HomeMy WebLinkAboutSite Inspection 9.12.22 NC 69Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190210
NCDOT - NC 69 Widening (A-0011C)
Clay
NCDOT - NC 69 Widening (A-0011C)
NC DOT Division 14 - Sylva
9/12/2022
Routine
Site Inspection (DOT)
Version: 2 Status:Issued
Project Type:Road/Highway Widening
Region:Asheville
Longitude:-83° 49' 32''+35° 00'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted on September 13, 2022 by Kevin Mitchell with the Asheville Regional Office. Reid
Whitehead, Nick Adams, and Jeff Mayland were present during the inspection. The following are items that need
attention:
- Retaining Wall across from NCDOT Field Office - Add groundcover to areas near JS.
- Station L 158+00-161+00 LT (Site 12) - Channel change has downcut further. All structures need repair. Proper
channel dimension is required. Need to include Patrick Breedlove or Kevin Barnett on repairs and oversight.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190210
9/12/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Site 12 (Channel Change) needs complete restoration repair. Structures have failed and stream is
continuing to headcut.
Comment:
page:2