Loading...
HomeMy WebLinkAbout20140275 Ver 2_401 Application_20140914Hood Richardson, PA C -576 Engineers — Surveyors — Geologists 110 West Second Street Washington, North Carolina 27889 (252) 975 -3472 September 22, 2014 NC DWR, 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, N. C. 27699 -1617. RE: TJ's Land Development, LLC Gentlemen: This is an application for an after the fact stream crossing (a ditch in farmland) at the head of the stream designation. The land is presently farm land, but will be used for a future camp ground. If I may provide additional information, please call on me. A check for $240.00 is enclosed. Since yours, Hood L. Richardson, PE, PLS, PG RECEIVED SEP 2 3 2014 DENR -LAND QUALITY STORMWATER PERMITTING �C�_ :n 1 I >' — U 7 _ < a014oa 7s v a- Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 A_ Pre - Construction Notification (PCN) Form Applicant Informabion 1. Processing to Type(sl of approval sought from the Corps: Y/14 ❑ Section 404 Permit ❑ Section 10 Permit 1b Speufy Nabonvr+de Permit (NWP) number: IvP i� or General Permit (GP) number: 1c Has the NWP or GP number been verified by the Corps? 1% A ❑Yes ❑ No td Type(s) of approval sought from the DWQ (check all that apply). r401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express Riparian Buffer Authorization to Is *n notification solely for the record For the record only for DWQ because written approval is not required? 401 Certification: Yes ❑ No For the record only for Corps Permit: ❑ Yes No if Is aayrient into a mibgahon bank or in -lieu fee program proposed for frvbgabon of Knpacts? If so. attach the acceptance letter from mitigation bank or r"oeu fee program. ❑ Yes No 19 Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. j�j'Yes ❑ No 11�"'�� 1,) Is the project k>cated within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes No 2. Project Wdorrnation -- 2a. Name of f TJ's L H d 2b County E o Z 2c. Nearest muinicipality : town ��,,— SEP 3 2d. �2e Subdr m" name x e NCDOT only. T.I.P. or state project no: ST TER PERMITTING- 3. Owner krkwmation 3a_ Narne(s) on Recorded Deed: j Lam} r(� ✓��D LG 3b Deed Book and Page No. -7 S3 3c Responsible Party (for LLC if 0 6 1N 3d. street address ,2 % / S 9 irs , 1. w/-1 6 ( / Z� 3e City. state. zip /})4 f e 4. C. 27 6 0 3f Telephone no 2 SZ, — % f J ` 6 to 7 7 39. Fax no.. / A 3h. Errmai address D big r , co M Page 1 of 10 PCN Form — Version 1.4 January 2009 IL 4. Applicant Information (if different from owner) j 4a- AppIecant is: Agent ❑ Other, specify 4b. name_ A NJ 04 v4% /+^� -�" L G G w 4c. Busff*ss name (i) CA ob,K f Tarrleama _ _y 4d- suet address } , o.. /.Sj z - _ 14e City state. np- K f . C, ?f E;6) 14f Tetiephone no -- I 2. — JY 3 — (0 6 77 4g. Fax no- / /-) 4r,_ Em al address I J b Y#AP go n o-wr ,,G J m 5_ Agent/Consultard Information (if applicable) 5a- Marne: r9J /L P S t1 !1! s 5b. Business name Cd ): JB d A e,4 4), L-c �::' '4 met - D W 6..ec-AJ s 5d. Coy. state. zip 1?/f�%�� N e h[ /iL C . 2 78 v Se. Te6ephdneno 5t Fax no- %Y A M5g- Emal address • v Page 2 of 10 B. Project fnforrnation and Prior Project History - 1. Property Identification la_ Property'identi ication no (tax PIN or parcel ID) -7 --- Z z- 7"Y tb_ Site 000rdmates�Crn deamal' degrees) Latitude �� a �' 7 4 Longitude ' Z 3 c7 f tc_ Property size acres 12- SurfaceMaters 2a- Nan* of nearest body of water to proposed project /� K Y �r � CAP 2b. water Quality Classification of nearest recemng water 2c. R,ver basin- 3 - Project Description F 3a_ Describe the a ng cxidrtions on the site and the general land use in the vicinity of''thQ protect at'the time this Cation. M,44 /ysj-de diTUt 10 1::;9nM L,0'9�140 IS C72JflE�( b� a� / A 8 Aq) A S A P Td SJa K ✓e- A GA ►" r Qlc,v -1 b. 3b Lrst.the total estimated acreage of all e)asbng wetlands on the property- 13c- List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 3d: Expilain the purpose of the proposed7roject o f=r A z, ruq A ' i s A O/ o r �N n �rv%,, Q}/0 F4Kwt !1 A 0^' C- 40ffiK�G ,PLfe-4no*6 Lq�+d 41, rNf #ei ,9 or A rrXj q^4 p1 re/t,.+ -vArt,,H by 96/4a. 3e_ Oesqribe the gverafl project in deta , i din the of equi ment to be use �9 b WA-f -Ted �e 1 cvL. LIlk ry r9. /H 4 M � d e d,"rc f 1 4. Jurisdictional Determinations '4a- Have juresdxfional wetland or stream determinabons,by the es ❑ No ❑Unknown Corps or State been requested or obtained for this property ! Co merits j Wojecit axWi all in the sty 4b_ H the Carps made the jurisdictional determination, what type E] Preliminary Final of determination was made 4c_ H yes. who defrneated the jurisdictional areas'? ( Name (d known): �I✓l �� /A�''1 �✓Qf c4,01tf C,>�c S Agency /Consultant Company her or✓ i1fo Ht/ S1 *e �'b K 0 4d_ H yes Est #* Pates of Ove Co rps jurisdictional de erminations ,, or State determinations and attach documentation �l Z3 pl 5. Project History � Sa_ Have permits or certifications been requested or obtained for ❑Yes E] No ❑ Unknown tis h project Catd uding all prior phases) in the pasty Sb_ H yes expian in detail according to 'hell file' instructions rnJS 1, N 14K d -CA d i -%AwT .4 776 .V C- 74 r!P/t,Mi , STJ �`'+ �✓q 1' 2r� /�+� f ��' T-i 1 6. Future Project Plans 6a_ is this a phased projects Ell Yes No 6b_ H yes. explain. N IA A-C,67' ON Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed lmpacts Inventory 1- Impacts Sum ary la- With sections were, completed below for your project (check all that�apply,) �Wetlancls AStreams — tributaries Buffers ❑ open Waters ❑ Pond Construction 2- Wedand Wgmcts s ff there are wetland mVacts proposed on the site, then complete this question for each wetland area impacted i 2a- 2b 2c 2d 2e 2f Wedand impact Type of impact Type of wetland Forested Type of jurisdiction Area of, number Corps (404,10) or impact Pint (P) or DWQ (401, other) (acres) T IW1 CChoose one Choose one 0 H,6� I G W2 Choose one Choose one Yes /No 1V3 Choose one Choose one Yes /No 1M4 Choose one Choose one Yes /No WS Choose one Choose one Yes /No v�^"o Choose one Choose,one Yes/No 2g Total Wetland' impacts: - - ( 2h- CormnenM- t 3 If there are perervual or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this Question for a9 stream sites impacted 3a- 3b: 3c 3d, 3e 3f 3g- Stream oVact Type of impact Stream name Perennial (PER) or Type of Average Impact_ rnnrtber intermittent (INT)'� jurisdiction stream length _ Permanent (P) or width (linear - Tempmary m ()H —/ /4/4 -E17 !l L OrnFrt (feet) feet) I St ! Choose otr* rI', AA4 Ani, - 0E2 _ r�K- 5- 'fz S2 �Choose, orte v Fe/C S3 Choose one - - S4 Choose or* S5 Choose one S6 Choose one 3h Total stream and ° tr,ibutary'impacts _ 4 N Coo rm-enis- Page 4,of, 10 PCN Form — Version 1 4 January 2009 r t' 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tnbutanes, sounds, the Atlantic Ocean, or any -other open waterof _V* U S then &Kfivxtuially list all open water impacts below 4a_ 4b 4c 4d 4e. Open water Name of waterbody impad number Cd applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type T 1 Ot A Choose one Choose 02 f Choose one Choose O3 Choose one Choose 04 Choose one 'Choose 4f Total open water,impacts 4g Comments S. Pond or Lake Construction tf pond or take construction proposed the complete the chart below 5a. 5b 5c 5d 5e Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Floodpd Filled Excavated Flooded Filled Excavated P1 I Choose one a P2 Choose one 5f Total: 5g Carr ments_ Sh_ Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no - 5i_ Effected pond surface area (acres). 5q Size of pond watershed (acres) 5k_ MeMod at construction_ 6. Buffer Impacts (for DWQ) If prood %vffl mg)act a, protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts # be6er_ If any impacts require mitigation,, then you MUST fill out Section D of this form f 6a_ Proved is in which protected bas,n'7 ❑ Neuse Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other s 6b. 6c. 6d 6e 6f 6g Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number — mitigation Impact impact Pesrnanent (P) or requited? (square (square T feet feet Bt / /� i� Vf� �� a,1 (-44j- Yes o p0 400 d 1132 Yes /No ! 83 Yes /No 64 Yes /No M Yes /No B6 Yes /No 6h Total Buffer Impacts: 6r_ Corn nts_ /V TH o/9 Page 5 of 10 h 3 T ' 1 D. trnpact Justification and Mitigation 11. Avoidance and Minimization la_ Speafacafty describe measures taken to avoid or minimize the proposed impacts in designing project 61t d rl E 0 4.r W OTH e oz D E d R r %l� %t' 9K7lef Tt> rTI<Q tb_ Specdkaflr descnbe measures taken to avoid or minimize the proposed impacts th ugh co struction techniques C,JLCtwT wa lac �5,i,-4t 1 X'4p J-o (- JU7-P-0If e/E &4ff" 2 Compensatory Mitt on for Im cts_to Waters,of the U.S. or Waters of the State 2a_ Does the prood require Compensatory Mitigation for imp to Waters of the U S or Waters of the State) ❑ Yes No 2b. tf yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c_ tf yes, which mitigation option will be used for this � ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation e - 13- Compiete if Using a Mitigation Bank. 3a. Marne of Mitigation Bank_ 3o Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type C se one Quantity Quantity Quantity - 3c. Cornments_ 4. Complete if Makin ,a Payment to In4ieu Fee Program J4a. Appro+ral letter from in -lieu fee program is attached ❑ Yes 4b_ Stream nitgaton requested linear feet 4c. tf,using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e_ Ripanan wetland mrbgabon requested Z acres 4f_ Mon- npanan wetland mitigation requested acres 49 Coastal (tidal) wetland mitigation requested acres 4h Orients 5- Complete if, Using a Permfttee Responsible Mitigation Plan 5a_ K ustng,a perrnrttee responsible mitigation plan, provide,a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Ultigation,(State Regulated Riparian Buffer Rules) — required by DWQ 6a. WM the protect result in an impact within a protected riparian buffer that requires ❑ Yes ❑ No buffer meagation? 6b tf yes. Then identify the square feet of impact to each zone of the npanan buffer that requires mitigation Calculate,the amognt of mitigation required � 6c 6d 6e Zoaee Reason for impact Total impact Multiplier Required mitigation (squ e f ) (square feet) Zone t � 3 (2 for Catawba) Zone t 15 6f Total buffer mitigation required 6g. If buffet ffutigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible- ripanan buffer restoration, payment into an approved in -lieu fee fund) 6h_ Canvnents Page 7 of 10 IE- Stormwater Management and Diffuse Flow Plan (required' by DWQ) I. Diffuse Floor Plan r 1a. Does the project mdude or is,rt adjacent to protected riparian buffers identified Yes ❑ No f win one of the NC Fbpanan Buffer Protection Rules? E t®_ tf yes. then is a diffuse flow plan included? If n P� —lain wby zeS[ w �t 1jo �gg� lri Yes El No 0 `� r O 2. Stommater Management Plan 2a_ What es the overall percent imperviousness of this project? 2b_ Does this project require a Stormwater Management Plan? ❑ Yes 9No 2c K iftas DOES OT require a Stormwater Management Plan, explain wh 4 ; s o f c. y �?�o S- c_ =-o.. 1, S ✓-e� -t�o� 2d. If this project DOES require a Stormwater'Manage men t Plan, then provide a brief, narrative description of the plan 2e. Who a-A be responsible for the revoew of the Stormwater Management Plan? 3.. Cued focal Govemment Stomr* –dWr Review 1,3a_ In wt6ch 6ocaf government s jurisdiction is this project? _ I ❑ Phase II 3b_ Whkh of the following locally- implemented st ter aj ment programs apply (check al'that apply) / J ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other 3c. Has the approved Stormwater Management Plan with proof of approval been anachedl ❑ Yes ❑ No, 14. DWO Stomiwater ram Review ❑Coastal counties ❑HQW 4a_ Whii& of the follovAng state - implemented stormwater management programs apply ❑ORW (check afl that apply) ❑Session Law 2006 -246 l []Other 6 4b_ Has,the approved Stormwater Manageme Plkn qth PI - proof of approval been attateed? ❑ Yes ❑ No S. DWC 401 Unit Stomwater Review k 5a_ Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No s 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form – Version 1 4 January 2009 Ai I( F. Supplamantary Information 4 1. Environmental Documentation (DWO Requirement) la- Does the progect involve an expenditure of public (federal/state /local) funds or the ❑ Yes o use of public (federal/state) land? # 1b If you answered 'yes' to the above, does the project require, preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑�No (North CamCma) Environmental Policy Act (NEPA/SEPA)? � 1c. tf you answered "yes' to the above, has the document review been finalized by the State Clearing House? (tf so attach a copy,of the NEPA or,SEPA final approval letter ) ❑Yes [] No + Comments. t 2 Vikillations (DWO Requirement) 2a_ Is the site in violation of DWO Wetland Rules (15A NCAC 2H 0500), Isolated Wei Rules.(15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is ttsis an after- Use -fad permit application? es ❑ No 2c- If you answered yes' to one or both of the above questions, provide an explanation of the violations �T/�p�isn C✓!✓A^r tKs rA114 09" !Lail � J�itpjcrfo -,(A/ Srrtes�A I.S OWzM,.�,,b C�.! 4f�c vt� -r�s i►�rra �i�. R 3. Cumulative Impacts (DWO Requirement) r 3a. Wit ttus propel (based on past and reasonably anticipated future impacts) result in + addbonal development, which could impact nearby downstream water quality ❑ Yes KO 3b- If you answered 'yes' to the above submit.a qualitative or quantitative cumulative impact analysis in accordance with, the ' E most recent DWO policy tf you answered 'no,' provide a short narrative description t l 4. Sewage Disposaf(DWO Requirement) 4a- hearty detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility d- tip es py /I Page 9 of 10 PCN Form — Version 1 4 January 2009 S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a_ VVM this project occur in or near an area with federally protected species or habdat? ❑ Yes No 5b_ Have you checked with the USFWS concerning Endangered Species Act ❑ Yes irnpacils.? �'No 5� ff yes eKlicate the USFWS Field Office you have contacted , - 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical 6 d�1vl t� CjAr5 W44rt Fr e-ld o b.F -ek-v4 r /a,,,Lf J 6- Essential Fish Habitat (Corps Requirement) 6a_ WO this proyect occur in or near an area designated as essential fish habitat? ❑ Yes ��o 6b What,data sources did,you use to determine whether your site would, impact Essential Fish Habitat? rkts is R /� A/t� (" A� ��TL4 , T. Historic or Prehistoric Cultural Resources, (Corps Requirement) 7a. Wig this p"W occur in or near an area that the state, federal or tribal governments have des"ted as having historic or cultural preservation ❑ Yes to status (e.g - National Historic Trust designabon or properties significant in North Caro€uha history and archaeology)? a lb_ 1r'M°hat data sources did you use to determine whether your site -would impact historir, or archeological resources? ire r Lis r-e d ai /IL ���Ti/�+rl 8,4T curl AZ- £G'rfr w d1= O'Kk't QS 8. Flood Zone Designation (Corps Requirement) 8a_ t4M this pr*d occur in a FEMA- designated 100 -year floodplain? Yes AMNo 8b. K yes. explain how project meets FEMA requirements All y � IIRv 4r4 ,ClaJ d 6Lp ✓A TI Z-1,14 Bin What source(s) did you use to make the�floodplain determination? J.�i .mA«rc �gTe Mlp 372- ��66f�vL)Jr /21 C, kA I*%- Jf ApplicanUAgent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization i letterfrom the applicanths provided Page 10 of 10 SANfPtE AGENT AUTHOR WTIQ►N f, OR M PROPEkTY LEGAL DESCRIMON: LOT NO. "1 ` 7 FLAB' NO,D�(� �G %S PARCEL ID: - Fleabe� err tA:; ' J- S Prapef'W ;Own6r —�-- Fwoprr '{�Swner: �id Mf %j'�12Tn / — The igded,, registere'd,,ptoperty owners -of the,above noted property, do hereby authorize of (Giraclor- f Argent) (Dame of consulting, firm) to act on my ISehaff and take all actions necessary for the processing„ issuance and acceptance of thi's,pe'rmit,or c4rdfication and, any and' all stondar'd'and speeial,condkiorrs,attached. Property Owner's Address (if different than , property'above): - rterephor,e: ,2,5--7- 6 6 77 We hereby certify the above information submitted in'thi5 application is true and accurate to the llegtrof our knowledge. AUth'orited 5igndture Au�thohzod-Signature Date: ��� ���� Date: C i ,• ; A0Li NC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Vs Land Development, LLC Attn: Mr,. Tobin T,etterton PO Box 12 -5 Pantego;= NC=27860 -- - Subject Property April 16, 2014 TYs Land Development, LLC Property UTs to Pungo Creek, Tar - Pamlico River Basin John E Skvarla, III Secretary DWQ# 14 -0275 Beaufort County On -Site Determination for Applicability to the Tar - Pamlico River Riparian Area Protection Rules (15A NCAC 2B .0259) Dear Mr Tetterton• On April 2, 2014, at your request Anthony Scarbraugh conducted an on -site determinations to review unnamed tributaries (UT) to Pungo Creek located on the subject property for applicability to the Tar - Pamlico Buffer Rules (15A NCAC 28;.0259). The•feature is labeled,as 14 -0275 A through 14 -0275 D" on the attached maps initialed by Mr. Scarbraugh on�April'16, 2014: The project is located at 1711 Yeatsville Road in Beaufort -County, NC. At your request, Mr: Scarbraugh conducted on -site determinations ds stated above. During his review, he evaluated the streams using the DWR Stream Classification, Form. He evaluated the stream reaches ;14- 0275 A at N 35.50592, W 77.72442, 14 -0275 C,at'N 35.50671, W 76.72442, and 14 -0275 D at N 35.50651, W 76.72657 and found evidence that this is a man -made feature not constructed for the purposes of navigational access. North Carolina Administrative Code 15A NCAC 02B 0259 (3)(a)(i) exempts ditches and 'manmade conveyances ,other than modified natural streams .unless constructed for navigation or boat access. He evaluated the stream reach 14 -0275 B and calculated the score to be 27.75 points. The form states that if the score is "greater than or equal to 19 points the stream is at least intermittent." The Division ,of Water Resources (DWR) has determined that a portion of feature labeled as "14 -0275 A, 14 -0275 C and 14 -0275 D" on the attached maps that is highlighted in red is not subject to the Tar - Pamlico Buffer Rules. The portion of the feature labeled as "14 -0275 B" on the attached maps, and highlighted in blue is subject,to the Tar - Pamlico Buffer - Rules. The portion of the feature labeled as "14- 0275 B" and highlighted in red and circled is rnoUsubject to the Tar - Pamlico Buffer Rules. The features and its ,associated buffers should -be identified on any future,.pl'ans for this property. The owner ,(or: future owners) should notify the DWR (and other relevant agencies) of this decision in any future correspondences concerning this property. This on -site determination shall expire five (5) years from the date of this letter. Division of Water Resources — Water Quallty,Regional 'Operations - Section —Washington Regional,Office 943 Washington Square Mall, Washington, NC 27889 Phone- 252 - 946 -6481 \ Fax, 252 - 975 -3716\ Internet www ncdenr gov An Equal Opportunity I Affirmative Action Employer— Made in part by recycled paper TJ's Land Development, LLC' Attn Mr Tobin Tetterton Stream Determination Page 2 of 2 The owner-(or future owners) should notify the DWR (and other relevant agencies) of this decision in any future correspondences concerning this property. This on -site determination shall expire five (S) years from the date of this letter. Landowners or affected parties that - dispute a determination made by the DWR or Delegate&Local Authority that a surface water exists,and thatiit is subject to the buffer rule may request a determination by the Director. A request fora determination by the Director shall be referred to the Director in writing c/o Karen Higgins, DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC 27699 -1650. Individuals that dispute a determination by the DWR or Delegated Local Authority that "exempts" a surface water from the buffer rule may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60 -day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision. DWR recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To a* for a hearing, send a written petition, which conforms to Chapter 1508 of the North Carolina Genera! Statutes to the _Office of,Administrtrve Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699 - 6714. - ° This determination is final and binding unless you ask for a, hearing within 60 days. This letter only addresses the applicability to the buffer rules and does not approve any activity within the buffers. Nor does this` letter approve any activity within Waters of the United States or Waters of the State: If you have any additional questions or require additional information please call Anthony Scarbraugh in the Washington Regional Office at (252) 948 -3924. Sincerely, �I Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDENR Attachments: USGS Topographic 1:24,000 °Quadrangle Map "P,antego" -- cc: DWR 401 & Buffer Permitting Unit File Copy Filename 14 -0275 sr rA , This map was compiled by U.S. Department of Agriculture, Soil Conservation Service and cooperating agencies on 1974 photography obtained from U.S. Department of Interior, Geological Survey. 5000 4000 3000 2J� i in En Vonme, i NL 4 _ motet 14 -0275 C 14 -0275 B O 14 -027' A 1:�• � 12-02750 Sr�� � r . i 2 A SV r Mag etic Dec'nati n_ �1 \ SCALE 1 12000 t Q 0 100 200 300 400 500 GM —x S7[ aC `>MCS i 0 - - 1000 - .. 0 100 200 300 400 sx xx w r'- -n+ rr'� loos kq—t U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. SAW 2013 - 01409 County,: Beaufort NO DEPARTMENT OF THE ARMY AUTHORIZATION REQUIRED Property Owner / Agent: Toby Tetterton Address! Post Office Box 125 Panteao, North Carolina 27860 Telephone Number: 252- 943 -6677 Size and Location of Property (waterbody, road,name /number, town, etc.): Property contains approximately 46 acres located southwest of the Town of Belhaven, on'the west side of Punao CrPPL- hetwPPn Veatecvi le Rood and Pungo Creek. The Property contains approximately 29 acres= the woodland is wetlands. PIN_ 07029943. Description of Activity: The applicant proposes to place fill material into the upland borrow pit to facilitate the development of a RV park. No fill is being placed in wetlands. Your work as proposed does not'require Department of the Army authorization for the following reason(s): There are no jurisdictional waters or wetlands within the boundaries of the property. X The,proposed project does`not impact jurisdictional waters or wetlands. _ The proposed project.is exempt from,Department,,of the Army regulation. Specify: This Department of the Army determination does not, relieve the permittee of the responsibility to obtain any other required Federal, 'State, or local, approvals /permits. The permittee •may need to contact appropriate State and local agencies before beginning work. For any activity within the twenty coastal counties, before beginning work, you must contact the N.C. Division of Coastal Management in Washington, North Carolina, at (252) 946 -6481 to discuss any required State authorization. Any changes in the above described work must be coordinated with the Corps of Engineers prior to commencement. If you have any questions regarding the Corps of Engineers regulatory program, please contact William'Wescott at,telephon Regulatory Project,Manager Signature Date: 08/06/2013 - ., SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORM, ETC., MUST BE ATTACHED TO THE YELLOW (FILE) COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Tobv Tetterton From: : Wescott;�WillFam =`G SAW [William G Wescott@usace.army mil] Sent: Tuesday, August 06', 2013 11'02 AM To: tobin @gotncounty com Subject: RV Park Toby, The,''No Permit Required' tearsheet to place fill in the borrow pit has been completed,and should be going in the mail today. I talked with Raleigh Bland. I told him,that you have a very clear break from uplands to wetlands on the creek side of the borrow pit. You are proposing the elevated boardwalk /pier to start on uplands and that you were not proposing any fill in wetlands. William V GAM 13 -01 -109 -D ? 3 �R ::z '4' o a r s = z O ,,• N � i � , CI,. JSS tt 0 3' -a Ix s 4' in s UL I I 5' ° W 1 1 1 I I - ----- - - - - -- - - - - k rn k I !X'1.7'i i Zp � ?< II � o h 2 zo `o f- z �O U o X / �! �k4.1'/ k ry j Zp 1 1 O J ) olio m i N / / W LO:ii k X LEGEND: i I I j p w � ii TAR - PAMLICO m RIPARIAN BUFFER Q4 -+ U O I t DWQ #14 -0275 3 O Ikl ^ k k gfi �• o k I I ^ n O Z i 1 - - TBM 1 CV - 821.63 -- �uI �yEATESVII�i� ROAD '98 - - 't N 13'34'03" W ;,� IFWVE ryN. 7.8 60' RAGHT of WAY - -� TJ'S LAND DEVELOPMENT, LLC o; - oi - - - - GAM 13 -01 -109 -D SCALE 1:24 000 1 D.5 0 gLOMETERS 1 CEIVED 1000 500 0 METERS 1000 05 0 MILES 2014 3935 lam D tom 2W2 2020 1001 1101 soon 10m 8101 9021 "1" �� c AND QUALITY I STORMWATER PERMITTING �o FREE UN 10 2'30" 3934 3932 >o 000 FEET 3931 m A r BISNOP RD ! CK NEC 5 5 Graveyard Point 3930 1'u190 Up 76 °45' 2 670 000 FEET 342 343 344 42'30" 346 KTMAL S Fir PANTEGO QUADRANGLE NORH AA*MCAN YewCA Q(M OF im NORTH CAROLINA- BEAUFORT C O. 7.5- MINUTE SERIES i r Y' �o m A r BISNOP RD ! CK NEC 5 5 Graveyard Point 3930 1'u190 Up 76 °45' 2 670 000 FEET 342 343 344 42'30" 346 KTMAL S Fir PANTEGO QUADRANGLE NORH AA*MCAN YewCA Q(M OF im NORTH CAROLINA- BEAUFORT C O. 7.5- MINUTE SERIES a I 9wAAfP 2 1 / r 19 1710 1779 1627 ch 11.44 a D 8 N A 4. - --- 1625 16 6 ? r POP. 171 1700 NOk 163 ^ 0 _ 70- I 1244 / - - PoI rr` 6 1 1624 A O ELMAVEN R M / N ? 6 162+ e� A >PO.1. s 1023 ", R Ory?om 2.4 Ir 61 162 � O 7rn CAM 6777e • 1817 �0 3 ns Srtr7�ax 7 5 3 17 7 a? Sank s �0 ?674 117 17 _ SWAM P � 1 \, 1622 1609 17 0 "I1 �!_lf , 176 2.s 1716 177 a 75 1718 ;� a • 177 7 1449 �. LLU Sid 1 ts,,e •a �r r -. R�nfomdlN 1722 — JACKSON 1732 �Uffppppe,� '— S W A M P I'06010i08 e �. J�� r a.rs ro.,■ +7 7 ch a $ a U 1334 7 / 0 a JL7 / 5LOUNTS SAY La �w a r: Ondlw> 8>e0f1 tn2 . � ------ ------ PIER PIER DETAIL 1 " = 40' 1-- 25, PUSIGN MPOUT c 40' SLIP 25c SUP 100 > co is 0 ry N °® rQ ro 0. ry ID ry c 4 �2 su P ro ru PUMPOUT 0 SIGN 1— 251-1 c� Z C) f?A4,S 11505� 0_AD I N 42- 43"W N 75'32'10"E 1383,63' N 75°32' El I 29.99 TBM 2 20' 0 r 0 awl c) Z co I Cad FINGER PIER D Z rQ c- 00 C_ � SLIP 30' > C SUP 100 > co is 0 ry N °® rQ ro 0. ry ID ry c 4 �2 su P ro ru PUMPOUT 0 SIGN 1— 251-1 c� Z C) f?A4,S 11505� 0_AD I N 42- 43"W N 75'32'10"E 1383,63' 0 co !"--S 75'32'I,'l"6 ELEVATION DATU�_ M: 1988 (FROM F -'l 6) N 75',32'10"E N 75'32'10"E 1(7�� 356.15° �5��� 1407.00° � Q) Q TBM % Z_ TBM POND Pl fi S 75`3410 1749.00' TBM 1: NAIL SET IN POWER POLE 1A TELT ABOVE GROUND.THE POLE IS 100 FEET NORTH FROM A NEW GRAVEL ROAD ANL) 33 FEET EAST FROM THE CENTER OF THE ASPHALT OF S.R. 1718 (YEATES VILLE; If) AD). THE POLE IS LABELED TSMC 14884. THE ELEVATION OF THE !,�i_AJL IS 7.0 FEET. TBM 2: NAIL SET IN A POWER POLE 1.!�' FEET ABOVE GROUND. THE POLE IS 320 FEET NORTH FROM A NEW GRAVEL ROAD A ND 33 FEET EAST FROM TEH CENTER OF THE ASPHALT OF S.R. 1718 (YEATESVILLE:,C)AD). THE POLE IS LABELED TSMC 15787, THE ELEVATION OF THIS i�, E AlL IS 7.0 FEET, TBM 3: NAIL SET IN A 15 -INCH MAPLE'f, REE 3.3 FEETABOVE GROUND. THE TREE IS 35 FEET NORTH FROM THE CORNER --) ' A POND, ON THE SOUTHEAST BANK OF A G DITCH HEADININTO THE WOODS AND ON THE CORNER OFTHE TREE LINE. THE ELEVATION OF THE NAIL IS TO FI; ' FT. TBM 4: NAIL SET INA 15 -INCH GUM TI? ' EE 1.6 FEETABOVE GROUND,THE TREE IS 120 FEET NORTH FROM THE CORNER OF A POND AND ON THE TREE LINE. THE ELEVATION OF THE NAIL IS TO Ffl'F_T . on fro I IV EXISTING PIE, '01 / N 75°32`10°`E c 0 432.20' 'x- .0) 188' <1\ AJL 545 210' (5 AL :k :7j 4N NOTE.' 404 WETLAAL0 I?UNS ALONG TOE OF EA115ANKMENT o 0, Q) 6 :Z- 0 68' 729,56' Pvc S 75-32'10"7— 41 A- rlD rTl LEGEND: 0 NEW IRON PIPE, CONTROL A RAILROAD SPIKE, CONTROL (D POINT, CONTROL DITCH 404 WETLAND LINE —NWS— NORMAL WATER LINE NOTTO SCALE (5.0') X WATER DEPTH Y"TEWUE IS 7.0 FEET ACCORDING TO FEM--'., FLOOD INSURANCE RATE 150 0 150 300 1 MAP 3720664000J DATED 511 -5/0.3, 0 m m m m GRAPIUC SCALE — FEET I sum( S.R. 714 R 0 "OV S.R. 1747 AREA MAP Rmsol`MLLE NO SCALE ko I 011 I TOBIN J. TETTERTON REVISED 2/18/14: PIER LOCATION REVISED 2/10/14: BOAT SLIPS PROPERTY OF: TJ'S LAND DEVELOPMENT, LLC BATH TOWNSHIP BEAUFORT COUNTY NORTH CAROLINA SCALE: 1" = 150' SURVEY DATE: NOVEMBER 22, 2013 SURVEYED BY: HOOD RICHARDSON, P.A. ENGINEERS— GEOLOGISTS— PLANNERS 110 WEST 2ND STREET WASHINGTON, N.C. 27889 PHONE: (1252) 975-3472 N 75°32' El I 29.99 TBM 2 r 0 awl c) Z co I Cad D Z rQ c- 00 0 co !"--S 75'32'I,'l"6 ELEVATION DATU�_ M: 1988 (FROM F -'l 6) N 75',32'10"E N 75'32'10"E 1(7�� 356.15° �5��� 1407.00° � Q) Q TBM % Z_ TBM POND Pl fi S 75`3410 1749.00' TBM 1: NAIL SET IN POWER POLE 1A TELT ABOVE GROUND.THE POLE IS 100 FEET NORTH FROM A NEW GRAVEL ROAD ANL) 33 FEET EAST FROM THE CENTER OF THE ASPHALT OF S.R. 1718 (YEATES VILLE; If) AD). THE POLE IS LABELED TSMC 14884. THE ELEVATION OF THE !,�i_AJL IS 7.0 FEET. TBM 2: NAIL SET IN A POWER POLE 1.!�' FEET ABOVE GROUND. THE POLE IS 320 FEET NORTH FROM A NEW GRAVEL ROAD A ND 33 FEET EAST FROM TEH CENTER OF THE ASPHALT OF S.R. 1718 (YEATESVILLE:,C)AD). THE POLE IS LABELED TSMC 15787, THE ELEVATION OF THIS i�, E AlL IS 7.0 FEET, TBM 3: NAIL SET IN A 15 -INCH MAPLE'f, REE 3.3 FEETABOVE GROUND. THE TREE IS 35 FEET NORTH FROM THE CORNER --) ' A POND, ON THE SOUTHEAST BANK OF A G DITCH HEADININTO THE WOODS AND ON THE CORNER OFTHE TREE LINE. THE ELEVATION OF THE NAIL IS TO FI; ' FT. TBM 4: NAIL SET INA 15 -INCH GUM TI? ' EE 1.6 FEETABOVE GROUND,THE TREE IS 120 FEET NORTH FROM THE CORNER OF A POND AND ON THE TREE LINE. THE ELEVATION OF THE NAIL IS TO Ffl'F_T . on fro I IV EXISTING PIE, '01 / N 75°32`10°`E c 0 432.20' 'x- .0) 188' <1\ AJL 545 210' (5 AL :k :7j 4N NOTE.' 404 WETLAAL0 I?UNS ALONG TOE OF EA115ANKMENT o 0, Q) 6 :Z- 0 68' 729,56' Pvc S 75-32'10"7— 41 A- rlD rTl LEGEND: 0 NEW IRON PIPE, CONTROL A RAILROAD SPIKE, CONTROL (D POINT, CONTROL DITCH 404 WETLAND LINE —NWS— NORMAL WATER LINE NOTTO SCALE (5.0') X WATER DEPTH Y"TEWUE IS 7.0 FEET ACCORDING TO FEM--'., FLOOD INSURANCE RATE 150 0 150 300 1 MAP 3720664000J DATED 511 -5/0.3, 0 m m m m GRAPIUC SCALE — FEET I sum( S.R. 714 R 0 "OV S.R. 1747 AREA MAP Rmsol`MLLE NO SCALE ko I 011 I TOBIN J. TETTERTON REVISED 2/18/14: PIER LOCATION REVISED 2/10/14: BOAT SLIPS PROPERTY OF: TJ'S LAND DEVELOPMENT, LLC BATH TOWNSHIP BEAUFORT COUNTY NORTH CAROLINA SCALE: 1" = 150' SURVEY DATE: NOVEMBER 22, 2013 SURVEYED BY: HOOD RICHARDSON, P.A. ENGINEERS— GEOLOGISTS— PLANNERS 110 WEST 2ND STREET WASHINGTON, N.C. 27889 PHONE: (1252) 975-3472