Loading...
HomeMy WebLinkAboutNC0026573_PAR Review_20220902Regional Pretreatment Annual Report Review NC0026573 PAR 2022090216 Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send any other submissions with it? Included? ADEQUATE? POTW noted Corrections? Regional Office: ARO Narrative ☒ YES ☐ NO ☐ NA ☒ YES ☐ NO ☐ NA POTW: City of Morganton PPS Form ☒ YES ☐ NO ☒ YES ☐ NO NPDES Permit No. NC0026573 SNCR ☒ YES ☐ NO ☒ YES ☐ NO Report Period: 1/1/21 to 12/31/21 IDSF ☒ YES ☐ NO ☒ YES ☐ NO ☒ Full ☐ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. Allocation Table ☒ YES ☐ NO ☒ YES ☐ NO Compliance Schedules ☐YES ☐ NO ☒ NA ☐YES ☐ NO ☒ NA Public Notice ☒YES ☐ NO ☐ NA ☒YES ☐ NO ☐ NA Program Information ☒YES ☐ NO ☒YES ☐ NO ☐YES ☐ NO Historical SNC ☒YES ☐ NO ☐ NA ☒YES ☐ NO ☐ NA ☐YES ☐ NO ☒ NA If No, check recommendation below: 1. Have at least 90% of SIU permits been issued within 180 days of expiration? (See Allocation Table). ☒ Yes ☐ No ☐ Not req’d ☐ NOD ☐ NOV ☐ QNCR ☐ NCP ☐ Civil Penalty Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) ☒Yes ☐ No ☐ Not req’d ☐ NOD ☐ NOV ☐ QNCR ☐ NCP ☐ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in SNC, including those causing pass-through or interference? (See Narrative and SNCR Form) ☒ Yes ☐ No ☐ NA ☐ NOD ☐ NOV ☐ QNCR ☐ NCP ☐ Civil Penalty Assessment 4. Does public notice cover all SIUs in SNC? ☒ Yes ☐ No ☐ NA ☐ NOD ☐ NOV ☐ QNCR ☐ NCP ☐ Civil Penalty Assessment Note: Exceptions should be explained in the comment section below: Reviewed By: S. Williams Date: 9/2/2022