Loading...
HomeMy WebLinkAboutWS0701172_Permit (Issuance)_20220913ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Mr. Seth Thompson Eastham Creek QOZ, LLC 3105 Glenwood Avenue, Suite 105 Raleigh, North Carolina 27612 NORTH CAROLINA Environmental Quality September 13, 2022 SUBJECT: Well Construction Permit No. WS0701172 Seth Thompson, Eastham Creek QOZ, LLC Duck Impoundment Pamlico County, North Carolina Dear Mr. Thompson: In accordance with your application received August 30, 2022 we are forwarding herewith Well Construction Permit No. WS0701172 dated September 13, 2022, issued to Seth Thompson, Eastham Creek QOZ, LLC for the construction of one water supply well located at 452 Middleprong Road, in Hobucken, Pamlico County, North Carolina. This Permit will be effective from the date of its issuance until September 13, 2023 and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this Permit are unacceptable to you, you have the right to an adjudicatory hearing before a hearing officer upon written demand to the Director within 30 days following receipt of this Permit, identifying the specified issues to be contended. Unless such demand is made, this Permit shall be final and binding. A Well Construction Record (GW-1) must be filled out by the driller and submitted to Environmental Quality, Attn: Information Management, 1617 Mail Service Center, Raleigh, NC 27699-1636, within 30 days upon completion of the well construction. If additional information or clarification is required, please contact Will Hart at 252-948-3968. Sincerely, R4 T>4( Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: Roger Hudson 2222 Swamp Road, Pantego, NC 27860 Gabrielle Chianese, DWR LaserFiche AROLINA ' omm mn ep..of o�.i DE NORTH C North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.9000 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES WATER QUALITY REGIONAL OPERATIONS SECTION PERMIT FOR THE CONSTRUCTION OF A WATER SUPPLY WELL OR WELL SYSTEM (Wells or Well Systems with a Design Capacity of 100,000 Gallons Per Day or Greater) In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations: PERMISSION IS HEREBY GRANTED TO Seth Thompson, Eastham Creek QOZ, LLC FOR THE CONSTRUCTION OF A WATER SUPPLY WELL SYSTEM consisting of one water supply well on property owned by the applicant. This Permit is issued in accordance with the application received on August 30, 2022 in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only and does not waive any provision or requirement or any other applicable law or regulation. This Permit does not constitute approval of a site, for which the Public Water Supply Section may require additional information or approval of the proposed volume of water to be withdrawn, within an area defined as a Capacity Use Area, regulated by the Division of Water Resources. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to water supply well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: DE NORTH CAROLINA gaparhneM of Environment,/quay North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.9000 1. A well test for yield shall be conducted in accordance with 15A NCAC 02C .0110(b) and the results of that test shall be submitted to the Division of Water Resources' Regional Office within 30 days of the test conclusion. 2. Each well shall have a Well Contractor Identification Plate and a Pump Installation Information Plate in accordance with 15A NCAC 02C .0107(j)(2) and (3). 3. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well completion. 4. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well abandonment. Permit issued the Thirteenth day of September, 2022 FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION D_E NORTH CAROLINA gokil T4( Robert Tankard, Assistant Regional Supervisor Division of Water Resources, NCDEQ Water Quality Regional Operations Section Washington Regional Office By Authority of the Environmental Management Commission gaparhneM of Environment,/quay Permit No. # WS0701172 North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.9000