Loading...
HomeMy WebLinkAbout20160493 Ver 1_Application_20140929 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 33 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: Replacement of Bridge 227on SR 1006 over Rocky River 2b. County: Cabarrus 2c. Nearest municipality / town: Mount Pleasant 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state project no: B-4972 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if applicable): not applicable 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no.: (919) 707-6126 3g. Fax no.: (919) 212-5785 3h. Email address: jhemphill@ncdot.gov Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.3 Dec 10 2008 1 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: 2 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): not applicable 1b. Site coordinates (in decimal degrees): Latitude: 35.3137 Longitude: - 80.4788 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 3.7 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Rocky River 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Yadkin-Pee Dee 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Forestland interspersed with residential development 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 188 3d. Explain the purpose of the proposed project: To replace a structurally deficient (and/ or) functionally obsolete bridge. 3e. Describe the overall project in detail, including the type of equipment to be used: Replace an existing 201’ five span concrete girder bridge with a four span, 380’ box beam bridge on the existing alignment. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Yes No Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: NCDOT Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. 3 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams - tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number – Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 2f. Area of impact (acres) Site 1 P T Yes No Corps DWQ Site 2 P T Yes No Corps DWQ Site 3 P T Yes No Corps DWQ Site 4 P T Yes No Corps DWQ Site 5 P T Yes No Corps DWQ Site 6 P T Yes No Corps DWQ 2g. Total wetland impacts 2h. Comments: The two wetlands onsite will not be impacted by the project. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number - Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 3f. Average stream width (feet) 3g. Impact length (linear feet) Site 1 P T Temp Causeway Rocky River PER INT Corps DWQ 36 43 Site 1 P T PER INT Corps DWQ Site 1 P T PER INT Corps DWQ Site 4 P T PER INT Corps DWQ Site 5 P T PER INT Corps DWQ Site 6 P T PER INT Corps DWQ 3h. Total stream and tributary impacts 0 Perm 43 Temp 3i. Comments: 4 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number – Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 P T O2 P T O3 P T O4 P T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavat ed Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 5 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Neuse Tar-Pamlico Other: Catawba Randleman 6b. Buffer impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 P T Yes No B2 P T Yes No B3 P T Yes No 6h. Total buffer impacts 6i. Comments: Project is not on the main stem of the Catawba 6 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The new structure has been designed with no permanent impacts to surface waters. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Grass lined ditches will be utilized for stormwater runoff treatment. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No If no, explain: No permanent impacts 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: 4c. If using stream mitigation, stream temperature: warm cool cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 7 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: 8 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If not, explain why. Comments: If required from 1a, see attached buffer permit drawings. Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? N/A 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached permit drawings. 2e. Who will be responsible for the review of the Stormwater Management Plan? Certified Local Government DWQ Stormwater Program DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? not applicable 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No N/A 5b. Have all of the 401 Unit submittal requirements been met? Yes No N/A 9 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: Yes No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 10 (V e r s i o n 1 . 2 ; R e l e a s e d S e p t e m b e r 2 0 1 1 ) B- 4 9 7 2 Co u n t y ( i e s ) : Ca b a r r u s Page 1 of 2 Pr o j e c t T y p e : Date: Ph o n e : Ph o n e : Em a i l : Em a i l : Co u n t y ( i e s ) : CA M A C o u n t y ? De s i g n / F u t u r e : Ex i s t i n g : Su r r o u n d i n g L a n d U s e : Ru r a l R e s i d e n t i a l 0. 2 5 10 8 0 0 ( 2 0 3 5 ) 0. 6 9 Pr o j e c t B u i l t - U p o n A r e a ( a c . ) Pr o p o s e d P r o j e c t Ex i s t i n g S i t e Pr o j e c t L e n g t h ( l i n . M i l e s o r f e e t ) : Pr o j e c t D e s c r i p t i o n tu r b i d i t y co p p e r ( C u ) zi n c ( Z n ) Ri v e r B a s i n ( s ) : Pr i m a r y R e c e i v i n g W a t e r : Cl a s s C Bu f f e r R u l e s i n E f f e c t Pr i m a r y : Ro c k y R i v e r No n e NC D W Q S u r f a c e W a t e r C l a s s i f i c a t i o n f o r P r i m a r y R e c e i v i n g W a t e r 30 3 ( d ) I m p a i r m e n t s : Ot h e r S t r e a m C l a s s i f i c a t i o n : HN T B N o r t h C a r o l i n a , P . C 34 3 E . S i x F o r k s R o a d , S u i t e 2 0 0 Ra l i e g h , N C 2 7 6 0 9 Ci t y / T o w n : Ad d r e s s : Mi d l a n d Ca b a r r u s 91 9 - 4 2 4 - 0 4 3 7 ac. Ge n e r a l P r o j e c t N a r r a t i v e : Re p l a c e m e n t o f B r i d g e N o . 2 2 7 o n S R 1 0 0 6 ( M t . P l e a s a n t R d . ) w i t h a 2 @ 1 0 0 ' - 0 " & 2 @ 9 0 ' - 0 " 3 9 " B o x B e a m B r i d g e . T o t a l b r i d g e l e n g t h i s 3 8 0 f t w i t h a t o t a l w i d t h o f 3 6 ' - 0 " o u t t o o u t . D e c k d r a i n s w i l l b e u t i l i z e d o n t h i s p r o j e c t , h o w e v e r , n o s t o r m w a t e r w i l l b e d i s c h a r g e d i n s i d e t h e c h a n n e l b a n k s . T h e p r o j e c t a l s o i n v o l v e s 9 7 0 f t o f r o a d w a y im p r o v e m e n t s . Ty p i c a l C r o s s S e c t i o n D e s c r i p t i o n : Re f e r e n c e s 4115 (2013) 1. 0 0 Av e r a g e D a i l y T r a f f i c ( v e h / h r / d a y ) : ac . No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Hi g h w a y S t o r m w a t e r P r o g r a m S T O R M W A T E R M A N A G E M E N T P L A N FO R L I N E A R R O A D W A Y P R O J E C T S Br i d g e R e p l a c e m e n t Ge n e r a l P r o j e c t I n f o r m a t i o n Ad d r e s s : 7/11/2013 Pr o j e c t / T I P N o . : NC D O T C o n t a c t : Pr o j e c t N o . : B- 4 9 7 2 Co n t r a c t o r / D e s i g n e r : bz e r m a n @ n c d o t . g o v Wi l l i a m S . Z e r m a n , P E Ra l e i g h , N C 2 7 6 1 0 10 2 0 B i r c h R i d g e R d . 91 9 - 7 0 7 - 6 7 5 5 2 - 1 2 ' a s p h a l t p a v e d l a n e s w i t h p a v e d s h o u l d e r s & g r a s s e d s h o u l d e r s . 2 - 1 1 ' a s p h a l t p a v e d l a n e s w i t h g r a s s e d s h o u l d e r s N/ A NC D W Q S t r e a m I n d e x N o . : Su p p l e m e n t a l : 13 - 1 7 ja b y r d @ h n t b . c o m No Ya d k i n - P e e D e e No n e (V e r s i o n 1 . 2 ; R e l e a s e d S e p t e m b e r 2 0 1 1 ) B- 4 9 7 2 Co u n t y ( i e s ) : Ca b a r r u s Page 2of 2 Sh e e t No . St a t i o n (F r o m / T o ) Fe a t u r e Im p a c t e d Wa t e r / W e t l a n d / Bu f f e r T y p e Re c e i v i n g S u r f a c e Wa t e r N a m e NR T R M a p ID NC D W Q S t r e a m In d e x NC D W Q S u r f a c e Wa t e r C l a s s i f i c a t i o n 30 3 ( d ) Im p a i r m e n t s Ty p e o f Im p a c t Existing SCM 21 + 2 7 21 + 4 6 - S t r e a m i m p a c t s a s s o c i a t e d w i t h t h i s p r o j e c t a r e t e m p o r a r y i m p a c t s r e s u l t i n g f r o m t h e c o n s t r u c t i o n o f a t e m p o r a r y c a u s e w a y . S T O R M W A T E R M A N A G E M E N T P L A N FO R L I N E A R R O A D W A Y P R O J E C T S Re f e r e n c e s Pr o j e c t / T I P N o . : * L i s t a l l s t r e a m a n d s u r f a c e w a t e r i m p a c t l o c a t i o n s r e g a r d l e s s o f j u r i s d i c t i o n o r s i z e . Pr o j e c t E n v i r o n m e n t a l S u m m a r y St r e a m 13 - 1 7 Fill No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Hi g h w a y S t o r m w a t e r P r o g r a m Proposed SCM N/AN/A A l l p r o p o s e d S C M s l i s t e d m u s t a l s o b e l i s t e d u n d e r S w a l e s , P r e f o r m e d S o u r H o l e s a n d o t h e r E n e r g y D i s s i p a t o r s , o r O t h e r S t o r m w a t e r C o n t r o l M e a s u r e s . E q u a l i z e r P i p e s t o b e n o t e d a s a m i n i m i z a t i o n o f i m p a c t s . De s c r i p t i o n o f M i n i m i z a t i o n o f I m p a c t s o r M i t i g a t i o n Su r f a c e W a t e r I m p a c t s 4 Pe r e n n i a l No n e C Ro c k y R i v e r TOTAL LENGTH OF TIP PROJECT B-4972 = 0.256 MI LENGTH OF STRUCTURE TIP PROJECT B-4972 = 0.072 MI LENGTH OF ROADWAY TIP PROJECT B-4972 = 0.184 MI G. E. BREW PE CABARRUS COUNTY GRADING, PAVING, DRAINAGE AND STRUCTURE 25 50 10050 25 50 10050 5 10 20 10 D *T = = = = = =55 % % MPH ADT ADT 2035 % 4 (RURAL LOCAL) * TTST 3 %+DUAL 10% SUB-REGIONAL TIER NSRS 2007NAD 83/ 2014 V 10 55 0 0 0 PROFILE (HORIZONTAL) PE PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA Prepared in the Office of:DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SIGNATURE: SIGNATURE: P.E. P.E. DIVISION OF HIGHWAYS 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK: 0 9 / 0 8 / 9 9 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 See Sheet 1-A For Index of Sheets 9 : 3 3 : 5 3 A M . . . \ b - 4 9 7 2 _ h y d _ p r m _ t s h . d g n $ $ $ $ U S E R N A M E $ $ $ $ 1000 Birch Ridge Dr., Raleigh NC, 27610 T I P P R O J E C T : D E P A R T MEN T O F TRANSPORTA T IO N S T A TEOFNORT H CAR O LI N A B-4972 40096.1.1 BRSTP-1006 (32) B - 4 9 7 2 C O N T R A C T : JUNE 25, 2014 BRIDGE NO. 227 OVER ROCKY RIVER ON SR 1006 2342 1145 1125 1144 1124 1103 1103 1251 1181 1252 1125 1125 1125 1179 Flows Store 1231 1146 1146 1132 1132 1271 1127 1106 1275 1174 1149 2670 2671 1256 1120 1123 11231125 1123 1108 1107 1100 1100 1100 1230 1177 1145 1187 1187 2334 1236 1235 1147 1105 1105 1190 1268 1267 1006 1006 2348 1006 1006 1100 1100 1104Smith Rd. Hartsell Rd. Loving Rd. 1143 1143 1143 1183 1142 1142 1253 1145 2363 2362 2364 2678 1151 2343 2329 1292 1295 1294 2308 1292 1292 1293 2310 2309 1148 1148 2313 2314 2359 2359 2360 2361 1152 1147 Holt Bethel SchoolDr. Wesley Dr. Rd. Howell Rd. Brook Rd. Sossoman Spring Rd. Helmdale Rd. Rd. Sam Gray Bark Rd. CarrikerRd.Spring Dr. Rd. Cal Bost Jim Kiser Rd. Wickersham Rd. Barkley Rd. Lamar Rd. Christopher Ln. Harvell Dr. John White Rd. Pineleaf Cir. SapytaLn. BaptistLn. Dakieta Cir. Joyner Rd. Edgefield Rd. Georgeville WagonwheelLn. WaldenLn.ForsytheLn. Sagebrush Cir. Palafox Dr. Erinbroo k Dr. Parks Lafferty Rd. Parks Lafferty Rd. Ray Link er Rd. Vanderburg Dr.Biggers Rd. RiverBendRd. Rd. Breezy Ln. Bostwood Ln. Clara Cir. Watson Dr.MarilynCt. Rd. Church Rd. Barrier - Georgeville Reed Mine Rd. Reed Mine Rd. Rd. Flowes Vander Horse Dr. Ashley Dr. Pinckney Ct. Old wagon Ln. Meeting St. Flowes Store Rd. Store Rd. mt. Pleasant Plea sant Mt. Rd. Sossoman Rd. Sossoman Jim Rd. Troutman Rd. Trou tman Rd. Little Buffalo Creek Ro c k y River River Rocky River Creek Meadow Creek Anderson And erson Anderson Creek Creek Creek Robert Rd. Bost Robert BostRd. DevelopmentCenterRd. McManus Rd. Hartsell Hartsell Rd. Rd. %601 %601 %601 (24 27 (24 27 (200 (200 (200 dR dR 2711 2713 2714 2715 2714 Maple Bluff Lane Willow Grove Lane Running Deer Dr. 2713 2398 Staff ord Farm Rd. 3005 3007 3003 3008 3002 Haydens Way ChanelCt 3009 Birdsong Ln.3010 Snow Crest Dr. G G GCedar GroveCh. F HG jEbenezer School jBethel School Saint Martins Church FBogers Chapel ChurchPine Bluff FEbenezer Church Locust Timothy Dr Jason Dr 2719KirklandDriveCourt Court Lane Ashebrook EastridgeFirethorne 3001 3001 3002 1006 10,800 13 4,420 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PROJECT SITE VICINITY MAP OFFSITE DETOUR -L-SR 1006 R O C K Y R I V E R PC Sta. 27+68.10 PT Sta. 26+41.97 PC Sta. 23+70.17 PT Sta. 17+63.15 K (27 24 JUNE 16, 2015 W. T. BEST BEG. APPROACH SLAB BEGIN BRIDGE END BRIDGE END APPROACH SLAB STA. 24+45.00+/- -L- STA. 24+57.00+/- -L- STA. 20+65.00+/- -L- STA. 20+53.00+/- -L- 40096.2.FD1 BRSTP-1006 (32) R/W, UTILITIES TO THE LIMITS ESTABLISHED BY METHOD II CLEARING ON THIS PROJECT SHALL BE PERFORMED BEGIN TIP PROJECT B-4972 -L- Sta. 15+50.00 -L- Sta. 29+00.00 END TIP PROJECT B-4972 THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARY WETLAND & STREAM IMPACTS SHEET OF PERMIT DRAWINGS 1 5 CONC #227 FIBER OPTIC CABLE DIRECTIONAL BORED UNDER RIVER C C C SHEET PILING RETAIN EXIST. EXCAVATION LIMIT WORKBRIDGE CAUSEWAY TEMP. ROCK HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 4 B-4972 1: 2 6 : 11 P M . . . \ D r a w i n g s \ 1 2 0 2 2 7 _ h y d _ p r m _ 0 1 . d g n $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 12 ' 12 ' 4' PAVED SHLD. 4' PAVED SHLD. 12 ' 12 ' 4' PAVED SHLD. 4' PAVED SHLD. 0 2 0 2 SKETCH SHOWING BRIDGE IN RELATION TO PAVEMENT APPROACH SLAB NAD 83/ NSRS 2007 0 2 0 2 12 ' 12 ' TYPE III TYPE III TYPE III TYPE III 0 2 0 2 3 3 ' - 6 " 4 ' M IN . 5 ' - 6 " M A X 54" CHL S W DK WD 1SFD MTL B K AN D C ON C W SOIL AND GR 1SFD W DK WD 12 " R C P S CONC GARDEN SO IL GATES54" CHL GR GR GR 9" CONC WW 9" CONC WW CONC WW CONC WW GR GATE MTL EXISTING R/W E X IS T IN G R / W (P B 14 - 4 0 ) E X IS T IN G R / W EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP LT B ON A N Z A D R . 13 ' GR R OC K Y R IVE R R OC K Y R IVE R EXISTING R/W (DB 8518-199) C C T CONC #227 EXISTING R/W EXISTING R/W 6 0 . 0 0 ' T T ELEV 497.98' BM#2 HH FIBER OPTIC CABLE DIRECTIONAL BORED UNDER RIVER RK RET WALLRR TIE AND C C C C C F C F F F F F F F F F F F F F C C C C F F F F F F C F C C C C C C C C C C CC C F F C C C C C C C C C C F 15 2 5 3 0 4' PS 4' PS 0 3 0 2 0 2 0 2 0 3 0 4 0 5 0 6 0 0 0 1 INTERVALS25.00' 0 2 0 2 + 0 0 . 0 0 12 ' 12 ' 12 ' 12 ' 4' PS 4' PS 12 ' 12 ' TYPE III TYPE III TYPE III TYPE III 0 2 0 4 INTERVALS 25.00 ' GRAU TYPE 350 GRAU TYPE 350 GRAU TYPE 350 GRAU TYPE 350 . 0 2 . 0 212 ' 12 ' 4'-7" 4'-11" 3 3 ' - 6 " 5'-6" MAX. 4' MIN. BASIN PROPOSED CHORD 8:1 8:1 8:1 15" RCP-IV D D FG TB2GI FG TB2GI D 15" RCP-IV D FG TB2GI FG TB2GI EST. 5 SY GEO EST. 1 TONS CLASS 'I' RIP-RAP EST. 5 SY GEO EST. 1 TONS CLASS 'i' RIP-RAP EST. 120 SY GEO EST. 40 TONS SEE DETAIL A STANDARD 'V' DITCH SEE DETAIL C LATERAL 'V' DITCH 2 ELBOWS 15" W/ EXISTING TIE TO EXISTINGTIE TO EST. 75 SY PSRM SEE DETAIL D TOE PROTECTION EST. 15 SYGF EST. 8 TONS CL. 'I' RIP RAP SEE DETAIL S DECK DRAIN DISSIPATOR PAD EST. 85 SYGF EST. 48 TONS CL. 'I' RIP RAP SEE DETAIL S DECK DRAIN DISSIPATOR PAD SHEET PILING RETAIN EXIST. ROCK ABUTMENT RETAIN EXIST. 2:12: 1 D ( Not to Scale) d STANDARD 'V' DITCH FROM -L- STA. 22+43 TO STA. 24+19 (LT) Type of Liner= Class 'I' Rip-Rap Max. d=1.0 Ft. Min. D=1.0 Ft. DETAIL A Ground Natural Spill Through Proposed Geotextile LATERAL 'V' DITCH ( Not to Scale) 2:1 2:1 D b d 1"/Ft. FROM -L- STA. 24+19 TO STA. 25+50 (LT) Slope Fill Type of Liner= Class 'I' Rip-Rap b=5.0 Ft. Max. d=1.0 Ft. Min. D=1.0 Ft. DETAIL B Ground Natural Geotextile LATERAL 'V' DITCH ( Not to Scale) D 2: 1 2:1 b 1"/Ft. FROM -L- STA. 25+50 TO STA. 27+00 (LT) b=5.0 Ft. Min. D=1.0 Ft. DETAIL C Ground Natural Slope Fill ( Not to Scale) TOE PROTECTION d FLATTER2:1 OR FROM -L- STA. 24+50 TO STA. 25+50 (RT) DETAIL D b b= 3.0 Ft. d= 1.0 Ft. Type of Liner= PSRM GROUND NATURAL SLOPE FILL FROM -L- STA. 22+40 TO STA. 24+20 (LT) FROM -L- STA. 20+90 TO STA. 21+20 (LT) DETAIL S GEOTEXTILE GROUND PLAN VIEW PROFILE VIEW DECK DRAIN DISSIPATOR PAD *NOTE: CENTER PAD DIRECTLY BELOW DECK DRAINS Type of Liner= Class 'I' Rip-Rap PAD DISSIPATOR ( Not to Scale) 15" 4.0' L EXCAVATION LIMIT 2 ELBOWS 15" W/ EXCAVATION LIMIT EST. 80 SY GEO EST. 30 TONS SEE DETAIL B LATERAL 'V' DITCH NO DECK DRAINS ARE TO BE PLACED OVER JURISDICTIONAL FEATURES. -L- STA. 22+40 TO 24+40 (LT) DECK DRAINS ARE TO BE INSTALLED @ 5' CENTERS FOR THE FOLLOWING STATION RANGE: -L- STA. 20+70 TO 21+24 (LT) NOTE: DECK DRAINS ARE TO BE INSTALLED @ 3' CENTERS FOR THE FOLLOWING STATION RANGE: WORKBRIDGE ( Not to Scale) DETAIL I TEMPORARY ROCK CAUSEWAY STREAM BED SLOPE 1•: 1 RIP RAP CLASS II 2 ' - 0 " RIP RAP CLASS B MI N . 1' - 0 " NWS 1" = 40' CAUSEWAY TEMP. ROCK WETLAND & STREAM IMPACTS LEGEND TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET OF PERMIT DRAWINGS 2 5 4 7 3 4 7 4 4 7 4 4 7 4 475 4 7 5 4 7 5 475 4 7 5 47 6 476 4 7 6 4764 7 6 477 477 4 7 7 4 7 8 47 8 478 4 8 0 4 8 0 4 8 1 4 8 3 483 4 8 4 4 8 5 4 8 5 4 8 7 4 9 2 4 7 3 4 7 4 4 7 4 4 7 4 475 475 4 7 5 475 4 7 5 47 5 4 7 5 4 7 5 4 7 6 4 7 6 476 47 6 4 7 6 476 47 6 476 47 6 4 7 6 476 476 4 7 6 4 7 6 4 7 6 4 7 6 4 7 6 477 4 7 7 4 7 7 477 4 7 7 477 47 7 477 477 4 7 7 4 7 7 4 7 7 477 4 7 7 4 7 7 4 7 7 4 7 7 477 4 7 7 47 7 4 7 7 4 7 7 4 7 7 4 7 8 478 4 7 8 4 7 8 4 7 8 47 8 478 4 7 8 4 7 8 4 7 8 47 8 4 7 8 478 4 7 8 4 7 8 478 4 7 9 4 7 9 4 7 9 4 7 9 479 47 9 479 4 7 9 4 7 9 479 4 7 9 4 7 9 4 8 0 4 8 0 4 8 0 4 8 0 4 8 0 4 8 0 4 8 0 4 8 0 480 4 8 0 4 8 0 4 8 0 480480 4 8 0 4 8 0 4 8 0 4 8 0 48 0 4 8 0 4 8 1 4 8 1 4 8 1 4 8 1 481 4 8 1 481 4 8 1 4 8 1 4 8 1 4 8 1 4 8 2 48 2 4 8 2 4 8 2 482 4 8 2 4 8 2 482 482 4 8 2 4 8 2 482 48 2 4 8 3 4 8 3 4 8 3 4 8 3 4 8 3 4 8 3 4 8 3 4 83 483 48 3 483 4 8 3 483 4 8 3 48 4 4 8 4 4 8 4 4 8 4 484 4 8 4 484 484 4 8 4 4 84 4 8 4 4 8 4 48 4 4 8 4 4 8 4 4 8 4 4 8 5 4 8 5 4 8 5 4 8 5 48 5 485 485 4 8 5 4 8 5 485 48 5 4 8 5 4 8 5 4 8 5 4 8 5 485 485 4 8 5 4 8 5 4 8 5 4 8 5 4 8 5 48 5 4 8 5 485 485 485 485485 485 4 8 5 4 85 485 4 8 5 4 86 48 6 4 8 6 486 486 486 486 4 8 6 4 8 6 486 4 8 6 4 8 6 4 8 6 48 6 486 486 4 8 6 4 86 4 86 4 8 6 48 7 48 7 48 7 487 48 7 4 8 7 4 8 7 4 8 7 4 8 7 4 8 7 487 4 8 7 4 8 7 4 8 7 4 8 7 4 8 7 487 487 487 487 48 8 488 48 8 488 488 4 8 8 488 48 8 488 488 4 8 8 48 8 4 8 8 48 8 4 8 8 4 8 8 4 8 8 48 8 488 488 4 8 8 4 8 9 48 9 48 9489 489 489 4 8 9 4 8 9 4 8 9 489 4 8 9 489 4 8 9 489 4 8 9 489 489 4 8 9 489 489 489 4 8 9 49 0 4 90 4 9 0 49 0 490 490 49 0 49 0 490 490 490 4 9 0 4 9 0 4 9 0 490 4 9 0 490 4 9 0 490 490 490 490 49 0 4 9 0 4 9 0 4 9 0 49 0 4 9 0 4 9 0 490 490 490 4 9 0 4 9 0 4 9 0 4 9 0 490 490 490 490 490 4 9 0 4 9 0 49 0 4 9 0 4 90 4 9 0 4 9 0 49 1 4 9 1 491 49 1 491 491 4 9 1 4 9 1 4 9 1 49 1 4 9 1 4 9 1 4 9 1 4 91 491 4 9 1 4 9 1 491 491 4 9 1 491 491 4 9 1 491 491 4 9 1 4 9 1 491 491 4 9 1 49 1 4 9 1 49 1 491 4 9 1 491 49 1 4 9 1 491 491 4 9 1 492 492 4 9 2 492 4 9 2 4 9 2 49 2 4 9 2 492 4 9 2 4 9 2 4 9 2 49 2 4 9 2 4 92 4 9 2 49 2 4 9 2 4 9 2 4 9 2 4 9 2 4 9 2 492 49 2 492 492 4 9 2 492 4 9 2 492 49 2 4 9 2 4 9 2 4 9 2 492 49 2 49 2 492 4 9 2 4 9 3 49 3 4 9 3 4 93 493 49 3 4 9 3 4 9 3 49 3 4 9 3 4 9 3 4 9 3 493 4 9 3 49 3 4 93 493 49 3 49 3 4 9 3 49 3 49 3 493 49 3 4 9 3 4 9 3 4 9 3 4 9 3 493 4 9 3 493 49 3 49 3 4 9 3 493 493 494494 4 9 4 4 94 4 9 4 494 49 4 4 94 4 9 4 4 9 4 4 9 4 49 4 494 4 9 4 494 4 9 4 494 4 94 494 494 49 4 4 9 4 4 9 4 49 4 4 9 4 49 4 4 9 4 4 9 4 4 9 4 4 9 4 494 494 495 495 49 5 4 9 5 49 5 495 4 9 5 495 495 495 4 9 5 49 5 49 5 4 9 5 4 9 5 4 95 4 9 5 4 9 5 49 5 4 9 5 4 9 5 4 9 5 49 5 4 9 5 4 9 5 4 9 5 49 5 495 4 9 5 4 9 549 5 4 9 5 4 9 5 495 495 49 5 495 49 5 495 495 495 495 4 9 5 49 5 49 5 495 4 9 5 4954 9 5 495 495 49 5 495 49 5 4 9 5 4 9 5 4 9 5 49 5 49 5 495 4 9 5 495 495 495 4 9 6 4 9 6 4 9 6 4 9 6 496 496 496 496 49 6 49 6 4 9 6 496 496 496 496 49 6 4 9 6 4 9 6 4 9 6 496 49 6 49 6 4 96 496 4 9 6 49 6 496 4 9 6 4 9 6 4 9 6 49 6 4 9 6 4 9 6 496 4 9 6 4 9 6 496 496 4 9 6 4 9 6 496 4 9 6 49 7 4 97 4 97 497 497 497 4 9 7 4 9 7 49 7 4 9 7 4 9 7 497 497 49 7 4 9 7 497 49 7 49 7 497 497 497 497 4 9 7 497 4 9 7 497 497 4 9 7 4 9 7 4 9 7 497 4 9 7 4 9 8 4 9 849 8 4 9 8 49 8 49 8 498 49 8 4 9 8 498 49 8 498 498 498 498 4 9 8 4 9 8 4 9 8 49 8 498 498 4 9 8 49 8 498 4 9 8 498 4 9 8 4 9 8 499 4 9 9 499 4 9 9 499 4 9 9 4 9 9 49 9 4 9 9 4 9 9 499 4 9 9 49 9 499 499 499 499 499499499 499 49 9 499 499 4 9 9 4 9 9 4 9 9 4 9 9 5 0 0 50 0 5 0 0 5 0 0 500 5 0 0 50 0 500 500 500 50 0 5 0 0 500 500 5 0 0 500 500 5 0 0 500 500 500 500 500 500 50 0 5 0 0 50 0 5 0 0 5 00 50 0 500 500500 500 500 500 5 0 0 5 0 0 500 500 500 50 0 500 500 50 0 5 0 0 50 0 5 01 5 0 1 501 50 1 501 5 0 1 501 501 501 501 501 501 501 5 0 1 5 0 1 501 501 501 5 0 1 50 1 501 5 0 1 501 50 2 5 0 2 5 0 2 502 502 502 502 502 502 502 50 2 502 502 50 2 502 502 5 0 2 502 50 2 5 0 2 50 2 5 0 2 5 0 2 50 3 5 0 3 503 503 50 3 503 503 503 503 503 50 3 50 3 5 0 3 50 3 5035 0 3 503 50 3 503 50 3 5 0 4 5 0 4 5 0 4 5 0 4 5 0 4 504 504 504 504 504 504 5 0 4 5 0 4 5 0 4 504 5 0 4 504 50 4 504 504 5 05 5 0 5 5 0 5 5 0 5 5 0 5 505 50 5 505 50 5 505 505 505 505 5 0 5 505 505 505 5 0 5 5 0 5 5 0 5 5 0 5 5 0 5 5 0 5 505 505 5 0 5 5 0 5 50 5 505 505 505 505 505 50 6 5 0 6 5 0 6 506 506 5 0 6 506 506 506 5 0 6 5 06 5 0 6 5 0 6 506 506 5 0 6 506 5 06 506 506 50 7 5 0 7 5 0 7 507 50 7 50 7 507 507 507 507 5 0 7 5 0 7 507 507 5 0 7 507 507 507 507 5 0 8 5 0 8 5 0 8 508 508 5 0 8 508 50 8 508 508 50 8 5 0 8 5 0 8 508 508 508 508 50 8 508 5 0 8 509 5 0 9 50 9 509 509 509 509 50 9 5 0 9 5 0 9 509 509 509 5 0 9 509 5 0 9 50 9 510 51 0 5 1 0 5 1 0 510 5 10 51 0 51 0 510 510 510 510 510 510 51 0 5 1 0 5 1 0 5 1 0 510 5 10 510 51 0 510 510 510 510 51 0 510 510 5 1 0 51 0 51 1 5 1 1 511 5 1 1 511 511 51 1 511 5 1 1 5 1 1 511 511 511 51 1 51 2 512 512 512 512 5 12 512 512 5 1 2 5 12 512 512 512 5 12 5 1 2 5 1 3 5 1 3 513 513 5 1 3 513 513 513 513 5 13 5 1 3 513 513 513 5 1 3 513 51 3 51 4 514 51 4 514 514 514 514 514 51 4 51 4 514 514 51 4 5 1 4 515 51 5 51 5 515 515 51 5 5 15 515 515 515 515 515 515 5 1 5 51 5 51 5 5 1 5 5 1 5 5 1 5 51 5 515 515 515 5 1 5 515 515 51 5 516 516 516 516 516 5 1 6 51 6 5 1 6 516 5 1 6 516 5 1 6 51 7 517 51 7 517 517 5 1 7 5 1 7 51 7 517 517 518 518 518 518 518 5 1 8 51 8 5 1 8 518 518 519 519 519 51 9 519 519 5 1 9 519 5 1 9 519 519 519 520 5 2 0 520 5 20 5 2 0 5 2 0 520 520 520 520 520 5 2 0 5 2 0 5 2 0 520 520 520 5 2 1 521 521 521 521 5 2 1 52 1 5 2 1 521 52 2 52 2 522 522 522 522 5 2 2 523 523 5 2 3 523 523 5 2 3 523 5 2 3 524 52 4 524 524 524 524 524 525 525 525 5 2 5 525 52 5 525 525 5 2 5 525 525 52 5 5 2 6 526 526 526 526 5 2 6 5 2 6 52 7 527 5 2 7 527 527 527 52 7 527 5 2 8 528 528 528 5 2 9 529 529 529 529 52 9 530 530 530 5 3 0530 530 530 53 0 530 53 0 531 531 531 5 31 531 532 53 2 532 532 532 533 533 533 53 3 533 534 534 534 5 3 4 535 53 5 535 535 535 5 3 5 5 3 6 5 3 7 537 CONC #227 FIBER OPTIC CABLE DIRECTIONAL BORED UNDER RIVER C C C SHEET PILING RETAIN EXIST. EXCAVATION LIMIT WORKBRIDGE CAUSEWAY TEMP. ROCK HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 4 B-4972 1: 2 5 : 3 1 P M . . . \ D r a w i n g s \ 1 2 0 2 2 7 _ h y d _ p r m _ 0 2 . d g n $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 12 ' 12 ' 4' PAVED SHLD. 4' PAVED SHLD. 12 ' 12 ' 4' PAVED SHLD. 4' PAVED SHLD. 0 2 0 2 SKETCH SHOWING BRIDGE IN RELATION TO PAVEMENT APPROACH SLAB NAD 83/ NSRS 2007 0 2 0 2 12 ' 12 ' TYPE III TYPE III TYPE III TYPE III 0 2 0 2 3 3 ' - 6 " 4 ' M IN . 5 ' - 6 " M A X 54" CHL S W DK WD 1SFD MTL B K AN D C ON C W SOIL AND GR 1SFD W DK WD 12 " R C P S CONC GARDEN SO IL GATES54" CHL GR GR GR 9" CONC WW 9" CONC WW CONC WW CONC WW GR GATE MTL EXISTING R/W E X IS T IN G R / W (P B 14 - 4 0 ) E X IS T IN G R / W EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP LT B ON A N Z A D R . 13 ' GR R OC K Y R IVE R R OC K Y R IVE R EXISTING R/W (DB 8518-199) C C T CONC #227 EXISTING R/W EXISTING R/W 6 0 . 0 0 ' T T ELEV 497.98' BM#2 HH FIBER OPTIC CABLE DIRECTIONAL BORED UNDER RIVER RK RET WALLRR TIE AND C C C C C F C F F F F F F F F F F F F F C C C C F F F F F F C F C C C C C C C C C C CC C F F C C C C C C C C C C F 15 2 5 3 0 4' PS 4' PS 0 3 0 2 0 2 0 2 0 3 0 4 0 5 0 6 0 0 0 1 INTERVALS25.00' 0 2 0 2 + 0 0 . 0 0 12 ' 12 ' 12 ' 12 ' 4' PS 4' PS 12 ' 12 ' TYPE III TYPE III TYPE III TYPE III 0 2 0 4 INTERVALS 25.00 ' GRAU TYPE 350 GRAU TYPE 350 GRAU TYPE 350 GRAU TYPE 350 . 0 2 . 0 212 ' 12 ' 4'-7" 4'-11" 3 3 ' - 6 " 5'-6" MAX. 4' MIN. BASIN PROPOSED CHORD 8:1 8:1 8:1 15" RCP-IV D D FG TB2GI FG TB2GI D 15" RCP-IV D FG TB2GI FG TB2GI EST. 5 SY GEO EST. 1 TONS CLASS 'I' RIP-RAP EST. 5 SY GEO EST. 1 TONS CLASS 'i' RIP-RAP EST. 120 SY GEO EST. 40 TONS SEE DETAIL A STANDARD 'V' DITCH SEE DETAIL C LATERAL 'V' DITCH 2 ELBOWS 15" W/ EXISTING TIE TO EXISTINGTIE TO EST. 75 SY PSRM SEE DETAIL D TOE PROTECTION EST. 15 SYGF EST. 8 TONS CL. 'I' RIP RAP SEE DETAIL S DECK DRAIN DISSIPATOR PAD EST. 85 SYGF EST. 48 TONS CL. 'I' RIP RAP SEE DETAIL S DECK DRAIN DISSIPATOR PAD SHEET PILING RETAIN EXIST. ROCK ABUTMENT RETAIN EXIST. 2:12: 1 D ( Not to Scale) d STANDARD 'V' DITCH FROM -L- STA. 22+43 TO STA. 24+19 (LT) Type of Liner= Class 'I' Rip-Rap Max. d=1.0 Ft. Min. D=1.0 Ft. DETAIL A Ground Natural Spill Through Proposed Geotextile LATERAL 'V' DITCH ( Not to Scale) 2:1 2:1 D b d 1"/Ft. FROM -L- STA. 24+19 TO STA. 25+50 (LT) Slope Fill Type of Liner= Class 'I' Rip-Rap b=5.0 Ft. Max. d=1.0 Ft. Min. D=1.0 Ft. DETAIL B Ground Natural Geotextile LATERAL 'V' DITCH ( Not to Scale) D 2: 1 2:1 b 1"/Ft. FROM -L- STA. 25+50 TO STA. 27+00 (LT) b=5.0 Ft. Min. D=1.0 Ft. DETAIL C Ground Natural Slope Fill ( Not to Scale) TOE PROTECTION d FLATTER2:1 OR FROM -L- STA. 24+50 TO STA. 25+50 (RT) DETAIL D b b= 3.0 Ft. d= 1.0 Ft. Type of Liner= PSRM GROUND NATURAL SLOPE FILL FROM -L- STA. 22+40 TO STA. 24+20 (LT) FROM -L- STA. 20+90 TO STA. 21+20 (LT) DETAIL S GEOTEXTILE GROUND PLAN VIEW PROFILE VIEW DECK DRAIN DISSIPATOR PAD *NOTE: CENTER PAD DIRECTLY BELOW DECK DRAINS Type of Liner= Class 'I' Rip-Rap PAD DISSIPATOR ( Not to Scale) 15" 4.0' L EXCAVATION LIMIT 2 ELBOWS 15" W/ EXCAVATION LIMIT EST. 80 SY GEO EST. 30 TONS SEE DETAIL B LATERAL 'V' DITCH NO DECK DRAINS ARE TO BE PLACED OVER JURISDICTIONAL FEATURES. -L- STA. 22+40 TO 24+40 (LT) DECK DRAINS ARE TO BE INSTALLED @ 5' CENTERS FOR THE FOLLOWING STATION RANGE: -L- STA. 20+70 TO 21+24 (LT) NOTE: DECK DRAINS ARE TO BE INSTALLED @ 3' CENTERS FOR THE FOLLOWING STATION RANGE: WORKBRIDGE ( Not to Scale) DETAIL I TEMPORARY ROCK CAUSEWAY STREAM BED SLOPE 1•: 1 RIP RAP CLASS II 2 ' - 0 " RIP RAP CLASS B MI N . 1' - 0 " NWS 1" = 40' CAUSEWAY TEMP. ROCK WETLAND & STREAM IMPACTS LEGEND TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET OF PERMIT DRAWINGS 253 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 5 B-4972 12 : 5 6 : 4 9 P M . . . \ b - 4 9 7 2 _ r d y _ h y d _ p f l . d g n $ $ $ $ U S E R N A M E $ $ $ $ STA. 15+50.00 -L- BEGIN GRADE ELEV. 529.94 STA. 29+00.00 -L- END GRADE ELEV. 506.89' 16 17 18 19 20 21 22 23 24 25 26 27 28 29 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 PI = 17+14.21 EL = 514.54' (-) 9. 3 782 % (-)0.5001% VC = 310' K = 35 PI = 28+00.00 EL = 509.11' (-)2.2200% VC = 200' K = 116 PI =24+35.000 El = 488.09 (+) 0.6198% (+) 10.3556% P I = 2 5 + 5 0 .0 0 0 E l = 5 0 0 .0 0 (+) 4.7540% El = 486.90' PI = 22+43.00 CUT DITCH (LT) BEGIN STANDARD PI = 24+19.00 'V' DITCH (LT) BEGIN LATERAL CUT DITCH (LT) END STANDARD El = 507.13' PI = 27+00.00 'V' DITCH (LT) END LATERAL SURVEY 09-17-13 WS EL.= 477.9' DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 26130 = 50 = 505.9 = 30790 = 100 = 507.61 = 34000 = 200 +/- = 508.8 = 09-17-13 = 477.9 SHEET OF PERMIT DRAWINGS ELEV. = 489.4' WORKBRIDGE APPROXIMATE CAUSEWAY TEMP. ROCK 4 5 NWS EL.= 478.5' Ha n d Existing Existing Pe r m a n e n t T e m p . E x c a v a t i o n M e c h a n i z e d C l e a r i n g P e r m a n e n t T e m p . C h a n n e l C h a n n e l N a t u r a l Si t e S t a t i o n St r u c t u r e Fi l l I n F i l l I n i n C l e a r i n g i n S W S W I m p a c t s I m p a c t s S t r e a m No . (F r o m / T o ) Si z e / T y p e We t l a n d s W e t l a n d s W e t l a n d s i n W e t l a n d s W e t l a n d s i m p a c t s i m p a c t s P e r m a n e n t T e m p . D e s i g n (a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( f t ) ( f t ) ( f t ) 1 - L - 2 1 + 2 7 T O 2 1 + 4 6 T e m p o r a r y C a u s e w a y 0 . 0 1 43 TO T A L S * : 0 . 0 1 43 *R o u n d e d t o t a l s a r e s u m o f a c t u a l i m p a c t s NO T E S : Re v i s e d 2 0 1 3 1 0 2 4 SH E E T 5OF 5 - T e m p o r a r y R o c k C a u s e w a y i s f o r t h e r e m o v a l o f e x i s t i n g b r i d g e p i e r . - P e r m a n e n t S t r e a m I m p a c t s f r o m b r i d g e c o n s t r u c t i o n = < 0 . 0 1 a c r e s ( 6 4 s q . f t . ) - T e m p o r a r y S t r e a m I m p a c t s f r o m w o r k b r i d g e c o n s t r u c t i o n = < 0 . 0 1 a c r e s ( 4 0 s q . f t . ) NC D E P A R T M E N T O F T R A N S P O R T A T I O N DIVISION OF HIGHWAYS 7/11/2014 W E T L A N D P E R M I T I M P A C T S U M M A R Y WE T L A N D I M P A C T S SU R F A C E W A T E R I M P A C T S CABARRUS COUNTY BRIDGE 227 ON SR 1006 OVER ROCKY RIVER T O T A L L E N G T H O F T I P P R O J E C T B - 4 9 7 2 = 0 . 2 5 6 M I L E N G T H O F S T R U C T U R E T I P P R O J E C T B - 4 9 7 2 = 0 . 0 7 2 M I L E N G T H O F R O A D W A Y T I P P R O J E C T B - 4 9 7 2 = 0 . 1 8 4 M I G. E. BREW PE C A B A R R U S C O U N T Y G R A D I N G , P A V I N G , D R A I N A G E A N D S T R U C T U R E 2 5 5 0 1 0 0 5 0 2 5 5 0 1 0 0 5 0 5 1 0 2 0 1 0 D * T ====== 5 5 %%M P H A D T A D T 2 0 3 5 % 4 ( R U R A L L O C A L ) * T T S T 3 % + D U A L 1 0 % S U B - R E G I O N A L T I E R 2 0 1 4 V 1 0 5 5 0 0 0 P R O F I L E ( H O R I Z O N T A L ) PE P R O J E C T L E N G T H R I G H T O F W A Y D A T E : L E T T I N G D A T E : STATESTATE PROJECT REFERENCE NO.STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTIONNO.TOTAL SHEETS N.C.SHEET1 D E S I G N D A T A P r e p a r e d i n t h e O f f i c e o f : DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SIGNATURE:SIGNATURE:P.E.P.E. D I V I S I O N O F H I G H W A Y S 2 0 1 2 S T A N D A R D S P E C I F I C A T I O N S PROJECT ENGINEER PROJECT DESIGN ENGINEER G R A P H I C S C A L E S P L A N S P R O F I L E ( V E R T I C A L ) HYDRAULICS ENGINEER ENGINEERROADWAY DESIGN L O C A T I O N : T Y P E O F W O R K : 09/08/99 D I V I S I O N O F H I G H W A Y S S T A T E O F N O R T H C A R O L I N A 0 00 S e e S h e e t 1 - A F o r I n d e x o f S h e e t s 11-JUL-2014 09:08 R:\Roadway\Proj\b-4972_rdy_tsh.dgn $$$$USERNAME$$$$ 1 0 0 0 B i r c h R i d g e D r . , R a l e i g h N C , 2 7 6 1 0 TIP PROJECT: DEPA R T M ENTOFTRANSPORTATIONSTATEOFNORTHCAROLINAB-4972 40096.1.1 BRSTP-1006 (32) B-4972 CONTRACT: J U N E 2 5 , 2 0 1 4 B R I D G E N O . 2 2 7 O V E R R O C K Y R I V E R O N S R 1 0 0 6 23 4 2 11 4 5 11 2 5 11 4 4 11 2 4 11 0 3 11 0 3 12 5 1 11 8 1 12 5 2 11 2 5 11 2 5 11 2 5 11 7 9 Fl o w s St o r e 12 3 1 11 4 6 11 4 6 11 3 2 11 3 2 12 7 1 11 2 7 11 0 6 12 7 5 11 7 4 11 4 9 26 7 0 26 7 1 12 5 6 11 2 0 11 2 3 11 2 3 11 2 5 11 2 3 11 0 8 11 0 7 11 0 0 11 0 0 11 0 0 12 3 0 11 7 7 11 4 5 11 8 7 11 8 7 23 3 4 12 3 6 12 3 5 11 4 7 11 0 5 11 0 5 11 9 0 12 6 8 12 6 7 10 0 6 10 0 6 23 4 8 10 0 6 10 0 6 11 0 0 11 0 0 11 0 4 Smith Rd. Hartsell Rd. LovingRd. 11 4 3 11 4 3 11 4 3 11 8 3 11 4 2 11 4 2 12 5 3 11 4 5 23 6 3 23 6 2 23 6 4 26 7 8 11 5 1 23 4 3 23 2 9 12 9 2 12 9 5 12 9 4 23 0 8 12 9 2 12 9 2 12 9 3 23 1 0 23 0 9 11 4 8 11 4 8 23 1 3 23 1 4 23 5 9 23 5 9 23 6 0 23 6 1 11 5 2 11 4 7 Holt Be t h e l Sc h o o l Dr . Wes l e y Dr . Rd. Howell R d . Br o o k Rd . Sossoman Spring Rd . Helmdale Rd. Rd. Sam Gr a y Bark Rd. Carriker Rd. Spr i n g Dr. Rd. Cal Bos t Jim Kiser Rd . Wickersham Rd. Bar k l e y R d . Lam a r Rd. ChristopherLn. Harvell Dr. John Wh i t e Rd. Pi n e l e a f Ci r . Sa p y t a Ln . Ba p t i s t Ln . Da k i e t a Cir. Jo y n e r Rd. Edgefield Rd. G e o r g e v i l l e Wagonwheel Ln. Walden Ln.ForsytheLn . Sagebrush Cir . Pal a f o x Dr. Erinbrook Dr. P a r k s Lafferty Rd . Parks Lafferty Rd . Ray Linker Rd. Vanderburg Dr. Bi g g e r s Rd . Ri v e r Be n d Rd . Rd . Breezy Ln. Bo s t w o o d Ln . Clara Cir. Wa t s o n Dr . MarilynCt . Rd.Chu r c h Rd. Barrier - Georgeville Re e d Mine Rd. Reed Mine Rd. Rd. Flo w e s Vander Horse Dr. Ashley Dr.Pin c k n e y Ct . Old wagon Ln. Me e t i n g St. Flowes Store Rd. Store Rd . mt. Pleasant Pleasant Mt. Rd. Sossoman Rd. Sossoman Jim Rd . Troutman Rd. Troutman Rd. Little Buffalo Creek Rocky River River Roc ky River Cr e e k Mea d o w Creek An d e r s o n Anderson Anderson Creek Creek Creek Robert Rd. Bost Ro b e r t Bo s t Rd . Dev e l o p m e n t Ce n t e r Rd . McManus Rd. Hartsell Hartsell Rd. Rd. %6 0 1 %60 1 %6 0 1 (2 4 2 7 (2 4 2 7 (2 0 0 (2 0 0 (2 0 0 dR dR 27 1 1 27 1 3 27 1 4 27 1 5 27 1 4 Maple Bluff Lane Willow Grove LaneRu n n i n g D e e r D r . 27 1 3 23 9 8 Stafford Farm Rd. 30 0 5 30 0 7 30 0 3 30 0 8 30 0 2 Hay d e n s Way Chanel Ct 30 0 9 Birdsong Ln. 30 1 0 SnowCrestDr. G G G Ce d a r G r o v e C h . F H G j Eb e n e z e r S c h o o l j Be t h e l Sc h o o l Sa i n t M a r t i n s Ch u r c h F Bo g e r s C h a p e l Ch u r c h Pi n e B l u f f F Eb e n e z e r C h u r c h L o c u s t Timothy DrJason Dr 27 1 9 Kir k l a n d Driv e Co u r t Co u r t Lane Ashebrook Ea s t r i d g e Firethorne 30 0 1 30 0 1 30 0 2 10 0 6 1 0 , 8 0 0 1 3 4 , 4 2 0 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS P R O J E C T S I T E V I C I N I T Y M A P O F F S I T E D E T O U R - L - S R 1 0 0 6 ROCKY RIVER PC Sta. 27+68.10PT Sta. 26+41.97 P C S t a . 2 3 + 7 0 . 1 7 P T S t a . 1 7 + 6 3 . 1 5 K (2 7 2 4 J U N E 1 6 , 2 0 1 5 W. T. BEST B E G . A P P R O A C H S L A B B E G I N B R I D G E E N D B R I D G E E N D A P P R O A C H S L A B S T A . 2 4 + 4 5 . 0 0 + / - - L - S T A . 2 4 + 5 7 . 0 0 + / - - L - S T A . 2 0 + 6 5 . 0 0 + / - - L - S T A . 2 0 + 5 3 . 0 0 + / - - L - 40096.2.FD1BRSTP-1006 (32) R/W, UTILITIES T O T H E L I M I T S E S T A B L I S H E D B Y M E T H O D I I C L E A R I N G O N T H I S P R O J E C T S H A L L B E P E R F O R M E D B E G I N T I P P R O J E C T B - 4 9 7 2 - L - S t a . 1 5 + 5 0 . 0 0 -L- Sta. 29+00.00 END TIP PROJECT B-4972 T H I S P R O J E C T I S N O T W I T H I N A N Y M U N I C I P A L B O U N D A R Y NSRS 2007NAD 83/ USE TYPICAL SECTION NO. 1CLGRADE TO THIS LINEGRADEPOINT CL GRADE POINT F D P S FDPS T 4’ 4 ’ TU11’11’ O R I G I N A L G R O U N D DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANSSHEET NO.PROJECT REFERENCE NO.ROADWAY DESIGN ENGINEERENGINEER2B-4972 PAVEMENT DESIGN 6/2/99 11-JUL-2014 09:09 R:\Roadway\Proj\b-4972_rdy_typ.dgn $$$$USERNAME$$$$ T Y P I C A L S E C T I O N N O . 1 ORIGINAL GROUNDVARIES 2:1 TO 4:1-L- (SR 1006)-L- (SR 1006)6’ 4: 1 8 ’ 6 ’ 2:1 12’12’12’12’TYPICAL SECTION NO. 3 USE TYPICAL SECTION NO. 3W 6 :1 12"12"C1 / / / / / / / / / / / / M I N . U E 2 3 " M I N . " 21 2 M I N . " 21 2 M I N . 3 " D e t a i l S h o w i n g M e t h o d o f W e d g i n g C S U R V E Y L C 2 D 2 D 1 C 1 E 2 D 1 D1E1 E 1 0.020.02*9’ w/GUARDRAIL -L- STA. 27+00.00 TO STA. 28+75.00 CL GRADE TO THIS LINEGRADEPOINT F D P S FDPS T 4’ 4 ’ T O R I G I N A L G R O U N D T Y P I C A L S E C T I O N N O . 2 ORIGINAL GROUNDVARIES 2:1 TO 4:1-L- (SR 1006)6’ 4: 1 8 ’ 6 ’ 2:1 12’12’ 6 :1 12"C1 D1 E 1 0.020.02*9’ w/GUARDRAIL USE TYPICAL SECTION NO. 2 D E S I G N D A T A - L - A D T 2 0 1 4 = 4 , 4 2 0 D H V = 1 0 % D I R = 5 5 % T T S T = 3 % D U A L = 1 0 % V = 5 5 m p h F U N C T I O N A L C L A S S = R U R A L L O C A L A D T 2 0 3 5 = 1 0 , 8 0 0 -L- STA. 15+75.00 TO STA. 20+65.00+/- (BEGIN BRIDGE)-L- STA. 24+45.00+/- (END BRIDGE) TO STA. 27+00.00-L- STA. 28+75.00 TO STA. 29+00.00, TRANSITION FROM TYP. SEC. NO. 1 TO EXISTING S U B - R E G I O N A L T I E R G U I D E L I N E S 0.02 * * * B I C Y C L E S A F E T Y R A I L 0.02-L- STA. 15+50.00 TO STA. 15+75.00, TRANSITION FROM EXISTING TO TYP. SEC. NO. 1 ( S E E S T R U C T U R E P L A N S ) C O N C R E T E W E A R I N G S U R F A C E ( F I N A L P A V E M E N T D E S I G N ) U S E W I T H T Y P I C A L S E C T I O N N O . 2 E 1 2:1 R 1 D 1 E 2 C 2 D E T A I L S H O W I N G S H O U L D E R B E R M G U T T E R 6 ’ - L - L T . S T A . 1 7 + 7 5 . 0 0 T O S T A . 2 0 + 5 3 . 0 0 - L - L T . S T A . 2 4 + 5 7 . 4 0 T O S T A . 2 5 + 5 7 . 7 5 * 9 ’ w / G U A R D R A I L * 9 ’ w / G U A R D R A I L 33’-6" LINE A-A - L - L T . S T A . 2 7 + 9 7 . 0 0 T O S T A . 2 9 + 0 0 . 0 0 LINE B-B LINE B-BLINE A-A T 6: 1 6 ’ 6 ’ 2:1 D 1 D E T A I L S H O W I N G S I D E R O A D W A Y D I T C H C 1 E 1 W U D E T A I L 2 ( M I L L I N G O F E X I S T I N G P A V E M E N T ) V L D 4 C 3 C - L - ( S R 1 0 0 6 ) T O B E U S E D I N C O N J U N C T I O N W I T H T Y P I C A L S E C T I O N S 1 M I L L E X I S T I N G - L - L I N E P A V E M E N T 1 . 5 " A N D R E P L A C E W I T H I 1 9 . 0 C 1.5" - L - L T . S T A . 2 7 + 0 0 . 0 0 T O S T A . 2 9 + 0 0 . 0 0 U S E W I T H T Y P I C A L S E C T I O N N O . 1 4’ MIN.-L- STA. 20+65.0+/- (BEGIN BRIDGE) TO STA. 24+45.00+/- (END BRIDGE) 5 ’ - 6 " M A X . 1 2 " 1 2 " G R O U N D O R I G I N A L G R O U N D O R I G I N A L G R A D E T O T H I S L I N E T 6 " G R A D E T O T H I S L I N E P A V E M E N T S C H E D U L E N O T E : P A V E M E N T E D G E S L O P E S A R E 1 : 1 U N L E S S S H O W N O T H E R W I S E . P R O P . V A R . D E P T H A S P H A L T C O N C R E T E I N T E R M E D I A T E C O U R S E , D 2 G R E A T E R T H A N 4 " I N D E P T H . D E P T H , T O B E P L A C E D I N L A Y E R S N O T L E S S T H A N 2 1 / 2 " I N D E P T H O R T Y P E I 1 9 . 0 B , A T A N A V E R A G E R A T E O F 1 1 4 L B S . P E R S Q . Y D . P E R 1 " C 1 D 1 E 1 P R O P . V A R . D E P T H A S P H A L T C O N C R E T E B A S E C O U R S E , T Y P E B 2 5 . 0 B , A T A N A V E R A G E R A T E O F 1 1 4 L B S . P E R S Q . Y D . P E R 1 " D E P T H . T O T H A N 5 1 / 2 " I N D E P T H . B E P L A C E D I N L A Y E R S N O T L E S S T H A N 3 " I N D E P T H O R G R E A T E R E 2 P R O P . V A R . D E P T H A S P H A L T C O N C R E T E S U R F A C E C O U R S E , T Y P E S 9 . 5 B , A T A N A V E R A G E R A T E O F 1 1 2 L B S . P E R S Q . Y D . P E R 1 " D E P T H . T O B E P L A C E D I N L A Y E R S N O T T O E X C E E D 1 1 / 2 " I N D E P T H . C 2 E X I S T I N G P A V E M E N T . U V A R I A B L E D E P T H A S P H A L T P A V E M E N T . ( W E D G I N G ) W E A R T H M A T E R I A L . T C O N C R E T E S H O U L D E R B E R M G U T T E R R 1 A T A N A V E R A G E R A T E O F 1 6 8 L B S . P E R S Q . Y D . I N E A C H O F T W O L A Y E R S . P R O P . A P P R O X . 3 " A S P H A L T C O N C R E T E S U R F A C E C O U R S E , T Y P E S 9 . 5 B , T Y P E I 1 9 . 0 B , A T A N A V E R A G E R A T E O F 3 9 9 L B S . P E R S Q . Y D . P R O P . A P P R O X . 3 - " A S P H A L T C O N C R E T E I N T E R M E D I A T E C O U R S E , A T A N A V E R A G E R A T E O F 6 2 7 L B S . P E R S Q . Y D . " A S P H A L T C O N C R E T E B A S E C O U R S E , T Y P E B 2 5 . 0 B , P R O P . A P P R O X . 5 M I L L I N G O F E X I S T I N G P A V E M E N T V E x i s t i n g E d g e o f P a v e m e n t E x i s t i n g C u r b P r o p o s e d S l o p e S t a k e s C u t P r o p o s e d S l o p e S t a k e s F i l l E x i s t i n g M e t a l G u a r d r a i l E x i s t i n g C a b l e G u i d e r a i l P r o p o s e d G u a r d r a i l E q u a l i t y S y m b o l P a v e m e n t R e m o v a l B a s e l i n e C o n t r o l P o i n t R I G H T O F W A Y : E x i s t i n g R i g h t o f W a y M a r k e r E x i s t i n g R i g h t o f W a y L i n e h E x i s t i n g C o n t r o l o f A c c e s s P r o p o s e d C o n t r o l o f A c c e s s P r o p o s e d R i g h t o f W a y L i n e C F E x i s t i n g E a s e m e n t L i n e P r o p o s e d T e m p o r a r y C o n s t r u c t i o n E a s e m e n t P r o p o s e d T e m p o r a r y D r a i n a g e E a s e m e n t P r o p o s e d P e r m a n e n t D r a i n a g e E a s e m e n t P r o p o s e d P e r m a n e n t U t i l i t y E a s e m e n t H Y D R O L O G Y : S t r e a m o r B o d y o f W a t e r H y d r o , P o o l o r R e s e r v o i r F l o w A r r o w D i s a p p e a r i n g S t r e a m S p r i n g ; z v W K P r o p o s e d L a t e r a l , T a i l , H e a d D i t c h F a l s e S u m p P r o p o s e d C a b l e G u i d e r a i l M A J O R : B r i d g e , T u n n e l o r B o x C u l v e r t B r i d g e W i n g W a l l , H e a d W a l l a n d E n d W a l l M I N O R : H e a d a n d E n d W a l l P i p e C u l v e r t F o o t b r i d g e P a v e d D i t c h G u t t e r U T I L I T I E S : R O A D S A N D R E L A T E D F E A T U R E S : E x i s t i n g P o w e r P o l e P r o p o s e d P o w e r P o l e P U / G P o w e r C a b l e H a n d H o l e P o w e r M a n h o l e P o w e r L i n e T o w e r P o w e r T r a n s f o r m e r E x i s t i n g J o i n t U s e P o l e P r o p o s e d J o i n t U s e P o l e E x i s t i n g T e l e p h o n e P o l e P r o p o s e d T e l e p h o n e P o l e T e l e p h o n e M a n h o l e T e l e p h o n e B o o t h T e l e p h o n e P e d e s t a l U / G T e l e p h o n e C a b l e H a n d H o l e R }Tp Q l e ]/b H - F r a m e P o l e OO P O W E R : T E L E P H O N E : T e l e p h o n e C e l l T o w e r R e c o r d e d U / G P o w e r L i n e R e c o r d e d U / G T e l e p h o n e C a b l e D e s i g n a t e d U / G T e l e p h o n e C a b l e ( S . U . E . * ) R e c o r d e d U / G T e l e p h o n e C o n d u i t D e s i g n a t e d U / G T e l e p h o n e C o n d u i t ( S . U . E . * ) R e c o r d e d U / G F i b e r O p t i c s C a b l e WATER:Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line4IHa TV:TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*)r|I]GAS:Gas Valve Gas Meter Recorded U/G Gas Linenc SANITARY SEWER:Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*)d oA/G Water Above Ground Gas LineA/G GasAbove Ground Water Line Above Ground Sanitary SewerA/G Sanitary Sewer MISCELLANEOUS:Utility PoleO F S 3Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line ?CONC CONC WW vv D r a i n a g e B o x : C a t c h B a s i n , D I o r J B S t o r m S e w e r S t o r m S e w e r M a n h o l e m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil B O U N D A R I E S A N D P R O P E R T Y : S t a t e L i n e C o u n t y L i n e T o w n s h i p L i n e C i t y L i n e R e s e r v a t i o n L i n e P r o p e r t y L i n e E x i s t i n g I r o n P i n P r o p e r t y C o r n e r P r o p e r t y M o n u m e n t E x i s t i n g F e n c e L i n e P r o p o s e d W o v e n W i r e F e n c e P r o p o s e d C h a i n L i n k F e n c e P r o p o s e d B a r b e d W i r e F e n c e g F 1 2 3 E x i s t i n g W e t l a n d B o u n d a r y P r o p o s e d W e t l a n d B o u n d a r y E x i s t i n g E n d a n g e r e d A n i m a l B o u n d a r y E x i s t i n g E n d a n g e r e d P l a n t B o u n d a r y B U I L D I N G S A N D O T H E R C U L T U R E : A r e a O u t l i n e G a s P u m p V e n t o r U / G T a n k C a p C h u r c h S c h o o l D a m S i g n S m a l l M i n e W e l l V MWWS x F o u n d a t i o n S B u i l d i n g y y V E G E T A T I O N : S i n g l e T r e e X Y Vineyard S i n g l e S h r u b H e d g e W o o d s L i n e O r c h a r d V i n e y a r d R A I L R O A D S : S t a n d a r d G a u g e R R S i g n a l M i l e p o s t S w i t c h R R A b a n d o n e d R R D i s m a n t l e d S FL O W D e s i g n a t e d U / G P o w e r L i n e ( S . U . E . * ) D e s i g n a t e d U / G F i b e r O p t i c s C a b l e ( S . U . E . * ) Designated U/G Water Line (S.U.E.*)Designated U/G TV Cable (S.U.E.*)Designated U/G Gas Line (S.U.E.*)U/G Test Hole (S.U.E.*) * S . U . E . = S u b s u r f a c e U t i l i t y E n g i n e e r i n g W L B E I P B E C M CONC HW CB C S X T R A N S P O R T A T I O N M I L E P O S T 3 5 S W I T C H C e m e t e r y E X I S T I N G S T R U C T U R E S : P a r c e l / S e q u e n c e N u m b e r E AATUR End of InformationE.O.I. N o t e : N o t t o S c a l e SHEET NO.PROJECT REFERENCE NO.1-BB-4972 Abandoned According to Utility Records W L B E A B E P B R W R W R W C A E T D E P D E P U E S P P T T TC TC T FO T FOWWTVTVTV FO TV FO G G SS FSS FSS ?UTL J u r i s d i c t i o n a l S t r e a m J S 04/16/11 B u f f e r Z o n e 1 B u f f e r Z o n e 2 B Z 1 B Z 2 W e t l a n d P r o p o s e d P e r m a n e n t E a s e m e n t w i t h I r o n P i n a n d C a p M a r k e r P r o p o s e d T e m p o r a r y U t i l i t y E a s e m e n t T U E I r o n P i n a n d C a p M a r k e r P r o p o s e d R i g h t o f W a y L i n e w i t h D U E P r o p o s e d P e r m a n e n t D r a i n a g e / U t i l i t y E a s e m e n t A U E P r o p o s e d A e r i a l U t i l i t y E a s e m e n t C R P r o p o s e d C u r b R a m p S T A T E O F N O R T H C A R O L I N A D I V I S I O N O F H I G H W A Y S C O N V E N T I O N A L P L A N S H E E T S Y M B O L S Underground Storage Tank, Approx. Loc.Geoenvironmental BoringUST K n o w n S o i l C o n t a m i n a t i o n : A r e a o r S i t e P o t e n t i a l S o i l C o n t a m i n a t i o n : A r e a o r S i t e C o n c r e t e o r G r a n i t e R / W M a r k e r P r o p o s e d R i g h t o f W a y L i n e w i t h C A C o n c r e t e C / A M a r k e r P r o p o s e d C o n t r o l o f A c c e s s L i n e w i t h - L - S t a . 1 0 + 0 0 . 0 0 2 1 B M - 1 B M - 2 BM-3 B 4 9 7 2 - 2 B L - 3 B L - 4 BL-5BL-6BL-7 B 4 9 7 2 - 1 T O U S 6 0 1 TO NC 200NC GRIDNAD 83/NSRS 2007 N O T E : D R A W I N G N O T T O S C A L E 11-JUL-2014 09:08 R:\Roadway\Proj\b4972_ls_1c.dgn $$$$USERNAME$$$$ L O C A T I O N A N D S U R V E Y S U N I T : M O N U M E N T S U S E D O R S E T F O R P R O J E C T C O N T R O L B Y T H E N C D O T I N D I C A T E S G E O D E T I C C O N T R O L M O N U M E N T S F O R H O R I Z O N T A L C O N T R O L I N D I C A T E S B A S E L I N E M O N U M E N T S F O R H O R I Z O N T A L P R O J E C T C O N T R O L I N D I C A T E S B E N C H M A R K S F O R V E R T I C A L C O N T R O L U T I L I Z I N G T H E N C G S R T N S Y S T E M ( V R S ) . N O T E S : B 4 9 7 2 _ L S _ L O C A L . T X T 1 . T H E C O N T R O L D A T A F O R T H I S P R O J E C T C A N B E F O U N D E L E C T R O N I C A L L Y B Y S E L E C T I N G P R O J E C T C O N T R O L D A T A A T : H T T P S : / / C O N N E C T . N C D O T . G O V / R E S O U R C E S / L O C A T I O N T H E F I L E S T O B E F O U N D A R E A S F O L L O W S : B 4 9 7 2 _ L S _ C O N T R O L . T X T 2 . S I T E C A L I B R A T I O N I N F O R M A T I O N H A S N O T B E E N P R O V I D E D F O R T H I S P R O J E C T . I F F U R T H E R I N F O R M A T I O N I S N E E D E D , P L E A S E C O N T A C T T H E 3 . P R O J E C T C O N T R O L E S T A B L I S H E D U S I N G G L O B A L P O S I T I O N I N G S Y S T E M , L O C A T I O N A N D S U R V E Y S U N I T . 7 B L - 7 5 7 3 4 8 5 . 0 0 8 6 1 5 5 9 3 2 2 . 2 0 0 5 4 9 4 . 7 1 O U T S I D E P R O J E C T L I M I T S 6 B L - 6 5 7 3 2 4 8 . 0 2 1 1 1 5 5 9 2 8 4 . 9 1 0 8 4 9 8 . 9 6 3 0 + 6 3 . 8 7 2 0 . 3 5 R T 5 B L - 5 5 7 2 9 5 1 . 2 5 2 4 1 5 5 9 1 3 6 . 7 7 7 9 5 0 8 . 7 3 2 7 + 3 4 . 4 1 2 1 . 3 6 L T 4 B L - 4 5 7 2 5 5 8 . 9 4 2 9 1 5 5 8 9 7 8 . 6 0 3 0 5 0 0 . 8 0 2 3 + 1 2 . 8 6 1 6 . 9 9 R T 3 B L - 3 5 7 2 3 5 4 . 2 4 2 5 1 5 5 8 8 6 2 . 7 0 8 2 5 0 0 . 6 1 2 0 + 7 7 . 6 3 1 8 . 8 3 R T 2 B 4 9 7 2 - 2 5 7 1 8 0 6 . 8 3 9 0 1 5 5 8 5 0 2 . 1 9 6 0 5 3 9 . 9 0 1 4 + 2 4 . 8 4 1 9 . 7 6 R T 1 B 4 9 7 2 - 1 5 7 1 3 3 5 . 9 9 9 0 1 5 5 7 9 6 0 . 2 9 6 0 5 5 7 . 6 3 O U T S I D E P R O J E C T L I M I T S - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - P O I N T D E S C . N O R T H E A S T E L E V A T I O N L S T A T I O N O F F S E T B L SHEET NO.PROJECT REFERENCE NO.Location and SurveysB-49721-C DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "B4972-2"WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF NORTHING: 571806.839(ft) EASTING: 1558502.196(ft)ELEVATION: 539.90(ft)THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.9998530 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 S U R V E Y C O N T R O L S H E E T - Preliminary - TIE1 "B4972-2" TO -L- PT STATION 15+46.50 IS 05/13/14 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * R R S P I K E I N 1 5 " R E D O A K L S T A T I O N 1 3 + 4 8 3 3 L E F T N 5 7 1 7 8 7 E 1 5 5 8 4 1 1 B M 1 E L E V A T I O N = 5 4 3 . 5 3 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * R R S P I K E I N 1 0 " T W I N B I R C H L S T A T I O N 2 0 + 3 5 6 0 R I G H T N 5 7 2 2 9 7 E 1 5 5 8 8 7 7 B M 2 E L E V A T I O N = 4 9 7 . 9 8 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * R R S P I K E I N 2 4 " W H I T E O A K L S T A T I O N 3 0 + 1 4 3 4 R I G H T N 5 7 3 1 9 6 E 1 5 5 9 2 8 6 B M 3 E L E V A T I O N = 5 0 1 . 7 9 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * B E G I N P R O J E C T - L - P T S t a . 1 6 + 0 0 . 0 0 END PROJECT ROW Marker Iron Pin and Cap ALIGNSTATIONOFFSETNORTHEAST L15+25.0029.67571876.74131558576.9210 L15+25.00-30.33571914.81181558530.5355 L15+25.0063.00571855.59851558602.6816 L15+25.00-50.00571927.28821558515.3341 L17+63.1563.00572059.73861558743.8874 L17+63.15-50.00572116.18201558645.9938 L18+75.00-75.00572225.56661558680.2047 L23+70.17-75.00572654.53941558927.5412 L23+70.1763.00572585.60861559047.0927 L24+85.00-75.00572752.57811558981.5951 L25+77.00-55.00572823.80001559040.1435 L26+41.9763.00572831.96231559174.6340 L26+41.97-55.00572881.41251559067.4954 L27+27.64-55.00572959.19541559103.3964 L27+68.1063.00572946.48111559227.4905 L29+50.0063.00573123.75621559295.7304 L29+50.0030.96573133.30011559265.1475 L T Y P E S T A T I O N N O R T H E A S T P C 1 0 + 0 0 . 0 0 5 7 1 5 2 7 . 9 4 0 9 1 5 5 8 1 8 0 . 2 2 6 2 P T 1 3 + 3 0 . 8 9 5 7 1 7 5 2 . 2 2 5 0 1 5 5 8 4 2 3 . 1 7 5 0 P C 1 4 + 2 1 . 1 9 5 7 1 8 1 7 . 7 4 9 2 1 5 5 8 4 8 5 . 3 0 9 8 P T 1 7 + 6 3 . 1 5 5 7 2 0 9 1 . 2 0 7 0 1 5 5 8 6 8 9 . 3 0 9 5 P C 2 3 + 7 0 . 1 7 5 7 2 6 1 7 . 0 7 7 0 1 5 5 8 9 9 2 . 5 1 4 8 P T 2 6 + 4 1 . 9 7 5 7 2 8 5 8 . 3 6 3 7 1 5 5 9 1 1 7 . 4 3 2 8 P C 2 7 + 6 8 . 1 0 5 7 2 9 7 2 . 8 8 2 5 1 5 5 9 1 7 0 . 2 8 9 4 P T 3 1 + 7 0 . 9 6 5 7 3 3 5 7 . 7 6 1 6 1 5 5 9 2 8 4 . 5 3 0 6 P O T 3 2 + 8 6 . 9 2 5 7 3 4 7 2 . 5 1 1 8 1 5 5 9 3 0 1 . 2 4 7 1 Y T Y P E S T A T I O N N O R T H E A S T P O T 1 0 + 0 0 . 0 0 5 7 3 0 1 1 . 3 0 1 6 1 5 5 9 0 7 8 . 3 0 1 5 P O T 1 1 + 0 0 . 0 0 5 7 2 9 6 1 . 6 5 6 5 1 5 5 9 1 6 5 . 1 0 8 0 ROCK Y RIVER S R 10 0 6 M T . P L E A S A N T R O A D - L - -Y- E S T . 5 S Y G E O E S T . 1 T O N S C L A S S ’ I ’ R I P - R A P G e o t e x t i l e EST. 5 SY GEOEST. 1 TONSCLASS ’i’ RIP-RAP E S T . 1 2 0 S Y G E O E S T . 4 0 T O N S S E E D E T A I L A S T A N D A R D ’ V ’ D I T C H EST. 80 SY GEOEST. 30 TONS SEE DETAIL BLATERAL ’V’ DITCH SEE DETAIL CLATERAL ’V’ DITCH S l o p e F i l l G e o t e x t i l e S l o p e F i l l EST. 75 SY PSRMSEE DETAIL DTOE PROTECTION G R O U N D N A T U R A L S L O P E F I L L G E O T E X T I L E G R O U N D P A D D I S S I P A T O R HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.4 B-4972 11-JUL-2014 09:09 R:\Roadway\Proj\b-4972_rdy_psh.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS 12’12’ 4’ PAVED SHLD.4’ PAVED SHLD.12’12’4’ PAVED SHLD.4’ PAVED SHLD.02 02 SKETCH SHOWING BRIDGE IN RELATION TO PAVEMENT APPROACH SLAB020212’12’TYPE III TYPE IIITYPE III TYPE III020233’-6"4’ MIN.5’-6" MAX54" CHLSWDKWD1SFDMTLBK AND CONC WSOIL AND GRGR 1SFDWDKWD12" RCP SCONCGARDEN S OIL GATES54" CHL 54" CHL GRGR G R 9 " C O N C W W 9 " C O N C W W C O N C W W C O N C W W GR G A T E M T L 12" HDPE V E N D A T . H A R R E L L T O N E Y L E E H A R R E L L D B 6 3 1 4 P G 2 4 3 D B 2 5 1 3 P G 2 0 0 D B 1 5 7 3 P G 0 9 3 W E S L E Y J A M E S J O Y N E R DB 7106 PG 198 EXISTING R/WEXISTING R/W (PB 14-40)EXISTING R/W EIP EIPEIPEIPEIPEIP EIP E I P E I P E I P E I P E I P 5 6 7 8 9LT1011BONANZA DR. 13’ GR ROCKY RIVER ROCKY RIVER EXISTING R/W (DB 8518-199)12C C T1417LT C O N C # 2 2 7 E X I S T I N G R / W E X I S T I N G R / W 60.00’ T T13 E L E V 4 9 7 . 9 8 ’ B M # 2 N 62 41’04" W 297.97’ N 62 41’04" W 172.19’N 62 41’04" W 100.72’ N 4 0 2 8 ’3 9 " E 8 6 .3 9 ’ N 4028’39" E500.05’ S 4 0 2 5 ’3 6 " W 118 .8 0 ’ S 4025’36" W480.46’N 1356’01" E S 4913’45" E 75 .97’S 69 37’40" E 132.52’ S 88 04’58" E 75.03’ AMANDA S. GUYKENNETH E. GUY, JR. H H F IB E R O P T IC C A B L E D IR E C T IO N A L B O R E D U N D E R R IV E R 28.81’ +64.60 31.79’ +62 .97 V A N D E R B U R G E N T E R P R IS E S , L L L P D B 5 0 7 4 P G 0 2 4 DAVID WILLIAM LEDBETTER L EEANN WATERMAN LEDBETTER DB 8518 PG 199 LORENE U. TUCKERJOHN W. TUCKER DB 620 PG 556SHIRLEY A. BLACKWELDER DB 600 PG 557 RK RET WALLRR TIE AND B L - 4 B L - 3 BL-5 15 20 2530 P I S t a 1 5 + 9 2 . 9 7 D L = 3 4 1 . 9 6 ’ T = 1 7 1 . 7 8 ’ R = 1 , 4 5 0 . 0 0 ’ P I S t a 2 5 + 0 6 . 1 6 D L = 2 7 1 . 8 0 ’ T = 1 3 5 . 9 9 ’ R = 3 , 0 0 0 . 0 0 ’ P I S t a 2 9 + 7 0 . 9 3 D L = 4 0 2 . 8 6 ’ T = 2 0 2 . 8 3 ’ R = 1 , 4 0 0 . 0 0 ’ PC Sta. 27+68.10PT Sta. 26+41.97 P T S t a . 1 7 + 6 3 . 1 5 P C S t a . 2 3 + 7 0 . 1 7 - L - END STATE PROJECT B-4972 B E G I N S T A T E P R O J E C T B - 4 9 7 2 - L - S t a . 1 5 + 5 0 . 0 0 -L- Sta. 29+00.00 4 ’ P S 4 ’ P S 03 02 02 02030405060001INTERVALS25.00’ 02 02 B E G . A P P R O A C H S L A B B E G I N B R I D G E E N D B R I D G E E N D A P P R O A C H S L A B S T A . 2 4 + 4 5 . 0 0 + / - - L - S T A . 2 4 + 5 7 . 0 0 + / - - L - S T A . 2 0 + 6 5 . 0 0 + / - - L - S T A . 2 0 + 5 3 . 0 0 + / - - L - +00.00 12’12’ 12’12’4’ PS4’ PS 12’12’ T Y P E I I I T Y P E I I I TYPE III TYPE III 0204 IN T E R VA L S 2 5 .0 0 ’ G R A U T Y P E 3 5 0 G R A U T Y P E 3 5 0 GRAU TYPE 350GRAU TYPE 350 .02 .02POT Sta. 10+00.00 P0T Sta. 27+55.73-L-POT Sta. 11+00.00-Y-12’12’4’-7"4’-11" 33’-6" 5 ’ - 6 " M A X . 4 ’ M I N . B A S I N P R O P O S E D B A S I N P R O P O S E D CHORD 8 : 1 8:1 8:1 H H F IB E R O P T IC C A B L E D IR E C T IO N A L B O R E D U N D E R R IV E R + 2 5 . 0 0 - L - 3 0 . 3 3 ’ & 5 0 . 0 0 ’ + 2 5 . 0 0 - L - 2 9 . 6 7 ’ & 6 3 . 0 0 ’ + 6 3 . 1 5 - L - 6 3 . 0 0 ’ + 7 0 . 1 7 - L - 6 3 . 0 0 ’ +41.97-L-63.00’+68.10-L-63.00’+50.00-L-63.00’30.96’ &+88.83-L-55.00’+27.64-L-55.00’+41.97-L-55.00’ + 7 0 . 1 7 - L - 7 5 . 0 0 ’ + 6 3 . 1 5 - L - 5 0 . 0 0 ’ +50.00-L-80.00’+85.00-L-75.00’+18.00-L-75.00’ + 7 5 . 0 0 - L - 7 5 . 0 0 ’ 55.00’+77.00-L-39.00’+50.00 + 1 0 . 0 0 - L - 1 0 0 . 0 0 ’ 1 2 1 . 0 0 ’ + 6 5 . 0 0 - L - + 1 2 . 0 0 - L 7 5 . 0 0 ’ + 5 1 . 0 0 - L - 6 3 . 0 0 ’ + 8 9 . 0 0 - L - 9 2 . 0 0 ’ + 3 7 . 0 0 - L - 9 2 . 0 0 ’ + 6 4 . 0 0 - L - 6 3 . 0 0 ’ 1 2 3 45531.92’+15.00+07.1239.00’+50.00 29.71’ + 0 5 . 0 0 6 3 . 0 0 ’ + 2 0 . 0 0 7 8 . 0 0 ’ +35.0063.00’+20.0078.00’ 0 4 0 1 0 4 0 2 0403 0404 1 5 " R C P - I V D D F G T B 2 G I F G T B 2 G I D 15" RCP-IV D FG TB2GI FG TB2GI 2:1 2:1 D ( N o t t o S c a l e ) dS T A N D A R D ’ V ’ D I T C H F R O M - L - S T A . 2 2 + 4 3 T O S T A . 2 4 + 1 9 ( L T ) T y p e o f L i n e r = C l a s s ’ I ’ R i p - R a p M a x . d = 1 . 0 F t . M i n . D = 1 . 0 F t . D E T A I L A G r o u n d N a t u r a l S p i l l T h r o u g h P r o p o s e d L A T E R A L ’ V ’ D I T C H ( N o t t o S c a l e ) 2:1 2:1 D b d 1 " / F t . F R O M - L - S T A . 2 4 + 1 9 T O S T A . 2 5 + 5 0 ( L T ) T y p e o f L i n e r = C l a s s ’ I ’ R i p - R a p b = 5 . 0 F t . M a x . d = 1 . 0 F t . M i n . D = 1 . 0 F t . D E T A I L B G r o u n d N a t u r a l L A T E R A L ’ V ’ D I T C H ( N o t t o S c a l e ) D 2:1 2:1 b 1 " / F t . F R O M - L - S T A . 2 5 + 5 0 T O S T A . 2 7 + 0 0 ( L T ) b = 5 . 0 F t . M i n . D = 1 . 0 F t . D E T A I L C G r o u n d N a t u r a l 2 E L B O W S 1 5 " W / 2 ELBOWS15" W/ EXISTINGTIE TO EXISTINGTIE TO 1 7 + 7 5 . 0 0 ( L T . ) B E G I N S B G S T A . 2 0 + 5 3 . 0 0 ( L T . ) E N D S B G S T A . 24+57.42 (LT.)BEGIN SBG STA.25+57.00 (LT.)END SBG STA. ( N o t t o S c a l e ) T O E P R O T E C T I O N d FL A T TE R 2:1 O R F R O M - L - S T A . 2 4 + 5 0 T O S T A . 2 5 + 5 0 ( R T ) D E T A I L D b b = 3 . 0 F t . d = 1 . 0 F t . T y p e o f L i n e r = P S R M E S T . 1 5 S Y G F E S T . 8 T O N S C L . ’ I ’ R I P R A P S E E D E T A I L S D E C K D R A I N D I S S I P A T O R P A D E S T . 8 5 S Y G F E S T . 4 8 T O N S C L . ’ I ’ R I P R A P S E E D E T A I L S D E C K D R A I N D I S S I P A T O R P A D F R O M - L - S T A . 2 2 + 4 0 T O S T A . 2 4 + 2 0 ( L T ) F R O M - L - S T A . 2 0 + 9 0 T O S T A . 2 1 + 2 0 ( L T ) D E T A I L S P L A N V I E W P R O F I L E V I E W D E C K D R A I N D I S S I P A T O R P A D * N O T E : C E N T E R P A D D I R E C T L Y B E L O W D E C K D R A I N S T y p e o f L i n e r = C l a s s ’ I ’ R i p - R a p ( N o t t o S c a l e ) 1 5 " 4 . 0 ’ L S H E E T P I L I N G R E T A I N E X I S T . R O C K A B U T M E N T R E T A I N E X I S T . E X C A V A T I O N L I M I T E X C A V A T I O N L I M I T NO DECK DRAINS ARE TO BE PLACED OVER JURISDICTIONAL FEATURES.-L- STA. 22+40 TO 24+40 (LT)DECK DRAINS ARE TO BE INSTALLED @ 5’ CENTERS FOR THE FOLLOWING STATION RANGE:-L- STA. 20+70 TO 21+24 (LT)NOTE: DECK DRAINS ARE TO BE INSTALLED @ 3’ CENTERS FOR THE FOLLOWING STATION RANGE: C C C C C F C F F F F F F F F F F F F F C C C C FFFFFFCFCCCCCCCCCCC C C F F C C C C C C C C CCF N A D 83/ N S RS 2007 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS 5/14/99 SHEET NO.PROJECT REFERENCE NO.HYDRAULICSROADWAY DESIGN ENGINEERENGINEER5 B-4972 11-JUL-2014 09:09 R:\Roadway\Proj\b-4972_rdy_pfl.dgn $$$$USERNAME$$$$ S T A . 1 5 + 5 0 . 0 0 - L - B E G I N G R A D E E L E V . 5 2 9 . 9 4 STA. 29+00.00 -L-END GRADE ELEV. 506.89’ 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2526272829 4 0 0 4 1 0 4 2 0 4 3 0 4 4 0 4 5 0 4 6 0 4 7 0 4 8 0 4 9 0 5 0 0 5 1 0 5 2 0 5 3 0 5 4 0 5 5 0 5 6 0 400410420430440450460470480490500510520530540550560 P I = 1 7 + 1 4 . 2 1 E L = 5 1 4 . 5 4 ’ (-)9.3782% (- )0 .5 0 0 1% V C = 3 1 0 ’ K = 3 5 PI = 28+00.00 EL = 509.11’(-)2.2200%VC = 200’K = 116 P R O V I D E M I N I M U M 1 2 ’ S H E L F F O R F U T U R E M U L T I - U S E P A T H ( + ) 0 . 6 19 8 % (+) 10.3565%(+) 4.7533%El = 488.09’ E l = 4 8 6 . 9 0 ’ El = 500.00’El = 507.13’El = 487.99’CUT DITCH (LT.)BEG. LATERAL ’V’ S T A N D A R D C U T D I T C H ( L T . ) P I = 2 2 + 4 3 . 0 0 B E G . PI =25+50.00 (LT.)PI =24+35.00 (LT.)STANDARD CUT DITCHPI =24+19.00 ENDLATERAL ’V’ DITCH (LT.)PI =25+50.00 END D E S I G N D I S C H A R G E D E S I G N F R E Q U E N C Y B A S E D I S C H A R G E C F S Y R S Y R S B A S E F R E Q U E N C Y O V E R T O P P I N G E L E V A T I O N O V E R T O P P I N G F R E Q U E N C Y O V E R T O P P I N G D I S C H A R G E C F S C F S Y R S F T F T F T D E S I G N H W E L E V A T I O N B A S E H W E L E V A T I O N B R I D G E H Y D R A U L I C D A T A F T D A T E O F S U R V E Y W . S . E L E V A T I O N A T D A T E O F S U R V E Y F T = 2 6 1 3 0 = 5 0 = 5 0 5 . 9 = 3 0 7 9 0 = 1 0 0 = 5 0 7 . 6 1 = 3 4 0 0 0 = 2 0 0 + / - = 5 0 8 . 8 = = 0 9 - 1 7 - 1 3 = 4 7 7 . 9