Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
820242_30 day poa_20220824
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 8 2_ _ 2.2 County: S Q (r a 11 ..acility Name: Five. ?©finis Certified Operator Name: 5 is 'rev 1?Azzl r\„A Operator # C1951.4 ` 1. Current liquid level(s) in inches as measured from the current Liquid Level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Five. Lagoon Name/Identifier (ID): Pot Ai 5 Spillway (Yes or No): Level (inches): 2. Check all applicable items 16 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action. and to the best of my knowlodgc and ability, the information is accurate and correct. Si8ne.,4 Bkcr,A, Facility Owner/Manager (print) SACtifW iracili#y f w er/Manager aturr) Phone: C. 10 - �� 5 - 662.2 Date: e - 2Lt ` 2. 2_ PoA Cover Page 2/21/ti0 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Five_ 901 rr4 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker I inches b. designed 25 yr./24 hr. storm & structural freeboard 19 inches c. line b - line a (inches in red zone) = 3 inches d. top of dike surface area according to design 2 3 9 75 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 1" `E 8 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design l eo days g. volume of waste produced according to structural design Ig D'S ft3 1 h_ actual waste produced = current herd # x line g ft3 certified herd # i. volume of wash water according to structural design C' ft3 j. excess rainfall over evaporation according to design it (QQQ ft3 k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 8 - 2- ? .. m. (lines e + k) x line I = 10 - lb PAN 1000 2.00 gallons 1. 2_6 lb/1000 gal. ?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE •1_ TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21 /00 o. tract # 1 _ structure iD: 2. structure ID: 3. structure ID: 4_ structure ID: 5. structure ID: 6_ structure ID: n, lines1+2+3+4+5+6 = lll. TOTAL PAN BALANCE REMAINING FOR AVAILABLE PERIOD. DO NOT UST FIELDS TO WHICH PAN CAN NOT p. field # B1 q_ crop ken IS62 line m = I cD 3 lb PAN Iine m = line m= lb PAN lb PAN line m = lb PAN line m = 1b PAN line m = lb PAN 103 IbPAN CROPS DURING 30 DAYDRAW DOWN BE APPLIES DURING THIS 30 DAY PERIOD. t_ TOTAL PAN BALANCE FOR FIELD (lbs.) column rx s s. remaining IRR-2 PAN balance (lb/acre) Ibc 4.78 2 5 2„ 568, O8 SOB, O8 4'7Z 411 S' 2 .10 353 e 16 cj 219>02. 2. 2411 64 u_ application window' 1State current crop ending application date or next crop application beginning date for available receivingcrops- during 30 day drawn down period v. Total PAN available for all fields (sum of colu IV.. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21/00 nt) Yi 0 5 lb. PAN w. Total PAN to be land applied (line n from section 1l) _ I03 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 3 905 lb. PAN y. Overall PAN balance (w - x) = 38 O Z.. lb. PAN Line y must show as a deficit. if line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21/00