HomeMy WebLinkAboutNC0023876_authorization to construct_19900918State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Environmental Management
512 North Salisbury Street • Raleigh, North Carolina 27611
James G. Martin, Govemor George T. Everett, Ph.D.
William W. Cobey, Jr., Secretary Director
September 18, 1990
Mr. William R. Baker, City Manager
City of Burlington
P. 0. Box 1358
Burlington, North Carolina 27216
SUBJECT: City of Burlington
Permit No, NC0023876
Authorization to Construe-,. -,
Burlington South 1
Wastewater Treatment Facilities_
EPA Project No. C37Q385=06°&
CS370385-08
Alamance County
ATTENTION: Mr. Randall Kornegay
Dear Mr. Baker:
The final plans and specifications for the subject project have been
reviewed and found to be satisfactory.
Authorization is hereby granted for the construction and operation of
additions and rr>odifications to the existing 9.5 mgd activated sludge
wastewater treatment plant with an increase in capacity to 12.0 rngd to
consist of a new conveyor for the existing bar screen, a new primary scum
screen, biological phosphorous removal facilities, a new aeration basin,
replacement of the mechanical aerators in the existing aeration basins with
jet air diffusers, a new secondary clarifier, a new return activated sludge
pump station, a new waste activated sludge pump station, New scum skimmers
for existing secondary clarifiers, three (3) new scum pump stations, a new
blower building, two (2) aerobic digesters, conversion of one (1) existing
gravity sludge thickener to a dissolved air flotation thickener, a new
process drain pump station, replace the existing chlorination system with a
new jet disinfection system, a new dechlorination system, a new chemical
feed/control building, modification of the existing digester building by the
addition of two (2) new sludge transfer pumps, expansion of the existing
reuse water system, two (2) new mixers in the existing effluent filter
influent channel, replace the motors on the
Pollution Prevention Pays
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015
Page 2
existing primary sludge pump station, two (2) new primary sludge pumps, two
(2) new inline conrninutors in the existing primary sludge pump station,
replace the motors in the existing return activated sludge pump station and
associated piping, electrical and site work.
Do not proceed with construction until the Authorization -to -Award
package, EEO, and MBE documentation/certification have been reviewed, and
you are in receipt of our approval, if Federal funding is desired for
project construction.
The permittcc shall employ an actively State certified wastewater
treatment plant operator to be in responsible charge of the wastewater
treatment facilities. Such operator must hold a valid State Certificate of
the grade at least equivalent to the classification assigned to the waste-
water treatment facilities by the Certification Commission. When a new
chief operator must be obtained to be in responsible charge of the new
facilities, it is required that this be done by the time the construction of
the facilities is 50% complete.
The Authorization -to -Construct is issued in accordance with Part III,
Paragraph C of NPDES Permit No. NC0023876, issued July 10, 1990 and shall be
subject to revocation unless the wastewater treatment facilities are
constructed in accordance with the approved plans, specifications, and
supporting documents; and are in compliance with the conditions and
limitations specified in Permit No. NC0023876.
The permittcc shall have an acceptable sludge analysis and a sludge
E.P. toxicity analysis which have been approved by the Division of Environ-
mental Management, Water Quality Section prior to the disposal of any sludge
from the new, wastewater treatment plant. Copies of the analyses, supporting
documents, and approvals shall be submitted to the Division of Environmental
Management's Winston-Salem Regional Office.
During the construction of the proposed additions/modifications, the
permittee shall continue to properly maintain and operate the existing
wastewater treatment facilities at all times, and in such a manner, as
necessary to comply with the effluent limits specified in the NPDES Permit.
You are reminded that it is mandatory for the project to be constructed
in accordance with the North Carolina Sedimentation Pollution Control Act,
and, when applicable, the North Carolina Dam Safety Act. In addition, the
specifications must clearly state what the contractor's responsibilities
shall be in complying with these Acts.
The disposing, selling or free distribution of wet, dried, composted
sludge or sludge -like materials from, wastewater facilities without prior
review and approval by this Division is illegal.
One (1) set of final approved plans and specifications is to be
forwarded to you under separate cover. A copy of the approved plans and
specifications shall be maintained on file by the Owner for the life of the
project.
Page 3
Upon completion of construction and prior to operation of this
permitted facility, a certification must be received from a Professional
Engineer certifying that the permitted facility has been installed in
accordance with the approved plans and specifications. Nail the Certifica-
tion to the Permits and Engineering Unit, P. 0. Box 27687, Raleigh, North
Carolina 27611-7687. (Engineer's Certification Form is attached.)
If you have any questions or need additional information, please
contact Mr. Bill Hoffman, at (919) 733-6900.
incerely,
k- George T. Evere t
7
Attachment
BG:vk
cc: Piedmont Olsen, Inc.
Mr. Dennis Ramsey Mt. Don Safrit
Winston-Salem Regional Office
PPA
Mr. Tam Fahnestock
Mr. Don Evans
Ms. Valerie Helms
Mr. Bennie Goetze, Jr.
Ms. Cindy Finan
DMG
GPF