Loading...
HomeMy WebLinkAbout20131188 Ver 1_Approval Letter_20140923NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla III Governor Secretary September 23, 2014 DWQ # 13 -1188 Carteret County Mr. & Mrs. Elliott Manke 1052 Sea Gate Drive Newport, NC 28570 Subject Property: Lots # 97 Sea Gate Drive Neuse River Basin, Adams Creek, ICW [NEU 10, 27 -128; SA; HOW, NSW] REVISION of AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B.0233) Authorization Certificate Dear Mr. & Mrs. Manke: You have our authorization in accordance with 15A NCAC 02B .0233, Session Law 2012 -200, and any conditions listed below to impact approximately 1540 ftz of Zone 2 of the protected riparian buffers for the purpose of constructing a residential dwelling. The dwelling is to be located partially within Zone 2 of the riparian buffers on Lot # 97 as described in your e -mail for modification of application received in this Office on September 22, 2014. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non- discharge regulations. This authorization is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Authorization are: 1. Impacts Approved Water Quality Regional Operations Section 943 Washington Square Mall Washington, NC 27889 Phone: 252- 946 - 6481 \FAX 252- 946 -9215 Internet: wwwncwaterqualitv.ore An Equal Opportunity/Affirmative Action Employer —50% Recycled /10% Post Consumer Paper Page 2 of 2 The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 2. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non - erosive velocities through the protected stream buffers and will not re- concentrate before discharging into waters as identified within 15A NCAC 2B .0233(5). 3. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Resource, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. i Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0233. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC Division of Water Resources (DWR) if any impacts are proposed to either of these waters. If you have any questions, please telephone Roberto Scheller of the Washington Regional Office at 252- 948 -3940. Sincerely, Robert TAssistant Regio Supervisor Division of Water Resources Enclosures: Certificate of Completion cc: Joanne Steenhuis, Wi1RO DWQ Webscape Unit DLR, WaRO; File copy Filename: 13 -118 Ver.2 Amount Approved (Units) Plan Location or Reference Stream (feet) 404 /CAMA Wetlands (acres) Waters (acres) Buffers 1540 (square ft.) Zone 2 Plan Sheet 2. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non - erosive velocities through the protected stream buffers and will not re- concentrate before discharging into waters as identified within 15A NCAC 2B .0233(5). 3. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Resource, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. i Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0233. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC Division of Water Resources (DWR) if any impacts are proposed to either of these waters. If you have any questions, please telephone Roberto Scheller of the Washington Regional Office at 252- 948 -3940. Sincerely, Robert TAssistant Regio Supervisor Division of Water Resources Enclosures: Certificate of Completion cc: Joanne Steenhuis, Wi1RO DWQ Webscape Unit DLR, WaRO; File copy Filename: 13 -118 Ver.2