH-1 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 10+45.33 1157.16 1156.76 1156.83 LJH-2 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 11+50.46 1154.45 1154.05 1154.12 LJH-3 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 11+98.15 1152.80 1152.40 1152.47 LJH-4 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 12+57.54 1150.80 1150.40 1150.47 LJH-5 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 13+14.94 1148.80 1148.40 1148.47 LJH-6 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 13+62.10 1147.25 1146.85 1146.92 LJH-7 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 14+56.23 1143.95 1143.55 1143.62 LJH-8 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 15+61.06 1140.40 1140.00 1140.07 LJH-9 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 15+95.28 1139.15 1138.75 1138.82 LJH-10 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 16+64.11 1136.85 1136.45 1136.52 LJH-11 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 17+24.66 1135.32 1134.92 1134.99 LJH-12 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 17+89.82 1133.80 1133.40 1133.47 LJH-13 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 18+38.89 1132.68 1132.28 1132.35 LJH-14 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 19+53.56 1130.00 1129.60 1129.67 LJH-15 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 20+28.05 1128.20 1127.80 1127.87 LJH-16 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 20+83.02 1126.91 1126.51 1126.58 LJH-17 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 21+69.80 1124.67 1124.27 1124.34 LJH-18 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 22+72.59 1122.05 1121.65 1121.72 LJH-19 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 23+83.77 1119.20 1118.80 1118.87 LJH-20 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 25+33.03 1115.35 1114.95 1115.02 LJH-21 5.0 8.0 22.0 5.0% 1.6 3.7 22.0 2.0% 25+91.03 1113.80 1113.40 1113.47 Grade Control Log J-Hook Structures - UTC Reach 2 TABLES Structure # Sill Length (ft) Outside Arm Invert Length (ft) Inside Arm Station (ft) Elevation (ft) Length (ft) Angle (deg) Slope (%) Length (ft) Angle (deg) Slope (%) At Pt 2 Pt 1 Pt 2 Pt 3 LJH-22 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 27+25.43 1110.58 1110.13 1110.22 LJH-23 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 28+08.77 1109.20 1108.75 1108.84 LJH-24 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 28+71.10 1108.20 1107.75 1107.84 LJH-25 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 29+27.15 1107.25 1106.80 1106.89 LJH-26 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 30+08.31 1105.85 1105.40 1105.49 LJH-27 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 30+41.77 1105.35 1104.90 1104.99 LJH-28 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 31+30.61 1103.87 1103.42 1103.51 LJH-29 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 32+29.54 1102.25 1101.80 1101.89 LJH-30 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 32+85.28 1101.40 1100.95 1101.04 LJH-31 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 33+34.12 1100.60 1100.15 1100.24 LJH-32 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 33+71.53 1099.90 1099.45 1099.54 LJH-33 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 34+37.25 1098.90 1098.45 1098.54 LJH-34 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 35+59.00 1095.45 1095.00 1095.09 LJH-35 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 35+94.38 1094.45 1094.00 1094.09 LJH-36 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 36+86.23 1091.90 1091.45 1091.54 LJH-37 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 37+21.84 1091.00 1090.55 1090.64 Grade Control Log J-Hook Structures - UTC Reach 3 Structure # Sill Length (ft) Outside Arm Invert Length (ft) Inside Arm Station (ft) Elevation (ft) Length (ft) Angle (deg) Slope (%) Length (ft) Angle (deg) Slope (%) At Pt 2 Pt 1 Pt 2 Pt 3 LJH-38 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 38+64.57 1088.45 1088.00 1088.09 LJH-39 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 40+05.20 1086.20 1085.75 1085.84 LJH-40 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 40+46.64 1085.55 1085.10 1085.19 LJH-41 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 41+76.08 1083.45 1083.00 1083.09 LJH-42 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 42+48.05 1082.25 1081.80 1081.89 LJH-43 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 43+79.24 1080.05 1079.60 1079.69 LJH-44 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 44+58.84 1078.85 1078.40 1078.49 LJH-45 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 45+80.32 1076.87 1076.42 1076.51 LJH-46 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 46+22.00 1076.15 1075.70 1075.79 LJH-47 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 46+69.92 1075.35 1074.90 1074.99 LJH-48 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 47+69.55 1073.75 1073.30 1073.39 LJH-49 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 48+39.16 1072.60 1072.15 1072.24 LJH-50 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 49+28.61 1071.10 1070.65 1070.74 LJH-51 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 49+68.41 1070.47 1070.02 1070.11 LJH-52 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 50+91.33 1068.00 1067.55 1067.64 LJH-53 5.0 9.2 22.0 4.9% 1.9 4.3 22.0 2.0% 51+96.17 1066.48 1066.03 1066.12 Log Rollers - UTC Reach 1 Structure # Top Riffle (Pt 1) Log 1 (Pt 2) Log 2 (Pt 3) Log 3 (Pt 4) Log 4 (Pt 5) Log 5 (Pt 6) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) LR-1 10+61.64 1157.00 10+82.00 1156.35 10+94.65 1156.08 11+08.80 1155.60 11+22.40 1155.12 LR-2 12+08.23 1152.15 12+15.31 1151.85 12+26.96 1151.45 12+37.95 1151.10 LR-3 13+25.03 1148.13 13+35.45 1147.75 13+46.65 1147.40 LR-4 13+72.11 1146.51 13+85.08 1146.05 13+96.44 1145.65 14+08.42 1145.25 LR-5 14+66.19 1143.27 14+79.15 1142.80 14+91.41 1142.40 15+03.31 1141.95 LR-6 16+77.68 1136.15 16+87.74 1135.80 17+02.49 1135.50 LR-7 18+84.39 1131.45 18+92.51 1131.02 19+07.64 1130.68 19+23.57 1130.30 19+38.21 1129.97 LR-8 20+45.24 1127.49 20+56.87 1127.12 LR-9 22+19.25 1123.12 22+25.25 1122.90 22+36.50 1122.62 22+47.63 1122.33 LR-10 22+89.15 1121.32 23+05.51 1120.75 23+24.27 1120.35 REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 1 STRUCTURE TABLES (PROJECT # 116 SHEET NO. 3A 0 9 w Lo z z d U 0 z a 0 0 z U co 0 D NIT Ow NQ 001 rot Log Rollers - UTC Reach 2 Structure # Top Riffle (Pt 1) Log 1 (Pt 2) Log 2 (Pt 3) Log 3 (Pt 4) Log 4 (Pt 5) Log 5 (Pt 6) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) LR-11 28+22.58 1108.65 28+36.31 1108.30 28+52.42 1108.10 LR-12 29+41.35 1106.71 29+47.35 1106.55 29+60.65 1106.33 29+73.80 1106.12 LR-13 30+58.69 1104.79 30+64.69 1104.62 30+82.83 1104.32 30+99.75 1104.05 LR-14 32+44.45 1101.75 32+50.45 1101.60 32+64.18 1101.35 LR-15 33+00.05 1100.84 33+10.17 1100.55 LR-16 35+09.80 1096.56 35+15.80 1096.35 35+29.84 1095.92 LR-17 36+42.51 1092.85 36+48.51 1092.65 36+62.64 1092.25 Log Rollers - UTC Reach 3 Structure # Top Riffle (Pt 1) Log 1 (Pt 2) Log 2 (Pt 3) Log 3 (Pt 4) Log 4 (Pt 5) Log 5 (Pt 6) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) Sta. (ft) Elev (ft.) LR-18 40+68.50 1084.85 40+89.20 1084.40 41+08.33 1084.15 LR-19 42+71.88 1081.52 42+88.81 1081.15 43+07.51 1080.91 43+26.51 1080.60 LR-20 44+82.76 1078.08 44+98.15 1077.73 45+18.41 1077.47 LR-21 46+96.39 1074.59 47+10.98 1074.25 47+28.69 1074.02 LR-22 47+89.92 1073.06 48+02.77 1072.80 Log Step Structures - UTC R1 Structure # Station (ft) at Invert Elevation (ft) at Invert LS-1 12+84.23 1149.45 LS-2 15+39.48 1140.70 LS-3 16+47.64 1137.00 LS-4 18+19.09 1132.70 LS-5 18+71.75 1131.45 LS-6 19+80.89 1128.90 Woody Riffle Structures - UTC Reach 1 Structure # Point 1 Point 2 Bottom Width Length Slope Station Elevation Station Elevation WR-1 19+91.49 1128.76 20+07.61 1128.25 4.9 16.1 3.16% WR-2 21+34.00 1125.32 21+47.21 1124.85 4.9 13.2 3.56% WR-3 23+36.79 1120.09 23+54.79 1119.50 4.9 18.0 3.28% WR-4 24+37.78 1117.49 24+51.28 1117.05 4.9 13.5 3.26% WR-5 25+48.97 1114.62 25+62.68 1114.15 4.9 13.7 3.43% Woody Riffle Structures - UTC Reach 2 Structure # Point 1 Point 2 Bottom Width Length Slope Station Elevation Station Elevation WR-6 28+87.66 1107.59 29+02.20 1107.20 5.7 14.5 2.68% WR-7 31+50.28 1103.42 31+65.99 1102.90 5.7 15.7 3.31% WR-8 33+88.48 1099.39 34+04.12 1099.00 5.7 15.6 2.49% WR-9 36+12.68 1093.68 36+32.38 1093.05 5.7 19.7 3.20% Woody Riffle Structures - UTC Reach 3 Structure # Point 1 Point 2 Bottom Width Length Slope Station Elevation Station Elevation WR-10 39+30.00 1087.11 39+59.51 1086.45 4.9 29.5 2.24% WR-11 41+28.17 1083.87 41+45.57 1083.50 4.9 17.4 2.13% WR-12 44+02.77 1079.38 44+26.35 1078.90 4.9 23.6 2.04% WR-13 45+34.54 1077.23 45+52.22 1076.85 4.9 17.7 2.15% WR-14 48+59.85 1071.92 48+77.23 1071.55 4.9 17.4 2.13% Constructed Cascade Structures - UTC Reach 1 Structure # Point 1 Point 2 Bottom Width Length Slope Station Elevation Station Elevation CC-1 11+32.79 1154.75 11+50.46 1154.05 4.9 17.7 3.96% CC-2 11+60.42 1153.80 11+73.78 1153.25 4.9 13.4 4.12% CC-3 11+83.82 1153.00 11+98.15 1152.40 4.9 14.3 4.19% CC-4 12+08.23 1152.15 12+15.31 1151.85 4.9 7.1 4.24% CC-5 12+47.90 1150.79 12+57.54 1150.40 4.9 9.6 4.05% CC-6 12+67.35 1150.12 12+84.23 1149.45 4.9 16.9 3.97% CC-7 12+94.24 1149.19 13+14.94 1148.40 4.9 20.7 3.82% CC-8 13+25.03 1148.13 13+35.45 1147.75 4.9 10.4 3.65% CC-9 13+55.26 1147.09 13+62.10 1146.85 4.9 6.8 3.51% CC-10 13+72.11 1146.51 13+85.08 1146.05 4.9 13.0 3.55% CC-11 14+16.93 1144.97 14+27.77 1144.55 4.9 10.8 3.87% CC-12 14+37.80 1144.25 14+56.23 1143.55 4.9 18.4 3.80% CC-13 14+66.19 1143.27 14+79.15 1142.80 4.9 13.0 3.63% CC-14 15+11.44 1141.72 15+18.93 1141.40 4.9 7.5 4.27% CC-15 15+29.04 1141.11 15+39.48 1140.70 4.9 10.4 3.93% CC-16 15+49.53 1140.41 15+61.06 1140.00 4.9 11.5 3.56% CC-17 15+71.04 1139.67 15+95.28 1138.49 4.9 24.2 4.87% CC-18 16+05.30 1138.49 16+26.96 1137.70 4.9 21.7 3.65% CC-19 16+36.98 1137.40 16+47.64 1137.00 4.9 10.7 3.75% CC-20 16+57.62 1136.69 16+64.11 1136.45 4.9 6.5 3.70% Constructed Riffle Structures - UTC Reach 3 Structure # Point 1 Point 2 Bottom Width Length Slope Station Elevation Station Elevation CR-53 38+34.00 1088.68 38+64.57 1088.00 5.7 30.6 2.22% CR-54 38+84.00 1087.86 39+10.00 1087.30 5.7 26.0 2.15% CR-55 39+82.58 1086.25 40+05.28 1085.75 5.7 22.7 2.20% CR-56 40+25.00 1085.56 40+46.64 1085.10 5.7 21.6 2.13% CR-57 40+68.50 1084.85 40+89.20 1084.40 5.7 20.7 2.17% CR-58 41+62.04 1083.32 41+76.08 1083.00 5.7 14.0 2.28% CR-59 41+97.00 1082.75 42+11.00 1082.43 5.7 14.0 2.29% CR-60 42+29.23 1082.22 42+48.05 1081.80 5.7 18.8 2.23% CR-61 42+71.88 1081.52 42+88.81 1081.15 5.7 16.9 2.19% CR-62 43+46.57 1080.30 43+79.24 1079.60 5.7 32.7 2.14% CR-63 44+44.94 1078.70 44+58.84 1078.40 5.7 13.9 2.16% CR-64 44+82.76 1078.08 44+98.15 1077.73 5.7 15.4 2.27% CR-65 45+68.22 1076.68 45+80.32 1076.42 5.7 12.1 2.15% CR-66 46+01.00 1076.15 46+22.00 1075.70 5.7 21.0 2.14% CR-67 46+44.54 1075.43 46+69.92 1074.90 5.7 25.4 2.09% CR-68 46+96.39 1074.59 47+10.98 1074.25 5.7 14.6 2.33% CR-69 47+45.64 1073.78 47+69.55 1073.30 5.7 23.9 2.01% CR-70 47+89.92 1073.06 48+02.77 1072.80 5.7 12.9 2.02% CR-71 48+20.43 1072.56 48+39.16 1072.15 5.7 18.7 2.19% CR-72 48+96.54 1071.32 49+28.61 1070.65 5.7 32.1 2.09% CR-73 49+46.85 1070.50 49+68.41 1070.02 5.7 21.6 2.23% CR-74 49+89.40 1069.80 49+95.56 1069.70 5.7 6.2 1.62% CR-75 50+81.41 1067.73 50+91.33 1067.55 5.7 9.9 1.81% CR-76 51+16.62 1067.26 51+39.89 1066.83 5.7 23.3 1.85% CR-77 51+65.97 1066.60 51+96.17 1066.03 5.7 30.2 1.89% CR-78 52+15.80 1065.93 52+29.46 1065.75 5.7 13.7 1.32% TABLES REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING $c RESTO RATI O N 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION STRUCTURE TABLES (PROJECT # 116 SHEET NO. 3B z 9 S w d a_ d z z d i U 0 a 0 0 z U co 0 D NIT Ow NQ tol roL Toe -Wood With Geolift - UTC Reach 1 Structure # Toe Wood Dimensions Begin Station (ft) End Station (ft) STA Length (ft) Bank Length (ft) Width (ft) Toe Wood Depth (ft) TW-1 10+00.00 10+20.54 20.5 22.5 4.0 2.0 TW-2 10+42.42 10+55.27 12.8 16.4 4.0 2.0 TW-3 10+80.09 10+88.68 8.6 8.7 4.0 2.0 TW-4 10+92.82 11+01.14 8.3 10.2 4.0 2.0 TW-5 11+07.17 11+15.81 8.6 8.7 4.0 2.0 TW-6 11+20.33 11+33.03 12.7 12.7 4.0 2.0 TW-7 11+96.16 12+10.80 14.6 17.3 4.0 2.0 TW-8 12+13.18 12+28.20 15.0 14.5 4.0 2.0 TW-9 12+25.22 12+38.71 13.5 15.3 4.0 2.0 TW-10 12+36.27 12+48.53 12.3 12.2 4.0 2.0 TW-11 12+55.23 12+68.85 13.6 16.3 4.0 2.0 TW-12 13+12.94 13+28.25 15.3 18.5 4.0 2.0 TW-13 13+33.42 13+47.49 14.1 14.1 4.0 2.0 TW-14 13+44.91 13+55.70 10.8 11.3 4.0 2.0 TW-15 13+56.54 13+74.50 18.0 22.8 4.0 2.0 TW-16 13+82.97 13+92.38 9.4 9.5 4.0 2.0 TW-17 13+94.37 14+04.34 10.0 7.8 4.0 2.0 TW-18 14+06.19 14+17.07 10.9 11.2 4.0 2.0 TW-19 14+53.92 14+64.41 10.5 13.2 4.0 2.0 TW-20 14+76.97 14+92.13 15.2 15.2 4.0 2.0 TW-21 14+89.38 15+12.27 22.9 25.1 4.0 2.0 TW-22 15+00.81 15+13.56 12.8 10.5 4.0 2.0 TW-23 15+89.00 16+09.70 20.7 24.6 4.0 2.0 TW-24 16+85.88 16+97.37 11.5 11.6 4.0 2.0 TW-25 17+00.48 17+12.53 12.1 12.1 4.0 2.0 TW-26 17+21.81 17+36.10 14.3 16.7 4.0 2.0 TW-27 18+35.88 18+49.96 14.1 16.3 4.0 2.0 TW-28 18+89.52 19+00.25 10.7 9.2 4.0 2.0 TW-29 18+93.33 19+24.27 30.9 31.5 4.0 2.0 TW-30 19+21.94 19+64.40 42.5 45.2 4.0 2.0 TW-31 19+36.29 19+46.70 10.4 10.8 4.0 2.0 TW-32 20+23.82 20+38.65 14.8 17.5 4.0 2.0 TW-33 20+55.21 20+72.96 17.8 17.9 4.0 2.0 TW-34 20+80.38 21+01.88 21.5 26.0 4.0 2.0 TW-35 21+64.00 21+87.75 23.8 26.0 4.0 2.0 TW-36 22+23.16 22+37.29 14.1 14.0 4.0 2.0 TW-37 22+34.95 22+48.53 13.6 13.5 4.0 2.0 TW-38 22+45.69 22+55.64 9.9 10.0 4.0 2.0 TW-39 22+69.47 22+83.75 14.3 16.7 4.0 2.0 TW-40 23+03.90 23+14.72 10.8 11.3 4.0 2.0 TW-41 00+00.00 23+33.47 11.2 8.4 4.0 2.0 TW-42 23+24.76 23+35.23 10.5 13.1 4.0 2.0 TW-43 23+79.43 23+97.41 18.0 21.3 4.0 2.0 TW-44 25+29.01 25+49.85 20.8 19.7 4.0 2.0 TW-45 25+85.33 26+02.68 17.3 20.1 4.0 2.0 Toe -Wood With Geolift - UTC Reach 2 Structure # Toe Wood Dimensions Begin Station (ft) End Station (ft) STA Length (ft) Bank Length (ft) Width (ft) Toe Wood Depth (ft) TW-46 27+18.55 27+50.88 32.3 37.2 0.0 2.1 TW-47 28+04.52 28+20.93 16.4 19.7 0.0 2.1 TW-48 28+33.91 28+53.27 19.4 19.4 0.0 2.1 TW-49 28+50.28 28+64.54 14.3 14.3 0.0 2.1 TW-50 28+63.61 28+86.24 22.6 27.7 0.0 2.1 TW-51 29+21.03 29+61.86 40.8 44.7 0.0 2.1 TW-52 29+58.31 29+67.38 9.1 9.0 0.0 2.1 TW-53 29+71.15 29+85.96 14.8 12.8 0.0 2.1 TW-54 29+74.10 29+85.83 11.7 12.9 0.0 2.1 TW-55 30+00.51 30+26.20 25.7 30.5 0.0 2.1 TW-56 30+62.77 30+73.92 11.2 11.4 0.0 2.1 TW-57 30+81.14 30+90.05 8.9 8.5 0.0 2.1 TW-58 30+83.35 31+09.58 26.2 29.3 0.0 2.1 TW-59 31+28.51 31+48.40 19.9 24.2 0.0 2.1 TW-60 32+47.90 32+58.09 10.2 10.2 0.0 2.1 TW-61 32+61.88 32+73.36 11.5 11.6 0.0 2.1 TW-62 32+82.59 32+98.43 15.8 18.8 0.0 2.1 TW-63 33+08.08 33+19.37 11.3 11.6 0.0 2.1 TW-64 33+30.99 33+49.53 18.5 23.3 0.0 2.1 TW-65 33+66.31 33+86.13 19.8 23.4 0.0 2.1 TW-66 35+12.94 35+31.73 18.8 17.7 0.0 2.1 TW-67 35+26.55 35+42.13 15.6 15.6 0.0 2.1 TW-68 35+51.17 35+73.72 22.5 26.7 0.0 2.1 TW-69 35+91.08 36+11.27 20.2 26.1 0.0 2.1 TW-70 36+46.91 36+64.64 17.7 18.5 0.0 2.1 TW-71 36+59.76 36+96.84 37.1 40.0 0.0 2.1 TW-72 37+19.89 37+34.59 14.7 17.6 0.0 2.1 Toe -Wood With Geolift - UTC Reach 3 Structure # Toe Wood Dimensions Begin Station (ft) End Station (ft) STA Length (ft) Bank Length (ft) Width (ft) Toe Wood Depth (ft) TW-73 38+12.51 38+36.54 24.0 25.2 0.0 2.1 TW-74 38+12.20 38+35.82 23.6 24.7 0.0 2.1 TW-75 38+62.76 38+82.24 19.5 22.1 0.0 2.1 TW-76 39+62.45 39+81.99 19.5 22.1 0.0 2.1 TW-77 40+01.68 40+18.23 16.6 19.2 0.0 2.1 TW-78 40+27.79 40+58.24 30.4 34.3 0.0 2.1 TW-79 40+85.63 41+09.69 24.1 24.1 0.0 2.1 TW-80 41+05.68 41+17.32 11.6 10.9 0.0 2.1 TW-81 42+42.96 42+72.11 29.1 34.2 0.0 2.1 TW-82 42+85.98 43+09.25 23.3 23.3 0.0 2.1 TW-83 43+04.16 43+46.60 42.4 46.0 0.0 2.1 TW-84 43+23.57 43+34.29 10.7 9.0 0.0 2.1 TW-85 44+95.23 45+20.03 24.8 24.8 0.0 2.1 TW-86 45+15.33 45+25.73 10.4 9.4 0.0 2.1 TW-87 46+23.48 46+49.27 25.8 29.4 0.0 2.1 TW-88 47+08.33 47+36.96 28.6 32.5 0.0 2.1 TW-89 47+26.00 47+38.07 12.1 8.9 0.0 2.1 TW-90 47+71.75 47+86.20 14.4 16.8 0.0 2.1 TW-91 47+99.26 48+13.74 14.5 11.3 0.0 2.1 TW-92 48+36.94 48+52.77 15.8 20.9 0.0 2.1 TW-93 48+77.71 48+96.68 19.0 23.1 0.0 2.1 TW-94 49+26.86 49+95.73 68.9 82.0 0.0 2.1 TW-95 50+89.44 51+07.92 18.5 22.4 0.0 2.1 TW-96 51+66.76 52+06.38 39.6 47.2 0.0 2.1 Constructed Riffle Structures - UTC Reach 1 Structure # Point 1 Point 2 Bottom Width Length Slope Station Elevation Station Elevation CR-1 10+18.98 1158.04 10+45.33 1157.25 4.9 26.3 3.00% CR-2 10+61.64 1157.00 10+82.00 1156.35 4.9 20.4 3.19% CR-3 16+77.68 1136.15 16+87.74 1135.80 4.9 10.1 3.48% CR-4 17+14.42 1135.29 17+24.66 1134.92 4.9 10.2 3.61% CR-5 17+43.56 1134.60 17+57.15 1134.17 4.9 13.6 3.16% CR-6 17+74.99 1133.86 17+89.82 1133.40 4.9 14.8 3.10% CR-7 18+05.61 1133.14 18+19.09 1132.70 4.9 13.5 3.26% CR-8 18+29.81 1132.57 18+38.89 1132.28 4.9 9.1 3.19% CR-9 18+56.83 1131.93 18+71.75 1131.45 4.9 14.9 3.22% CR-10 18+84.39 1131.28 18+92.51 1131.02 4.9 8.1 3.20% CR-11 19+46.13 1129.83 19+69.55 1129.27 4.9 23.4 2.39% CR-12 19+69.55 1129.27 19+80.89 1128.90 0.0 11.3 3.26% CR-13 20+16.87 1128.16 20+28.05 1127.80 4.9 11.2 3.22% CR-14 20+45.24 1127.49 20+56.87 1127.12 4.9 11.6 3.18% CR-15 20+73.15 1126.83 20+83.02 1126.51 4.9 9.9 3.24% CR-16 21+00.00 1126.20 21+17.40 1125.60 4.9 17.4 3.45% CR-17 21+57.23 1124.72 21+69.80 1124.27 4.9 12.6 3.58% CR-18 21+87.68 1123.94 22+01.58 1123.45 4.9 13.9 3.53% CR-19 22+59.39 1122.09 22+72.59 1121.65 4.9 13.2 3.33% CR-20 22+89.15 1121.32 23+05.51 1120.75 4.9 16.4 3.48% CR-21 23+68.37 1119.28 23+83.77 1118.80 4.9 15.4 3.12% CR-22 24+00.01 1118.46 24+19.98 1117.80 4.9 20.0 3.30% CR-23 24+61.47 1116.88 24+79.79 1116.30 4.9 18.3 3.17% CR-24 24+95.10 1116.01 25+07.94 1115.60 4.9 12.8 3.19% CR-25 25+23.37 1115.28 25+33.03 1114.95 4.9 9.7 3.42% CR-26 25+74.47 1113.96 25+91.03 1113.40 4.9 16.6 3.38% CR-27 26+09.29 1113.06 26+22.19 1112.60 4.9 12.9 3.57% CR-28 26+36.35 1112.37 26+45.15 1112.10 4.9 8.8 3.07% Constructed Riffle Structures - UTC Reach 2 Structure # Point 1 Point 2 Bottom Width Length Slope Station Elevation Station Elevation CR-29 27+18.00 1110.36 27+25.43 1110.13 5.7 7.4 3.10% CR-30 27+43.19 1109.95 27+55.22 1109.60 5.7 12.0 2.91% CR-31 27+70.58 1109.50 27+80.87 1109.20 5.7 10.3 2.92% CR-32 27+96.71 1109.08 28+08.77 1108.75 5.7 12.1 2.74% CR-33 28+22.58 1108.65 28+36.31 1108.30 5.7 13.7 2.55% CR-34 28+62.91 1107.99 28+71.10 1107.75 5.7 8.2 2.93% CR-35 29+13.12 1107.17 29+27.15 1106.80 5.7 14.0 2.64% CR-36 29+86.59 1105.97 30+08.31 1105.40 5.7 21.7 2.62% CR-37 30+28.01 1105.29 30+41.77 1104.90 5.7 13.8 2.83% CR-38 31+14.61 1103.87 31+30.61 1103.42 5.7 16.0 2.81% CR-39 31+80.96 1102.79 31+97.73 1102.35 5.7 16.8 2.62% CR-40 32+13.64 1102.25 32+29.54 1101.80 5.7 15.9 2.83% CR-41 32+73.69 1101.27 32+85.28 1100.95 5.7 11.6 2.76% CR-42 33+00.05 1100.84 33+10.17 1100.55 5.7 10.1 2.87% CR-43 33+21.15 1100.50 33+34.12 1100.15 5.7 13.0 2.70% CR-44 33+49.99 1100.02 33+71.53 1099.45 5.7 21.5 2.65% CR-45 34+17.61 1098.92 34+37.25 1098.45 5.7 19.6 2.39% CR-46 34+53.17 1098.15 34+67.48 1097.60 5.7 14.3 3.84% CR-47 34+85.66 1097.24 35+00.00 1096.75 5.7 14.3 3.42% CR-48 35+43.45 1095.62 35+59.00 1095.00 5.7 15.6 3.99% CR-49 35+76.70 1094.69 35+94.38 1094.00 5.7 17.7 3.90% CR-50 36+73.25 1091.99 36+86.23 1091.45 5.7 13.0 4.16% CR-51 37+04.35 1091.12 37+21.84 1090.55 5.7 17.5 3.26% CR-52 37+33.74 1090.30 37+42.22 1090.00 5.7 8.5 3.54% TABLES REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING $c RESTO RATI O N 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION VEGETATION SELECTION (PROJECT # 116 SHEET NO. 3C z 0 0 9 0_ Lo z z d 0 u ll 0 a 0 z z 0 co 0 D NF Ow NQ tol roL Trees and Shrubs The following table lists bare -root vegetation selection for the project site. Trees and shrubs shall be planted to a total density of 680 stems per acre. Total planting area is approximately 5.0 acres. Exact placement of species will be determined prior to site planting. Common Name Scientific Name Percent Planted by Species Wetness Tolerance Trees (75%) Planted 8' X 8' Spacing — 544 Trees/ Acre River Birch Betula nigra 15% FACW Sycamore Platanus occidentalis 15% FACW Willow Oak Quercus phellos 15% FAC American Elm Ulmus americana 10% FACW Persimmon Diospryos virginiana 10% FAC Tulip Poplar Liriodendron tulipifera 15% FACU Tree Total 80% Shrubs (25%) Planted 8' X 8' Spacing -136 Shrubs/ Acre Tag Alder Alnus serrulata 5% OBL Spicebush Lindera benzoin 3% FAC Redbud Cercis canadensis 3% FACU Elderberry Sambucus canadensis 5% FAC Silky Dogwood Corpus amomum 5% FACW Shrub Total 20% Live Stakes Live staking will be applied to all restored streambanks and in other areas as shown on the plan set in accordance with the details in the plan set and the construction specifications. Common Name Scientific Name Percentage of Total Wetness Tolerance Elderberry Sambucus canadensis 10% FACW Silky Dogwood Corpus amonum 40% FACW Silky Willow Salix sericea 30% OBL Black Willow Salix nigra 20% OBL Total 100% Temporary Seed The following table lists temporary seed mix for the project site. All disturbed areas will be stabilized using mulch and temporary seed. Common Name Scientific Name Rate Dates Cereal Rye Grain Secale cereale 130 LBS/ACRE September to March Browntop Millet Urochloa ramosa 40 LBS/ACRE April to August Permanent Riparian Seed Permanent seed mixtures for the project site shall be planted throughout the floodplain and riparian buffer areas. Permanent seed mixtures shall be applied with temporary seed, as defined in the construction specifications. Common Name Scientific Name Percent of Mixture Seeding Density (Ibs/acre) Wetness Tolerance Floodplain Buffer Areas Virginia Wildrye Elymus virginicus 20% 3.00 FACW Autumn bentgrass Agrostis perennans 15% 2.25 FACW Switchgrass Panicum virgatum 15% 2.25 FAC Black -Eyed Susan Rdubeckia hirta 10% 1.50 FACU Lance -Leaved Tick Seed Coreopsis lanceolata 10% 1.50 FACU Big Blue Stem Andropogon gerardii 10% 1.50 FAC Eastern Gamma Grass Tripsacum dactyloides 5% 0.75 FACW Little Blue Stem Schizachyrium scoparium 5% 0.75 FACU Soft Rush Juncus effusus 5% 0.75 FACW Yellow Indian Grass Sorghastrum nutans 5% 0.75 FACU Total 100% Permanent Non -Riparian Seed The following table lists permanent seed mix for disturbed areas outside of the riparian zone. This includes any vegetated access paths, haul roads, and/or staging/stockpile areas. Common Name Scientific Name Rate Dates Kentucky Bluegrass Poa pratensis 44 LBS/ACRE September to March Tall Fescue Schedonorus arundinaceus 218 LBS/ACRE September to March TABLES REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/2 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING Be RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 1 9 0_ 1 1n 6) 10 19 z d In z _d a 0 Y U a 0 0 z_ U c❑ I CC NIT Ow COLe COL i511'I4##1482 ) NM ELEV: 11 8�. NV OUT: 1165. ' 1''24':@Gf,,. I I " / I / I I 1,. I1 PP 1 I BEGIN CONSTRUCTION REACH 1 STA. 10+00.00 J i / l arc PP 24" CI, "YNV IN: UNKNOWN INV ,U5838' I PIN.597617016538 SMH--(#'i482,9� „RIM ELEV. 1168.3' (8" VCE1.. INV OUT: 1158.914' VC$) . 66I89� 0271 PIN: 597617015559 � / 1160-- x-az u�FX Nc'E - 1159 PIN: 597617014641 09 X I X IER_14,41:77 E 5 i I 0 PIN: 597617014625 / 1159 i / — — 6911 — — - 1156� i i PROJECT # 116 (SHEET NO) 4 PLAN PROFILE - 1154 — - 1153 n z • SMH (#14832) ___ 20 10 0 20 40 INV VCP) OUT: 1148.1(8" VCP) hnrIrth SCALE (FT) 1,160 1,150 1,140 U N EXISTING GHJUV J U ,, r n , . IQ Q. s / su n L LJ '_��i'i"�3-.Vi `❑G 1-0 T Jl II J ■ +, N �7• M f V �Q - 1� f 1 W 1 ICJ II + O M ": • N W IA m r h --- l(F•4�44ly' ami j ° _ i " w p ■� fJ - _ m no DEIGN BAN CFU_L -• ��`�•--.. / d `- _ II I� 11 - ? _ �+>�I�, 7 N LY y T^ �. /L� m!U Cmmima. - A CI•C„ F: '• _ r (9 e0 .. —�_ — _ :� J M, N / + pip ,1.r® .$ceY u! w — ti .. - i_ _ _F. 4 ...............r] 1 y o a N rn :yQ j nu ,I J N u'v l C 4!s O- M• - 41-4 1 Ii r \-E.• P . I`tON `r + Y -a, ,G T . � IIi '''' ,,......7.--- � tffi n ii L W 1 L i . rJ r W` J _ C _ Nr C . d j N S. —,_ — DANK UL- SLOP a W 1 la I N_ O J s^ „�'���. .[ ri= I=CT1G�'� mC1VT r O. 09 b �� I ❑ W i 11 j 11 lt„L d � L■ a 1 I. I w N4. aC o A C/ �'� t AGES CNPTHA_W-C: 1 i' QT� I co r •_ + `g e v 4 m i e I i 'H t ID .1 -2 , r C � , 4L r J 0 L M rn a , "q Try I10 . 7 '1 ,111 I f a p + - 4. + _. �� =� a ' u� 1 n o -w 10+00 0s SI NO. 1 REVISIONS DESCRIPTION ISSUED FOR BID ENGR. JB APPROV. KT 8 DATE /30/22 f PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / f UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION O 0 9 In o_ 0 u07 05 0_ 0) z 0 0 a U W tt UI z a 0 u �I co 0- NIT Ow 00 0000 / No �- — 1153 \ \ \ \ \ \ 1155 iV 96t886.—e E. 1570289.90' ELEV: 1152.40' REMOVE AND DIS ElOSE OF DEBRIS OFF SITE — 1159 -- 11 8 — 1159 — --P1�,9761'V15' 8 / -1154— - -1153� - 1152� PIN: 597617012708 — / ® /1148_— _ 1149E\ \ / _ .mac _; .114• ' ,,...______:*„._________________________..._::__::_c___,,,.._,45 e,„ram �. ah\`i SLOPE BANKS AT 3: 1 . SEED, MULCH, MAT & LIVESTAKE BANKS. STABILIZE BED USING CONSTRUCTED RIFFLE MATERIAL. J : 1'.376.3' (8 3630' :ll36Dr 1847 I ll9bll 'Rink EtEb:-1�' �.c_�-S� l l INV IN: 1134.0' (8" VCP) INV OUT: 1133.3' (8" VCP) INSTALL 48" CMP INVERT IN: 1 136.71' INVERT OUT: 1 136.55' PIN: 596620919602 _�— _55- � A�-- — I PIN: 596620918622 17gg \ 114 8 143 i I • PROJECT # 116 (SHEET NO) 5 PLAN/ PROFILE Il4 20 10 0 hnr — - 1140 — INV IN: UNKNOWN INV OUT•11342 20 40 SCALE (FT) 1,150 1,140 1.130 1,120 NO. it r Z m cn m co m m 14+00 REVISIONS DESCRIPTION ISSUED FOR BID ENGR. JB APPROV. KT DATE 8 /30/22 15+00 f PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 10 16+00 / f 17+00 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / 18+00 PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 JA i 19+00 w M w 1 d WORM n lil PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 12 +15 S V) ❑I 12 0 12 O N z 0 0 a 0 tt UI z 12 0 0 z ❑I 10 0 CC NIT Nu m 101▪ e row¢ PIN: 596620917633 / /i3.0P otiN IN Iry 41" In / — 138/ X 111--cam-t / H /X / / �r L4"I / \ / / �--_� --..l II ' \ 6 �� � II:4/__.r: \ N —� \ Q \ \I\ PIN:596620916644 1144 - 1143 CON Ot-PO►NT N:.B 1862.93' PIN: 596620915665 /IIIIII� -1138 / IIIIIi —'i )// �I III`' - -IPA( OUT. l lzzo' (a"bs2..) 6E/i i 1138---_ PIN: 597617021118502 / -1132 // / - 112 a)\`� `-'1111� II�I \ '" \ \ N ' 59 \ \ 662097. 6 OL P I13 #303 IV: 1916.91' _ S RIMINELEV1 - INV IN 11242 (8" VCP V OUT 1124.0' (8" VCP) PROJECT # 116 (SHEET NO) 6 PLAN PROFILE L J 126—' >-- W N�. W -�, /— W �� `yam\_-`_- U \ 1128 i \ // \ \ ml \ V v z N N 20 10 0 20 40 hnrnscALE (FT) —J 1,130 1,120 1.110 NO. 19+00 1 REVISIONS DESCRIPTION ISSUED FOR BID ENGR. JB APPROV. KT DATE 8 /30/22 20+00 f d I) ro u 1_ JO N +id 11 J JII 0 II li PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 N 0 21+00 / f N 1 Kf- 1 J 8J LL 0 a 11 w N 1 o n a li f ; • ,_r II 7 22+00 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / 23+00 PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 es ro ro UJ o) 24+00 ti ae 1- l') { PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 N 9 U) 1 2) 2) N z Lo z J 2 ❑ a U U z a 0 z z U 00 O 7 2) NF NU Or, m do 000e mom¢ 91269 PIN:596620911753 C �� PINi5966 9917770 / \ \ __I y / / \ =_ \ sz z s2<< ` N, ��14847)\ Rr ELE7"93314' /_ 'INV • . Y`f23.5' PIN: 596620911 42 \\ ssi0 RIM E I�IV IN: INV IN: INV OUT: ONTROL.P-0 N: 9.62020.07' --E. 1569215.85' ELEV: 1125.10' 1 t\ PP #3D2 PIN: 596620924324501 PIN: 596620.81451 PIN_5969520819805 G gECO DER WALL. -p (;)Ni l II I. ER PRIOR-TBBT�kL- N�C� 8`LINE WITF-1�C,`L''ASS i 'ST\ L'� 850)\ N (8" VCP) A '7) \ \ \a \ \ --------2, Lle 9LLL � ENI°CQNSTRUCTION \ — — REACH \ e \� \P, GIN CONSTI-U.QTION \ — \ \ \ REAM - >779 `� \ \ STA.27+03.�S \ �� \ \ \ \ \ CONTROL P lNT#301 P/N a \ N'-9621.89.74' — Lz, E. 156901762' ELE 1-1_1_9.58' • —ZZLL PROJECT # 116 (SHEET NO) 7 PLAN PROFILE 20 10 0 20 40 hnrnSCALE (FT)—J to 24+00 a A w O) u N J 0 2- 01 REVISIONS DESCRIPTION ISSUED FOR BID -4 r 11 ENGR. JB L N IL LL (1 W (0 LU • KT 2- 05 L6 S 1 DATE 8/30/22 O 25+00 U UFO a A a M W O N 5 9 II 26+00 KI- CO N (S Ua 1 4,0 J U1 2 L N 5 v IJ W LL N ORO ND II JU Cr Cu 00 40 V J 1 2 n a V u GN r3 7 CY n 0. fi U OJ e u A ELT. L;L SI PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 0 0 t_ IS T �s s 4 • LSE 27+00 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC CD ea CO I_ LIU • 28+00 11 0_ LLI PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 tNI OD- ro co ry CO LL 29+00 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 11 9 0 1I 0 (D 7 6) Lo Q 0_ z _ 1) ll UI 0 a 0 0 z (1 (o O 7 0' NF NU Ow N 0 m 00 0000 1 E#22 z1z5) PIN: 596620824084 INV`N: 1117.0' (8" VCP) INV UT: 1116.9' (8" VCP) DER WALL. — — 1116 — CONTROL POIN 300 N. 962180;54� 1 V. 1114 66' —1 6LE — N • DEBT N IN:59 CONTROL POINL#301 662 g2�97 \ \ \ \ \ �g9.74 \ \ -""ELE- Wig_ \ --zz<<_ PINS 6 � � 2b8�27-qy2 1 1 CONTROL POINT #501 962344 69 E. 15686,31339. ELEV. PIN: 59661 E - 1110 — P # (PROJECT 116 (SHEET NO) 8 PLAN 7 PROFILE 1 7,10g Van N:596620827412 �g�•" 08264 i ENSUR EXl . \ j i� / 1 CHANNEL WALE 2inrni� L—J0 SCALE (FT) as u O LJ M 14 N 9 W 1- r �1 br G0 0- J 6P1 J ILO w cJ 1n n u W V 00. Xi 6 01 _ J W GO v u P1 ti • (�R N rt 1 0 NI7 0. V O €`U Y1 rt w A RtNKRLLL 1J LJ CL tl 0 1- 1 r a LL �a t>< V r• ll W ,f lV i 0, 0, n RJ r r- 41 w N ti ry ri p0 1- 10 N 90 e ro a ro N N n M_ r 0-41 N. 69 2 .19 Zi 29+00 30+00 31+00 32+00 33+00 34+00 REVISIONS DESCRIPTION ISSUED FOR BID ENGR. JB KT 1 DATE 8/30/22 PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING 8c RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION z 9 a_ 4) 0) N Q 10 J d a u U z a 0 z z 1) 10 O 7 4- NF NU Ow do 81e roo'¢ PIN:59661ac21666 )00 1103 — �n LL - - - sa PIN^5.6 082644'7 - ENSURR EXI T / / // ///�II� CHANNEL a,. 'OSI I WALE AGE. AGE- / / / b0ll—� SOII•— / — 00 ✓ / PI . 46-825459-- 7- — 793 1104' / , \\\ E.'2r ELEV:V: 1100.59' PIN: 596 1-68\24625 END CONSTRUCTION REACH 2 BEGIN CONSTRUCTION REACH 3 STA. 37+53.30 nnw' II1(ELEV: 1104.3' N: 1097.71 (8" PVC) OUT: 1097.6' (8" PVC) \\' ..(100 PROJECT # 116 (SHEET NO) 9 PLAN / PROFILE -- =81�. GE POOL —& €-VVETr-�Z-1 STONE r W w , � N ELEV: 109$8' \ \ I l 1 IN: 1095.5'($W ) 1h97 3' wvo�,T: 10 777,\ 20 10 0 20 40 hnrnscALE (FT) —J 1,100 1,090 1.080 MMMMM NNENIIIINNEN NNENIENNENN MMMM ■■10 ■NG MERLE NMI EN NEON NENE ■■ NENE■■ M■■■L■ MENEM ooE■■ J CO- 34+00 7 A REVISIONS DESCRIPTION ISSUED FOR BID ( U n IN. w Co Q II J kIVh:F FL EC ENGR. JB (4 -0 ri 00 (3 IA ro L SLCJPC 0 N JOIN KT 1 DATE 8/30/22 V a ur V 00 18 L 10 35+00 0 dna OD O OJ U — DE_C CP1 T. + 0- 01 4- TI IA 36+00 LW • a� 0 O 10 10 27 LL cid 1.9 PIN M w 17,1 a n 01 JL d rn w a J `� PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 V• a. 11 1 co M li A ♦j 0 fT EI J ■J cn J JII 4 W 1 VI M1 UJ M CI 1ST N 00 111 37+00 BA IvA UT TO CHINQUAPIN CREEK SURRY COUNTY, NC 00 38+00 • art .00 0,1 PREPARED IN THE OFFICE OF ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 gam 0 00 z 39+00 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION (7 O 0) 40 0) In 15 Z IL z IL a u ll UI a 0 0 z z U 0) O 7 f1 NIT NU Ow m do 0)1e m6'¢ ffz 1y; U + GE POO • 1 STOE\� /. 59661682166 \ /%///_ \\\— �/ / / ......' 1-,Qo-/--.... , ���k� 1 � 'O040 — • oti vffr 0- r 0 1096 — // 3 _ T 00 M LL t t 1 61 W 1998 — 1097� • i / t teat t _ ✓/e� �e�t6c I . t t t * * t * t * * t * t SIE-E-XLSTI,NG SWALE TO CHANNEU MATCH EXISTING DININSIC,N. l# gpeNStRUCTED RIFFLES TO S�'iAWIL.IZEtBFt.��}}°°t"�GliAQE4 MAT, AND LIVESTAKE BAN *S * S DIRE*TED BY ENGINEER. N L1 DO tit 1L O. F. at 61 M LJ • 4 ri 0) itl O aJ IPi IA O LL1 0) 0- ce c 1f 6 M uJ U a Ill A N v i P/:596616g2D854 096 5 - — 1p9 93 //1097' �- 709 89 // 00 ta / I A 1 m ri 00 IL (J C� V^ 0 MA rF ro r1 I'1!I,If I;1',I,pgi,p, uR P/N: 5966j 1 \\\\ . t *' \,� / %�"_ * _* (a ant * _*_ j_*.* j,I \I -RTC "KEE" p 0CON INT #602 INV IN: 0.8(8"PVC) INV OUT: 10.80.7 fa" PVC) -' - ,'GKO'L1IGDLQBR5IN&FES• _._.. _.: _.._ r. �Ir i QI VI P P 0 I -) E ro II 1 U P) M (o TH A cad- W • LWE 1 CO n Ld N. 963139.26' .i i E: 1568192.72' ELEV: 1087.63' P/N. . 0966j6g3216 h I-3 4- Cr 1 N b. N 1 u c LL I 7 3 51 6J 8 d NJ� (1J n 42 ro 1 (V -b� 81 N b N n L w m rn I 0 C u- c 9- 40 h D b; 11-0 (PROJECT #) 16 (SHEET NO) 0 PROFILE Lie SCALE (FT) 121 CA- 39+00 40+00 41+00 42+00 43+00 44+00 REVISIONS DESCRIPTION ISSUED FOR BID ENGR. JB KT 1 DATE 8/30/22 PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 UT TO CHINQUAPIN CREEK SURRY COUNTY, NC PREPARED IN THE OFFICE OF ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION fro S U) ❑I 0) 0) N Q 0_ z _ a U U z a 0 O z U 0) O 7 0' NIL) NU Ow m 0 c 0)1a roo'¢ J:596616738095 - 92- - 10 — 109 -10 — / 66 / — /— / / J,N 6616738100 //,p6y // 1�1111VIII11R�d111 �1'CI�Jj���»`�� --et) ROL POINT #603 PIN: 596616831660 RBC "KEE" GROUND COORDINATES N: 963354.44' E: 1568083.79' LEV: 1084.66' / _--1084— 7 RI LIVES C—� \ i ANNEL. MA H AS DI CTED BY ENGTI PIN/9661673'�168 / TIJIEXISTID�G SWE TO 0I BANKS/ ISTINGpIMEN ONS. 4SE CONSTRUC1ED LES T STABI,LIZE B D. GRADE, MAT, ,L BE RIM ELEV: 1082.2' \ INV IN: 107 8 N PVC) \ IN: 1074.7' 4.7' (8" PVC) — 4; PIN: 596616830658 ✓ I I II l 1079 _� II II Ioli \I 595 MAG NAIL _-.-..-.._.._,_.._ GROUND COORDINATES N: 953583.09' E: 1568034.80' ELEV: 1086.81' PROJECT # 116 (SHEET NO. ) 1 FLAN/ PROFILE 20 10 0 20 40 hnrni�1 SCALE (FT) 7-10 1 44+00 s Q J ••ft NI- t- '5- 1 0 V J W REVISIONS DESCRIPTION ISSUED FOR BID co ENGR. JB 0) V Ii D m m v KT 11 5 O 1 DATE 8/30/22 M O v T 4 ti J 45+00 w r9 01 VI es a 19 w c In 46+00 ri v t` 8 1R 0 a 1 Si RAN V Q A 4- J 9: a XIOT1 1•) M P% V .PD r • 91 91 J 9J 0 0- w L 0.1 b RI n 0- N 18 .n • LJ LID PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 0) u 11 Fy J e La ESI t` rn 1 5- V 90 1J GN Cr) 0) kL J 0- e W 47+00 90 90 r- 5) M 0- UT TO CHINQUAPIN CREEK SURRY COUNTY, NC C N G h ti P.D 1 Ou- 48+00 -/ 015 PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING 8c 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 on LO CO 49+00 co Ll 11. PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION z 10 S 00 0_I 0) 10 / z z J 0 0 0 a 0 / a U z 0 a 0 z z u �I co 0 CC NIT Ow N�0 m 0)1e row¢ '33714 H o 1^ DI — 1080 PIN: 596615733714 CONSTRUC-T-F'LLING� PeQl_ `LINE WITH CLASS 1 STOACE= `070 — 70''8 \, 70� / 702 N.ELE - ' _ / iisfy OUT: 1070.0 8 PVC) CONSTRUCT STACKED BOULDER WALL. NUMBER OF ROWS WILL VARY. CONSULT WITH ENGINEER PRIOR TO BUILDING. i1 WER 0613'i'�PUMP ATIO STy _� IN ' 1� — —vJ-\ R LEV. 1077.5' \ y 1 INV 1062.1 (8" PVC) INV IN. ;.2.1 (8" PVC) 11 PUT: 2.0' (8" PVC) \ ,1s�\111 // _)III, 1075 08g 1 ,cck 5 _ 1074 - \� _ I 066 ,/ %III ELEV. 1070.9' IN- 1065.3' (8" — .0UFt.:0(Z7278" PVC) 5966167388,47 1 LVo' RIAA IEL V:1076.8' IN' I : 1064.6' (8" PVC) I� UT: 1064.5' (8" PVC) EV: 1077.3' 64.6' (8" PVC) 22' (8" PVC) END CONSTRUCTION STA. 52+29.46 DO NOT DISTURB FROM STA. 52+29.46 - 58+47.52 J \ NJ/ \+�/i``', / \ 107j r i0 If \ \ 1\\\li;il 11�c.A�I 20 10 0 20 40 PROJECT # 116 (SHEET NO. 12 PLAN PROFILE hnrric�� �S—J \ EKIS*INC G .0LND W 7� ,I J j i 1- J i O 2, go�W J rl`i U Imo- M 9 (I.D �.. \♦ Iz' —_E D-SIC-N PRCF_LE IN EXI=-INC PECFILE _% ' ^ �. _. ` _•F+.. •.. `1 W / ] W 1 Ij I - 11 G - O �_ (� 11! �. W 2:3 • y �� _ a.i II E. i g a 0 c� ro c -- W �I o r 0 of r j / / 7 I ry g DEIGN TT HAL44EG 1. W E u s LL it 2 -� J 8"' FVe SEATLINE - OTEL EL. 065 06�OG 73 49+00 50+00 51+00 52+00 53+00 54+00 NO. REVISIONS DESCRIPTION ISSUED FOR BID ENGR. JB APPROV. KT DATE 8 /30/22 f PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / f UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION '"< J /,'- 10�2 % �—/ice 1 z'Air\ / 1("$' ' ��, it \� ;') ///11 1 /4 \1 �,\,_ — — //7/(74 ...„..\ .� 1l\i — y°/// \ 1059' \ J` \ • �� / % Esoi Eso/' \ \ Names\ \��_ 1il ti}"� II iIice„,"0. END REACH 3 UT TO CHINQUAPIN (PROJECT # 116 SHEET NO. 13 PLAN / PROFILE 20 10 0 20 40 hnrInn SCALE (FT) 1,070 0 0 a_ 0 0) z a_ 0 z 0 O O 0 U z 1,040 0 I co 0 CC NIT Ow N u �aa and � 1,060 1,050 N W W 2 2 � ...... — - — — XIC"ING CROUN-D — W ���`— 7 W Z J _..-1 — 1 . 11 NO. 1 REVISIONS DESCRIPTION ISSUED FOR BID ENGR. JB APPROV. KT DATE 8 /30/22 f PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / f UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 0 7 06 7 Z 76 z 0 0 0 0 ll Uz a 0 u �I co 0 0 NIT Or, NQ /01 NO rot TREES, SHRUBS, AND RIPARIAN SEED LIVESTAKES PERMANENT NON -RIPARIAN SEED BEGIN CONSTRUCTION EACH 1 OAF' #502 N: 9fi1984.9b' E'16'0623 03' ELEV: 11T9 42' PIN: 597617015559 PIN: 597617015538 I I I I I I I I I PIN: 592617014541 //.f" •���.��. ` "r • ' ,� �11WL.r ELEV-. 115240 U.� PIN: 597617014625 PIN' 597517012652 7 1 I 1 1 1 1 1 1 1 L rro PIN: 597617 i12]08 I 1 1 1 T PIN' 596620919ti02 PROJECT # 116 (SHEET NO. 14 VEGETATION PLAN 1 1 1 I PIN: 01 40 20 0 40 80 IIII W111� SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 0 0 In In 0 z 0 z J 0_ a 0 UI z 0 U �I m 0- NIT or, NQ �C rot TREES, SHRUBS, AND RIPARIAN SEED LIVESTAKES PERMANENT NON -RIPARIAN SEED PIN'. 596520917633 \... ��/// /// /"� // � / / /r a J// ���dre ^7,�'1isr �'/��`� coN72iOL-6eIK1 _- �N t0fi293' - <` T PIN595620916644 i 1 ...••••••••"'1 1 1 1 ,% PIN: 596520915665 _''+ i ` / ,C' PIN'. 59]51]02111E502 ` \\ \ \ \s \ � '^\ m fOLP MN303 \ r \\ \ \ -- -------------- ----------------------------- I END CONSTRUCTION REACH 1 BEGIN CONSTRUCTION REACH 2 Sr. 27+03.00 PN/6 _1 PN596, I I I I I I I I I I I I I I I 1 i I ; II II III I PROJECT # 116 (SHEET NO. 15 VEGETATION PLAN / / / / Wes\• 40 20 0 40 80 IIII Wi11\._� SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION z 0 0 +15 0 0 Pzi z 0 z J D_ a 0 ll Ui z z u �0 m 0- NIT Ow NQ 071 /01 �C ro10 TREES, SHRUBS, AND RIPARIAN SEED LIVESTAKES PERMANENT NON -RIPARIAN SEED -aiN757, 74?ne NC767 POINTn36p : 96218Q Vasa / CONTROL PpIWL30\ 5B6 \ E 6EM,Iy19s 'O CONTROL POINT p501 N: 962344.b9' E: E88fi38.39' ELEV. 1113.p6' _END CONSTRUCTION 47,7 ,,. sue\ z a>z •�,gym//1104 1 NTRONNLPO: �- 9� I ELEV. S \� II IIII ILI-Sg6 i �2�6\25 I / /EN 5966,6825ti>p CONTROL POINT LLOS REACH 2 . 37+53.30 PROJECT # 116 (SHEET NO. 16 \ VEGETATION PLAN LLI 1I I 40 20 0 40 80 IIII W11� SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION Z a_ 9) 9) 9) 0) Z Q 9) z J Q 0 Uz a 0 u co 0— NIT Ow NCOI /01 �C rot TREES, SHRUBS, AND RIPARIAN SEED LIVESTAKES PERMANENT NON -RIPARIAN SEED \8Z 625 P1N.-r*966fi625610 \\ /: ' ).....---;.'rrr . /�� -= \� // \\\sg66i692,ti66 '''-'7"-'r".'''-r''''''''''r",--:T-::.":/:::rl':;:-:""r-n--::----J- ------ iiiii; HU k'-�l , \\ \\ PIN. 5966163238sg \ \ \ \ \ \ \ / \ 't1_ PIN_ 596616832,E PIN. Sg 66,E NT / / / / / / / / / / / / / / 6316)38,� 56� (PROJECT # 116 SHEET NO. 17 VEGETATION PLAN \ \ PI ,tzrB30653 40 20 0 40 80 IIII W��� SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 0 0 0 0 7) z Q 4) J d 0 ll Ui z 0. a 0 u co 0 0 NF or, NQ �C rot TREES, SHRUBS, AND RIPARIAN SEED LIVESTAKES PERMANENT NON -RIPARIAN SEED .5g5a16�33t' /` /• rri zrri I I l r,,g6 158 / II 7 _ `�� / / / ( ______,r �I` e PI N: 596b1 '''' 16830155, • 157 33 714 / / /',/ / / // / / / END CONSTRUCTION REACH 3 STA. 52+29.46 \\ * I \\\\\III<< vole (PROJECT # 116 SHEET NO. 18 \ VEGETATION PLAN ` 40 20 0 40 80 IIII WI SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 7 06 7 Z 76 z 0 0 0 0 Lo UI a 0 u �I co 0- NIT Nu NQ 071 /01 �C rot TERRACE SLOPE STABILIZATInN AREAS FILL AREAS I BEGIN CONSTRUCTION EACH 1 +00.00 CDNTROL POINT #502 N: 9fi1984.9b' E'16T0623 03' ELEV: 11T9 42' 1 P16697617016638 1 1 1 I 1 I I SEED, MULCH, AN MAT LEFT TERRACE SL PE STA. 1 0+00 - 1 0+2 PIN: 607617015559 1 PIN: 592617014541 SEED, MULClH, AND MAT LEFT TERRAICE SLOPE STA. 10+65 10+80 / / _„-91 -/ / 7 1 I 1 1 1 1 1 1 1 NOTE: IF PROPOSED CONTOURS TIE INTO EXISTING GROUND AT AN UNSTABLE LOCATION, GRADE TRANSITION PER DIRECTION OF THE ENGINEER. PIN: 597617014525 933 PIN' 697517012662 — — — - E. 15, 0289.90 ELEV-. 1152 40' L PIN: 597617012708 1 1 1 1 'ilk PROJECT # 116 (SHEET NO. 19 GRADING PLAN T 1 -I- I I I I I I I I I IPIN' 696520019902 PIN:5.1K 322 i -- - -I - ! UI O 40 20 0 40 80 IIII W1�� SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION z 0 a 0 1) 1) 56 z a 96 z J LoI 0 ll UI z z u �0 Er 071 0 0 NF Ow NQ /01 �C I1 TERRACE SLOPE STABILIZATION AREAS FILL AREAS PIN: 596520917933 20918622 C9 \ PIN: 595620916E44 PIN: 596520915555 117- 41I1 SEED, MULCH, AND MAT RIGHT TERRACE SLOPE STA. 20+60-20+95 NOTE: IF PROPOSED CONTOURS TIE INTO EXISTING GROUND AT AN UNSTABLE LOCATION, GRADE TRANSITION PER DIRECTION OF THE ENGINEER. I I I I I I I I I I I I -------------- ------------------ '06299 �53 J / SEED, MULCH, AND MAT BOTH TERRACE SLOPES STA.25+25.26+50 P1M END CONSTRUCTION REACH 1 BEGIN CONSTRUCTION REACH 2 STA. 27+03.00 `\ --Ii ,z�, 1 i ram; 1 / / �1 / 1 / '1I 1 1 1 I 1 1 1 1 SEED, MUL HI, AID AT LEFT TER CE1S PE STA. 27 - -W11±12 +75 1_„„ 1 1L„3:1I PROJECT # 116 (SHEET NO. 20 GRADING PLAN / / / / / / / / / / / co 2 40 20 0 40 80 IIII 111\—...011111111 SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION z 0 0 N S 0 2) 2) 2 z Q IL 1n Pzi z 2 Q 0 ll UI z 0 2 0 u co 0 0 Cr NF 0u NQ COI /21 C 81 PIN•_596608g05, stz TERRACE SLOPE STABILIZATi AS I I I I I I I AREAS \\ �� Ui FR iA N \ —� t\ CONTROL POINT#300 96218C, eLEvllas' CONTROL 741.4301 PM, \ 1 � 44zh ELEh!�i119.58�' CONTROL POINT#501 N. 96234469' E: 15680A39' ELEV 1113.00' \ 968 08Z,a PIN = 5.966166,1666 END CONSTRUCTION REACH 2 BEGIN CONSTRUCTION REACH 3 N^ROLPOINT 00 9fi�fi49.Ob' /E 156855].]4' ELEV. 11p4.]6 MULCH, S B TH=iT,RRACE N PES+5 I STA6S79+00 70 I I � � I I I I I I _ �- 1 _1 _-_—------------ - ___----------------------------- NOTE: IF PROPEL\ CONTOURS TIE INTO EXISTING GROUND AT AN UNSTABLE LOCATION, GRADE TRANSI iN 1;'ER DIRECTION OF THE ENGINEER. 246,6 \ (PROJECT # 116 SHEET NO. 21 GRADING PLAN SEA Tjy 7. c 40 20 0 40 80 IIII 1211\ „mil SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION Z N S 01 d 01 01 LL7 Q / / G a 0 / W W UI a 0 UI �I co 0 0 NF Ow NQ �C 0010 662 /7 \ TERRACE SLOPE STABILIZATION AREAS \ / \ \ FILL AREAS 7 \ \ \ \ i �' \ \ \ ,\ \ \ \ \ \ \ \ \ ' SEED, MULCH, AND MAT \ \ \ BOTH TERRACE SLOPES \ \ STA. 38+10 - 39+00 \ ss Pw \ oN��9° ® � \\ / 9 �g15op"19 \ �` �N�PIN: Sstisls3238s9 k0O OD NOTE: IF PROPOSED CONTOURS TIE INTO EXISTING GROUND AT AN UNSTABLE LOCATION, GRADE TRANSITION PER DIRECTION OF THE ENGINEER. • / PIN: 596616832,E PING 596665238095 / / / / / / / / / / / / PROJECT # 116 (SHEET NO. 22 \ GRADING PLAN \ \ \ \ \ \ \ / \ / SIN: 596616>81Irn \ / \ PI g°Ty TER 'C STA. 9q 40 20 0 40 80 IIII WII�� SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 N S 67 05 Z d Z J d 0 ll UI a 0 u I co 0 Er NIT Ow NCOI /051 �C rot TERRACE SLOPE STABILIZATION AREAS FILL AREAS Ns I✓ 503 N PI 506a16830658 • ED, MULCH, AND MAT I \` BO TERRACE SLOPES A.50+60-51+25 I l „.„ t58 / III 7 — `\� / / II` .,o'E�PIN:50oe33]14 / ( ° ? J! / f=-__ SEED, MULCH, AND MAT BOTH TERRACE SLOPES STA. 49+00 - 50+00 SEED, MULCH, AND MAT BOTH TERRACE SLOPES STA. 50+70 - 51+25 SEED, MULCH, AND MAT BOTH TERRACE SLOPES STA. 51+85 - 52+40 —, PIN.506 `/— \� 714 NOTE: IF PROPOSED CONTOURS TIE INTO EXISTING ROUND AT AN UNSTABLE LOCATION, GRADE TRANSITION PER DIRECTION OF THE ENGINEE END CONSTRUCTION REACH 3 STA. 52+29.46 PROJECT # 116 (SHEET NO. 23 GRADING PLAN EED MULCH, AND MAT 11I qq \ �� / OTH TERRACE SLOPES 1111`�Q��� 1 ��f i ivalk 1 STA.51+60-52+40 �\`111�,»1/�j j )4e // �e / �• . yti UN FR, POINT .00 / ` 40 20 O 40 80 IIII �� SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 1 24 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 LoI 4) Z 1n z 0 0 0 0 ll UI a 0 u I co 0 CC NF Ow NQ COI NC rot BEGIN CONSTRUCTION EACH 1 +00.00 CDNTROL POINT #502 N: 9fi1984.9b' E'16T9623 03' ELEV: 11T9 42' I I I ---1 PIN: 597617015559 PIN: 597617015538 1 1 I I I I I I PIN: 562617014541 PIN: 597617014625 ,155 11.1ah - *�Ie — — — — woolff-m.-- .,�� w. ... -- •-- �i.: ^•� � — t .,, x, eve.. ELEV 115240. I .. 7 1 I 1 1 1 1 1 1 1 L PIN:597617012703 WOOD MAT PIN' 597517012652 1 1 1 1 1155 \ _ 115, 0 PROJECT # 116 (SHEET NO. 24 EROSION \ CONTROL PLAN / 7 6_ T PIN, 596520919602 �' rc' eIv,:F• eEry co 1 yi'�. ��\ K I o m m m m (Sl 40 20 0 40 80 IIII WII\—.mil SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION PROJECT # 116 (SHEET NO. 25 z 0 115 0 0 0 0 0 z a z J CL a 0 UI z z u �0 0 0 0 NIL) Ow NQ /01 N2' rot \ P\N 50062009°02 FAN tit PIN: 595620915644 PIN'. 595620917633 ¢o'�g6zz / M IN'. 5976170211.502 PIN: 596620915665 l WOODtAT I I I I I I I I I I I I I I END CONSTRUCTION REACH 1 BEGIN QONSTRUCTION REACH 2 1 i EROSION \ CONTROL PLAN L. 40 20 0 40 80 IIII W��� SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION z N S 0 2 0 2 0) 0) z Q 0 z J 0 0 ll UI z a a 0 0 U F co 0 0 NI-0) Ow NQ /01 �C Col 000 PIN 5966g51 LIMP'S- OF DIg-r • sass\�� \\���v -- \\\ Ilv Arri WOOD MAT P^ 5gs \ I I 12�625 1 _1 ________________________________________________________________ 1 J . ______________________________ _ ____________ _____________________________________________________________________________________ I I� P,N 59s6,68256,0 I I — i i I ; I I II II I I I I I i 1 1 II I II I ) END CONSTRUCTION REACH 2 BEGIN CONSTRUCTION REACH 3 I I I I I I I li • ��\`�!���+ '`.• � � Imo-—.��d1\1'Iy� (PROJECT # 116 SHEET NO. 26 1- 40 20 1111 EROSION CONTROL PLAN / - -O SCALE (FT) CO REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION z N N S 0 d 0 0 LL7 0 Z d 0 z J O 0 Y LoI UI a 0 u �I m 0- NIT Ow N071 /01 �C rot \ '11, -��� \ss, 36+00 oe 3q 0, • D CONSTRUC a " // CO �z,h oREACH / / .-- .-- BEANCd i5TRUCTION / \ REACH 3 // /i STA. 37+53.30/ 'IL/// :2" \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ TEMPORARY GRAVEL \ \ CONSTRUCTION ENTRANCE \ Jr s966/682,6, \�\\\ w0O' 8 •'�;/ \ \ \ \ PIN ' 9861fi3238sg \ \ / \ \ \ \ \ / \ PIN59661683.'16 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ PIN'6g666 is PIN Sg6616>380gs \ \ / / / / / / / / / / / / / \ \ PI PROJECT # 116 (SHEET NO. 27 EROSION \ CONTROL PLAN / R CD 7 ^mot 15� HAUL Es&(.10,0\ V 40 20 O 40 80 IIII SCALE (FT) REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 5141 0 0 0 0 0 z 0 J d 0 ll UI z CT_ 0 z u �I m 0 CC NIT Ow NQ COI /01 N� rot • rri PI : 598a15830666 II IIL-- / oIIL .p PIN: S966t5]'S3]14 7551.1560551.1. • s66157],4 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE END CONSTRUCTION REACH 3 STA. 52+29.46 / / / / h� / / / / / / PROJECT # 116 (SHEET NO. 28 EROSION \ CONTROL PLAN / 40 1111 �� SCALE (FT) 20 0 40 80 REVISIONS NO. DESCRIPTION ENGR. APPROV. DATE 1 ISSUED FOR BID JB KT 8/30/22 [ PREPARED FOR: TOWN OF PILOT MOUNTAIN 124 W. MAIN STREET PILOT MOUNTAIN, NC 27041 / UT TO CHINQUAPIN CREEK SURRY COUNTY, NC / PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 204 STONE RIDGE BLVD. ASHEVILLE, NC 28804 LICENSE # P-1 182 PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION