August 30, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Second Baptist Church of Shelby, NC
Attention: Sandy Skipper Allen, Jr., Lead Pastor
1114 South Lafayette Street
Shelby, North Carolina 28152
RE: Project Name: New Building for Hope Community Church
Project ID: CLEVE-2023-002
Acres Approved: 6.0
County: Cleveland
City: Lawndale
Location: East Stage Coach Trail
River Basin: Broad
Stream Classification: Other
Submitted By: Second Baptist Church of Shelby, NC
Date Received by LQS:.Iuly 20, 2022
Plan Type: New
Dear Mr. Allen:
�arc�e�1
9 -bo -(0 5)
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by'ritle 15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are requited to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. Amer the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The cNOI form may be accessed at deq,nc.gov/NCGOI, Please direct questions about
the eNOI form to the Stormwater Pro ram staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC,
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
Norllr Carolina Department ofEnvirolnrental Quality Di4sion of Energy, Mineral and Resources
e:!r5fD E Mooresville Regina[ Office 1610East Center Avenue, Suite 301 Mooresville, north Carolina 28115
t anrn�n�oftms. lfla®aif 704.663,1699
DocuSign Envelope ID: 20AE05B1-AO57-4C8E-B2D6-88CF84EGFOC;B .
Letter of Approval with Modifications
Second Baptist Church of Shelby, NC
August 30, 2022
Page 2of3
2. The NCGO 1 permit and the COC, once it is received.
Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it
is determined that the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through
66), this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also
apply to this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely, 00cu5lgned by:
8B37DAC4A10E49A...
Kenny S, Llywelyn
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NC001 fact Sheet
Marls D. Thompson
2111 Windermere Lane
Shelby, NC 28150
North Carolina Department of Environmental Quality 1341sion of Energy, Mineral and Resources
�F4.�
Mooresville Reginal Office IG10 East Center Avenue, Suite 301 Mooresville, North Carolina 28115
(704.663.1699
anaga rnsvn.�m.�G+.�sn\ ��
DocuSign Envelope ID:2CAEO5B1-AO57-4CBE-B2D6-88CF84ECFOCB
Letter of Approval with Modifications
Second Baptist Church of Shelby, NC
August 30, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: New Building for Hobe Community Church
Project Ill: CLEVE-2023-002
County: Cleveland
Reviewed by: Kenny S. Llywelyn
1. Additional measure may be needed between the phases of development.
North Carolina Delrarimenf of Enviromuental Quality Division of Energy, Mineml and Resources
Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Mooresville, Norili Carolina 28115
ee�Mla<I� Er -non n.nlbl Ousvly
704.663. i 699
CDd m
o
m z k
CD cD p
C)
0
o �y �-+� ¢ CD o UQ
cr
CD-
tjCD CD CD
Z3 CD
CD ITZ
CD 0
�• O ton
® o arAD
H
CD
o �. CD
•Ow r.1, O`
v ::;' CCD o
k..� (n CDCD
(C)
` ca
N O Z O CD ttAT`
rK CD
�uw CD
n PE -
CD
C
Ow. 0` y O CD
CD
CCD �.
'' O+
H co A:
�s CD
-•TQ A�
CD '� C CD r - o-d. CD