Loading...
HomeMy WebLinkAbout820385_Routine_20220820Facility Number tJ� 0 Division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency LE `IN)I22 Type of Visit: 9 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: q .aa mill rvn Arrival Time: Departure Time: Owner Name: ►1�C Mailing Address: Physical Address: Facility Contact: Owner Email: Phone: county:SQ)7)Iqfl Region: Fr° C E3ai-I,' i C-K Title: -rem G r Phone: Onsite Representative: ;c MQ Integrator: ,3rn i riei4 Certified Operator: A-Q hd bh 1 v D 1 Certification Number: I QQ 13 Si Back-up Operator: Location of Farm: Certification Number: Latitude: Longitude: Swine Design Current Capacity Pop. Wean to Finish Wean to Feeder X Feeder to Finish MS-1B j9JOO Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Cattle Design Current Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes �No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes �No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes b\No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ' No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 5/12/2020 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 2 Structure 3 Structure 4 2 y 3C3 LoO f (l?0 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No ❑ Yes o Structure 5 ❑NA ❑NE ❑NA ❑NE Structure 6 ❑ Yes IkNo ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? E Yes ❑\No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes \J No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes hi No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑,No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window f ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): ()e r r u d alr o V€ rGoe d 13. Soil Type(s): c U t V (l t o 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. • ❑ Yes ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Page 2 of 3 Itt No 0 No 13\No lE No N No LJ No ❑ NA ❑ NA ❑ NA ❑ NA ❑ NA ❑ NA ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE No ❑ Waste Transfers ❑ Monthly and 1" Rainfall Inspections it No No ❑ Yes ❑ Yes ❑NA ❑NE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE ❑ NA ❑ NE 5/12/2020 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check •Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes allo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes '❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes `�No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes 'No ❑ NA ❑ NE ❑ Application Field El Lagoon/Storage Pond El Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 'No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 'No El NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? El Yes �R\To ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). remove trees f'om lagoon is faun R worKi rrg on bore cufac Reviewer/Inspector Name: KQt. f n-Qn 0 I- sue 9kNitvii Reviewer/Inspector Signature: Page 3 of 3 KKratie fo nentt g Phone: Date: • c9.? 5/12/2020