Loading...
HomeMy WebLinkAbout20141049 Ver 1_EEP Letter_20141001 ir ", "W n a�n VAN,- � �IDll��uw ;�,Wk6'h ,wvr✓ rwaiwumama N m D E N North Carohna D€.�IX' l H(,IIrlt of El.IoIoi71YYen iand Resources rr; ('1..,,;1',)ry f�lll;��"�i�f L I��`y{'I" �.,�lit:; . �.'D? 4J'.71-1'i .;: Skr a{i a. III plmp l,n September 30, 201.4 Mr, Ail King NCI)OT Division S Environmental ()fficer North C'arolitaa Depaartment of Transportation 902 N. Saandhills I3oulcvard Aberdeen, North Carolina 28315 Dear Mr. King: Subject. EEP Mitigation Acceptance Letter: Division i Project. Replace Bridge S4 over Muddy Creek on SIB 1603, Randolph County The purpose, ofthis letter is to notify you that the Ecosystern Enhancement Program (I?IT) will provide the stream and buffer mitigation for the subject project. Based on the. information supplied by you on September 30, 2014, the impacts are located in CU 03030003 ofthe Cape Fear River in the Central Pic(finont (CP) Lco-Rcgion, and are as follows: Stream Wetlands Streamand River CU Eco ___._._ ....__.....__ _. ........._.._._.......m_.... ... .... ......._..... _. ._._.. Wetlands Basin Location Region Coid Cool Warm Riparian Non- Coastal Riparian Marsh _........__.-___............... _._ ............._ _.. ....__...._ _ _ ....... __........__ Impacts Cape 03030003 CP 0 0 83.0 0 0 0 Fear ..__ _._. _... �.._ .._.. ... *Sofne of tl7c Stream and wed and impacts in4ty be proposed to be Innig atcd at a 1 1 rruti'llation ratio. `ice permit nq)phcation for(Jemils. All buffer mitigation requests and approvals are administrated through the Riparian restoration Buffer Rand. The NCDOT will be responsible to ensure that appropriate compensation for the buffer ritigation will be provided in the agreed upon method of fund transfer. Upon receipt of the: NCDWR's 13uffer Authoricatioti. Certification, E P will transfer funds front the NCDOT 29S4 Fund into the Riparian Restoration Buffer Lurid. Upon completion of transfer payment, NCDO 1 will have completed its riparian buffer mitigation responsibility for the above referenced project. Subsequently, EFII' will conduct a review of cairrent NCDOT II.F Program mitigation projects in the river basin to determine If available buffer mitigation credits exist. If there are buffer mitigation credits available, then the Riparian Restoration Buffer Fund will purchase the appropriate amount Of buffer mitigation credits from NCDOT IEF Program. Buffer Impacts Buffer River Basin CU Eco-Region ................__ Zone 1 Zone 2 TOTAL Impacts Cape Fear 03030003 CI' 2,479.0 1,341.4 3,820.0 Mr. Art King 8qdcmbu'30, 2Ol4 SR l60} — Bridge 84 — Division 8 Pagel\wu These impacts and associated mitigation needs were Under projected by the NCDOT in the 2014 impact data. EFII will commit to Implement SUITlCiCut,C01upenSatory strearn irlitigation credits and buff'er mitigation to offset the impacts associated with this pro.cct as du1uouiuud by tile regulatory agencies using the delivery timellne listed in Section F.3.c.iii ofthe N.C. Department of Environment and Natural Res(.mrces' Ecosystem 2nbaoucmuxt Program In-Lieu Fee bmbnuzco1 dated July 28, 2010. Ifde above referenced 1111pac1 uux`uo m are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation icceptance letter will bc required from EEP. Ifyou have any questions or need additional information, please contact Ms, Beth I larnioll at 919-707- 8420. Sincerely, /ocIJ�13r� SzacuU} LIEP Asset Management Supervisor Cu: Mm. Liz xir, (J3ACB— Wilmington Regulatory Field Off-ice Mr. David Wainwright, Y4C Division ofVVater Resources— Raleigh D1o. ljnUa Fitzpatrick, NCD0T- 9D2A Mr. PbiUp Beach, S[PiEngineering File: SK 1603 — Bridge g4— Division b