Loading...
HomeMy WebLinkAbout820733_Routine_20220825015ivision of Water Resources 0 Division of Soil and Water Conservation Q Other Agency L�F•�ts���z Lf e'9I ,122 Type of Visit: atroinpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: : Arrival Time: /air Departure Time: Farm Name: Owner Name: W).75 j," Mailing Address: Physical Address: 8rLi 1 c � Owner Email: la 3 Phone: County:- Region: l V Facility Contact: ss L1 Title:� G►�C Phone: 57P0/4/7--/e1 Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Integrator: Certification Number: Certification Number: Longitude: Swine Design Current Capacity Pop. _•; Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Poo Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Wet Poultry Capacity Pop. Cattle Layer Non -Layer Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Design Current Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes [ No ❑ NA ❑ NE O Yes ❑ No ❑ NA ❑ NE ❑ Yes No El NA El NE ❑ Yes ❑ No 0 NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes o El NA El NE Page 1 of 3 5/12/2020 Continued A croct panuiluo3 OZOZ/ZUS 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 22. Did the facility fail to install and maintain a rain gauge? Pci p ❑ ❑ cn CD co co 0 on 0 . ❑� v' 0 ❑ O er,00 J O", Cn w N p ..", r d d d d ❑❑❑ rn W O� O <p '� 0 o co 0 •cD Q. O -t-t CD A o O Y 0. 0 co 0 `C v 0 0 w m �* 0 X Cr Y o"'p � w �`Pio oa cc 0 Cco o w CD vco F51: cn n• .�, �; 0: "� 0 C 0 0 N '-C ... 0 CD to 0 c CD 0 as 4 x~ �,,. * C o D °0° o \\CD 'd ° ° o CD o a o o a O o .� O " 'C .J " ura 0 O C "- CD co cooR a� o p 0 w V C a 0 �' p" n' 0 f 0 clo ❑❑ 0 C Co 0 a 0 0 S 0 a. 0 rn o n O. a p CD CY ° w ❑ 0co P ' Po 0 o• 0 C ❑ Y 0 0 0 O " 0 Q. 0. cn "0 .0 r,- co 'CS 'a 0 o C] n y w �` o �; G cn (TA m '"C coo 0 o ►• o a p 0 0 w cCDo 0 tra 0 .. o- - "t w w 0 A c w p li CD C x o coo o CoC Oy �C CM ❑ 0- .J 0 cn c. N r-ti M N \ n iG 1— CD DI0 N cn sm 0 0 ,..,) 0 w Co p', C o 0 �t cn 0 a CD .t p O N 0- CD ❑ o 0 o� o' aa' ❑ J 0 o Q. p 0 a. ., w ❑ 0 5 0 0 . 0 4 ?; o o o CD coo o �, w p ❑ CD n 0 on 0 a !Y� tr1 VrOn 0 .'rn• C] C CC $ CyC l C • ^ o 0 p - 0 0 c �'�`• \. CD d I I 0 W C7 0 a� 0 ,�-,, 0 w 0. o co J I a 0 a P 0 ElCD O ; ❑ o t'' w a �,' Gco Ua 0 ❑ a- w a w A ' -Li o ao ego o o cn O H �' J - ❑ 0 ❑ 0• "O `-C 0 0 a ,..' x 0' 03 Ura szo co dn CD Po a- u 0� O w 7 • O �/-- O e0-' 0 cn E O 0 cn 0 51. El cn , cn cn CA CA m CA cn cn a C% D ,n (n cn cn m © CAcn 0 cn CD cn 0 U J i( s .. _, t7 ri 1. T ,, CL z .0 „., .:_. co rQ 0 z z z zE7 zk O CD ri• z z z Z z z z � z z z z z= z z a s a s a a a a s a a a a s :(ut) pzeogoaz,d panzasgo :(ur) pmogaazd pau2isau CID a co •J �•t 0 a CD 0 CoFor CID 0 • 0 cD c 0 N 0 P t Pp' 0 0 CCD w . E 0 4, .A rr cn cn 0 00 CD 0 0 0 c cn aa CD cn 0 cn cn cn A CD •J 0 El co 0 cn 0 DI cg0 0 a a ❑❑ luawleaas, uoipalloJ alsIM Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the appropriate box(es) below. `❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ❑ Yes 3 No ❑ NA ❑ NE ❑ Yes NA NE 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes �o ❑ NA Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 124o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes To ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30.. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes Er< ❑ NA ❑ NE' permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes do ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ Yes ❑ Yes ❑ NE ❑ NE No ❑ NA ❑ NE Erv� ❑NA ❑NE No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). j )1. 6cd'r ,/% y r-s �— ��'Q5% �-�- 7/5. �° Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 fornot i<culAdq-crity Phone: 902 --o3-0/37 Date:f%- 5/12/2020