Loading...
HomeMy WebLinkAbout820268_30-day poa_20220810• P�i�ls )(Io( 2.7.. PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-268 County: Sampson Facility Name: William Powell #2 Certified Operator Name: William Powell Operator Number: 18428 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop informatioh. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 8/9/2022 I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. William Powell Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 910 532-4410 Date: 8/10/2022 top 2i') II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: 1 n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 460.9 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 460.9 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window 7110 1 coastal bermuda 2.11 225.00 474.8 Mar -Oct 7110 2 coastal bermuda 2.46 146.00 359.2 Mar -Oct 7110 3 coastal bermuda 1.32 184.00 242.9 Mar -Oct 7110 4 coastal bermuda 2.53 187.00 473.1 Mar -Oct 7110 5 coastal bermuda 4.29 200.00 858.0 Mar -Oct 7110 6 coastal bermuda 4.89 160.00 782.4 Mar -Oct 7110 7 coastal bermuda 3.32 225.00 747.0 Mar -Oct 1State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE 3937.3 Ib. PAN w. Total PAN to be land applied (line n from section II) = 460.9 Ib. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 3937.3 Ib. PAN -3476 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields began as weather and field conditions permited. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current.liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2580 certified herd # 18.0 19.0 inches inches 1.0 inches 68766 ft2 42864 gallons 180 85057 2580 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 6/6/2022 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 85057 ft3 0 42000 ft3 ft3 158398 gallons 2.29 Ibs/1000 gal. 460.9 Ibs. PAN PoA (30 Day) 2/21/00