HomeMy WebLinkAbout20131188 Ver 1_Approval Letter_20140923NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory John E. Skvarla III
Governor Secretary
September 23, 2014
DWQ # 13 -1188
Carteret County
Mr. & Mrs. Elliott Manke
1052 Sea Gate Drive
Newport, NC 28570
Subject Property: Lots # 97 Sea Gate Drive
Neuse River Basin, Adams Creek, ICW [NEU 10, 27 -128; SA; HOW, NSW]
REVISION of AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B.0233)
Authorization Certificate
Dear Mr. & Mrs. Manke:
You have our authorization in accordance with 15A NCAC 02B .0233, Session Law 2012 -200,
and any conditions listed below to impact approximately 1540 ftz of Zone 2 of the protected
riparian buffers for the purpose of constructing a residential dwelling. The dwelling is to be
located partially within Zone 2 of the riparian buffers on Lot # 97 as described in your e -mail for
modification of application received in this Office on September 22, 2014. In addition, you
should obtain or otherwise comply with any other required federal, state or local permits before
you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-
discharge regulations.
This authorization is for the purpose and design that you described in your application. If you
change your project, you must notify us and you may be required to send us a new application. If
the property is sold, the new owner must be given a copy of this authorization letter and is
thereby responsible for complying with all conditions. This authorization requires you to follow
the conditions listed below.
The Additional Conditions of the Authorization are:
1. Impacts Approved
Water Quality Regional Operations Section
943 Washington Square Mall
Washington, NC 27889
Phone: 252- 946 - 6481 \FAX 252- 946 -9215
Internet: wwwncwaterqualitv.ore
An Equal Opportunity/Affirmative Action Employer —50% Recycled /10% Post Consumer Paper
Page 2 of 2
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
2. Diffuse Flow
An additional condition is that all stormwater shall be directed as diffuse flow at non - erosive
velocities through the protected stream buffers and will not re- concentrate before discharging
into waters as identified within 15A NCAC 2B .0233(5).
3. Certificate of Completion
Upon completion of all work approved within this authorization, and any subsequent
modifications, the applicant is required to return the attached certificate of completion to the
401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Resource,
1650 Mail Service Center, Raleigh, NC, 27699 -1650.
i
Any disputes over determinations regarding this Authorization Certificate (associated with the
approved buffer impacts) shall be referred in writing to the Director for a decision. The
Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This
Authorization Certificate shall expire five (5) years from the date of this letter.
This letter completes the review of the "No Practical Alternatives" determination under 15A
NCAC 2B .0233. This letter does not authorize any impacts to either Waters of the United States
or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC
Division of Water Resources (DWR) if any impacts are proposed to either of these waters. If you
have any questions, please telephone Roberto Scheller of the Washington Regional Office at 252-
948 -3940.
Sincerely,
Robert TAssistant Regio Supervisor
Division of Water Resources
Enclosures: Certificate of Completion
cc: Joanne Steenhuis, Wi1RO
DWQ Webscape Unit
DLR, WaRO;
File copy
Filename: 13 -118 Ver.2
Amount Approved (Units)
Plan Location or Reference
Stream
(feet)
404 /CAMA Wetlands
(acres)
Waters
(acres)
Buffers
1540 (square ft.) Zone 2
Plan Sheet
2. Diffuse Flow
An additional condition is that all stormwater shall be directed as diffuse flow at non - erosive
velocities through the protected stream buffers and will not re- concentrate before discharging
into waters as identified within 15A NCAC 2B .0233(5).
3. Certificate of Completion
Upon completion of all work approved within this authorization, and any subsequent
modifications, the applicant is required to return the attached certificate of completion to the
401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Resource,
1650 Mail Service Center, Raleigh, NC, 27699 -1650.
i
Any disputes over determinations regarding this Authorization Certificate (associated with the
approved buffer impacts) shall be referred in writing to the Director for a decision. The
Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This
Authorization Certificate shall expire five (5) years from the date of this letter.
This letter completes the review of the "No Practical Alternatives" determination under 15A
NCAC 2B .0233. This letter does not authorize any impacts to either Waters of the United States
or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC
Division of Water Resources (DWR) if any impacts are proposed to either of these waters. If you
have any questions, please telephone Roberto Scheller of the Washington Regional Office at 252-
948 -3940.
Sincerely,
Robert TAssistant Regio Supervisor
Division of Water Resources
Enclosures: Certificate of Completion
cc: Joanne Steenhuis, Wi1RO
DWQ Webscape Unit
DLR, WaRO;
File copy
Filename: 13 -118 Ver.2