Loading...
HomeMy WebLinkAbout20140770 Ver 1_King ECP-Stormwater Detail revised 9 13 14_20140923Strickland, Bev From: Devane, Boyd Sent: Wednesday, September 24, 2014 1:09 PM To: Strickland, Bev Subject: please file these. Beaverdam 14 -0770 Attachments: King ECP- Driveway Permit Detail sheet 2.pdf, King ECP- Driveway Permit.pdf; King ECP -401 404 Permit revised 9 13 14.pdf, King ECP - Stormwater Detail revised 9 13 14.pdf Please file the note below and file these four files. Thanks. From: Wanda Austin [ mai Ito: wandajoyceaustin(d)amail.com] Sent: Tuesday, September 23, 2014 9:47 PM To: Devane, Boyd Subject: Re: Can you send me an electronic version? Good evening. I have attached the revised sheets. Let me know if you need any additional information. Wanda Austin On Tue, Sep 23, 2014 at 2:38 PM, Devane, Boyd <boyd.devanegncdenr.gov> wrote: I From: Wanda Austin [ mai Ito: wandajoyceaustin(d)amail.com] Sent: Saturday, August 23, 2014 9:12 AM To: Devane, Boyd; Adam King Subject: Storm Water Good morning. I have addressed the concerns that we discussed yesterday for the Beaverdam Road project. The pdf version of the storm water 41 and permit drawing 41 are attached. The entire drainage area for the phase 1 can be best viewed from the permit drawing. Phase 1 includes the buildings shown. The supplemental flow directional arrows have been added along with more detail on the detention outlet pipe and the by pass flow channel. Thank you for your review and let me know if you have any other questions. Wanda Austin GENERAL NOTES: 1, Utility services exist on site, The location of all surface and underground utilities, right -of -ways, easements, etc,, shall be verified by the contractor, The contractor shall be responsible for protecting all utilities from damage during construction and to repair any damage which should occur to the satisfaction of the owner and utility companies, Commencement of landscape installation indicates acknowledgment of and acceptance by the contractor of existing conditions, 2. Actual as -built and /or existing site conditions may vary from this plan, 3. Stormwater basin, level spreader and vegetated filter strip shall be included in a recorded permanent drainage easement, 4. Protect existing grass areas, trees and other vegetation to remain, 5. Damage by contractor to undisturbed areas outside the limits of construction shall be repaired by contractor to the satisfaction of the owner, 6. Final acceptance: The owner's representative will provide the final inspection after the contractor has satisfactory corrected the deficiencies on the punch list should the inspection find work incomplete, the contract shall remedy the deficiencies, 7. Remove erosion control items once vegetation is established, 8. Amend soil in vegetated filter strip according to table below, 9. Cover vegetated filter strip with 6 inches of top soil and sod with Blue Grass or Tall Fescue, 10, Provide a sediment depth indicator in the dry detention basin, 11. Use 3000 psi concrete to construct the level spreader, 12. Verify 0% grade along the level spreader, 13. Caution should be taken to not damage level spreader when backfilling, 14. Construct overflow weir of Class B rip rap, Start -up Fertilizer Application to the Engineered Filter Strip Topsoil (from NCSU Cooperative Extension Service 2008) If Obtaining a Soil Test Send approximately 1 cup of the air -dried soil sample to the NCDA & CS Agronomic Division Soil Testing Services, 1040 Mail Service Center, Raleigh NC 27607, Boxes and forms can be obtained at your county Cooperative Extension center or at the Agronomic Division office in Raleigh. Allow several weeks for the results to be returned. Apply the amount of lime and fertilizer recommended for your soil by the soil testing laboratory. For additional information about interpreting a soil test, visit this Web site: http:// www .ncagr.com /agronoml /uyrst.htm If No Soil Test is Obtained Apply the following for grasses other than centipedel •75 lbs of ground limestone per 1,000 sq ft, •A starter type fertilizer (one that is high in phosphorus) based on the type of grass and the planting method, Fertilizer bags have a three - number system indicating the primary nutrients, such as 8 -8 -8 or 5- 10 -10, These numbers denote the N -P -K ratio —the percentage of each nutrient in a fertilizer, The percentages are noted in the following order: N Nitrogen for green color and growth, P2 05 Phosphorus for good rooting, K20 Potassium to enhance pest and environmental stress tolerance. Common examples of starter fertilizers required for a 1,000 sq ft area include 40 lbs of 5- 10 -10, 20 lbs of 10- 20 -20, or 16 lbs of 18 -24 -6. For sandy soils, typical to the Coastal Plain and SandhiRs, fertilizer rates should be increased by 20 percent, Note: For centipede grass, apply % lb of nitrogen per 1,000 square feet. Too much fertilizer will kill centipede, ELEV 2641 --� BOTTOM ELEV 2637 SHWT ELEV 2630 30 FREEB ❑AD rN BASIN CROSS SECTI ❑N /tT[1P,MWAT ER � 48" BARREL /\ T 1° IFI�/E AN / R GUARD /Y AI TENAA ESS 2i ej / SG WE I .� I L_ l� 1 C DITCH CPDE -� P v ULV RT VEGET ED LTE \ STRIP LI]W �P S SDI H -o El \ I � I '3 x BE0 00 i ST ❑R W ER I� DRY D E T N B SIN —� 160'X30'X � � � � I 4/ � \1/ C =0,32 VEREL W `'' Fri FL D E � z D IN W \ T EVE P AD � \t/ \j / EXIS G C❑NSTRUCTI ❑N SCHEDULE: 1, Stake limits of storm water basin, 2, Install temporary silt fence around the limits of the basin, 3, Install wattles at silt fence drainage outlets, 4, Grade basin to dimensions provided, 5. Construct outlet device, 6, Construct vegetative filter strip to grade indicated, 7, Construct level spreader, 8. Seed areas according to schedule, 9, Water Vegetated Filter Strip frequently for the first three weeks of sod installation so that first 1,5 inches of soil is kept moist, 10. Once area is established, remove temporary silt fence, MAINTENANCE SCHEDULE: 1, Inspect dry detention basin quarterly and within 24 hours after a storm event greater than 1,0 inch, 2, Remove sediment, trash, debris and repair bare spots according to the Operation and Maintenance Agreement, 3, Maintain a grass height of 3 to 6 inches in the filter strip, LEVEE SPREADER 30- 6,6 ELEV 2643 — � 2 1 3� VEGETATED FILTER STRIP 1 20 40 61 :1 100 STAGE STORAGE VOLUME CALCULATION TABLE ELEVATION SURFACE AREA (SF) INCREMENTAL VOLUME (CF) CUMULATIVE VOLUME (CF) LESS THAN 2637 OPERATING VOLUME 0 0 2637 960 0 0 2638 1920 1440 1440 2639 2880 2400 3840 2640 3,840 3360 7,200 2641 4,800 4320 11,520 OVER 2641 FREEBOARD 0 11,520 PP ❑PILE VIEW CROSS SECTI ❑N ❑VERDE ❑W SEDIMENT DAM L ST❑RMWATER 1 8 -22 -14 MODIFY DETAIL Elevations �N CARP 0,- �FESS% 0,,•QQ 9� •,'y SEAL _ JUNE 26 2014 Lj CL M z� o H U Q LO > �00 r� r v a� � 00 CU V) Q Ld < �C � Z LJ Ld - Q�ZQQ� �= Wo >o Z _j � L I -q- V) Q Z 't LJ M z 00 Q 00 u z Q LJJ Q 3 n/ 0 V) U DD (� CD O I J00 00 J 0j (LJ z z �I I� o � I J 0 CO z> W W 0,11 -C C ai I (� LL Q COUNTY: HAYW❑ ❑D TOWNSHIP: BEAVERDAM WATERSHED: FRENCH BROAD SCALE: 1" = 20'