Loading...
HomeMy WebLinkAboutSW8160306_Historical File_20171013ROY COOPER Governor MICHAEL S. REGAN Secretary Energy. Mineral & TRACY DAVIS Land Resources Director ENVIRONMENTAL QUALITY. October 13, 2017 Hoosier Daddy LLC Attn: Jack Carlisle, Manager 6025 Tarm Road Wilmington, NC 28409 Subject: State Stormwater Management Permit No. SW8160306 Tarin Woods H High Density Subdivision Wet Detention Pond Project New Hanover County Dear Mr. Carlisle: The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the subject project on October 6, 2017. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 as amended by Session Law (SL) 2008-211 and as subsequently amended on January 1, 2017 (2017 Rules), as applicable. We are forwarding modified Permit No. SW8 160306 dated October 13, 2017, for the construction, operation and maintenance of the stormwater control measures (SCMs), built -upon area, as well as the stormwater collection system and/or vegetated conveyance system associated with the subject project. Please add the attached plans to the previously approved plan set. Please replace the previous application (SWU-101), proposed deed restrictions and protective covenances, Pond 2 supplement and Pond 2 operation and maintenance agreement with the attached, modified versions. This permit shall be effective from the date of issuance until June 2, 2024 and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. Please pay special attention to the permit conditions regarding the operation and maintenance of the SCMs, stormwater collection system, and/or vegetated conveyances; the limitation of built -upon area; modification of the project; the procedures for changing ownership of and/or transferring the permit; and the need to renew the permit. Please also pay attention to the permit conditions that requires the recordation of deed restrictions and protective covenants, easements, and the maintenance agreement, which must all be provided along with certification upon completion of the project. Failure to comply with these requirements will result in future compliance problems. Please refer to Attachment 1 for a detailed description of the current proposed major modification and a list of all the past modifications approved during the effective period of the permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 15 OB of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. State of North Carolina I Environmental Quality ' Energy, Mineral and Land Resources WiLnington Regional Office 1 127 Cdrdindl Drive Extension I Wilmington, NC 28405 910196 7215 State Stormwater Permit No. SW8 160306 Page 2 of 2 ll•you have any rlUeSti0lls, or need additional inliorniation concerning this matter, please. contact Christine ' Ball in the Wilmington Regional Office, at (910) 796-721 5. Sincerely, .,Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A — Designer's Certification Form Attachment 1 — Permitting History GDS/canh: \\\Stormwater\Permits & Projects\2016\160306 HD\2017 10 permit 160306 cc: Howard Resnick, PE, CSD Engineering New Hanover County Inspections New Hanover County Engineering Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional OfSce 1 127 Cardinal Drive Extension I VVIlmington. NC 28405 910 796 7215 State Stormwater Management Systems Permit No. SW8 160306 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMW"ATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Hoosier Daddy LLC Tarin Woods Il Shiloh Drive, Wilmington, New Hanover County FOR THE construction, operation and maintenance of three (3) wet detention pond systems ("stormwater control measures" or "SCMs") in compliance with the provisions of 15A NCAC 2H .1000 as amended by Session Law (SL) 2008-211 and as subsequently amended on January 1, 2017 (2017 Rules), as applicable (collectively, the "stormwater rules') and the approved stormwater management plans, application, supplements, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until June 2, 2024 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. The maximum built -upon area allowed for the entire subdivision is 1,390,617 square feet. 2. The drainage areas for the on -site stormwater systems will be limited to the amounts of built - upon area indicated in this permit and the approved plans and specifications. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control measures. The stormwater control measures labeled Pond 1, Pond 2, and Pond 3 have been designed using the runoff treatment method to handle the runoff from 268,377, 712,864, and 408,886 square feet of built -upon area, respectively. The built -upon area for future development within the drainage areas labeled Pond 1, Pond 2, and Pond 3 is limited to 15,000, 26,500, and 216,478 square feet, respectively. Additionally, 20,000 square feet of BUA has been allocated within the drainage area for Pond 2 for a future amenity center. 3. Each of the 223 lots are limited to a maximum of 3,500 square feet of built -upon area, as indicated in the approved plans and specifications. 4. A 50-foot wide vegetative setback must be provided and maintained adjacent to all surface waters, measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline in accordance with the stormwater rules and the approved plans and specifications. Page 1 of 6 State Stormwater Management Systems Permit No. SW8 160306 5. The stormwater control measures are permitted based on the design criteria presented in the supplements and as shown in the approved plans and spepifications. These stormwater control measures must be provided and maintained at the design condition. The approved supplements are incorporated by reference into this permit. 6. Within the areas subject to Session Law 2008-211, all runoff being directed into wetlands shall flow into and through those wetlands at a non -erosive velocity. 7. Within the areas subject to the 2017 Rules, the peak flow from the 10-year storm event shall not cause erosion downslope of the stormwater outlet discharge point. 8. Within Pond 1, a decorative spray fountain will be allowed, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in this pond is'h HP. 9. Within Ponds 2 and 3, decorative spray fountains will be allowed if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. 10. When using a wet pond for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. 11. The landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established, the operation and maintenance agreement must be followed. II. SCHEDULE OF COMPLIANCE The project shall be constructed in accordance with the conditions of this permit and the approved plans and specifications. 2. The on -site stormwater system shall be entirely constructed, vegetated and operational prior to the construction of any individual lot development, per the approved plans and specifications. 3. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4. All stormwater control measures, stormwater collection systems vegetated conveyance systems, and/or maintenance accesses must be located in public rights -of -way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. 5. The permittee shall at all times provide and perform the operation and maintenance necessary, as listed in the signed Operation and Maintenance Agreement, to assure that all components of the permitted on -site stormwater system functions at the approved design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 6. The operation and maintenance agreement for Ponds 2 and 3 must be recorded with the Office of the Register of Deeds. Page 2 of 6 State Stormwater Management Systems Permit No. SW8 160306 7. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 8. The final plats for the project must be recorded with the Office of the Register of Deeds prior to the sale of lots. The recorded plat for Phase 2 must reference the Operation and Maintenance Agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. 9. Recorded deed restrictions and protective covenants must be recorded with the Office of the Register of Deeds, will be incorporated into this permit by reference, and include, at a minimum, the following statements related to stormwater management: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 160306, as issued by the Division of Energy, Mineral and Land Resources under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the Division. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. f. The maximum built -upon area per lot is 3,500 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the pond or street, grading the lot to drain toward the street or directly into the pond, or grading perimeter swales and directing them into the pond or street. h. Built -upon area in excess of the permitted amount will require a permit modification. i. All affected lots shall maintain a 50' wide vegetative buffer adjacent to surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of each side of streams and rivers and the mean high water line of tidal waters. j. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the Stormwater Rules is subject to enforcement procedures as set forth in G.S. 143, Article 21. 10. For the entire project, the deed restrictions and protective covenants outlined in Section 11.9 of this permit must be recorded with the Office of the Register of Deeds prior to the sale of individual lots or groups of lots. 11. For each lot, the permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. 12. The maximum built -upon area. assigned to each lot via this permit and the recorded deed restrictions and protective covenants may not be increased or decreased by either the individual lot owner or the permittee unless and until the permittee notifies the Division and obtains written approval from the Division. Page 3 of 6 State Stormwater Management Systems Permit No. SW8 160306 13. The permittee shall review each lot for new construction and all subsequent modifications and additions to ensure compliance with the conditions of the permit and the approved plans and specifications. The plans reviewed must include all proposed built -upon area, grading, and driveway pipe placement. The permittee shall not approve any lot plans where the maximum allowed built -upon area has been exceeded, or where modifications to the grading or to the storm drainage system are proposed unless and until a permit modification has been approved by the Division. The permittee may establish an Architectural Review Board (ARB) or Committee (ARC) to conduct these reviews. However, any approval given by the ARB or ARC on behalf of the permittee does not relieve the permittee of the responsibility to maintain compliance with the conditions of the permit and the approved plans and specifications. 14. The permittee is responsible for verifying that the proposed built -upon area on each individual lot and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall routinely monitor the lots for compliance with permit, the approved plans and specifications, and the recorded deed restrictions and protective covenants. The permittee shall notify any lot owner that is found to be in noncompliance with the conditions of this permit in writing, and shall require timely resolution. 15. Upon completion of the project, the permittee shall determine whether or not the project is in compliance with the permitted plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the permitted plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the permitted plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 16. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below: a. Any modification to the approved plans and specifications, regardless of size including the stormwater control measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, or resizing of any component of the approved stormwater control measure, stormwater collection system and/or vegetative conveyance system shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement within the common areas for BUA credit that was not included in the approved plans and specifications. The request must include a proposed amendment to the deed restrictions and protective covenants for the subdivision, and a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. g. The construction of any 57 stone area or trails to be considered a permeable surface that were not included in the approved plans and specifications. h. Other modifications as determined by the Director. 17. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. Page 4 of 6 State Stormwater Management Systems Permit No. SW8 160306 18. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system is in compliance with all permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS 1 Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the permittee from complying with and obtaining any and all other permits or approvals that are required in order for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 3. In the event that the facilities fail to perform satisfactorily, the permittee shall take immediate corrective action. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed State Stormwater Request Form for Permit Transfer or Permit Information Update, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. Any ownership change including: i. The assignment of declarant rights to another individual or entity; ii. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; iii. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256. iv. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and NCGS 57D-6-07; b. Bankruptcy; c. Foreclosure, subject to the requirements of Session Law 2013-121 d. A name change of the current permittee; e. A name change of the project; f. A mailing address change, of the permittee; 5. The permittee is responsible for compliance with all of these terms and conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 6. The permittee grants Division Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions Page 5 of 6 State Stormwater Management Systems Permit No. SW8 160306 8. Approved plans, application, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee at all times. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater control measure must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Title 15A NCAC 21-1.1000 and NCGS 143-215.1 et.al. 11. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit modified and re -issued this the 13th day of October 2017. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION r cy Dav' , P.E.; Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 160306 Page 6 of 6 State Stormwater Management Systems Permit No. SW8 160306 Attachment A Tarin Woods II Page 1 of 2 Stormwater Permit No. SW8 160306 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL cc: NCDEQ-DEMLR Regional Office New Hanover County Building Inspections Page 1 of 2 State Stormwater Management Systems Permit No. SW8 160306 Page 2 of 2 General Certification Requirements: .1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. All slopes are grassed with permanent vegetation. 6. Vegetated slopes are no steeper than 3:1. 7. The inlets are located per the approved plans and do not cause short-circuiting of the system. B. The permitted amounts of surface area and/or volume have been provided. 9. All required design depths are provided. 10. All required parts of the system are provided. 11. The required dimensions of the system are provided, per the approved plan. 12. All components of the stormwater control measure are located in either recorded common areas, or recorded easements. Wet Pond Certification Requirements: 1. The outlet/bypass structure elevations are per the approved plan. 2. The outlet structure is located per the approved plans. 3. A trash rack is provided on the outlet/bypass structure. 4. Required drawdown devices are correctly sized per the approved plans. Page 2 of 2 Attachment 1 - Permitting History Train Woods II Permit No. 5W8 160306 Approval Date Permit Action BIMS Version Description of the Changes 6/2/2017 Original Approval 1.0 Phase 1 (with 51 lots) and Pond 1 approved under Session Law 2008-211 7/25/2017 Major Modification 1.1 Adding Phase 2 (with 90 lots) and Pond 2 (interconnected Ponds 2A and 2B) approved under the 2017 rules. 10/13/2017 Major Modification 1.2 Pond 2: Increasing the drainage area (DA) and BUA by adding Phase 4 (with 42 lots) and adding Pond 2C to the previously approved interconnected Pond 2 (Ponds 2A and 2B). Adding Phase 3 (with 40 lots) and Pond 3 (interconnected Ponds 3A and 313). Both of these changes are approved under the 2017 Rules. Page 1 of 1 Permit Number: (to be provided by DWO Drainage Area Number: i Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. ; Inspection activities shall be performed as follows. Any proble at are found shall be repaired immediately. t4AN W W - V BMP element: Potentialproblem: How I wilArollmediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at a height of I approximatelyapproxjqMLely six inches. Form 5W40i-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number:��(� I? Ago d �� (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: The inlet device: pipe or The pipe is clogged. swale The pipe is cracked or otherwise damaged. Erosion is occurring in the swale. The forebay Sediment has accumulated to a depth greater than the original design depth for sediment storage. The vegetated shelf The main treatment area Erosion has occurred. Weeds are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Weeds are present. Sediment has accumulated to a depth greater than the original design sediment storage depth. Algal growth covers over 50 % of the area. Cattails, phragmites or other invasive plants cover 50% of the basin surface. How I will remediate the probl Unclog the pipe. Dispose of the sediment off -site. Replace the pipe. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it Will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Prune according to best professional practices Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Consult a professional to remove and control the algal growth. Remove the plants by wiping them with pesticide (do not spray)__ - MAR 0 8 2&w Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number. 5L,(-) E 1 &0 3U (to be provided by DWO Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4_5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.5 feet in the forebay, the sediment shall be removed. Sediment Removal A. 14 Bottom FOREBAY BASIN DIAGRAM ill in the blanks) Lft Min. Sediment Storage Form SW401-Wet Detention Basin O&M-Rev.4 Permanent Pool Elevation 19.5 Sediment Removal Elevation 15 --- Volume Bottom Elevation MAIN POND 1-ft Storage MAR g'(:__Ro 4 Permit Number: aw A l (�qo y 30(" (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Tarin Woods II BMP drainage area number:I Print name:James Yonn Title:sianing authority by Jack Carlisle, Manager, form attached Address:6025 Tarin Road Wilmington NC 28409 Phone:910-443-3060 Signature: Date: _ ';t 9 - I Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, M_ ' N `# M � , a Notary Public for the State of a� 8 1 , County of ?F1KDfA_ , do hereby certify that 1 5 L. IOP �n personally appeared before me this day of flE&WW ,D! (! ., and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, f BRITTANY M HUGHES Notary Public, North Carolina Pander County My Corr1misls_ion„Expires SEAL My commission expires 11 -M 1619 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Ve Project Name: Project Location: Tarin Woods II Phase Two, Three & Four Lt. Congleton Road maintenance recoms snap De Kept on the tonowing i3w(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level Spreader/VFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: O&M tables wil Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): De side and I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. County of Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: James Yopip Signing Authority on file at NCDEQ, Hoosier Daddy, LLC 6026 Tarin road Wilmington, NC 28409 910-443-3060 NJ!-nes@rockfordpartnefs.net �� _.'� \A,eSc n personally appeared before me this � RL Date: tll - / -/ 7 a Notary Public for the State of �1 \ /C0.� do hearby certify that _ E S L. 7 o p day of ? � �- Zo I 1 and acknowledge the due execution oft , peratiogs and Ala tenance Agreement. Witness my hand and official seal, �1 11 *„M�wwwwr pTAR r «•' Pus "C • OVER • aw My commission expires �1 �D 9/15/2017 rsion 1.4 Page 1 of 5 IECEIVED SEP 1 B 201� AY; IECEIV k SEP 18 2017 STORM-E? 9111 sipr Wet Detention Pond tlfthnteinance The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). _ No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant EC E IVJ'E health. Plants are dead, diseased or Determine the source of the pr I m: soils, h rol'ogy, ease, etc. dying. Remedy the problem and repla lants. Provide a on - ime fertilizer application to establish the ground 'cover it a soil es in icates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. STORM-F7 9M V2E The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50% of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. ECEIVED SEP 18207 BY:_ STAR RA-F7 9115/2C Wet Detention Pond Design Summa WET POND ID FOREBAY 261,2,3; 2C-1,2 2A-1 MAIN POND 2A,213.2C 2 Permanent Pool El. 19.5 19•5 Permanent Pool El. 19.5 Temporary Pool El: 20.1 20.1 Temporary Pool El: 20.1 Pretreatment other No Clean Out Depth: 3.5 2.5 Clean Out Depth: 3.5 than forebay? Sediment Removal El: 16 17 Sediment Removal El: 16 Has Veg. Filter? No Bottom Elevation: 1 15 16 Bottom Elevation: 15 WET POND ID FOREBAY 3B1-3 MAIN POND 3A,3E3 3 Permanent Pool El. 19.5 Permanent Pool El. 19.5 Temporary Pool El: 20.2 Temporary Pool El: 20.2 Pretreatment other Clean Out Depth: 2.5 Clean Out Depth: 3.5 than forebay? No Sediment Removal El: 17 Sediment Removal El: 16 Has Veg. Filter? No Bottom Elevation: 1 16 Bottom Elevation: 15 _,W-%EIVEP JCT 0 2 2017 BY TORM-EZ 9/15/2C DEMLR USE ONLY Dft-ReggiyadFee Paid Perini Numb r O Applica 1 Rul ❑ Coastal SW -1 ❑ Coastal S - 2 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M&mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Tarin Woods Il 2. Location of Project (street address): 5926 Shiloh Road City:Wilminfgn County:New Hanover Zip:28409 3. Directions to project (from nearest major intersection): From intersection of Hwy 132 and Hwy 421 take Carolina Beach Rd south Left on Manassas Drive left on Shiloh Drive. 4. Latitude:37* 07 17" N Longitude:770 53' 43" W of the main entrance to the project. 11. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU--102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number SW8160306 , its issue date (if known) 7-25-17 and the status of construction: ❑Not Started []Partially Completed* ❑ Completed* "provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density []Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control:15.51 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the ProjectName, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes sh— If yes, see S.L. 2012-200, Part VI. httl2:lZportal.ncdenr.org/web/Ir/rules-and-regulations SEA' 18 2017 Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Hoosier Daddy LLC Signing Official & Title:Tames Yonp(by authority given by lack Carlisle. Manager, form included) b. Contact information for person listed in item 1a above: Street Address:6025 Tarin Road City:Wilmington State:NC Zip:28409 Mailing Address (if applicable): City: Phone: (910 ) 443-3060 Email:james@rockfordpartners.net State: Zip: Fax: ( ) Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: Email: Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Lisa Beaman Signing Official & Title:Lisa Beaman (or Tames Yq1212), Manager b. Contact information for person listed in item 3a above: Mailing Address:6025 Tarin Road City: Wilmington State:NC Zip:28409 Phone: (910 ) 769-3053 or (252 )916-5030 Fax: ( ) Emai1:E85lisafgmail.com 4. Local jurisdiction for building permits: New Hanover Coun E C E I V G Point of Contact Phone #: BY. Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff wiill be directed into stormdrain conduit then discharged into a wet basin 2. a. If claiming vested rights, identify the supporting, documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUDApproval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 94.21 acres 5. Total Coastal Wetlands Area: n/a acres 6. Total Surface Water Area: n/a acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 94.21 acres Total project area shall be calculated to exclude the foIlowing: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (B UA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 33.8 % 9. How many drainage areas does the project have?3 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drama a Area Drama a Area Drainage Area _ Drama a Area Receiving Stream Name Stream Class * Stream Index Number Total Drainage Area (sf) On -site Drainage Area (sf) Off -site Drainage Area (sf) Proposed Impervious Area** (sf) % Impervious Area** (total) Impervious" Surface Area Drainage Area Drama e Area _ Drainage Area — Drainage Area On -site BuLn-digs/Lots (sf) — On -site Streets (sf) On -site Parking (sf) On -site Sidewalks (sf) Other on -site (sf) Future (sf) Off -site (sf) Existing BUA*** (sf) Total (sf): Stream C:iass and index Number can be determined at: U4,:''-L4ioi Ion+;r;c csi,LC _R`;ti1 ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 Drainage Area 1 Receiving Stream Name Everett Creek Stream Class SA; HQW Stream Index Number 18-87-29 Total Drainage Area 675,561 On -site Drainage Area 675,561 Off -site Drainage Area Proposed Impervious Area (sf) 268,377 % Impervious Area (total) 39.7 Phase 1 Lots 178,500 Pumpstation 4,947 Proposed Streets 61,197 Proposed Sidewalks 8,733 future 15,000 Total 268,377 Drainage Area 2 Receiving Stream Name Everett Creek Stream Class SA; HQW Stream Index Number 18-87-29 Total Drainage Area 1,852,386 On -site Drainage Area 1,852,386 Off -site Drainage Area Proposed Impervious Area (sf) 712,864 % Impervious Area (total) 38.5 Phase 2 Lots 315,000 Phase 2 Streets 114,095 Phase 2 Sidewalks 18,116 Phase 4 Lots 147,000 Phase 4 Streets 63,127 Phase 4 Sidewalks 9026 Amenity 20,000 future 26,500 Total 712,864 Drainage Area 3 Receiving Stream Name Everett Creek Stream Class SA; HQW Stream Index Number 18-87-29 Total Drainage Area 1,066,462 On -site Drainage Area 1,066,462 Off -site Drainage Area Proposed Impervious Area (sf) 408,886 % Impervious Area (total) 38.3 Phase 3 Lots 140,000 Phase 3 Streets 45,038 Phase 3 sidewalks 7,370 future 216,478 Total 408,886 ECEIVE OCT 0 2 2017 BY. 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new B LIA. L1. How was the off -site impervious area listed above determined? Provide documentation. Proiects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 1 SA NCAC 02B . 0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhtty://portal.ncdenr.or-z/web/wq/ws/su/bmv-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hgp://portal.ncdenr.org/web/w,q/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://12ortal.ncdenr.org/web/3yq/ws/su/maps.) Please indicate that the following_ required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htW://yortal.ncdenr.org/web/wq/ws/su/statesw/forms dots. Initials 1. Original and one copy of the stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants 0752-4 Form. (if required as per Part VII below) 3. Original of the applicable Supplement Forms) (sealed, signed and dated) and O&M /l%3 agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to� htt :/ /www.wyhelg.org/pages/onestoRgaress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor� the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the 011 R [.E receiving stream drains to class SA waters within 1/s mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 415 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including. / a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. CC j. Site Layout with all 13UA identified and dimensioned. E 4..�+ a• G I V E k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control meApi#reSEP 18 201t in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated b qualified person. Provide documentation of qualifications and identify the person made the determination on the plans. Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify ma Ac4-- elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to veilfiy the SHVVT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 5836 Page No:1392 F76E' 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC o� fi GE Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hW2:/Zwww.secreigU.state.nc.us/­Con2orations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Howard Resnik, PE Consulting Firm: CSD Engineering Mailing Address:PO BOX 4041 City:Wilmington State:NC Zip:28406 Phone: (910 ) 791-4441 Fax: (910 ) 791-1501 Email:howard®csd-gngineering.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. nECEIVEnt `. SEP 18 2017 j,. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Date: / " /2- /% I, -,a Notary Public for the State Of 12AII C-ad e 1I AJ O , County of do hereby certify that L •� g� = personally appeared before me this day of <5z 20% , Mnknowledge 1 e(�due execution of the application for a stormwater permit. Witness my hand and official seal ��ul 7 � gay S (rp\e � eY-,..1►� SEAL My commission expires ,- Z I- 2 1 b X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) James Yopp certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-1.1000 and any other applicable state stormwater requirements. Signature: 1 c4 w = Date: O' cl / de— n a Notary Public for the State of V 1OJ\\-j�D �'��, County of �y o �� . do hereby certify that S— e3 L- �uP{' �— personally appeared 1� , before me this ` day of . oJ{'_-z/),1J C,- Zo 11 , and a owledge the d e ecution of the application for a stormwater permit. Witness my hand and official seal, c'y�kl SEAL My commission expires 1- Z 1- Z d) � ECEIV'E SEP 16 2017 BY: Fonn SWU-101 Version Oct. 31, 2013 Page 6 of 6 Permit No. (to be provded by DW ��� vVR7�9 _ pG KDENRO Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM NET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part I1Q must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Tarin Woods II Contact person Howard Resnik, PE Phone number 910-7914441 Date 6/2/2016 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 675,561 fe Impervious area, post -development 268,377 fe % impervious 39.73 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume reeuirad 34,625 fe Volume provided 38,906 fe OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume fe Pre -development 1-yr, 24-hr runoff fe Post -development 1-yr, 24-hr runoff fe Minimum volume required fe Volume provided fe Peak Flow Calculations Is the prelpost control of the lyr 24hr stone peak flow required? y (Y or N) 1-yr, 24-hr rainfall depth 3.8 in Rational C, pre -development 0.20 (unitless) Rational C, post -development 0.82 (unitless) Rainfall intensity: l-yr, 24-hr storm 0.16 In/hr OK Pre -development 1-yr, 24-hr peak flow 25.07 ie/sec Post -development 1-yr, 24-hr peak flow 31.48 felsec Pre/Post 1-yr, 24-hr peak flow control 6.41 elsec Elevations Temporary pool elevation 20.30 fmsl Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) 19.50 msl 20.00 msl EI� Bo 1of vegetated egetated shelf elevation 19.00 msl ) :' JUN 0 2 20% Sediment cleanout, top elevation (bottom of pond) 15.00 msl Sediment deanout, bottom elevation 14.00 msl Sediment storage provided 1.00 It BY: Is there additional volume stored above the state -required temp. pool? n (Y or N) Elevation of the top of the additional volume fmsl Form SW401-Wet Detention Basin-Rev.94118/12 Parts I. & II. Design Summary, Page 1 or 2 Permit No. (to be provided by DWG) II. DESIGN INFORMATION Surface Areas Area, temporary pod 50,696 fe Area REQUIRED, permanent pool 23,510 ftz SAIDA ratio 3 48 (unitless) Area PROVIDED, permanent pool, 4.-PW 45,405 fig OK Area, bottom of 10ft vegetated shelf, Ab�L,hw 41,093 ff Area, sediment cleanout, top elevation (bottom of pond), Ab„Lp„tl 21,816 fly Volumes Volume, temporary pool 38,906 fe OK Volume, permanent pool, V,,Lpw 166,317 fe Volume, forebay (sum of forebays if more than one forebay) 36,498 fe Forebay % of permanent pool volume 21.9% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? y (Y or N) Mountain/Piedmont SAIDA Table Used? n (Y or N) SAIDA ratio 3.48 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, VP, ,,_, I 166,317 fl Area provided, permanent pool, A�,,w 45,405 ffz Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, d,,,, (Round to nearest 0.5ft) it Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, Ap.,.,,, 45,405 fe Area, bottom of 1Oft vegetated shelf, Ab�L,w 41,093 fe Area, sediment cleanout, top elevation (bottom of pond), A 21,816 ff "Depth" (distance b!w bottom of 1 Oft shelf and top of sediment) 4.00 ft Average depth calculated 3.54 ft OK Average depth used in SAIDA, d.,(Round to down to nearest 0.5ft) 3.5 ft OK Drawdown Calculations Drawdown through orifice? Diameter of orifice (f circular) Area of orifice (d-non-circular) Coefficient of discharge (Co) Driving head (Hj Drawdown through weir? Weir type Coefficient of discharge (C„) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: y (Y or N) 3.50 in in 0.60 (unidess) 0.33 ft (Y or N) (unidess) (uni6ess) ft ft 25-07 its/sec 31.48 ftslsec U.16 fOlsec 2.70 days OK, draws down in 2-5 days. 3:1 QK 10 :1 OK JUN 0 2 2016 UL 10.0 ft OK 3 :1 OK 3.0 :1 OK Br y (Y or N) OK TO ft OK n (Y or N) OK y (Y or N) OK y (Y or N) OK portable pump Form SW4011-Wet Detention Basin-Rev.9.4/18/12 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) ik. REQUIRED ITEMS CHECKLIST _ Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result In a request for additional Information. This will delay final review and approval cif the project. Initial ill t ;e spac6 provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. EG S 1. Plans (1 ° - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. EC Partial plan (1 " = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, Maintenance access, - Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the wet detention basin 0" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. _ 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. [z I 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. CktGS 7. The supporting calculations. e i M 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. _ D-K- 9. A copy of the deed restrictions (if required). L° Aus 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/1e/12 Eu MAR 0 8 2016 BY' Part III. Required Items Checklist, Page 1 of 1 p m-v0cnpz o � � m I m m .`1 �1 • MO // ep is a o a n 4! w ii .y d m ; !7 y 'O ..jx •• a � w o p N x y m m a Q! V� 0 ho : �, W c ' ; m -� rn� m U3 CD i 0 I s 1 I co I 0 0 �g m v w 3 =� w •w � a w= 0 3� Cr m= a ;+ �� � D g1D 5. 0 o� o m _. o c La. a5 ° C'0 aw m � •0 m 0 rL C)v o 85 aai C. CL 9 CD 0 ID N rt o i*0 a 3 0 � O 0 w= � 0 o0 �o Cp1DN �D cry a, m m� Z;0 �� m m• 3 m = 0 t� �' � � � c � o• n � F� N � Dc�' n a o 0 •e j t �. O Q � I chi 1 1 I 1 I _•i m my�f°3 v fl! S N 3 c �3 � n�� C•n m � n m m � $ m a � � o �I i I l � I �1 I { i o 1 I { f w NO fy D' N tr IT Dm > N ;ri cw O _— mm w 'Sa •S g swI ,> IL i$ m( g m m h pCD�p IIB'm m C n, 5F j®m 3 5 m B. 0 CN sS � � $ �m � m S !3 °.'. $. °- rr m °, s m 5 m m 3 m� S u: 3 m° a 3 !e. ^�' 3 �. D$ m 3 g $ O o $ m o S m g RfR0 m ci m �f l _ CL +o is '� L� S S 3 E a. c S °� c a 5 s S, Sr 3� w $ m 3 ;fa ypsf o h 0 m m c c� I=. m� m� 3 m e-i 510 i;ia, � �O. m -ry n� C C i I �_ m W R a �i{[: °• w �. me I m v 1p m Lp y�g�. G i ® ° o N N � � •O � .x 0. � �• 1-fA co $ C 'a^ 'D a? m °° 3Ga 0SI: 7tI$ i 1 o m o o �jm 0 3= o <J m = imw c a $ a Fm ±" O w $ jS _ ' $ Q a FA 3 iCL W FA m m lit e. o a o' ' f =r 1= 01 o ° m J m I ! a J 3� SO c k� J 1 J• j ! i j �, I I � I N �� e j I I # 1 i 9 v lS i t o v o u, m r SC a S " "" W rn o o C5 ���-' _ > Q >• g M o to G: a m 9mP I fSgR� s. g E m c g g a m > 0. > o' 0 S. m Er p 5� m m r& $� !� 3 $. C m a 1] iA: Ip O m m s m 0 f� m m 1� C ' ca 7� CL SCn 7 �; ro' 3 too =0a a -, 3 a o 1 m 0 O O a m•�` S m m .4. is . W Z7 ! w s a o a �. a o IL 3 3 m n a C Y �� & Iro 3 s -p� � m= S W$ A m a D m m m m$ m m c 3 S a? a 5 07 is m 7 a a J N o �. R w m &- w p �• fE G. '_' m $ 1 C n c �" Ip 06 S w- vZ Q 1] 'r a o -0aa 3 2 3$ w pQppp 3 W �3 a@ o m w= i c sa og mi$. 3 .0v o o c a m s G) =5 g m 3 20 } $ 'n m $ +} .. C> a�i 02 m $ S m n P- n p a CL �Q .°c. � CD a m J J J ro m 3 a J n 3: J 1 7 m � mf 1 1° i ILfI J � 4 O f „FF1 # j i611 �.�� •G � � � �C at•<1d � � � mEia /a Wtat�; to -tl-C �-< :mdld �w ��dp pO � 1 t i i►w I� I � '� I.'�1. /w'7 y � i"� 1, � •w j ' � i� ` W ,p,���� EAIN I3 4�5 i I 1.1� � IL ® a E{ 1 I O v O O M 3 CD 9 Im y c) vn CD d:fii NH to. wm go. In m i)Ib r., : > CD o -o •w (D as �f'•••••;.� 0 a• .. a 1 � O M, t^' I 0. v cn - II co n.l 0 w c to. ` w N g { I m CL N O, o 0 � � �D � -� m yom t�,. o- oc o o N m I a, m 0 21 m ro ort o w a ry C a w y a H 7 N �M to Qto q G r. 0 a a� o may G. -+ o m � �. p y ao m a�� CD 3 co M w t'n � m C W '�* p N 7 m a S W 7 ON N N �D !f! w 3 II 7 �ID rt _� trey w o `*� o w���• m �s c n o� m % � m to CD is I � � 3 a, n � N � Q' o. o 0 � 31 I m .� j I I I I� J I Ij' 1 J 1 I i I J r v� 0. -t � CD 3 cow � 2 r � R7 OO � g• z a� lD � 3 < 0 w�� W w Q- 00 7 mm � o N ' I J a A m j I E i I I i 3 f I E o t � o 1 I ' I i I I � y m r m.rti_ Q m t'4 0 cm MNJ r sm w Q� -' �as.ss.m� m w� s 13 F� m: � m m 3 l w n 3 I I W C a a IW 0 n N a 11 ' �� �,V .mom .'p O :� 1 ;CD {:N O .cO OCC •Z IW �OV1 Im Ij I1,3 I:O Ip ix A:tn ID. t :' }I• i i I � i h . x i •E3,��': rip 3 II.D O O1� d:m ID m N{m Cr alM ID m �I< I w1 G C. o;m m�T O' D d� appI OI 7 ID: i 0 m n �O O U3 I c 0 a M* m D m 3 m Er 1� 7 IN 9 I A p � O J 0 N± m I Z p I y m. N O{ IO 0 I is 5C N TZ W M N 1 ��G N 0I� m N m m �l. E l w g m c� n .. m m m m 3 3 p{�3 P m n m o m O m p m iy!aCL m �I� m m 7 i m I° m m m (n 0 n him m 'O w o 3 3 3 f� (n OO N P 2 » m ID 3 p m m a c m o i} m m = J y m 9 illp O a R o W P m c a' ti; l y fm 7 O 1 0. m I = � o. Q m �+ m w O '0 l Ym:`m ly Im 0Iy 0 0 �,�p 'tn > > 3 CL a0 O O m g."omI sm = m �i ;Im � IIS w IpD m �+ m c 05 m l � rr 13D l i! w = Ilm 0 z 'aw z m 7 m m 3 0 c 'm MrW S Cry {' Ou O I m >: O 0- x yD c m c O o m =r m m sm O OR Q m 3 0 3 n w fc^i7 d �Z n O O ,J 11 i7 •J a � O cic c a W,N1 m :a sv 'Z'i :Q f�.fn .v m. M,, (a'° �m.. m 3 3 P m mll - {o A�N'AI I CD C. ODm!y a ICL a CD .A:11' High Density Residential Subdivisions C� Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 21-11.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the storr„..,ater control facility. I, James Yopp acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 180306 Phase 2, 3, 4 as issued by the Division of Energy, Mineral and Land Resources underihe Stormwater Manegement Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Energy, Mineral and Land Resources. 6. The maximum allowable built -upon area per lot is 3,500 square feet. This allotted amount includes any built -upon area constructed within thg lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE 06 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. 8. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. EIVE SEP 1 u 2017 BY. Form DRPC-3 Rev.2 05Nov2009 Page 1 of 2 Hiah Density Residential Subdivisions Deed Restrictions & Protective Covenances or i' W A , a Notary Public in the State of -�, o�',�Iva , County of V"*'W w do hereby certify that tees Tn �P rt.� personally appeared before me this the g day of �e �em�P' , 20 k , and acknowledge the ue execution of the foregoing instrument. Witness my hand and official seal, S SEAL Signature e o c "j S e l o� peannwww; My Commission expires l - Z 1 Z o 1 +, ay s. 060 GE•CEQ��� 4kom•'0#01Ait :9 VER COS+�, ww4rrrY►M Form DRPC-3 Rev.2 0514ov2009 Page 2 of 2 Tarin Woods Ph II Phase 1 Lot Numbers 1-51 Phase 2 Lot Numbers 52-141 Phase 3 Lot Numbers 154-180, 197-209 Phase 4 Lot Numbers 210-251 MEMORY TRANSMISSION REPORT TIME :10-17-2017 10:32 FAX NO.1 :9103502004 NAME :Mainfax FILE NO. 535 DATE 10.17 10:28 TO 97911501 DOCUMENT PAGES 11 START TIME 10.17 10:29 END TIME 10.17 10:32 PAGES SENT 11 STATUS OK CSD ENGINEERING October 6, 2017 Christine Hall DEQ/Stormwater Section NC Department of Environment & Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Express Stormwater Management Permit Modification Tarin Woods II New Hanover County CSD Project No. 06-134 Christine: We are in receipt of your comments dated October 4, 2017. Enclosed please find the following items: Two (2) copies of the revised pages EC3sw, EC6sw and EC10 Comment: 15A NCAC 02H.1042(2)(g)(vii): The collection system information appears to be missing from plan sheet EC6sw. The inlet protection appears to be missing from plan sheets EC3sw and EC10. Please confirm that all applicable labels or layers are turned on. Response: Layer was errantly turned off on previous submittal. Inlets are now plotting along with their design information. Added IP to the inlets on EC3 and added the rip rap apron on the connecting culvert on EC10. Comment: 15A NCAC 02H.1042(2)(g)(iv): Please provide additional proposed contours or drainage patterns along the roads to the north of lots 219 and 180 on plan sheets SC3sw and EC6sw to support the delineated drainage areas. Response: Added spot shots along the roadways in the referenced area on sheets EC3 and EC6. Please let me know if you have any questions or require any additional information. Sincerely, Mike Broyhill Encl.: As noted above CC: Hoosier Daddy, LLC I V E OCT 0 6 2017 BY: 3805 Cherry Avenue - Wilmington, NC 28403 - 910 7914441- www.csd-engineering.com — License # C-2710 CM (95 ENGINEERING Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY October 4, 2017 Hoosier Daddy LLC Attn: Jack Carlisle, Manager 6025 Tarin Road Wilmington, NC 28409 Subject: Request for Additional Information Stormwater Project No. SW8 160306 Tarin Woods H New Hanover County Dear Mr. Carlisle: ROY COOPER Governor MICHAEL S. REGAN secretary TRACY DAVIS Director The Wilmington Regional Office received and accepted a modified Express State Stormwater Management Permit Application for the subject project on September 18,2017 with additional information received on October 2, 2017. A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed. To continue the review, please provide the following additional information: 1. 15A NCAC 02H.I 042(2)(g)(vii): The collection system information appears to be missing from plan sheet EC6sw. The inlet protection appears to be missing from plan sheets EC3sw and EC10. Please confirm that all applicable labels or layers are turned on. 2. 15A NCAC 02H. I 042(2)(g)(iv): Please provide additional proposed contours or drainage patterns along the roads to the north of lots 219 and 180 on plan sheets SC3sw and EC6sw to support the delineated drainage areas. Recommendation: In the case where the contour interval on a "topographic " map is too large to adequately reflect the existing and proposed drainage patterns of a relatively, flat property, spot elevations and/or a site -specific elevation survey may be needed. 3. Due to the relatively minor nature of these comments, the express additional information review fee has been waived. Please remember to confirm that any revised information is presented consistently throughout the application documents including calculations, supplements, narrative, and plans. Please also remember to provide two hard copies of any updated documents per 15A NCAC 02H.1042(2). The requested information should be received in this Office prior to October 12, 2017, or the application will be returned as incomplete. If the project is returned and you wish to re -submit to the Express Program, you will need to reschedule the project through the Express Coordinator for the next available review date and will need to resubmit all required items at that time, including the application fee. If additional time is needed to submit the requested information, please email your extension request, prior to the original due date, to the Division at the email address provided below. The extension request must include ajustification and a date of when the requested information will be submitted to the Division, which shall be no later than 5 business days past the original due date. Please remember that extension requests delay the issuance of the final permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Ss?.t: er's"1:.thCnrafi ,i 1 En*:�;;nmernalQuallty i',s e,rtinar= .:n+.;lr:!dR.e;ourxx:•; W_minc;_�nP_ryi� ;�?:�.Ul�ic� 1; Cardirla;l�rnx Ex,�•n.�n I Wiir ingtun,A:i; 36-9:1:: 910, fku 7215 State Stormwater Permit No. SW8 160306 Page 2 of 2 Please label all packages and cover letters as "Express" and reference the State assigned project number on all correspondence. If you have any questions concerning this matter, please feel free to call me at (910) 796-7215 or email me at christine.hall@ncdenr.gov- Sincerely, Christine Hall Environmental Engineer GDS/canh: \\\Stormwater\Permits & Projects\2016\160306 HD\2017 10 addinfo 160306 cc: James Yopp / Lisa Beaman; Hoosier Daddy, LLC Howard Resnick, PE, CSD Engineering Wilmington Regional Office Stormwater File t.c•..A?«thCz<<a1�:sr;I [n.;ronr:ic:rtoiQj.rlity I C.:�.;•.ery.Mi:�.;:ri+? =n;iL:�ndi2es�H�:r:;�y. SY�minolc:;.iNa c;�r: Office I ""i C.. uin, Drh- Ex:?:i:'Un I %Vi1;TJk1gtM,NC 7.8435 P10".3o'l21S Hall, Christine From: Hall, Christine Sent: Wednesday, October 04, 2017 11:10 AM To: Howard Resnik (howard@csd-engineering.com); 'Rodney Wright'; 'Mike Broyhill'; 'iames@rockfordpartners.net' Cc: Weaver, Cameron Subject: 2nd request for additional info - Tarin Woods II, SW8 160306 Attachments: 2017 10 addinfo 160306.pdf Al I, Attached is a pdf of the second request for additional information. There are just a few minor items that need to be clarified on the plans. I discussed many of these with Rodney yesterday. Please let me know if you have any questions. Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine. hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 "*"t.'e is l f `µ *R Y fti I i'}N}. 1.'z all vorre r op'd'-nce 0 caaM1 h7t'7 tiliF dti rSS r8 SlibjOCI in the r``Vc,-i.h Car fina t�obfi : %S'P.cords r-aw c tid., in jl, i7ie diz-rIUC P. d in From: Hall, Christine Sent: Thursday, September 21, 2017 12:29 PM To: Howard Resnik (howard@csd-engineering.com) <howa rd @ csd-engi nee ri ng.co m>; 'Rodney Wright' <rodney@csd- engineering.com>; 'Mike Broyhill' <mike@csd-engineering.com>; 'james@rockfordpartners.net' <james@rockfordpartners.net> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: Tarin Woods 11, SW8 160306 All, Attached is a pdf of the request for additional information for the subject project. Please note that I will be out of the office next week so if you have any questions, please let me know this week. Also, for anything I receive on September 22, 1 may not have enough time to process it before leaving and it may have to wait until I return on October 2"d. Thank you in advance for your understanding and cooperation! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine. iiall(a.ncdenr.00v 127 Cardinal Drive Ext. Wilmington, NC 28405 'Nothing omp area: - -- September 29, 2017 Christine Hall DEQ/Stormwater Section NC Department of Environment & Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Express Stormwater Management Permit Modification Tarin Woods II New Hanover County CSD Project No. 06-134 Christine: CSD ENGINEERING EIVE OCT 0 2 2017 8y We are in receipt of your comments dated September 21, 2017. Enclosed please find the following items: Two (2) copies of the revised Stormwater Drawing sheets Two (2) copies of the revised Catch Basin Drainage Area map Two (2) copies of the revised Pond 3 Forebay Area map One (1) copy of the revised Stormwater Calculations for Phase 3 One (1) copy of the revised Stormwater Calculations for Phases 2 & 4 Revised Wet basin supplement showing correct orifice diameter Revised 0&M data page Two (2) copies of the Revised Page 3 of Application Two (2) copies of the Phased BUA allocation spreadsheet for application Comment: The built -upon area allocations presented in Section IV.10 of the application are not consistent with the allocations presented elsewhere in the submittal documents. Please confirm the allocations are presented consistently. Response: Created spreadsheet for phased BUA allocation to be attached to application. Comment: Please provide proposed contours and drainage patterns within Phases 3 & 4. Response: Proposed contours have been added to the plans. Comment: Please provide contour labels in the forebays for Pond 2C and Pond 3B on sheets EC8B and EC10. Response: Contour labels have been added. Comment: Please update the outlet protection information on plan sheet EC6 to include the additional proposed outlets or provide a citation of where the outlet protection is specified. Response: Outlet protection table on sheet EC6 has been. updated. _..___.__._..._....----._.._.....---....---.---.--.._._....._..._-_--._.__._............._--. ____.___._.._.._._._...._._._._.__._______........._._._..__...._... ........ ......._..___._.__.._...-------............ ......... _____.._....---------.__.._____.......---_--.------..----_ 3805 Cherry Avenue - Wilmington, NC 28403 - 910 7914441- www.csd-engineering.com — License # C-2710 . GICSD NO Request for Additional Information: SW8160306 1.2 Comment: For Pond 2, the provided surface area being compared to the required surface area is for the entire pond, not the main pond. Please confirm that only the main pond surface area is being compared against the required surface area. Response: Revised spreadsheet to reflect main bay only. Comment: Please double-check the stage -storage table for Pond 3, Forebay 1. The same surface area is presented at an elevation of 19' and 19.5'. The listed forebay volume is associated with the volume at an elevation of 19' instead of 19.5', which could impact the total forebay volume listed in the other submittal documents. Response: Calculations, Supplement, O&M and Pond 3 forebay area map have been revised. Comment: The supplement for Pond 3 lists the provided orifice diameter as being 6 inches while the other submittal documents list this diameter as 4 inches. Please confirm. Response: Supplement has been revised to show a 4 inch orifice diameter. Please let me know if you have any questions or require any additional information. Sincerely, 4 �; r61;7 /L;'_ Mike Brovhill ECEIVE OCT 0 2 2017 End.: As noted above CC: Hoosier Daddy, LLC 3805 Cherry Avenue - Wilmington, NC 28403 910 7914441- www.csd-engineering.com — License # C-2710 �� ' CSD STORMWATER MANAGEMENT CALCULATIONS for TARIN WOODS II, PHASE 3 PREPARED FOR HOOSIER DADDY, LLC. 6025 Tarin Road Wilmington, NC 28409 Prepared by: 31 CSD ENGINEERING PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 ° License # C-2710 C f �o y • � SEAL '°'02 3548 f- `ilk - %*,�;BIME��- Howard Resnik, P.E. =GIVE OCT 022011 iCSD ENGINEERING Storm Water Narrative September 2017 PROJECT NAME: Tarin Woods II (SW8160306) Phase 3 PROJECT DESCRIPTION: This submittal is for a modification to existing NCDEQ permit SW8160306 to add a new section within the development (Phase 3) containing an additional 40 single family lots. Portions of this section have not been evaluated for wetlands. The drainage area for this section will include a future BUA allocation for a future design within the drainage which will be completed once the wetlands determination has been completed. The owner of the property is Hoosier Daddy LLC.. This section of the development will connect to existing Appomattox Drive and Sweet Gum Drive from Section 1 of the Tarin Woods II Development. The project is not located within Y2mile of SA waters. Stormwater from the site drains through a tributary to Everett Creek SA;HQW located in the Cape Fear River Basin (Index # CPF 18-87-29). The project will be high density and will be treated with a high density BMP. The proposed site will utilize a wet basin for treatment. The basin will be split with one of the basins adjacent to an existing ditch for discharge and the other basin will be connected via underground storm drainage pipe. Roads within the development are designed to be super elevated and directed into catch basins that will convey the water to the wet basin. Since the project is located within New Hanover County the site will also need to meet the 2,10 and 25 year pre/post requirement. Proposed impervious for this section is 38%. Water and sewer for the site will be public and provided by the CFPUA. PROJECT BMP: storm water pond. STORMWATER ENGINEER/CONSULTANT: CSD-Engineering PO Box 4041 Wilmington, NC 28406 Rodney Wright rodnev@csd-eneineerine.com 910 7914441 office 910 7911501 fax 3805 Cherry Avenue - Wilmington, NC 28403 - 910 7914441- www.csd-engineering.com — License # C-2710 %� IUD PROJECT DATA: Existing Site Data (within Pond drainage delineation) Existing wetlands portion of area to be determined Existing uplands 1,066,462 sf (24.48 acres) Total proposed project area 1,066,462 sf (24.48 acres) Proposed Site Data: Ph 3 Proposed 40 Single Family lots Ph3 Proposed streets Ph3 Proposed sidewalks future Total proposed impervious area Soil Types Within Proiect Limits: Abbreviation Type and Description Le Leon Sand Ly Lynn Haven Kr Kureb Pm Pamlico (See attached soils map) 140,000 sf (3.21 acres) 45,038 sf (1.03 acres) 7,370 sf (0.17 acres) 216,478 sf (4.97 acres) 408,886 (9.39 acres) Hydrologic Group Area C/B 2.89 ac D 16.76 ac A 4.42 ac D 0.33 ac ROUTING CALCULATIONS: PRE -DEVELOPED CONDITIONS FOR WETBASIN 3 (see hydrograph summary and reports): Pre-dev. to Wet Basin CN Pre Developed = 68 (SCS) composite value determined as follows: +/-192,916 sf of soils are A, Woods good condition (CN = 30) +/-126,062 sf of soils are C, Woods good condition (CN = 70) +/- 747,484 sf of soils are D, Woods good condition (CN = 77) ((192,916 x 30) + (126,062 x 70) + (747,484 x 77) / 1,066,462 = 67.7 USED CN = 68 Area=1,066,462 sf or 24.48 acres Time of Concentration =10.0 min Qmax for pre-dev 1-yr/24-hr storm = 24.22 cfs Qmax for pre-dev 2-yr/24-hr storm = 35.01 cfs Qmax for pre-dev 10-yr/24-hr storm = 81.02 cfs Qmax for pre-dev 25-yr/24-hr storm=102.13 cfs POST -DEVELOPED CONDITIONS (see hydrograph summary and reports): Post-dev. to Wetbasin CN Post Developed = 82 (SCS) composite value determined as follows: +/- 408,886 sf of impervious surface (CN = 98) +/- 460,896 sf of soils area D, open space good condition (CN = 80) +/-118,951 sf of soils area A, open space good condition (CN = 39) +/- 77,729 sf of soils area C, open space good condition (CN = 74) ((408,886 x 98) + (460,896 x 80) + (118,951 x 39) + (77,729 x 74)) / 1,066,462 = 81.9 USED CN = 82 Area=1,066,462 sf or 24.48 acres Time of Concentration =10.0 min Qmax for post-dev 1-yr/24-hr storm = 49.17 cfs Qmax for post-dev 2-yr/24-hr storm = 63.03 cfs Qmax for post-dev 10-yr/24-hr storm=116.13 cfs Qmax for post-dev 25-yr/24-hr storm=138.58 cfs Routed site — areas draining to pond (see hydrograph summary & reports): Qmax for post route 1-yr/24-hr storm = 4.05 cfs Qr=ax for post -route 2-yr/24-hr storm = 8.95 cfs Qmax for post -route 10-yr/24-hr storm = 58.59 cfs Qmax for post -route 25-yr/24-hr storm = 91.17 cfs SUMMARY: Wetbasin 3 Storm Event Pre-Dev Qmax (cfs) Post-Dev Qmax (cfs) Routed Post Qmax (cfs) 1 yr 24.22 49.17 4.05 2 yr 35.01 63.03 8.95 10 yr 81.02 116.13 58.59 25 yr 102.13 138.58 91.17 WITH WORKING OUTLET STRUCTURE BMP 100 year water elevation Top of Bank Elevation 3 22.35 23.0 NO OUTLET STRUCTURE BMP 100 year water elevation Top of Bank Elevation 3 22.50 23.0 WET DETENTION BASIN CALCULATIONS Pond 3 DETERMINE IMPERVIOUS PERCENTAGE area to basin = 1,066,462 sf 24.48 acres buildings = 140,000 sf 3.21 acres roads = 45,038 sf 1.03 acres sidewalks = 7,370 sf 0.17 acres future = 216,478 sf 4.97 acres rec = - sf - acres total impervious surface = 408,886 sf 9.39 acres total non -impervious surface = 657,576 sf 15.10 acres percent imp. = 38.3 % DETERMINE REQUIRED SURFACE AREA from SA/DA Chart depth = 3 ft Imp % SA/DA 30 2.18 38.3 x 40 2.96 x= minimum surface area = surface area provided = 1.5" VOLUME DETERMINATION: Pond 3 DETERMINE RUNOFF COEFFICIENT (Rv) 2.83 0.0283 x 1,066,462 sf 30,181 sf 54,006 sf 9 elevation 19.5 I = 38.3 percent impervious Rv = ? (runoff coefficient, inches per inch) Rv= 0.05 +0.009 (1) Rv = 0.39 in/in DETERMINE VOLUME design storm = 1.5 inch Rv = 0.39 in/in drainage area = 24.48 acres volume = ? volume = (design storm)(Rv)(drainage area) volume = 1.2 acre-ft volume = 51,985 of of required storage volume CSD ENGINEERING PO BOX 4041 WILMINGTON, NC 28406 WET DETENTION BASIN STAGE -STORAGE TABLE: Pond 3, Main Bay Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 15 31238 sediment storage not used in calcs 16 35,562 17 40,003 37,783 37,783 18 44,558 42,281 80,064 Bottom Shelf 19 49,225 46,892 126,956 PP 19.5 54,006 25,808 152,764 Main Bay, Forebay Berm and Forebay PP 19.5 72,790 _ Top Shelf 20 78,304 37,774 37,774 1.5" STORAGE 20.2 79,421 15,773 53,547 21 83,931 52,081 105,628 22 89,671 86,801 192,429 23 95,525 92,598 285,027 perimeter of PP main bay only = 1,612 ft 1.5" storage volume provided (elev. 20.2) = 53,547 cf SA at bottom of 6:1 shelf main bay only (19) = 49,225 sf volume at PP Main Bay only (elev. 19.5) = 152,764 cf minimum forebay volume (15%) = 22,915 cf maximum forebay volume (20%) = 30,553 cf volume provided in forebay only (elev. 19.5) = 26,671 cf AVERAGE POND DEPTH Option 2 When shelf is submerged Davg = VPP Vshelf /Abottomofshelf VPP 152,764 volume of permanent pool main bay (cf) Vshelf = 1,209 volume over the shelf only (cf) (0.5 x Depth x Perimeter x Width) Depth = 0.5, width = 3.0 A = 49,225 area of bottom shelf (sf) Davg 3.08 - 61. CSD ENGINEERING PO BOX 4041 WILMINGTON, NC 28406 FOREBAY STAGE -STORAGE TABLE: Pond 3, Forebayl Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 16 3,162 sediment storage not used in talcs 17 4,026 18 4,969 4,498 4,498 19 5,991 5,480 9,978 19.5 6,586 3,144 13,122 forebay volume provided = 13,122 cf Pond 3, Forebay 2 Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 16 179 sediment storage not used in talcs 17 499 18 917 708 708 19 1,425 1,171 1,879 19.5 1,737 791 2,670 forebay volume provided = 2,670 cf Pond 3, Forebay 3 Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (d) 16 2414 sediment storage not used in calcs 17 3220 18 4,097 3,659 3,659 19 5,043 4,570 8,229 19.5 5,557 2,650 10,879 forebay volume provided = 10,879 cf total forebay volume provided = 26,671 cf '.�C..... ., ily: — CSD ENGINEERING PO BOX 4041 W ILMINGTON, NC 28406 STAGE - DISCHARGE TABLE: Pond 3 size of orifice (in) = 4.00 crest length of weir cut (ft) = 6.00 crest length of grates (sf) = 8.0 crest length of spillway (ft) = 65.0 ELEVATION 40' PVC WEIR (ft) (S) Ws) 19.5 0.00 - 20 0.30 - 21 0.51 14.17 22 0.66 47.82 23 0.79 92.77 PVC DRAW DOWN Pond 3 Orifice size = 4.00 in Normal Pool Storage Elev. = 19.50 1.5" storage Elev. = 20.2 elevation of orifice = 19.50 elevation of weir cut = 20.2 elevation of grates = 20.7 elevation of spillway = 21.6 GRATES SPILLWAY TOTAL (cfs) (cfs) (cfs) - 0.30 4.34 - 19.02 39.13 87.61 92.09 323.02 508.67 Orifice coefficient (C) = 0.6 Average head from 1.5" storage to orifice (h) _ (20.2 -19.5) /3 = Orifice cross sectional area (A) = pi x rA2 = 3.14 x (r/12)A2 = Acceleration due to gravity (g) Q=CA (2gh)Al/2 = 0.6 x 0.08722 x (2x32.24.23)Al/2 = 51,985 / 0.20141= 258,105 seconds = 0.23 ft 0.08722 sf 32.2 ft/sA2 0.20141 cfs 2.99 days CSD ENGINEERING PO BOX 4041 WILMINGTON, NC 28406 VELOCITY CONTROL FOR PIPE OUTFALL POND 3 OUTFALL - (2) 24" PIPE OUTFALL; 58.59 / 2 =17.75 Qpeak = 29.29 cis from 24 "pipe (see sheet EC10) Q=VA V= Q/A = 29.29 / 3.14 9.3 ft/sec From chart 8.06b, Q = 29.29 cis d= 24" d50 - 0.30 it or 3.6 ", use 4 " La = 30 it 3d - 6.0 ft W=d+0ALa= 14ft dmax=1.5xd50= B" apron thickness = 1.5 x dmax = 9 " apron dimensions: min. stone size = 4 Inches min. apron thickness = 9 Inches apron length - 30 ft width of apron at pipe outlet = 6 it width of apron at end of apron = 14 it CSD ENGINEERING PO BOX 4041 WILMINGTON, NC 28406 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 31302015 by Autodesk, Inc. v10.4 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow Interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SC:S Runoff 24.22 2 730 100,696 — — — Pre Dev 2 SCS Runoff 49.17 728 188,635 — — Post-Dev 3 Reservoir 4.052 840 69,779 2 21.06 123,713 Routed 5 Reservoir 1.037 1220 17,713 2 21.62 172,604 No Outlet Pond_C.gpw Return Period: 1 Year I Friday, 09 / 15 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2015 by Autodesk, Inc. v10.4 Hyd. No. 1 Pre_Dev Hydrograph type = SCS Runoff Peak discharge Storm frequency 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 24.480 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.83 in Distribution Storm duration = 24 hrs Shape factor Q (C%) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 ' 1 1 1' 0 120 240 360 480 — Hyd No. 1 0 Pre_Dev Hyd. No. 1 —1 Year Friday, 09 115 / 2017 = 24.22 cfs = 730 min = 100,686 cuft = 68 = 0 ft = 10.00 min = Type III = 484 Q (Cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 ' ' 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Hyd. No. 2 Post-Dev Hydrograph type~ = SCS runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 24.480 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.83 in Storm duration = 24 hrs * Composite (Area/CN) = [(12.720 x 98) + (13.640 x 61)] / 24.480 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post-Dev Hyd. No. 2 —1 Year Friday, 09 / 15 / 2017 = 49.17 cfs = 728 min = 188,635 cuff = 82* = 0 ft = 10.00 min = Type III = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2015 by Autodesk, Inc. v10.4 Hyd. No. 3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post-Dev Max. Elevation Reservoir name = Pond 3 Max. Storage Storage Indication method used. Routed Friday, 09 / 15 / 2017 = 4.052 cfs = 840 min = 69,779 tuft = 21.06 ft = 123,713 cult 1 /1 • • -_ 1 11 ,! 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2015 by Autodesk, Inc. A 0.4 Hyd. No. 5 No Outlet Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post-Dev Max. Elevation Reservoir name = Pond 3 No Outlet Max. Storage Storage Indication method used. Q (cfs 50.00 30.00 20.00 10.00 Friday, 09 / 15 / 2017 = 1.037 cfs = 1220 min = 17,713 cuff = 21.62 ft = 172,604 cuff Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Timemin) Hyd No. 5 — Hyd No. 2 i- Total storage used = 172,604 cuft ( Hyd rog ra p h Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 35.01 2 730 140,432 — ----- Pre Dev 2 SCS Runoff 63.03 2 728 241,568 — ---- Post-Dev 3 Reservoir 8.951 2 774 122,712 2 21.17 133.300 Routed 5 Reservoir 3.771 2 902 70,646 2 21.67 177,044 No Outlet Pond_ ,gpw i Retum Period: 2 Year Friday, 09 115 / 2017 i Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31382015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 1 Pre_Dev Hydrograph type = SCS Runoff Peak discharge = 35.01 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 140,432 cuft Drainage area = 24.480 ac Curve number = 68 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Pre Dev Q (cfs) Hyd. No. 1 -- 2 Year Q (°) 40.00 40.00 30.00 30.00 20.00 20.00 k1 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Hyd. No. 2 Post-Dev Hydrograph type = SCS Runoff Leak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 24.480 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.50 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(12.720 x 98) + (13.640 x 61)] / 24.480 Post-Dev Q WS) Hyd. No. 2 — 2 Year 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 Friday, 09 / 15 / 2017 = 63.03 cfs = 728 min = 241,568 tuft = 82* = Oft = 10.00 min = Type III = 484 Q (Cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Hyd. No. 3 Routed Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post-Dev Reservoir name = Pond 3 Storage Indication method used. Q (Cfs 70.06 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Friday, 09 / 15 / 2017 = 8.951 cfs = 774 min = 122,712 cuft = 21.17 ft = 133,300 cuft Q (Cfs) 70.00 F. 4 We 50.00 40.00 30.00 20.00 10.00 0.00 1 1 0.00 0 120 240 360 480 600 720 840 960 1060 1200 1320 1440 1560 Time (min) Hyd No. 3 — Hyd No. 2 t Total storage used = 133,300 cuff Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 5 No Outlet Hydrograph type = Reservoir Peak discharge = 3.771 cfs Storm frequency = 2 yrs Time to peak = 902 min Time interval = 2 min Hyd. volume = 70,646 cult Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 21.67 ft Reservoir name = Pond 3 No Outlet Max. Storage = 177,044 cuff Storage Indication method used. No Outlet l�_��� ��� �� • 1 1 1 1 1 1 .1 :1 •ll 1. :�.1 ••1 !:1 11 1 -1 .1 Hyd rog ra p h Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc. v10A Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cult) 1 SCS Runoff 81.02 2 728 312,504 — — PreDev 2 SCS Runoff 116.13 2 728 450,514 — ---- Post-Dev 3 Reservoir 58.59 2 742 331,858 2 21.94 200,049 Routed 5 Reservoir 53.71 2 744 279,592 2 22.06 211,600 No Outlet Pond_C.gpw I Return Period; 10 Year I Friday, 09 / 15 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31302015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 1 Pre_Dev Hydrograph type = SCS Runoff Peak discharge = 81.02 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 312,504 cuft Drainage area = 24.480 ac Curve number. = 68 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Pre Dev Hyd. No. 1 —10 Year Q (cfs) 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 1 L -_..r- i i i 1 1 --r 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139) 2015 by Autodesk, Inc. 00.4 Friday, 09 / 15 / 2017 Hyd. No. 2 Post-Dev Hydrograph type = SCS Runoff Peak discharge = 116.13 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval 2 min Hyd. volume = 450,514 cuft Drainage area = 24.480 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139 2015 by Autodesk, Inc. v10.4 Hyd. No. 3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post-Dev Max. Elevation Reservoir name = Pond 3 Max. Storage Storage Indication method used. Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 Routed Hyd. No. 3 —10 Year Friday, 09 / 15 / 2017 = 58.59 cfs = 742 min = 331,658 cuff = 21.94 ft = 200,049 cuft Q (cfs) 120.00 100.00 60.00 40.00 20.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 — Hyd No. 2 � Total storage used = 200,049 cult Time (rain) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2015 by Autodesk, Inc. A0.4 Hyd. No. 5 No Outlet Hydrograph type = Reservoir peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post-Dev Max. Elevation Reservoir name = Pond 3 No Outlet Max. Storage Storage Indication method used. No Outlet Friday, 09 / 15 / 2017 = 53.71 cfs = 744 min = 279,592 cuft = 22.06 ft = 211,600 cult �„ �„ ,am lot H yd rog ra p h Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2015 by Autodesk, Inc. v10.4 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (aft) (min) (min) (cult) (ft) (cuft) 'i SCS Runoff 1112.13 728 391,97 — - — Pre Dev 2 SCS Runoff 138.58 i 728 541,335 — — Post-Dev 3 Reservoir 91.17 738 422,479 c 22.11 215,727 Routed 5 Reservoir 86.85 738 370,413 _ 22.24 227,907 No Outlet Pond_C.gpw Retum Period: 25 Year Friday, 09 / 15 / 2017 I Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2015 by Autodesk, Inc. A0.4 Hyd. No. 1 Pre_Dev Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 24.480 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 8.05 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 120.00 100.00 80.00 40.00 20.00 11111I07 Pre_Dev Hyd. No. 1 — 25 Year Friday, 09 / 15 / 2017 = 102.13 cfs = 728 min = 391,971 cuff = 68 = 0 ft = 10.00 min = Type III = 484 Q (Cfs) 120.00 100.00 80.00 40.00 20.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139 2015 by Autodesk, Inc. v10.4 Hyd. No. 2 Post-Dev Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 24.480 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.05 in Storm duration = 24 hrs * Composite (Area/CN) _ [(12.720 x 98) + (13.640 x 61)] / 24.480 Q (cfs; 140.00 120.00 100.00 80.00 40.00 20.00 1 1 240 360 41 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post-Dev Hyd. No. 2 — 25 Year Friday, 09 / 15 / 2017 = 138.58 cfs = 728 min = 541,335 cuft = 82* = Oft = 10.00 min = Type III = 484 Q (Cfa) 140.00 120.00 100.00 80.00 40.00 20.00 FITITi7 600 720 840 860 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2015 by Autodesk, Inc. v10.4 Hyd. No. 3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post-Dev Max. Elevation Reservoir name = Pond 3 Max. Storage Storage Indication method used. Routed Friday, 09 / 15 / 2017 = 91.17 cfs = 738 min = 422,479 cuft = 22.11 ft = 215,727 cult Hydr®graph Report Hydraflow Hydrographs Extension for AutoCAD® Civil XG 2015 by Autodesk, Inc. v10.A Hyd. No. 5 No Outlet Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post-Dev Reservoir name = Pond 3 No Outlet Storage Indication method used. Q (CfS 140.00 120.00 100.00 80.00 60.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Friday, 09 / 15 / 2017 = 30.35 cfs = 738 min = 370,413 cuft = 22.24 ft = 227,907 cuft Q (Cfs) 140.00 120.00 100.00 80.00 [:I111If 40.00 20.00 n nn 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) - Hyd No. 2 i s 1 ". __- _ 1 Total storage used = 227,907 cult Hyd rog ra p h Summary ReportHydrallowHydrographs Extension for AutoCAD® Civil 31341) 2015 by Autodesk, Inc. A 0.4 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuff) (ft) (cuft) 1 SCS Runoff 142.52 2 728 546,334 — ------ --- Pre Dev 2 SCS Runoff 180.15 2 . A 712,563 -- ----•- - Post-Dev 3 Reservoir 143.76 2 734 593,708 2 22.35 237,766 Routed 5 Reservoir 143.11 2 734 541,641 2 22.50 251,448 No Outlet Pond_C.gpwr I Return Period: 100 Year Friday, 09 / 15 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3136 2015 by Autodesk, Inc. A 0.4 Friday, 09 / 15 / 2017 Hyd. No. 1 Pre_Dev Hydrograph type = SCS Runoff Peak discharge = 142.52 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 546,334 cuft Drainage area = 24.480 ac Curve number = 68 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 Pre Dev Hyd. No. 1 --100 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 ' 1 1 1 I I I I L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 2 Post Dev Hydrograph type = SCS Runoff Peak discharge = 180.15 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 712,563 cuft Drainage area = 24.480 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) = [(12.720 x 98) + (13.640 x 61)] / 24.480 Q (CfS 210.00 180.00 150.00 120.00 •1 11 60.00 30.00 Q WS) 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31301) 2015 by Autodesk, Inc. A0.4 Friday, 09 / 15 / 2017 Hyd. No. 3 Routed Hydrograph type = Reservoir Weak discharge = 143.76 cfs Storm frequency = 100 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 593,708 cuft Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 22.35 ft Reservoir name = Pond 3 Max. Storage = 237,766 cuff Storage Indication method used. Q (Cfs; 210.00 180.00 150.00 120.00 90.00 30.00 Q (Cfs) 210.00 180.00 150.00 120.00 90.00 30.00 Wr7ST11 3 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 3 Hyd No. 2 �._L,!"_ :] Total storage used = 237,766 cuff Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 5 No Outlet Hydrograph type = Reservoir peak discharge = 143.11 cfs Storm frequency = 100 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 541,641 cuft Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 22.50 ft Reservoir name = Pond 3 No Outlet Max. Storage = 251,448 cuff Storage Indication method used. Q (ds) 210.00 180.00 150.00 120.00 90.00 30.00 No Outlet Hyd. No. 5 --100 Year Q (Cls) 210.00 180.00 150.00 120.00 30.00 0.00 `1 1 ' ' '0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 — Hyd No. 2 it F, i.-.-.--.---1 Total storage used = 251,448 cult Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Pond No. 2 - Pond 3 No Outlet Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation =19.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqR) Incr. Storage (cuff) Total storage (tuft) 0.00 19.50 72,790 0 0 0.50 20.00 78,304 37,761 37,761 1.50 21.00 83,931 81,093 118,855 2.50 22.00 89,671 86,777 205,631 3.50 23.00 95,525 92,573 298,204 Culvert / Orifice Structures [A] [8] [C] [PrfRsr] Rise (In) Inactive Inactive 0.00 0.00 Span (In) = 24.00 4.00 0.00 0.00 No. Barrels = 2 1 0 0 Invert El. (ft) = 19.50 19.50 0.00 0.00 Length (ft) = 28.00 1.00 0.00 0.00 Slope (%) = 0.30 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multl-stage = n/a Yes No No Stage (fl) 4.00 3.00 2.00 1.00 0.00 ' ' 0.0 30.0 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) Inactive Inactive 65.00 0.00 Crest El. (ft) = 20.20 20.70 21.60 0.00 Weir Coeff. = 3.33 3.33 2.60 3.33 Weir Type = 1 Rect Broad - Multi -Stage = Yes Yes No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 21.00 Note: Culvert/Ortfice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 60.0 90.0 120.0 150.0 Elev (ft) 23.50 22.50 21.50 20.50 I I I I ' 19.50 180.0 210.0 240.0 270.0 300.0 Discharge (ds) Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Pond No. 1 - Pond 3 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation =19.50 it Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuff) Total storage (cult) 0.00 19.50 72,790 0 0 0.50 20.00 78,304 37,761 37,761 1.50 21.00 83,931 81,093 118,855 2.50 22.00 89,671 86,777 205,631 3.50 23.00 95,525 92,573 298,204 Culvert / Orifice Structures [A] [B] [C] [PrfRSr] Rise (in) = 24.00 4.00 0.00 0.00 Span (in) = 24.00 4.00 0.00 0.00 No. Barrels = 2 1 0 0 Invert El. (ft) = 19.50 19.50 0.00 0.00 Length (ft) = 28.00 1.00 0.00 0.00 Slope M = 0.30 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multistage = n/a Yes No No Stage (ft) 4.00 3.00 2.00 1.00 0.00 ' ' 0.0 30.0 Total 0 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 8.00 6.00 65.00 0.00 Crest El. (ft) = 20.70 20.20 21.80 0.00 Weir Coeff. = 3.33 3.33 2.60 3.33 Weir Type = 1 Rect Broad Multi -Stage = Yes Yes No No Exfll.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 21.00 Note: Cuhrert/OriNce outflows we analyzed under inlet (1c) and outlet (oc) control. Weir risers checked for orlice conditions (1c) and submergence (a). 60.0 90.0 Stage / Discharge Elev (ft) 23.50 22.50 21.50 20.50 'I 1' 19.50 120.0 150.0 180.0 210.0 240.0 270.0 300.0 330.0 Discharge (cfs) Y 0 0 N fmyll G m U m 2 � 0- z N m e7 IL t a i a. c 0 M� � � � m � � � � � E � w \ � � o @ � k ■ 8 t 06 ■ � o E 2 § a k & � a � x o E � B S @ � 06 E d d \ R § I o E t, d z � f m , § � d 3 co $ 1- / CNI C5 G k k CL ® �■ � a k 0 © •- m ui # in 2 12 79 0 0 d La § a § � § % 88 d d § + § k c I CIA � d w % j E R C . V . 2 .. § K S ) § - " 2 .r. a. w 4w 4) i I" zo `d a� o N g o 0 e CL rn ,,, o � o �V d W o _ C o O I o n N S C O O x lq M �i C O O O O N O ai O O C a o o y Z O 0 o co v P. SS 5 3 O c r_ m C pp O q i' J 9 C Cn N L II 00 CD .m .. O m O. E J 0 0 o ohm, C m :3 C 9 O O c d E O N co U CM + m CL L o o o o O o0� c o Q c co co o o o o II Ca o o c 11 O CCDD 0 o o o II to m m V CLl a a m � O I JZ E cmI IL z Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil MO by Autodesk, Inc. TW 11 Forebay 3B-2 Rectangular Weir Crest = Broad Bottom Length (ft) = 120.00 Total Depth (ft) = 1.00 Calculations Weir Coeff. Cw = 3.00 Compute by: Known Q Known Q (cfs) = 10.67 1.50 1.00 0.50 1 11 -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) TW II Forebay 313-2 Friday, Sep 15 2017 = 0.10 = 10.67 = 11.48 = 0.93 = 120.00 Depth (ft) 2.00 1.50 1.00 0.50 -0.50 Weir W.S. Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3136 by Autodesk, Inc. TW II Forebay 3B-3 Rectangular Weir Crest = Broad Bottom Length (ft) = 98.00 Total Depth (ft) = 1.00 Calculations Weir Coeff. Cw = 3.00 Compute by: Known Q Known Q (cfs) = 20.23 Depth (ft) 2.00 1.50 1.00 0.50 A l f -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) TW II Forebay 313-3 Friday, Sep 15 2017 = 0.17 = 20.23 = 16.44 = 1.23 = 98.00 0 10 20 30 40 50 60 70 80 90 100 110 120 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Weir - W.S. Length (ft) m U M 2 d w c 0 a E Z k a a 0 ■ � � § � § � � � 8 � E R 2 k o, E . � ■ CIA q CL E � � S § � � � k e 2 / z § C CL aF RL co ® k � k _ ■ � � • CL �§ LQ � e �■ . � 2 N 2 f $ 2 7 CL o � § © u � � $� � 2 / S v + k to Bco " . E $ cr) I ' I 2 � 2 . 12� $ w | 2 z cc§ — � m I e mJmZ CL_ a� o N P, cm o c CL c w a LC c I W CE a 0 � a 0 o to o m O C N 0 a 0 Z 0 O 1° a 3$ c ' 12 � S�? J .�. N if � M m 8 � 0 C .e o o°fo = v co E 0 0 co e F� U + d a C3► m �t oo o a c v TL d � If f7 C rm+ � Lq C O F C U � m c V CL � � _ � e a LL m a z 3 z C a 0 M .OSES V 0 a 0 a m 0 a L. 0 0 .y w= uW W cc E L 0 cc 0 i. L A I c 0 � m � � � � Lm � � � E 0 � I 2 o Q § � § � 2 0 CCL _ � k ■ S § W E A k § & o E c § CL E R R � 0 $ . CM 8 ■ C d ■ ■ E � V § E o E co 0 o ■ 2 a � Lad " � 2 Go 0 co � ® « _ � 2 0 ° � 12 wi ui � ■ � 2CL e E g § £ w m § � %� 8 G ■ �§ d d » § C4 C £ / E k o k d w § § . � « E � , . --- _-- -- � � � \ | § - ~ a. t: 0 CL w 4mo CD 7E etCL ^ o£ 0 CM � § I &E . § � . 8 G � E C � §_ o it CE o a ' k 8 ' 09 0 o ] m c $ 0 0 . . o 0 c $ . k k B @ ■_ o o % � 0 0 R �K § § 3 2 o co ■E § § CY 0 g o § ■KCay b ■& 0 e 8 § \ E " . a o e 2 0 d CL 8 8 ■ � E d � � CR � §£ d d 0 « q � § k + � 0 0 k oCL � d d V � 0 o ■ 1 f @_ . ■E � B 8 d d " f 0 0 � d§ v o k 0 7 _E � ■ § = z a. 7 2 2 ƒ w z c cm , a 0 M V a 0 a 0 a L 0 .y W L E L. 0 3 0 L � I w 0 S 0 2 E Z m m Ul t+) T a U. O a ■ CL c 0 � � � � � L � � U) E � � 9L m 2 0 a0 0 § e � ■ m 0 IL a LU CL E § . R $ o E Q E k m m w a R co s E 0 % m cn 8 8 R § ■CLE 0 m m % e E $ 8 8 E § K m 2 _ In In § - 0 § M■ In to £LO e � § M § - a § Lq f �2 r- L « • cq o = I- co c © 2 m E 2 w 2 f 2 " $ Lo 2 _ CL § m N o 2 u 2 d d d 3 v % 0 2 0 o 0 w2 § 0 0 0 � k U) w o I k o 0 0 � o k 0 0 i k c § B $ e C a § c L _ cm § 2 w a z — N m v 0 CL � � � � m§z CL_ q o 0 C4 w wzz . � w ca § 3 m R _ 0 £ o d d C. § @ � 8 0 E 03 Cf) CO) � 00 q a E 0 0 0 _ CO) m n 0 0 o e . o 0 0 . k 0 0 0 G G q d d § a e o % 8 q k S. K 0 E 0 ci J 0 8 0 ■ E d d d § ■K ca CRO § ■ E ® § 2 § § § / a E to tn d m ■ w go 00 a d d d E B B B a m E CD d w J, d to d o � Go 2 E E E v v + + 8 8 8 k . � § d 8 o e d d d � 0 0 0 _e " ■ ■ 0 0 0 # k § § § $ § d C! 2 0 § to k § m e > z x = x $ LL � B § z ~ n a�2| e Pov.a D. STORMWATER MANAGEMENT CALCULATIONS for TARIN WOODS II, PHASE 2 & 4 PREPARED FOR HOOSIER DADDY, I.I.C. 6025 Tarin Road Wilmington, NC 28409 Prepared by: I: q4wv, CSD ENGINEERING PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License # C-2710 `�,�Illill/!//// �`%N tN C A RQ �o o�Esa/o %4"5- SEAL = ✓, z9 025483 y'0%- 0ilME�t. �►� :Z. Howard Resnik, P.E. CSD ENGINEERING Storm Water Narrative September 2017 PROJECT NAME: Tarin Woods II (SW8160306) Phase 4 PROJECT DESCRIPTION: This submittal is for a modification to existing NCDEQ permit SW8160306 to add a new section within the development (Phase 4) containing an additional 42 single family lots. The area where this portion of the development will occur has been observed by the ACOE and no wetlands are present within the project area. The owner of the property is Hoosier Daddy LLC.. This section of the development will connect to Ironwood Drive in Phase Two which hasn't been constructed at this time. Water and sewer will be provided by the CFPUA. This project is not located within Y2 mile of SA waters. Stormwater from the site drains through a tributary to Everett Creek SA;HQW located in the Cape Fear River Basin (Index # CPF 18-87-29). The project will be high density and will be treated with a high density BMP. This section of the project will construct a new basin (Pond 2C), which will be linked to the previous permitted basin 2A & 2B by underground storm drainage pipes. All three sections of the basin will function as one pond once they are linked together. The calculations for Phase 2 have been revised to include this new section of the development. The proposed site will utilize a wet basin for treatment. Roads within this section of the development are designed to be super elevated and directed into catch basins that will convey the water to the wet basin. Since the project is located within New Hanover County the site will also need to meet the 2,10 and 25 year pre/post requirement. Proposed impervious for this section is 38%. PROJECT BMP: storm water pond. STORMWATER ENGINEER/CONSULTANT: CSD-Engineering PO Box 4041 Wilmington, NC 28406 Rodney Wright rodnev@csd-ensineerins.com 910 7914441 office 910 7911501 fax 3805 Cherry Avenue - Wilmington, NC 28403 - 910 7914441- www.csd-engineering.com — License # C-271Q C4� CM PROJECT DATA: Existing Site Data (within Pond drainage delineation) Existing wetlands Existing uplands Total proposed project area Proposed Site Data: PH 2 Proposed 90 Single Family lots PH2 Proposed streets PH 2 Proposed sidewalks PH 4 Proposed 42 Single Family lots PH4 Proposed streets PH 4 Proposed sidewalks Amenity future Total proposed impervious area Soil Types Within Project Limits: Abbreviation Type and Description Pm Pamlico Mu Murville Le Leon Sand (See attached soils map) 67,051 sf (1.53 acres) 1,785,335 sf (40.98 acres) 1,852,386 sf (42.52 acres) 315,000 sf (7.23 acres) 114,095 sf (2.62 acres) 18,116 sf (0.42 acres) 147,000 sf (3.37 acres) 63,127 sf (1.45 acres) 9,026 sf (0.21 acres) 20,000 sf (0.46 acres) 26,500 sf (0.61 acres) 712,864 (16.37 acres) Hydrologic Group Area D 19.32 ac A 22.05 ac C 1.15 ac ROUTING CALCULATIONS: PRE -DEVELOPED CONDITIONS FOR WETBASIN 2A,213,2C (see hydrograph summary and reports): Pre-dev. to Wet Basin CN Pre Developed = 52 (SCS) composite value determined as follows: +/- 841,688 sf of soils are D, Woods good condition (CN = 77) +/- 960,556 sf of soils are A, Woods good condition (CN = 30) +/- 50,142 sf of soils are C, Woods good condition (CN = 70) ((841,688 x 77) + (960,556 x 30) + (50,142 x 70) / 1,852,387 = 52.4 USED CN = 52 Area=1,852,387 sf or 42.52 acres Time of Concentration =10.0 min Qmax for pre-dev 1-yr/24-hr storm = 6.96 cfs Qmax for pre-dev 2-yr/24-hr storm =15.41 cfs Qmax for pre-dev 10-yr/24-hr storm = 69.10 cfs Qmax for pre-dev 25-yr/24-hr storm = 97.18 cfs POST -DEVELOPED CONDITIONS (see hydrograph summary and reports): Post-dev. to Wetbasin CN Post Developed = 74 (SCS) composite value determined as follows: +/- 712,864 sf of impervious surface (CN = 98) +/- 525,899 sf of soils area D, open space good condition (CN = 80) +/- 587,867 sf of soils area A, open space good condition (CN = 39) +/- 25,756 sf of soils area C, open space good condition (CN = 74) ((712,864 x 98) + (525,899 x 80) + (587,867 x 39) + (25,756 x 74) / 1,852,387 = 73.8 USED CN = 74 Area=1,852,387 sf or 42.52 acres Time of Concentration =10.0 min Qmax for post-dev 1-yr/24-hr storm = 59.48 cfs Qmax for post-dev 2-yr/24-hr storm = 80.67 cfs Qmax for post-dev 10-yr/24-hr storm=167.89 cfs Qmax for post-dev 25-yr/24-hr storm = 206.17 cfs Routed site — areas draining to pond (see hydrograph summary & reports): Qmax for post route 1-yr/24-hr storm = 3.52 cfs Qmax for post -route 2-yr/24-hr storm = 6.44 cfs Qmax for post -route 10-yr/24-hr storm = 23.43 cfs Qrnax for post -route 25-yr/24-hr storm = 30.03 cfs SUMMARY: Wetbasin 2 Storm Event Pre-Dev Qmax (cfs) Post-Dev Qmax (cfs) Routed Post Qmax (cfs) 1 yr 6.96 59.48 3.52 2 yr 15.41 80.67 6.44 10 yr 169.10 6789 23.43 25 yr 97.18 �2106.17 130.03 WITH WORKING OUTLET STRUCTURE BMP 100 year water elevation Top of Bank Elevation 2 22.34 23.0 NO OUTLET STRUCTURE BMP 100 year water elevation Top of Bank Elevation 2 22.5 23.0 WET DETENTION BASIN CALCULATIONS Pond 2A, 2B, 2C DETERMINE IMPERVIOUS PERCENTAGE area to basin = 1,852,386 sf 42.52 acres PH 2 buildings = 315,000 sf 7.23 acres PH 2 roads = 114,095 sf 2.62 acres PH2 sidewalks = 18,116 sf 0.42 acres PH4 Buildings = 143,500 5f 3.29 acres PH4 roads = 63,127 sf 1.45 acres PH4 sidewalks = 9,026 sf 0.21 acres amenity = 20,000 sf 0.46 acres future = 30,000 sf 0.69 acres total impervious surface = 712,864 sf 16.37 acres total non -impervious surface = 1,139,522 sf 26.16 acres percent imp. = 38.5 % DETERMINE REQUIRED SURFACE AREA from SA/DA CHART: @ depth = 3 ft imp % SA/DA 30 2.18 38.5 x 40 2.96 x ° 2.84 minimum surface area = 0.0284 x 1,952,386 sf = 52,640 sf surface area provided = 127,658 sf @ elevation 19.5 1.5" VOLUME DETERMINATION: Pond 2A,2B,2C DETERMINE RUNOFF COEFFICIENT (Rv) I = 38.5 percent impervious Rv = ? (runoff coefficient, inches per inch) Rv= 0.05 + 0.009 (1) Rv = 0.40 in/in DETERMINE VOLUME design storm = 1.5 inch Rv = 0.40 in/in drainage area = 42.52 acres volume = ? volume = (design starm)(Rv)(drainage area) volume = 2.1 acre-ft volume = 91,775 cf of required storage volume WET DETENTION BASIN STAGE -STORAGE TABLE: Pond 2A,2B,2C, Main Bay Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 15 75,020 sediment storage not used in calcs 16 84,478 - 17 95,289 89,884 89,884 18 105,891 100,590 190,474 Bottom Shelf 19 116,688 111,290 301,763 PP 19.5 127,658 61,087 362,850 Main Bay, Forebay Berm and Forebay PP 19.5 165,421 - - Top Shelf 20 176,388 85,452 85,452 1.5" STORAGE 20.1 177,494 17,694 103,146 21 187,525 164,259 267,405 22 198,831 193,178 460,583 23 210,307 204,569 665,152 perimeter of PP main bay only = 3,684 ft 1.5" storage volume provided (elev. 20.1) = 103,146 cf SA at bottom of 6:1 shelf main bay only (19) - 116,688 sf volume at PP Main Bay only (elev.19.5) = 362,8S0 cf minimum forebay volume (15%) = 54,427 cf maximum forebay volume (20%) = 72,570 of volume provided in forebay only (elev.19.5) = 60,235 of AVERAGE POND DEPTH Option 2 When shelf is submerged Davg = VPP - Vshelf /Abottomofshelf VPP = 362,850 volume of permanent pool main bay (cf) Vshelf = 2,763 volume over the shelf only (cf) (0.5 x Depth x Perimeter x Width) Depth = 0.5, width = 3.0 A = 116,688 area of bottom shelf (sf) Davg = 3.09 FOREBAY STAGE -STORAGE TABLE: Forebay 2A-1 Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 16 sediment storage not used in caics 17 819 18 1,393 1,106 1,106 19 2,075 1,734 2,840 19.5 2,"1 1,129 3,969 forebay volume provided = 3,969 d Forebay 28-1 Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (Fr) (SF) (cf) (cf) i5 1,230 sediment storage not used in caics 16 1,962 17 2,752 2,357 2,357 18 3,658 3,205 5,562 19 4,680 4,169 9,731 19.5 5,205 2,471 22,202 forebay volume provided = 12,202 of Forebay 2B-2 Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 15 1,687 sediment storage not used in talcs 16 2,419 17 3,262 2,841 2,841 18 4,219 3,741 6,581 19 5,288 4,754 11,335 19.5 5,895 2,796 14,130 forebay volume provided = 14,130 of Forebay 2B-3 Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 15 1,687 sediment storage not used In talcs 16 2,419 17 3,262 2,841 2,941 18 4,219 3,741 6,581 19 5,288 4,754 11,335 19.5 5,895 2,796 14,130 forebay volume provided = 14,130 of Forebay 2C-1 Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (Co (d) 15 815 sediment storage not used in calcs 16 1,437 17 2,295 1,816 1,816 18 3,085 2,640 4,456 19 4,108 3,597 8,053 19.5 4,661 2,192 10,245 forebay volume provided = 10,245 d Forebay 2C-2 Only INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (Cf) (Cf) 15 202 sediment storage not used in calcs 16 551 17 1,050 801 801 18 1,682 1,366 2,167 19 2,445 2,064 4,230 19.5 2,869 1,329 51559 forebay volume provided = 5,559 d forebay volume provided = 60,235 of STAGE - DISCHARGE TABLE: Pond 2A size of orifice (in) = 6.00 elevation of orifice = 19.50 crest length of weir cut (ft) - 7.00 elevation of weir cut m 20.1 crest length of grates (sf) 12.0 elevation of grates = 20.6 crest length of spillway (ft) = 40.0 elevation of spillway = 22.0 ELEVATION 6" PVC WEIR GRATES SPILLWAY TOTAL (n) (cfa) (eft) (Cfe) (Cfe) (cfe) 19.5 0.00 - - - 20 0.67 - - 0.67 21 1.16 19.72 10.02 - 30.90 22 1.49 80.50 65.60 0.00 127.59 23 1.77 114.08 147.24 120.00 383.08 PVC DRAW DOWN Pond 2A,2B,2C Orifice size = 6.00 in Normal Pool Storage Elev. = 19.50 1.5" storage Elev.. 20.1 Orifice coefficient (C) = 0.6 Average head from 1.5" storage to orifice (h) = (20.1 -19.5) /3 = 0.20 1t Orifice cross sectional area (A) = Pi x r"2 = 3.14 x (r/12)"2 = 0.19625 sf Acceleration due to gravity (g) = 32.2 ft/s^2 Q=CA (2gh)"1/2 0.6 x 0.19625 x (2x32.2x0.20)A1/2 = 0.42259 cis 91,775 / 0.42259 = 217,172 seconds = 2.61 days Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc. v10.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (curt) Hydrograph Description 1 SCS Runoff 6.962 2 740 55,777 — —___ ____ ProDev 2 SCS Runoff 59.48 2 730 234,412 — Post-Dev 3 Reservoir 3.519 2 9" 130,775 2 20.36 151,348 Routed 5 Reservoir 0.000 I 2 I n/a 0 2 20.82 234,412 I No outlet I Pond 2withPM.gpw Rebirn Period: 1 Year Friday, 09 / 15 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2015 by Autodesk, Inc. A0.4 Friday, 09 / 15 / 2017 Hyd. No. 1 Pre Dev Hydrograph type = SCS Runoff Peak discharge = 6.962 cfs Storm frequency = 1 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 55,777 cuft Drainage area = 42.520 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 Pre_Dev Hyd. No. 1 --1 Year Q (cfs) 7.00 . IE 5.00 4.00 3.00 2.00 fi31] 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v1OA Hyd. No. 2 Post-Dev Hydrograph. type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 42.520 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (To) Total precip. = 3.83 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 60.00 50.00 40.00 20.00 10.00 0.00 ' 0 120 240 Hyd No. 2 360 480 Post-Dev Hyd. No. 2 --1 Year no Friday, 09 / 15 / 2017 = 59.48 cfs = 730 min = 234,412 cuft = 74 = 0 ft = 10.00 min = Type III = 484 Q (Cfs) 60.00 50.00 40.00 30.00 20.00 10.00 - I 1 I I I I R ' 0.00 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. 00.4 Friday, 09 / 15 / 2017 Hyd. No. 3 Routed Hydrograph type = Reservoir Peak discharge = 3.519 cfs Storm frequency = 1 yrs Time to peak = 944 min Time interval = 2 min Hyd. volume = 130,775 cuft Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 20.36 ft Reservoir name = Pond 2A 2B 2C Max. Storage = 151,348 cuff Storage Indication method used. Routed Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2016 by Autodesk, Inc. 00.4 Friday, 09 / 15 / 2017 Pond No.1 - Pond 2A 2B 2C Pond Data Contours -User- defined contour areas. Conic method used for volume calculation. Begining Elevation =19.50 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 19.50 165,421 0 0 0.50 20.00 176,388 85,429 85,429 1.50 21.00 187,525 181,910 267,339 2.50 22.00 198,831 193,131 460,470 3.50 23.00 210,307 204,522 664,992 Culvert I Orifice Structures Weir Structures [A) IBl IC] [PrfRsr] [A] [Bl [C] ID] Rise (In) = 36.00 6.00 0.00 0.00 Crest Len (ft) = 12.00 7.00 70.00 0.00 Span (in) = 36.00 6.00 0.00 0.00 Crest El. (ft) = 20.60 20.10 22.00 0.00 No. Barrels = 3 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 19.50 19.50 0.00 0.00 Weir Type = 1 Rect Broad - Length (ft) = 28.00 1.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.30 0.00 0.00 n/a N-Value = .013 .013 .013 n/a OrMce Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 20.10 Stage (ft) 4.00 3.00 2.00 0.00 ' ' 0.0 30.0 Total Q Note: CulvertfOrifice cutflows are analyzed under Inlet (Ic) and outlet (oc) control. Weir risers checked for orifice canditions (tc) and submergence (a). Stage I Discharge 60.0 90.0 120.0 150.0 160.0 210.0 240.0 270.0 Elev (ft) 23.50 22.50 21.50 20.50 1 19.50 300.0 Discharge (cfs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. A 0.4 Friday, 09 / 15 / 2017 Hyd. No. 5 No outlet Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = nla Time interval = 2 min Hyd. volume = 0 cuff Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 20.82 ft Reservoir name = Pond 2A 2B 2C No outlet Max. Storage = 234,412 cult Storage Indication method used. No outlet Pond Report Hydraflow Hydrographs Extension for AutOCAD® Civil 3DO 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Pond No. 3 - Pond 2A 2B 2C No outlet Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation =19.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuff) Total storage (cult) 0.00 19.50 165,421 0 0 0.50 20.00 176,388 85,429 85,429 1.50 21.00 187,525 181,910 267,339 2.50 22.00 198,831 193,131 460,470 3.50 23.00 210,307 204,522 664,992 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsrl [A] [B] [C] [D] Rise (in) Inactive Inactive 0.00 0.00 Crest Len (ft) Inactive Inactive 70.00 0.00 Span (in) = 36.00 6.00 0.00 0.00 Crest El. (ft) = 20.60 20.10 22.00 0.00 No. Barrels = 3 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) - 19.50 19.50 0.00 0.00 Weir Type = 1 Rect Broad - Length (ft) - 28.00 1.00 0.00 0.00 Multi -stage = Yes Yes No No Slope [%) = 0.30 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfll.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 20.10 Stage (ft) 4.00 3.00 2.00 1.00 0 00 Note: Culvad/Orifloe outflows are analyzed under Inlet (Ic) and outlet (oc) control. Weir risers checked for orrice conditions (k:) and submergence (9). Stage / Discharge Elev (ft) 23.50 22.50 21.50 20.60 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 200.0 Total Q Discharge (cfs) Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc. v10.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation 0" Total strge used (cuft) Hydrograph Description 1 SCS Runoff 15.41 2 736 94,314 — — -- Pre Dev 2 SCS Runoff 80.67 2 730 313,941 — - - — Post-Dev 3 Reservoir 6.440 2 866 210,303 2 20.52 179.935 Routed 5 Reservoir 0.000 2 n/a 0 2 21.24 313,940 No outlet Pond 2withPh4.gpw I Retum Period: 2 Year Friday, 09 ! 15 / 2017 I Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3136 2015 by Autodesk, Inc. A 0.4 Hyd. No. 1 Pre Dev Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 42.520 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.50 in Storm duration = 24 hrs Q (Cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 ' 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre_Dev Hyd. No. 1 — 2 Year Friday, 09 / 15 / 2017 = 15.41 cfs = 736 min = 94,314 cuft = 52 = 0 ft = 10.00 min = Type III = 484 Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 'I I I i ''&- ' 0.00 360 480 800 720 840 980 1080 1200 1320 1440 1560 Time (mite) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139 2015 by Autodesk, Inc. A 0.4 Hyd. No. 2 Post-Dev Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 42.520 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.50 in Storm duration = 24 hrs Q WS) 90.00 80.00 70.00 60.00 50.00 40.00 20.00 10.00 Friday, 09 / 15 / 2017 Peak discharge = 80.67 cfs Time to peak = 730 min Hyd. volume = 313,941 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Post-Dev Hyd. No. 2 -- 2 Year Q (Cfs) 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 ' ' ' 1 1 1 1 1 —r —_�" 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc. v10.4 Friday, 09115 / 2017 Hyd. No. 3 Routed Hydrograph type = Reservoir Peak discharge = 6.440 cfs Storm frequency = 2 yrs Time to peak = 866 min Time interval = 2 min Hyd. volume = 210,303 cuff Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 20.52 ft Reservoir name = Pond 2A 2B 2C Max. Storage = 179,935 cuft Storage Indication method used. Routed • � � � �wl���■■I■■���■�■■■■■I�����Iww�III�IIAI�I���■I • � r r � � �■rl�l��l��l■►�rr���■I�����rrl�■lii■��II���� � � � �� �■�., �.�..rarrrrarr��n■I■�I� r � � Hydrograph Report Hydranow Hydrographs Extension for AutOCAD® Civil 31382015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 5 No outlet Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuff Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 21.24 ft Reservoir name = Pond 2A 2B 2C No outlet Max. Storage = 313,940 cuft Storage Indication method used. No outlet • 1 1 1 � �����-�� • 1 1 1 ■� ii���i�i�� �i�i� �=�1� ins I�rr9 n■■1�■Irllli rrlrtllt�rllrr �111rtlllrf 11g rlrr■ntrrr■ �■Ir■li 1►Irttiltititil�il �tltttlr■i■■ rlt•■r ■ririiiili�ttrt � ■t�l�lt �e itl�■irrtlri �� Itl•Itl• It•It�' Illrl■IIIM111 ■i�llllgrl1111 ���� ■�� �� � ��� � Iltl•������ �� ��r �/ ■11rI1Mll/ �I/�� wr�rwilrl�i�ilr��irrlliel■I■r�l� �M �rrl� �w�wl ��■il�l��i�il�l�riltl•rill■rlr�il�r rr�wrrillr�l�l�r■I�■■��■■■■■r��■�■1�■■■��1 . 1 1 1 -- �-- -- • 1 1 1 i���ltttl.�i■ nii ��or�ir �w��l� ��It■1■�1■�I■■Ittl•�i tl•Itl•�I���g ���� ��wrlrlr�rllrwwri�t�irlr�lrlr•■i■ir�il �Iwrrrwr�ll�r �Iwwlrirloiwrii�ri Ilttlrr�lil�■�■■n■Iti��ri■Itti•�I�lill�i �I�I�Irl���l���wl��ww tl•I������■�� ���91t1•��■■��tl•■��� �� In��lll■ulll�l�rre rr�r�rirrrlr��rurrrrrrr�l�rr�li■rl�wwrr��rilrrrrinllrl�wl �� �� w�r���llllllllll��lllll�ltl•II�� � Illlli�lll � lrl■Ir� fr■■�I tttittitttttirrlrlillttirnli■il■i■■iltll■inlru■■Ittl•r��r•I Ittittitlri■i�llttittitttl•t�lll�r■r��li■rilrrltleriltttttittttiri�a�r� 0-1 .11- 1 -1 •.1 1:1 11 1 -1 •1 • •r_ • _. c• • 1 H yd rog ra p h Summary Report Hydrallow Hydrographs Extension for AutoCAD® Civil 3138 2015 by Autodesk, Inc. v10.4 Hyd. No. Hydrograph type (origin) Peak flow (cis) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 69.10 2 730 293,920 — -- — Pre_Dev 2 SCS Runoff 167.89 2 728 643,380 - ----- Post-Dev 3 Reservoir 23.43 2 776 539,741 2 21.33 331,724 Routed 5 Reservoir 8.660 2 932 182,908 I I 2 22.13 486,567 No outlet Pend 2withPM.gpw Return Period: 10 Year i Friday, 09 / 15 / 2017 � � Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 1 Pre_Dev Hydrograph type = SCS Runoff Peak discharge = 69.10 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 293,920 cuft Drainage area = 42.520 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (efs) 70.00 60.00 40.00 30.00 20.00 10.00 Pre Dev Hyd. No. 1 --10 Year 0 WS) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 I I 1 1 / 1 I I I I 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3136 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 2 Post-Dev Hydrograph type = SCS Runoff Peak discharge = 167.89 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 643,380 cuft Drainage area = 42.520 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 180.00 160.00 M111[1I4l 120.00 100.00 80.00 60.00 40.00 20.00 Post-Dev Hyd. No. 2 —10 Year Q (Cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 3 Routed Hydrograph type = Reservoir Peak discharge = 23.43 cfs Storm frequency = 10 yrs Time to peak = 776 min Time interval = 2 min Hyd. volume = 539,741 cuff Inflow hyd. No. = 2 - Past-Dev Max. Elevation = 21.33 ft Reservoir name = Pond 2A 2B 2C Max. Storage = 331,724 cuff Storage Indication method used. Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 240 Hyd No. 3 Routed Hyd. No. 3 --10 Year 480 720 960 1200 1440 1680 1920 Hyd No. 2 IF i ; _J Total storage used = 331,724 cult Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 0.00 2160 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 5 No outlet Hydrograph type = Reservoir Peak discharge = 8.660 cfs Storm frequency = 10 yrs Time to peak = 932 min Time interval = 2 min Hyd. volume = 182,906 cuff Inflow hyd. No. = 2 - Post-Dev Max. Elevation _ 22.13 ft Reservoir name = Pond 2A 2B 2C No outlet Max. Storage = 486,567 cuff Storage Indication method used. No outlet �� ��� Ilnlnrr�l�l�l�nlill��l illal�wl�iii lli�i�� lir��l� w wwlwwrlrlw�wl Irllnlllrrrrwwl�rr�llrlrlrrllllrrinillrrrllilrrrrrllwww�lllrlll�lr ��i�EN= ���111����r�IwrwIIIN■r1�r�■ w�r�llrl�rl ■r�l�l�rll�r■ II�I■�Ir~I�Ir�■I�■�I�II�II���I M w�iri ir�ii��i ■� ���i��a��a■M�■��i�i .' , � I_ _I� �Ilr■� r■�■■■� �111�IIIII�101�■��r�lll�■�I�I■011■I� . r r � Hydrograph Summary Report Hydrat>aw liydrographs Extension for AutoCAD® Civil 31382015 by Autodesk, Inc. v10.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 97.18 2 730 396,908 — — — Pre_Dev 2 SCS Runoff 206.17 2 728 791,147 -- — — Post-Dev 3 Reservoir 30.03 2 770 687,509 2 21.74 409,281 Routed 5 Reservoir 18.07 2 822 330,673 2 22.21 I 504,070 I No outlet Pond_2withPh4.gpw Return Period: 25 Year I Friday, 09 ! 15 / 2017 I Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2015 by Autodesk, Inc. v10.4 Hyd. No. 1 Pre Dev Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 42.520 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 8.05 in Distribution Storm duration = 24 hrs Shape factor Friday, 09 / 15 / 2017 = 97.18 cfs = 730 min = 396,908 cuff = 52 = 0 ft = 10.00 min = Type III = 484 Pre_Dev Q (ofs) Hyd. No. 1 — 25 Year Q (Cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 100.00 90.00 80.00 70.00 80.00 50.00 40.00 30.00 20.00 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. 00.4 Friday, 09 / 15 / 2017 Hyd. No. 2 Post Dev Hydrograph type = SCS Runoff Peak discharge = 206.17 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 791,147 cuft Drainage area = 42.520 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.05.in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 ' ' 0 120 240 — Hyd No. 2 Post-Dev Hyd. No. 2 -- 25 Year 360 480 600 720 Q (Cfs) 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. 00.4 Friday, 09 / 15 / 2017 Hyd. No. 3 Routed Hydrograph type = Reservoir Peak discharge = 30.03 cfs Storm frequency = 25 yrs Time to peak = 770 min Time interval = 2 min Hyd. volume = 687,509 cuft Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 21.74 ft Reservoir name = Pond 2A 2B 2C Max. Storage = 409,281 cuff Storage Indication method used. Q WS) 210.00 180.00 150.00 120.00 60.00 30.00 0 00 Routed Hyd. No. 3 — 25 Year Q WS) 210.00 180.00 150.00 120.00 90.00 30.00 0 240 480 720 960 1200 1440 1680 1920 2160 — Hyd No. 3 — Hyd No. 2 111-E _..i."......._...._._ Total storage used = 409,281 cuft Time (rain) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Hyd. No. 5 No outlet Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post-Dev Max. Elevation Reservoir name = Pond 2A 2B 2C No outlet Max. Storage Storage Indication method used. Q (Cfs 210-00 180.00 150.00 120.00 90.00 30.00 Friday, 09 / 15 / 2017 = 18.07 cfs = 822 min = 330,673 cuff = 22.21 ft = 504,070 cuff Q (Cfs) 210.00 180.00 150.00 120.00 •1 11 .1 We 30.00 3 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 — Hyd No. 5 — Hyd No. 2 L i-�--J Total storage used = 504,070 cult Time (min) Hydrograph Summary Report HydraiowHydrographsExtension forAutoCADVCivi13DQD2015byAutodesk,Inav10.4 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow Interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) . (min) (cuff) (ft) (Cuff) 1 SCS Runoff 154.35 2 730 608,728 -- 2 SCS Runoff 278.16 2 728 1,073,991 — 3 Reservoir 72.93 2 754 970,353 2 5 Reservoir 72.03 2 754 613,517 2 -- --- Pre Dev — ---- Post-Dev 22.34 529,221 Routed 22.54 570,492 No outlet Pond_2withPh4.gpw i Return Period: 100 Year i Friday, 09 / 15 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil MOD 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15 / 2017 Hyd. No. 1 Pre Dev . Hydrograph type = SCS Runoff Peak discharge = 154.35 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 608,728 cuft Drainage area = 42.520 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 160.00 140.00 120.00 100.00 80.00 40.00 20.00 Pre_Dev Hyd. No. 1 --100 Year 0.00 ' ' 0 120 240 360 480 600 Hyd No. 1 Q (cfs) 160.00 140.00 120.00 100.00 80.00 40.00 20.00 I 1 I I I I M . 1 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D9 2015 by Autodesk, Inc. A 0.4 Hyd. No. 2 Post-Dev Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 42.520 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 10.00 in Distribution Storm duration = 24 hrs Shape factor Q WS) 280.00 240.00 200.00 160.00 120.00 80.00 Post-Dev Hyd. No. 2 —100 Year Friday, 09 / 15 / 2017 = 278.16 cfs = 728 min = 1,073,991 cuft = 74 = 0 ft = 10.00 min = Type III = 484 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc. v10.4 Friday, 09 / 15.12017 Hyd. No. 3 Routed Hydrograph type = Reservoir Peak discharge = 72.93 cfs Storm frequency = 100 yrs Time to peak = 754 min Time interval = 2 min Hyd. volume = 970,353 cuft Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 22.34 ft Reservoir name = Pond 2A 2B 2C Max. Storage = 529,221 cuff Storage Indication method used. Routed ■ IIIMIIIIIII�III IIIIII �� ■� ' -0 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Hyd. No. 5 No outlet Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post-Dev Max. Elevation Reservoir name = Pond 2A 2B 2C No outlet Max. Storage Storage Indication method used. No outlet Friday, 09 / 15 / 2017 = 72.03 cfs = 754 min = 613,517 cuft = 22.54 ft = 570,492 cult 11 - ����■l�lli�lllNW �l! \�IN���l�l�l���r 1 1 �� .1 �:1 .11 1 :�.1 ••1 1:1 Il / ��l .1 Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. TW II Forebay 2C-1 Rectangular v"."eir Crest = Broad Bottom Length (ft) = 150.00 Total Depth (ft) = 1.00 Calculations Weir Coeff. Cw = 3.00 Compute by: Known Q Known Q (cfs) = 17.30 1.50 1.00 0.50 M -0.50 Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Top Width (ft) TW II Forebay 2C-1 Friday, Sep 15 2017 = 0.11 = 17.30 = 17.07 = 1.01 = 150.00 MMEIN I= M MMIM mm MIN M =M101m MMIM 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Depth (ft) 2.00 1.50 1.00 0.50 Mi -0.50 - Weir --- W.S. Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3138 by Autodesk, Inc. TW II Forebay 2C-2 Rectangular Weir Crest = Broad Bottom Length (ft) = 137.00 Total Depth (ft) = 1.00 Calculations Weir Coeff. Cw = 3.00 Compute by: Known Q Known Q (cfs) = 28.43 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) TW II Forebay 2C-2 Friday, Sep 15 2017 = 0.17 = 28.43 = 23.07 = 1.23 = 137.00 MMMMMMMM MMMMMMM IMMM MM M MMM MM MMM MMIMEMMM NIMMEM M MMM MM MMM =ME MMMMM I BEE==MMN=MM=M=M === M MMMMM MMMMMMMMIMMIMMMMM MMMMMEMMMMMMEMMM MMMMMMM M MEEMORNE NNOW MMM EMMME .MMEE.110 Depth (ft) 2.00 1.50 1.00 0.50 act -0.50 Weir - W.S. Length (ft) C a 0 M V Q C� O a d Q L 40. .y W i d cc E L co 3 O L 0 W 0 w 0 e m Z a a m � a O La U LO M = a m x a. m U Z a J i � a o� U ro .Q a & � c 0 � � 75 � � � � � � � E *0 co I I I I I § co o ■ S 8 8§ a 8 CL E N � k q § IE 0 E § N§ k N cm 9 SCL 10 a - - . E N N cm . � � q 0 q xE § CM CIJ § 1 c 8� 8 8 B § . g 8 B NPI: 8 8 7 o E $ § § § d d z CL 0§§ 0 0§ 0 a A A m A CL.1-Z - $ a 2 q § 8 § $ § m CL . � 2 _ 2 ui Cd 6 2 6 f . e § q @ @ 8 � § 2 - w d d d ` ® 8 § k 2 S o 2 o o o < % 8 8 8 8 C4 CR J d o d o d d + I § $ n o m I.§ � v a q © ® - - d � f B" B 8 m k w d o o § § � o 0 0 0 w in ! W a § z § - 0 m IL CL m�z° S. o 0 0 0 0 0 pp o O C T CC .O- CD 3r fA �, p 8 p pp r o _ C 7 0,0 W O COD �M�yy ^. o 07 M G OD OO S n 0 S N a 0 0 0 0 0 0 M M M M M M s o s .o s s 0 0 0 0 0 0 m O O O O O O o o s o o a U) o 0 o o o o - 0 0Lr) 0 0 O 8 0 m E a o 0 0 0 0 0 0 0 0 0 0 Z o S o O S O N N N N .-. ta N a NO l00 9 Nw pp C S W W W W 3 0 0 m � J o in CV N N N N 1pp1 V C Cp N C7 N N 7 . m J o fD P'7 C7 C4 C9 C CO Ci S G e $, E E E E E O N N �F� pp U a U 0 U + a L �i o o 0 0 o 0 0 0 0 0 0 0 am c w 0 in 0 � 0 cn m c O u c ao — 0 ai wi co. O O S S O O p 0 0 0 0 0 0 c 0 O 0 W m J 0 G II rn 0 HI 7 W U M M M co co U z Y Y Y Y Y Y ei c a a a a a a U. w C a o J z �- a co v u) 0 I I z ca m U IL w 0 E 3 z r e I .4 CL q o 0 g k m � o a I § 8 8 S CL E R E § ] ACE 2 § 2 cr R � � CL E § C q w � PIT 2 o E N O N . _ B q OR ILLU E k ■ � m R OR\ I a E� I, z k.Ci § cc o o d - C4 Cl) ] � @ G CL d ® v ) a . r- � CO 3 _ � . �■ _ ..._ --..�.. m cn E - § 2 / . . 7 _ $ 2 2 2 ■ § S 8 8 I u d d d 0 k § § § % 8 Go k B 8 N § v d d d , + 8 8 \ o k 2 d d0 - co § 8 CD B . ~ ■ i2: § I z |cc | - N m | �0 C ag c N Q 3� a ? C3 O O 0 0 O CV ti O O O COO 0 0 1- 8 8 8 O O O I C 7 S O O O O O CO oo� 000 O O o 0 0 C M m O O O c 0 0 o E Z 0 8 8 N CV co 0 o ' 0 0 CO) C 0 ID N Ippppppl pp � O O 0 0 CD E 0 0 8 i 0 0 CD a O O O O 0 0 co O e 0 N aD N V + N E O O O A 0 0 0 C 0 0 8 8 0 0 0 ui am O o O 11 O o o -a, 0 0 0 O o Lo �i c O O b J IL O 0 0 II m 7 �I > f� O in m U U d S S S @ C a IL a LL w Flo N M I IL I Z m x a J L F- Q� R, N_ m V (S LL m .Q a � � c 0 � � � � � L � � � E 0 *0 cc � � a � o § o a a k ■8 8 # CL E cm � % Q 0 0 0 & o E § N § q G ■ § ■CLE 0 (9 § n o r_ OR § C § r- d ■ E � LU � o 0 0 E 9 0 § � CL R R R f ■ � 2 w vi a _ FC-0 % 2 06 R S CD — . ■ � � o _ P, a:) w � a- . .. � c 2 / Cd ui 12 2 0 0 $ 7 k § C4 C4 § u 12 CIA w f 1 8 8 " § c 0 0 CM« o% B 8 S cm 2 a d d d + G a_ e w GO R | � a n n 8 8 § I 0 G c 0 d C p 2 co § 8 E U B �j 0. Z CM CO e m7Z C L o 0 0 ar 0 0 CV o o Lr O O r o r 00 00 a, g c o r rA a o 0 0 ,C X co co m c o 0 0 a>! o cs o e H- o c o ,s � o 0 o E z 0 0 0 m 0 0 H� 0 0 o o 3 m e c o m J 0 o ui N � O O - w 0 0 co a E O $ 0 O C J Co O O O O C m 0 c$ a E 0 N m x 0 N a o g o N 0 0 0 0 c Q. IA a C o m O c16i 0 0 o 0 ao o g o r u d o 0 0 0 %^ c O O O ,,E J O O r Cp 0 01 O w � W 0 O r N r r NI i m m m m m V z m m c a a a m O r N CO E LU 0 J z a z Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY September 21, 2017 Hoosier Daddy LLC Attn: Jack Carlisle, Manager 6025 Tarin Road Wilmington, NC 28409 Subject: Request for Additional Information Stormwater Project No. SW8 160306 Tarin Woods II New Hanover County Dear Mr. Carlisle: ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director The Wilmington Regional Office received and accepted a modified Express State Stormwater Management Permit Application for the subject project on September 18,2017. A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed. To continue the review, please provide the following additional information: �1. 15A NCAC 02H.1042(2)(a)(iv): The built -upon area allocations presented in Section IV.10 of the application are not consistent with the allocations presented elsewhere in the submittal documents. Please confirm the allocations are presented consistently. 2. 15A NCAC 02H.1042(2)(g)(iv): Please provide proposed contours and drainage patterns within Phases 3 and 4. Recommendation: In the case where the contour interval on a "topographic " map is too large to adequately reflect the existing and proposed drainage patterns of a relatively flat property, spot elevations and/or a site -specific elevation survey may be needed. , 3. 15A NCAC 02H. 1 042(h)(i): Please provide contour labels in the forebays for Pond 2C and Pond 3B on Sheets EC813 and EC10. 4. 15A NCAC 02H.1050(4): Please update the outlet protection information on plan sheet EC6 to include the additional proposed outlets or provide a citation of where the outlet protection is specified. /. 15A NCAC 02H.1053(1): For Pond 2, the provided surface area being compared to the required surface area is for the entire pond, not the main pond. Please confirm that only the main pond surface area is being compared against the required surface area. ,, �'6. 15A NCAC 02H.1053 (5): Please double check the stage -storage table for Pond 3, Forebay 1. The same surface area is presented at an elevation of 19 ft and 19.5 ft. The listed forebay volume is associated with the volume at an elevation of 19 ft instead of 19.5 ft, which could impact the total forebay volume listed in the other submittal documents. U 7. 15A NCAC 02H.1053(7): The supplement for pond 3 lists the provided orifice diameter as being 6 inches while the other submittal documents list this diameter as being 4 inches. Please confirm. 8. Due to the relatively minor nature of these comments, the express additional information review fee has been waived. Please remember to confirm that any revised information is presented consistently throughout the application documents including calculations, supplements, narrative, and plans. Please also remember to provide two hard copies of any updated documents per 15A NCAC 02H.1042(2). S?a:(� v: Tor'.h Caralina I Em it n;J+ :n: al Qu=, Ii I nupy, Mineral end Land Resourc, s Wrx3n tonRcgk,nalOCi;X I Vt CAinal.DrivcExtensiun I Wilmington,NC 28,05 910 796 7,715 State Stormwater Permit No. SW8 160306 Page 2 of 2 The requested information should be received in this Office prior to October 3, 2017, or the application will be returned as incomplete. If the project is returned and you wish to re -submit to the Express Program, you will need to reschedule the project through the Express Coordinator for the next available review date and will need to resubmit all required items at that time, including the application fee. If additional time is needed to submit the requested information, please email your extension request, prior to the original due date, to the Division at the email address provided below. The extension request must include ajustification and a date of when the requested information will be submitted to the Division, which shall be no later that. 5 business days past the original due date. Please remember that extension requests delay the issuance of the final permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the State assigned project number on all correspondence. If you have any questions concerning this matter, please feel free to call me at (910) 796-7215 or email me at christine.hall@ncdenr.gov. Sincerely, CAG;J�a 14JA Christine Hall Environmental Engineer GDS/canh: \\\Stormwater\Permits & Projects\2016\160306 HD\2017 09 addinfo 160306 cc: James Yopp / Lisa Beaman; Hoosier Daddy, LLC Howard Resnick, PE, CSD Engineering Wilmington Regional Office Stormwater File Ft:i G e;' North Car0m� , f Enrrc* amc r>iz;I Qc :: y I Energy, M9ner -! Lm_ Lund Kesournss : ' mington Rcg G_',-dm.' r`-1w Cxtenrion I W ':-:h.gton, NC 2840: 0107946,715 Hall, Christine From: Hall, Christine Sent: Thursday, September 21, 2017 12:29 PM To: Howard Resnik (howardPcsd-engineering.com); 'Rodney Wright'; 'Mike Broyhill; 'iames@rockfordpartners.net' Cc: Weaver, Cameron Subject: Tarin Woods II, SW8 160306 Attachments: 2017 09 addinfo 160306.pdf All, Attached is a pdf of the request for additional information for the subject project. Please note that � will be out of the office next week so if you have any questions, please let me know this week. Also, for anything I receive on September 22, 1 may not have enough time to process it before leaving and it may have to wait until I return on October 2"d. Thank you in advance for your understanding and cooperation! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 . 1i?<?i f,'Tc'�i-:_'11;:i;F?Y.,- f ciinl ff'Ri�' .t= _ ,''C�1':S.ti' 1 ' t ?,= v Ur:1f;..1: iC i T jC-!if7 Cotf'o}7rrc^:. Recr.=ms - ,f ?^;r`°^c '? ' �r7 7 c: ' c f?•_ ilk)/ i'E C ✓..e(i <<. tt':. 18'i7P To: Christine Hall Company: NCDEQ CSD ENGINEERING TRANSMITTAL From: Mike Broyhill Date: September 18, 2017 Re: Tarin Woods II Phase 3 & 4 Submittal CC: ❑ Urgent x For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle -Comments: Christine, Please find attached two copies of sheets EC5 and EC7 per your request. Let me know if you need anything else. Sincerely, Mike Broyhill EI V E aEP 19 2011, BY: 3805 Cherry Avenue - Wilmington, NC 28403 - 9i0 7914444L - www.csd-engineering.com OD emvmmma CSD ENGINEERING September 18, 2017 Christine Hall DEQ/Stormwater Section NC Department of Environment & Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stormwater Management Permit Modification 2017 Express Submittal, SW8160306 BY: Tarin Woods II New Hanover County CSD Project No. 06-134 Christine: The enclosed permit modification package is for Tarin Woods II, Phases 3 & 4, a proposed 82-lot single-family development in New Hanover County. Enclosed please find the following items: - Original and one (1) copy of the stormwater permit application Two (2) copies of the Stormwater Management plans Two (2) copies of the Drainage Area maps Two (2) copies of the Pond Planting Plans One (1) copy of the Stormwater Calculations for Phase 3 One (1) copy of the Stormwater Calculations for Phase 2 & 4 $4000 application fee, Check #2520 Wet basin supplement for Ponds 2A-2C and Pond 3A-3B Original signed wet basin 0&M agreement Original and one (1) copy of the high -density deed restrictions Wetland Delineation letter and map Please let me know if you have any questions or require any additional information. Sincerely, 6 0!::71 4��? Mike Broyhill Encl.: As noted above CC: Hoosier Daddy, LLC 3805 Cherry Avenue - Wilmington, NC 28403 - 910 7914441- www.csd-engineering.com — License # C-2710 C`/i SDD EMNEEIUNO U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2007-02953 County: New Hanover U.S.G.S. Quad: Wilmington - NC GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee." Jack Carlisle Hoosier Daddy, LLC 6025 Tarin Road Wilmington. North Carolina 28409 Agent: Deal Lutheran Southern Environmental Grouo, Inc. 5315 South College Road, Suite E Wilmington, North Carolina 28412 Size (acres) approximated 47 acres Nearest Waterway Everetts Creek USGS HUC 03030302 Description of projects area and activity:: CCIME SEP 18 2017 BY: Nearest Town Wilmington River Basin White Oak Coordinates Latitude: 34.1240 N Longitude:-77.8941 W 0i�i�. �rnrrity wirerI Applicable Law: Section 404 (Clean Water Act, 33 USC 1344) [[. Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permit Number: 12 — Utility Line Activities SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached plans titled "Heglar Tract; 404 Wetlands Location Map", dated December 1, 2017. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class 1 administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in .Wilmington, NC, at (910) 795-7215. This Department of the Army verification does not relieve thepermittee of the responsibility to obtain any other required. Federal, State or local approvals/permits. .If there are any questions program, please: contact-KI Corps Regulatory Official: ing this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory Expiration Date of Verification:. J.: Date: Seg ember 7, 2017 Determination of Jurisdiction: A. ❑ There are waters, including: wetlands; on the. above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC §.403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which: is an appealableaction, by contacting the Corps district for further instruction. Please :note; if work is authorized by either a general or nationwide permit,. and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and theappeal process concluded prior to the commencement of any work in waters of the United States:and prior to any work that could alter the hydrologyof waters of the United States. B. ❑ There. are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA): (33; USC § 403) and Section 404 of the Clean Water Act.(CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations,., this determination may be relied upon fora period not to exceedfive years from the _date of this notification.. C. 0 There are wetlands within the above described project area that are subject to the permit requirements of Section 404.of the Clean Water Act (CWA)(33 USC §, 1.344) Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project. area have been identified under a previous action. Please reference jurisdictional determination issued . Action iD` SAW - Basis For Determination: 7 Remarks: E. Attention USDA Program Participants This delineation/determination has been. conducted.to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation!determination may not be valid fdr the wetland conservation.provisions .of the Food Security Act of 1985. If you or your tenant are USDA Programparticipants,or anticipate > participation in USDA programs,you should request a certified wetland determination from. the local office of the Natural Resources Conservation; Service,prior to starting. work. M F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C above). This correspondence constitutes an approved jurisdiction determination for the above described site. Ifyou. object to. this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part :331. Enclosed you will fnd'a: Notification of. Appeal Process (NAP) fact sheet and request for .appeal. (RFA). form. If you request to.: appeal this. determination you mustsubmit a completed RFA form to the: following address: US Army: Corps of Engineers South. Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room IOM15 Atlanta, Georgia 30303-8.801 Phone: (404) 562-51.37 In order for an RFA to be accepted by the. Corps, the Corps must determine that it is complete,: that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division. Office within 60 days of the date of the NAP. Should you decide to submit an RFA form,. it mustbe received at the above address by 11/.7/2o17 **It is not necessary to submit an RFA for%-Wrr VIVI#p Office if youdo not object to the determination in this correspondence. 1 Corps Regulatory Ofl7cial:� . Date of JD: September 7, 2017 Expiration Date of JD: September 7, 2022 SAW-2007-02953 SPECIAL CONDITIONS Heglar Tract, Tarin Woods .H 1. Restoration of the site subsequent to installation of the force main and sewer lines will be subject to the criteria described in the attached restoration plan titled "Heglar Tract; 5819 Carolina Beach Road; Wetland Restoration: Plan", dated January 31, 2017. This restoration plan: was developed to address a previous violation, specifically the discharge of fill material in jurisdictional wetlands, within the current project area. Action ID Number: SAW-2007-02953 County: New Hanover Permittee: .lack Cariisie. Hoosier Daddy Project Name: Healar Tract Date Verification Issued: $egttember 7, 2017 Project Manager: KvIe Dahl Upon completion of the activity authorized by this permit and any mitigation required by the permit., sign: this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Kyle Dahl 69 Darlington Avenue, Wilmington, NC 28403 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization. may result in. the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in. accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Tarin Woods Ph 11 Phase 1 Lot Numbers 1-51 Phase 2 Lot Numbers 52-141 Phase 3 Lot Numbers 154-180, 197-209 Phase 4 Lot Numbers 210-251 ECEIVE 5EP 18 2017 BY: For DEQ Use ONLY Reviewer G' 1A North Carolina Department of Environmental Quality submit: Request for Express Permit Review Time. Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application acka a of the project location. Please include this form in the application package. • Asheville Region Alison Davidson 828-296-4698;alison.davidson(cbncdenr.aov • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(c-ncdenr.aov • Mooresville or Winston Salem -Marcia Allocco 704-235-2107, marcia.el/occoAncdenr.pov • Washington Region -Lyn Hardison 252-948-3842 or lun.hardison(CD-ncdenr.pov • Wilmington Region -Cameron Weaver910-796-7303 or cameron.weaver0ncdenr.0ov /VOTE. Project application received after 12 noon will be stamped in the following work day Project Name: TARIN WOODS II County: NEW HANOVER Applicant: JAMES YOPP Company: HOOSIER DADDY Address: 6025 TARIN ROAD City: WILMINGTON, State: NC Zip: 28409-_ Phone: 910-443-3060, Fax: _ _ , Email: James@rockfordpartners.net Physical Location:SWEET GUM LANE Provided Exishrug Permits related to tails Project 16039-1 —ae NPDES —_— NPPHS I �%,� E&S E&S Project Drains into SA, HQW waters — Water classification 18-87-29 (DWR Surfage Water Classifications MaDJ Project Located in CAPE FEAR River Basin. Is project draining to class ORW waters? n, within % mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: HOWARD RESNIK Company: CSD ENGINEERING Address: PO BOX 4041 City: WILMINGTON, State: NC Zip: 28406-_ Phone: 910-791-4441, Fax: 910-791-1501, Email: howard@csd-engineering.com ,�ppi�pp PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE 19P 17 2091 $ # JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWR, ❑ DCM, ❑ DEMLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _# Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems El High Density —SW Wetlands # Treatment Systems ® High Density -Other 3 # Treatment Systems/ f ; ``0D:N' )r ❑Minor ❑ rlan Revis or: U Redev. E-c:Usior. SW (r :c ;.ewe is 0 ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with acres to be disturbed. (CK # & Amt. (for DEQ use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No Received from US ACOE ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: _acre(s) Isolated wetland on Property ❑ Yes ❑ No 404 Application in Process w/ US ACOE: U Yes ❑ No Permit For DL-Q use onIV Fee Split for multiple permits: (Check # ) Teta! Fee Amnr,nt SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (L] HD, ❑ LD, ❑ Gen) $ 401: $ LQS $ Stream Deter,_ $ NCDEQ EXPRESS March 2016 sw,l CSD ENGINEERING Storm Water Narrative July 2017 PROJECT NAME: Tarin Woods II (SW8 160306) PROJECT DESCRIPTION: This submittal is for a modification to existing NCDEQ permit SW8 160306 to add a new section within the development containing an additional 40 single family lots. No wetlands are present within the proposed area for phase 3. The owner of the property is Hoosier Daddy LLC.. This section of the development will connect existing Appomattox Drive and Sweet Gum Drive from Section 1 of the Tarin Woods II Development. The project is not located within A mile of SA waters. Stormwater from the site drains through a tributary to Everett Creek SA;HQW located in the Cape Fear River Basin (Index # CPF 18-87-29). The project will be high density and will be treated with a high density BMP. The proposed site will utilize a wet basin for treatment. Roads within the development are designed to be super elevated and directed into catch basins that will convey the water to the wet basin. Since the project is located within New Hanover County the site will also need to meet the 2,10 and 25 year pre/post requirement. Proposed impervious for this section is 40%. Water and sewer for the site will be public and provided by the CFPUA. PROJECT BMP: storm water pond. STORMWATER ENGINEER/CONSULTANT: CSD-Engineering PO Box 4041 Wilmington, NC 28406 Rodney Wright rodney@Esd-gngineerinE.com 910 7914441 office 910 7911501 fax ---_ ..... ............- 3805 Cherry Avenue - Wilmington, NC 28403 - 910 7914441 - www.csd-engineering.com — License # C-2710 I D ENdN6ENN6 TARN WOODS R m m PHASE 2 DEO PHASE LINES gg S z LOC.IIEO lM R9EMAL POdr mNMSw 3P 5 q MEN' MM'04flt GYMMtt NplTI LAR°WA TARN IN700S 11 E g " "SPj„ om tx: co rA rtn of vnrMCION. NC TDCDB o Z k aEv. uo. MEMaMMs E Weaver, Cameron From: Rodney Wright <rodney@csd-engineering.com> Sent: Monday, July 17, 2017 8:02 AM To: Weaver, Cameron Cc: Howard Resnik Subject: SW express submittal Date Attachments: Phase_3.pdf, REQUEST FOR EXPRESS form FINAL.pdf, SW_narrative.pdf Cameron, Attached please find an express request for a submittal date for stormwater only. We're adding another phase (Phase 3) to the Tarin Woods II project which is currently under review with Christine for Phase Two. Thanks, Rodney Wright 3805 Cherry Avenue Wilmington, NC 28403 910 791 4441 office 910 791 1501 fax www.csd-engineering.com It is Me professional opinion of CSD Engineering that this electronic information provides design information current as of the date of its release. It is the responsibility of the receiver of this document to examine it and determine whether it's the information requested. In the deliverance of this file we make no promise as to the usability or compatibility of this file. This file shall not be considered a certified document. k a \r\ � - C, ka Avt,�� ? e 04� �6 Atf C.6�CN41� A � � AA Vvrf- 5�.o.r►h V4��• 1v onS�t� YS �rs�re. �A CJ'CS