SW6220602_Plansheet (C-3.0) - Grading_Drainage Plan_20220810
GRADING NOTES 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND LONGITUDINAL SLOPE NO STEEPER THAN 5%. 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL - PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. - -� EIP N/F F SANDY ROBINSON DB 496, PG 455 \\ I N\ CHAD LENTON STARLING goDB 10639, PG 594 ❑ 1 1/2" l U - � O EIP O 1" EIP N/F (PINCHED) CHAD L. STARLING / \ 40C - DB 8981, PG 770 / 0 1 1/2" EIP 50 I 51 0 52 i 00 O EIP N/F \ O JAMES OLIVER JACKSON, JR. \\ DB 9292, PG 160 1 • O ,Y 4- W N' V� 1 i,« a W 1 EIP l (�' �� <o l» 19 CD-�� W W�/. " / (PINCHED) 2 22 LEGEND: ECM ECM 3s `� ? ~ �� ! / ur' ��'` ` 11 'O f' 2 I 07 I / U ® ECM -EXISTING CONCRETE MONUMENT EIP Oo EIP-EXISTING IRON PIPE ` \ 21 ��� `1 �� \W\ I G O \ N/F EIS - • \ WOW `- �/ I O „ RAYMOND STANLEY CHAVIS &WIFE, O EIS EXISTING IRON STAKE W <o /t II W L W �, 1 .1 1 / >� o KATHY L. CHAVIS ERGO ERB-EXISTING REBAR �� \ c' W / ccn W W W - L / / y� l W `/ / p^ ya EIP DB 5990, PG 893 o COMPUTED POINT � � 20 � W � ♦ -' � ♦ �" • � ♦ � v, o G PB 99, PG 160 N/F - NOW OR FORMERLY �/ I c� $ O y W, I \ J0� ,� EIP \ \ r ♦ I W a CA2 Q R W- RIGHT OF WAY J / � O # PROPERTY IN y I � 1 � S LINE 1 I ` \ W W i�� c> ADJACENT PROPERTY LINE `�- G W W W • • W �W / W� RIGHT-OF-WAY Z I ♦ to / - SETBACK LINE SD STORM DRAINAGE E 1M EIP H ° 1 / W - ✓- W� W % �' 6 \'\ "` w WATER LINE (PINCHED) 17 OVERHEAD UTILITY 7 ,, 1k 1. 7 / 'oo WETLANDS o <p �W l W W m n PERMANENT EASEMENT �S / n I J ) W # `% I X FENCE LINE �G'/ 12� • •, C _ TREE LINE \ \ I '\ v W 7 V W W' W W W W w O ^ W W 32 .. .•I W N/F 210 MAJOR CONTOUR ySJ v W ri �/� • W W �W GEORGE BARKSDALE TARRANT, III &WIFE, EIP I W W "� W �"� %< KRISTY B. TARRANT / 207 MINOR CONTOUR C3.L 1ERB W y \ W W W + )+ ��W W ( W W W TRACT 1 OF / x 20e.47' SPOT ELEVATION C3.1C W < v J� W W I` Wl,- W W W �W W)� -4-( W DB 9710, PG 817 - BENCHMARK 3/4' \ W W\ 125 \, / - W\if r W W W W W W W W 1\-\� W( v v ■ PP• UTILITY POLE EIP O Y V W W ��\ W Y W"/// W W / W \ %3o> M! . M YI + r- GUY WIRE \`� W W W k�W 1� W �W W W✓ -~W \�3�1' Y���'q 1W W W� W W� W� 1 \� W W� V� W N WATER VALVE l \ / / .y Q Q W W W I� W J/Wi W D ( 7 �� ,Y .Y ,Yi \ W ,Y � W� W � /W�� �Y� W � S V FIRE HYDRANT o 1 W 123'` v w�//J�\ON ti o C .y %W W W W .Y ,Y I/ W W •Y W W �,Y ,Y �W 1 /2„ �iO v W WELL a W W W W W o SHEET KEY W W W`� W , �.� 1„ l� ERB /CO HARDWOOD TREE C ^'� W l\C/ W �W NC O \� W W �W GRID NAD PINE TREE % ) ASPHALT C3.3 3 4"��i 1W o (� l /� W W 3 (2011 CONCRETE EIP ^ �W� W y y /Y1 W W W W W W W�� W W W W V V y �Y/ WW //+ W\ Y V.�W /W O EIP WETLANDS w w1W_W� �--� x2s� ���\ /W W �b UNSUITABLE SOILS \ W W Z/�v✓ W W Vo W�'`Y �' 1. �W W W / V W� W W `Y W W 12y ` C" W W - t oc t oc- LIMITS OF CONSTRUCTION 1 y�) v �_ W W-( _4 ✓ J W ,W W W W W n _SF -SF -SILT FENCE LINE ��V� W �� W ✓i \�/ �WWig v v v `� `✓�\� W W W �L W `Y D W �W +L V•� W W •Y W I1W I1 `1' W /�. - JN - dN -JUTE NETTING W� ro- DIVERSION BERM CONSTRUCTION SEQUENCE -Dlv-D/"c�� W W W W w W ,✓ W W W w O / OINLET PROTECTION 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND GROUND STABILIZATION CHART '1 � Wu W� W W W W �-�� W W W � W W�Cv W ' ,i" W W W� W 4,W HOLD PRE CONSTRUCTION CONFERENCE. J 2. INSTALL STONE CONSTRUCTION ENTRANCES, TEMPORARY SILT FENCE, AND TEMPORARY DIVERSION BERMS WHERE SPECIFIED. 3. CONSTRUCT TEMPORARY SKIMMER & SEDIMENT BASINS. 4. CLEAR AND GRUB THE SITE AS NEEDED. 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN GRASSED. 6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. 7. INSTALL UTILITIES. 8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER INLETS. 9. PERFORM FINE GRADING. 10. INSTALL AND PREPARE BASE COURSE. 11. PAVE ROADWAYS. 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 13. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF TERMINATION (NOT). THE NOT IS AVAILABLE AT: HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. VICINITY MAP NOT TO SCALE N/F SIDS MILL PROPERTIES, LLC TRACT 1 OF DB 10080, PG 367 ffl \ 1/2" / 1" EIP ERB (PINCHED) / N/F / DOLORES G. EVERHART DB 5347, PG 598 1/2" EIP N EROSION CONTROL NOTES 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 910-433-3300 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION CONTROL MATTING AND/OR SODDING AND STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL STABILIZATION AND PERMANENT VEGETATION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ACTIVITY. 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION 9002 ERB - 36 <� � J O � � rb N 5 ACTIVITIES. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS BEN STOUT. CONTACT 910-779-0019. N/F SIDS MILL PROPERTIES, LLC TRACT 1 OF DB 10080, PG 367 NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1. 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. I I I I 3/4" EIP - 39 40 41 42 �' / I 43 44 45 46 / / 47 48 49 / If 35 -- r PERCHERON PATH ' R/W - PUBLIC STREET • I• W W Y •Y rJ W ;� y'� •Y L ,V�r',Y •Y W \l'J •YI W W •Y l Y O W •Y x ( N EIP PI)W�d ^ © Y c W f NCHED W � W •Y f� / � �J Y YW W `L �Y �Yy W nW �V W ^rye c �Y W W W W, y J W W W •Y J` '�}' �W/ W�� W W / Know what's below. W ECM Call before you dig. Q �� W \ W /VI Y Y �I'/h� W Y •V W .Y lY/�W \ W W W W 1/2" .y w w `� / (/ • ERB W w W W L� W W W W Ws-41 io W -� W as J % GRAPHIC SCALE W �W Op / 100 0 50 100 200 W Op ( IN FEET ) PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT / 1 inch = 100 ft. MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE OF TERMINATION PROCESS. ECM n0 Frnn THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN,ORDER TO HAVE THE EXISTING UTILITIES LOCATED SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) 400 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite.U2, Fayetteville, INC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com ICI IA11 J♦N .pQ'••�ESS /O ••���i �/ O 4� q� SEA _ • 02 ♦ � ••• G I NE•.• � �♦ SCOT T ••�� ����` ///1111111\� U8 0�_22 REVISIONS PROJECT NAME TARRANT ESTATES SUBDIVISION (ZERO LOT LINE) OVERALL GRADING AND EROSION CONTROL PLAN CLIENT STOUT LAND DEVELOPMENT, LLC 1786 Metromedical Drive Fayetteville, North Carolina 28304 Phone: (910) 779-0019 PROJECT INFORMATION DESIGNED BY: BRETT DRAWN BY: BRETT CHECKED BY: SCOTT PROJECT NUMBER: 1827 DRAWING SCALE HORIZONTAL: 1 "=100' DATE RELEASED AUGUST 9, 2022 SHEET NUMBER C-3nO