HomeMy WebLinkAbout20051986 Ver 6_Corps of Engineer Correspondence_20140915REPLY TO
ATTENTION OF
Regulatory Division/1200A
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403 -1343
Action ID: SAW- 2009 -00106
Mr. H. Brantley Powell
HBP Properties, LLC
5210 Driftwood Lane
Morehead City, NC 28557
Dear Mr. Powell:
September 15, 2014
or
Reference the Department of the Army (DA) permit issued to you on May 21, 2009,
which authorized total permanent impacts to 376 linear feet of perennial streams and
0.006 acre of wetlands, and temporary impacts to 38 linear feet of stream associated with
Phase III of the Legend Oaks Subdivision. Also reference four previously approved
modifications to this permit in 2010, 2011, 2012 and 2013. The project site is located at
the end of the existing phase of the subdivision, north of Lystra Road and east of US
Highway 15 1501 near Chapel Hill, in Chatham County, North Carolina. The site is found
at Latitude and Longitude in Decimal Degrees of 35.8422 °N and - 79.0721 °W. All waters
drain to Cub Creek in the Cape Fear River Basin.
Reference is also made to your letter of May 10, 2014, including updated plans
received on July 28, 2014, requesting another modification to the existing DA permit
referenced above. Specifically, you have requested a change in the construction plans to
allow for an additional permanent impact to 34 linear feet of jurisdictional stream on Lot
5. Eighteen (18) linear feet of impacts are the installation of a culvert and sixteen (16)
linear feet of impacts are associated with a rip rap dissipation pad.
We have completed our evaluation and concur with your request for the changes
stated above. Mitigation ratios have been assessed at a 1:1 ratio for 18 linear feet of
stream channel. The applicant has proposed payment to NCEEP for 18 linear feet,
representing a 1:1 restoration ratio for all permanent impacts resulting in a loss of water.
An acceptance letter from the NCEEP dated July 15, 2014, has been received for this
component of the mitigation plan. Construction drawings are attached to this letter and
will act as special permit conditions for this modification at those specific impact
locations.
-2-
The following Special Condition is applicable to the increase in impact amounts
covered under this modification. It is in addition to the original permit conditions, and
does not alter or change any of the original conditions or the conditions required by the
previous modifications:
The permittee shall make payment to the North Carolina Ecosystem
Enhancement Program (NC EEP) in the amount determined by the NC EEP,
sufficient to perform the restoration of 18 linear feet of warm water stream in
the Cape Fear River Basin, Cataloging Unit 03030002.
Construction within jurisdictional areas on the property shall begin only after the
permittee has made full payment to the NC EEP and provided a copy of the payment
documentation to the Corps, and the NC EEP has provided written confirmation to the
Corps that it agrees to accept responsibility for the mitigation work required, in
compliance with the MOU between the North Carolina Department of Environment and
Natural Resources and the United States Army Corps of Engineers, Wilmington District,
dated November 4, 1998. Therefore, Special Condition "e" regarding that portion of
Legend Oaks included within Phase I and II is hereby modified to read:
In order to compensate for impacts associated with this permit, mitigation
shall be provided in accordance with the provisions outlined on the most recent
version of the attached Compensatory Mitigation Responsibility Transfer Form.
The requirements of this form, including any special conditions listed on this
form, are hereby incorporated as special conditions of this permit authorization.
Once again, we have completed our evaluation of your request and concur with your
request for a change to the mitigation and construction phasing associated with your
referenced DA permit. It is understood that all other conditions of the permit, including
those pertaining to the remaining Phases of the subdivision remain applicable. Should
you have questions, contact Mr. Andrew Williams, Raleigh Regulatory Field Office at
telephone (919) 554 -4884, Extension 26.
Sincerely,
Kevin P. Landers Sr.
Colonel, U. S. Army
District Commander
Enclosure
"I. -
-3-
Copy Furnished w /enclosure:
Ms. Karen Higgins
401,E Buffer Permit Unit
1617 Mail Service Center
Raleigh, NC 27604
Mr. Todd Tugwell
US Army Corps of Engineers
Falls Lake Office
11405 Falls of Neuse Road
Wake Forest, NC 27587
Ms. Kelly Williams
NC Ecosystem Enhancement Program
1652 Mail Service Center
Raleigh, NC 27699 -1652
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory (!/litigation Responsibility Transfer Form
Permittee: Mr. H.Brantley Powell Action ID: SAW- 2009 -00106
Project Name: Legend Oaks, Phase I and II County: Chatham
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Ecosystem Enhancement Program (NCEEP), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to
ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed
copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation
Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and /or the mitigation will occur
in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms
for each Sponsor and /or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at
the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the
bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project
Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply
with all reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03030002, Cape Fear River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverine
Riparian Non - Riverine
Non - Riparian
Coastal
18
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03030002, Cape Fear River Basin
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian Riverine
Riparian Non - Riverine
Non - Riparian
Coastal
18
Mitigation Site Debited: NCEEP
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCEEP, list NCEEP. If the NCEEP
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and /or advance credits for NCEEP), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Page 1 of 2 Form Updated 23 October, 2013
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only
after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has
accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by
the North Carolina Department of Transportation ( NCDOT), construction within jurisdictional areas may proceed upon
permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of
permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming
that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE
administrative records for both the permit and the Bank /ILF Instrument. It is the Permittee's responsibility to ensure
that the USACE Project Manager (address below) is provided with a signed copy of this form.
If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and /or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District
guidance and a new version of this form must be completed and included in -the USACE administrative records for both
the permit and the Bank /ILF Instrument.
Comments /Additional Conditions: None
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the
USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell,
11405 Falls of Neuse Road, Wake Forest, NC 27587 (email: todd.tugwell@usace. army. mil). Questions regarding this form
or any of the permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: Andy Williams
USACE Field Office: Raleigh Regulatory Field Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Email: Andrew.e.williams2 @usace.army.mil
September 15, 2014
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http: / /ribits.usace.army.mi1.
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our website at http : / /regulatory.usacesurvey.com/ to complete the survey online.