Loading...
HomeMy WebLinkAboutSite Inspection 9.12.22 NC 69Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190210 NCDOT - NC 69 Widening (A-0011C) Clay NCDOT - NC 69 Widening (A-0011C) NC DOT Division 14 - Sylva 9/12/2022 Routine Site Inspection (DOT) Version: 2 Status:Issued Project Type:Road/Highway Widening Region:Asheville Longitude:-83° 49' 32''+35° 00' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on September 13, 2022 by Kevin Mitchell with the Asheville Regional Office. Reid Whitehead, Nick Adams, and Jeff Mayland were present during the inspection. The following are items that need attention: - Retaining Wall across from NCDOT Field Office - Add groundcover to areas near JS. - Station L 158+00-161+00 LT (Site 12) - Channel change has downcut further. All structures need repair. Proper channel dimension is required. Need to include Patrick Breedlove or Kevin Barnett on repairs and oversight. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190210 9/12/2022 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Site 12 (Channel Change) needs complete restoration repair. Structures have failed and stream is continuing to headcut. Comment: page:2