HomeMy WebLinkAbout20140770 Ver 1_King ECP-Driveway Permit_20140923Strickland, Bev
From: Devane, Boyd
Sent: Wednesday, September 24, 2014 1:09 PM
To: Strickland, Bev
Subject: please file these. Beaverdam 14 -0770
Attachments: King ECP- Driveway Permit Detail sheet 2.pdf, King ECP- Driveway Permit.pdf; King
ECP -401 404 Permit revised 9 13 14.pdf, King ECP - Stormwater Detail revised 9 13
14.pdf
Please file the note below and file these four files. Thanks.
From: Wanda Austin [ mai Ito: wandajoyceaustin(d)amail.com]
Sent: Tuesday, September 23, 2014 9:47 PM
To: Devane, Boyd
Subject: Re: Can you send me an electronic version?
Good evening. I have attached the revised sheets. Let me know if you need any additional information.
Wanda Austin
On Tue, Sep 23, 2014 at 2:38 PM, Devane, Boyd <boyd.devanegncdenr.gov> wrote:
I
From: Wanda Austin [ mai Ito: wandajoyceaustin(d)amail.com]
Sent: Saturday, August 23, 2014 9:12 AM
To: Devane, Boyd; Adam King
Subject: Storm Water
Good morning. I have addressed the concerns that we discussed yesterday for the Beaverdam Road
project. The pdf version of the storm water 41 and permit drawing 41 are attached. The entire drainage area for
the phase 1 can be best viewed from the permit drawing. Phase 1 includes the buildings shown. The
supplemental flow directional arrows have been added along with more detail on the detention outlet pipe and
the by pass flow channel. Thank you for your review and let me know if you have any other questions.
Wanda Austin
i
WARD
DB 471 PG 2451
i
i
�j - w l7q�l Al
0%
NE \ / -
/ \
\ \\\ \ \ 1 PA NG PACES
\ \ IAV DING IINGNnOT
INTERNATIONAL PAPER CO \ \ \ \ \ - � \C� R
DB 253 PG 249 \ 11a
PRINT PAVEMENT IIRRKI
\ \ \Y1\\ \ \ \ \ \ \ \ AINT PAVEMENT NANKINGS
\\ \ \\ \ P V NG ARE
/ IB' E%ISTIIIfi 21' \ \ \ \ \
RESTVE SIPENI C1yMEL
VE DRIVEVAY CRlECilw \ \ \\ \ \ \ R2
\ \ \\ \ PRGPGSEB %
10,0U SF / \
MANUFACTURING
\ \ \ \ f
PA U PARKING
\ \ \ v NCL PARKIN H A
INM I
\ \ \ \\ \ \\ 3' CREEK BUFFER
\ asap \
CREEK BUFF
EXISTING
8 '
REMOVE ALL TREE
ALwG E%ISTING
i
INTEI2NATI AL APER
DB 25 G.249,
1,
CULVERT
26/B
a
� v
OF WA NORTH CAROLNA_. \ \
I -40 \
\
\
\
\
� A
0 20 40 60 60 100
\
\
\
TOP sIw FUTURE DEVELOPMENT `
PHASE 2
Ppa PAVED
PRVE) it NARKIIlGS \ \
EIlBIOG DRrvEVRr \\ \ \
b4,66'"ah"'..
\ \ FUT DEVELOP T
\
AR L Y ENTERP ES, LLC \
DB 85 G 474 \ \
\
\
\
KELLY INVESTMEN
PROPERTIES
DB 631 PG 354
KELLY IMVMS
PROPERTIES
\ \ \ DB 631 PG 354
�v
\I
PERMIT 1
6 -7 -14 MODIFY
CULVERT LENG
H
MARCH 23, 2014
LD
z
zI
I
U Ld
Q >7:
LL- CL
El
z-1
Q LLJ
Ld
:
V /
LLJ
CL
<E
L\L
/ \J
L�
U
V J � Q
O
O
H I J00
00 J ClJ
I zz
~� O
LJ L�J `0
� J LLJ -i
CoZi
z
Ld LLJ
LJJ
z��
H �
CL
LLJ
L�
COUNTY; HAYWO ❑D
TOWNSHIP:
EAVERDAM
WATERSHED:
FRENCH BROAD
SCALE:
1 " =30' INSET
1" =100' OVERVIEW