Loading...
HomeMy WebLinkAboutNCC223198_Site Plan or Location Map_202209123 2 r Y SITE DATA PIN 0759-01-19-1167, 0759-01-18-2912, 0759-01-18-6965, 0759-01-18-2760, 0759-01-18-3454, 0759-01-28-1608, 0759-01-18-9824, 0759-01-18-9638, 0759-01-18-7524, 0759-01-28-5359, 0759-01-28-6298 PID 203363, 211393, 164913, 211392, 164911, 211388, 164916, 164914, 164909, 164918, 164929 SITE AREA 43.95 AC PROJECT AREA 30.90 AC ZONING CG(D) (Z05-18) DEVELOPMENTTIER SUBURBAN WATERSHED F/J-B OVERLAY WATERSHED FALLS LAKE RIVER BASIN NEUSE RIVER BASIN EXISTING USE VACANT COMMERCIAL&RESIDENTIAL PROPOSED USE 336 APARTMENTS BUILDING AREA 336,050 SF BUILDING HEIGHT MAXIMUM 50' PROPOSED <50' BUILDING COVERAGE MAXIMUM 60% EXISTING 0.60% PROPOSED 24.9% SETBACKS REQUIRED STREET YARD: 25' SIDE YARD: 8' REAR YARD: 25' (12.5' ADJACENT TO NON-RESIDENTIAL) PROPOSED STREET YARD: 25' SIDE YARD: 8' REAR YARD: 25' PARKING REQUIRED APARTMENT: 336 UNITS x 2.0/UNIT = 672 SPACES *A BY -RIGHT PARKING REDUCTION IS PROPOSED VIA ADDITIONAL TREE COVERAGE. AN ADDITIONAL 88 CANOPY TREES WITH A MINIMUM 6" DBH SHALL BE PRESERVED. SEE SHEET C2.00 FOR ADDITIONAL TREE SAVE DETAILS. TOTAL: 584 SPACES PROPOSED STANDARD: 530 SPACES GARAGE: 38 SPACES ACCESSIBLE: 24 SPACES EV: 2 SPACES TOTAL: 594 SPACES ACCESSIBLE PARKING REQUIRED 14 SPACES PROPOSED 24 SPACES VAN ACCESSIBLE REQUIRED 3 SPACES PARKING PROPOSED 24 SPACES BICYCLE PARKING REQUIRED 1 SPACE PER 10 UNITS TOTAL: 34 SPACES PROPOSED 34 SPACES (28 OUTDOOR, 6 INDOOR) IMPERVIOUS EXISTING 0.44 AC (1.4%) MAXIMUM 21.39 AC (70%) PROPOSED 11.83 AC (38.7%) SITE TOTAL 11.83 AC (38.7%) TREE COVERAGE REQUIRED 30.90 AC x 20%= 6.18 AC PROPOSED 10.06 AC (32.56%) RESIDENTIAL DENSITY REQUIRED 11 UNITS/AC (MAXIMUM) PROPOSED 336 UNITS / 30.90 AC = 10.87 UNITS/AC OPEN SPACE REQUIRED 18% GROSS AREA = 242,281 SF (5.56 AC) PROPOSED 491,991 SF - PASSIVE OPEN SPACE AREA (TREE SAVE) 82,437 SF - RECREATIONAL OPEN SPACE 574,428 SF - TOTAL OPEN SPACE (32.90%) RECREATIONAL OPEN REQUIRED 33% REQUIRED OPEN SPACE AREA = 79,953 SF SPACE PROPOSED 48,918 SF - MAIN AMENITY AREA 15,662 SF - LINEAR AMENITY 6,129 SF - DOG PARK 9,486 SF - TRAIL AMENITY 82,437 SF TOTAL RECREATIONAL OPEN SPACE VICINITY MAP Z11031 01 till -I k t F!dr U!!T 0 1 SL i I 0 SANDERS AVENUE DURHAM, NC 27703 CONSTRUCTION DRAWINGS THE CITY OF DURHAM AND THEIR ASSIGNS HAVE RIGHT OF ACCESS TO THE PERMANENT STORMWATER CONTROL MEASURES [BIO-RETENTION, PERMEABLE PAVEMENT, WETLAND] FOR INSPECTIONS AND MAINTENANCE ENFORCEMENT. A BLANKET EASEMENT TO, OVER, AND AROUND THE STORMWATER CONTROL MEASURES IS HEREBY GRANTED FOR INSPECTIONS AS WELL AS ENFORCEMENT OF OPERATION AND MAINTENANCE. ANY OBSTRUCTION PLACED IN THE BLANKET EASEMENT THAT IMPEDES NECESSARY MAINTENANCE ENFORCEMENT WILL BE REMOVED AND ALL THE ASSOCIATED COSTS WILL BE BORNE SOLELY BY THE OWNER. COMMITTED ELEMENTS (Z05-18) ORIGINAL REZONING COMMITTED ELEMENTS: PROJECT NUMBER: 2021110337 DATE: MAY 8, 2022 REVISED: J U N E 101 2022 1. MAXIMUM BUILDING SQUARE FOOTAGE FOR THE COMMERCIAL ZONING SHALL BE 431,052 S.F. 2. DEDICATE 25 FEET OF ADDITIONAL RIGHT-OF-WAY FOR THE U.S. 70 FRONTAGE OF THE SITE. 3. CONSTRUCT MAY STREET TO THE CITY OF DURHAM/NCDOT STANDARDS WITH A TURN AROUND FOR THE SITE FRONTAGE. 4. THE DEVELOPER WILL PAY A FEE EQUIVALENT TO THE STANDARD COST OF A CITY OF DURHAM BUS SHELTER (UP TO $5,000.00), TO BE PLACED WITHIN THE DEVELOPMENT AT A LOCATION RECOMMENDED BY THE DURHAM AREA TRANSIT AUTHORITY (DATA) PRIOR TO THE ISSUANCE OF THE 10TH CERTIFICATE OF COMPLIANCE. UNLESS DATA STATES THAT THE BUS SHELTER IS NOT NEEDED. DATA MUST DESIGNATE IN WRITING WHERE WITHIN THE PUBLIC RIGHT-OF-WAY THE BUS SHELTER WILL BE LOCATED. 5. THERE WILL BE A NORTHERN PROPERTY ROADWAY CONNECTION OF THE PROPOSED STREET (FROM U.S. 70) ONTO COPPERLEAF PARKWAY WITHIN THIS GENERAL AREA. THIS ALIGNMENT OF THE PROPOSED ROAD AND THE CONFIGURATION OF THE INTERNAL INTERSECTIONS WILL BE DETERMINED AT THE SITE PLAN REVIEW STAGE IN CONFORMANCE WITH THE CITY OF DURHAM TRANSPORTATION GUIDELINES. 6. ANY BIKE AND/OR PEDESTRIAN TRAILS WITHIN BRIGHTLEAF AT THE PARK WILL BE CONTINUED INTO AND THROUGH THE COMMERCIAL DEVELOPMENT OF BRIGHTLEAF COMMONS, THE EXACT LOCATIONS AND METHODOLOGY WILL BE DETERMINED AT THE SITE PLAN REVIEW STAGE. 7. THE TRIP GENERATION POTENTIAL OF THE SITE WILL NOT EXCEED 21.776 NET NEW EXTERNAL DAILY TRIPS, BASES ON THE 7TH EDITION OF THE ITE TRIP GENERATION MANUAL AND THE TRIP GENERATION METHODOLOGY PROVIDED IN THE ORIGINAL TIA, AS WELL AS THE TRIP GENERATION SUMMARY LETTER DATED JULY 23, 2008, 8. THE 50 FOOT BUFFER ALONG THE NORTHERN PROPERTY LINE BETWEEN BRIGHTLEAF AT THE PARK DEVELOPMENT AND TWO LOTS OFR OFFICE 1, 2, & 3 WILL BE SUPPLEMENTED BY AN ADDITIONAL 20 FEET UTILIZING A 3 FOOT TO4 FOOT HIGHT BERM PLANTED WITH UNDERSTORY PLANTINGS WHERE BUILDINGS OR PARKING AREAS OCCUR. 9. THE TWO LOTS ADJACENT TO THE NORTHERN PROPERTY LINE AND BRIGHTLEAF AT THE PARK DEVELOPMENT WEST OF COPPERLEAF PARKWAY SHALL BE LIMITED TO USES ALLOWED UNDER SECTION 5.2.6 TITLED "OFFICE USE CATEGORIES" OF THE DURHAM UNIFIED DEVELOPMENT ORDINANCE, OFFICE NUMBER 3 LOCATION AS SHOWN ON SHEET D002A WILL NOT BE PERMITTED TO HAVE A DRIVE -UP WINDOW. 10. THERE WILL NO SINGLE-FAMILY RESIDENTIAL UNITS CONSTRUCTED AT THIS SITE. IN ADDITION, THE DEVELOPER WILL DONATE $500.00 PER INDIVIDUAL MULTIFAMILY RESIDENTIAL UNIT TO THE DURHAM PUBLIC SCHOOLS IF THE DEVELOPER CONSTRUCTS MULTIFAMILY RESIDENTIAL AT THE SITE. PAYMENT WILL BE MADE PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 11. PRIOR TO THE ISSUANCE OF A BUILDING CO FOR RETAIL'A', PROVIDE A PLANTED BERM HEIGHT OF 10 FEET BETWEEN THE EAST SIDE OF COPPERLEAF PARKWAY (FROM HWY US 70 TO THE ENTRANCE DRIVE OF RETAIL'A') AND THE CURB LINE OF RETAIL'A'. THE BERM HEIGHT WILL BE MEASURED FROM THE FINISHED FLOOR OF RETAIL'A'. THE PLANTINGS, WHERE THE BERM ALONE IS UTILIZED, WILL CONTAIN, AS A MINIMUM, THE FOLLOWING IN ADDITION TO THE ORDINANCE REQUIREMENTS FOR STREET TREES: 5 CANOPY OR EVERGREEN TREES 3/1/2" CAL. FOR EACH 100 LF OF BERM ALONG COPPERLEAF PARKWAY. 5 DECIDUOUS OR EVERGREEN UNDERSTORY TREES FOR EACH 100 LF OF BERM ALONG COPPERLEAF PARKWAY. 25 EVERGREEN SHRUBS FOR EACH 100 LF OF BERM ALONG COPPERLEAF PARKWAY. WHERE THE DISTANCE BETWEEN THE RIGHT-OF-WAY OF COPPERLEAF PARKWAY AND THE BACK OF CURB AT RETAIL W IS LESS THAN 50 FEET AND A 10' BERM WITH THE ABOVE PLANTINGS IS NOT PRACTICAL; THE DEVELOPER WILL PROVIDE A BUFFER UTILIZING BERMS AND/OR WALLS TO ACHIEVE THE 10-FOOT (ABOVE FINISH FLOOR) SCREEN HEIGHT. 12. FOR RETAIL'A', THE SIDES AND REAR AREAS OF THE BUILDING FACING A PUBLIC STREET SHALL FEATURE ENHANCED ARCHITECTURE SUCH AS A FAUX STOREFRONT THAT MATCH THE MATERIALS AND DESIGN ELEMENTS OF THE BUILDING'S FRONT FACADE, TO BE DETERMINED AT THE SITE PLAN STAGE OF APPROVAL. 13. ALL ENTRYWAYS ONTO COPPERLEAF PARKWAY SHALL INCORPORATE MONUMENT SIGNS AND WALLS AS EQUIVALENT AS POSSIBLE IN COLOR, DESIGN, ARCHITECTURAL STYLE AND MATERIALS TO THE EXISTING FEATURES ATTHE COPPERLEAF PARKWAY AND US 70 ENTRANCE. 14. THE DEVELOPER WILL INSTALL UP TO TWO (2) TRAFFIC CALMING DEVICES ON HEMLOCK HILLS CONTINGENT UPON CITY TRANSPORTATION DIVISION APPROVAL. SAID IMPROVEMENTS MUST BE WARRANTED AND APPROVED FOR CONSTRUCTION BY THE CITY TRANSPORTATION DIVISION WITH FIVE (5) YEARS OF THE ISSUANCE OF THE INITIAL COMMERCIAL BUILDING PERMIT OR THE DEVELOPER HAS NO FURTHER OBLIGATION TO PROVIDE THESE DEVICES. 15. THE DEVELOPER AGREES THAT NO BUILDINGS OR PARKING SHALL BE CONSTRUCTED WITH A 5,000 SF TRIANGULAR -SHAPED AREA LOCATED AT THE INTERSECTION OF THE SOUTHERN BOUNDARY LINE OF THE 10-FOOT, 0.8 OPACITY BUFFER PARALLEL TO HEMLOCK HILLS DRIVE AND THE NORTHERN RIGHT-OF-WAY BOUNDARY FOR COPPERLEAF PARKWAY. 16. THE DEVELOPER WILL UTILIZE AN ON -SITE STORMWATER RE -USE SYSTEM TO ASSIST THE WATER QUALITY BMPS IN THE FURTHER REDUCTION OF NITROGEN RELEASED FROM THE SITE, TO BE DESIGNED AT SITE PLAN. 17. THE DEVELOPER WILL COMMIT TO WORK WITH THE CITY'S PUBLIC WORKS DEPARTMENT AND UTILIZE BEST MANAGEMENT PRACTICES FOR CONTROLLING THE GEESE POPULATION THAT MAY GATHER IN AND AROUND THE WATER QUALITY AND STORMWATER PONDS. SUMMARY OF TIA REQUIRED IMPROVEMENTS: GENERAL 1. MODIFY SIGNAL TIMING AND HARDWARE AS PER NCDOT STANDARDS. US70/SOUTH MIAMI BOULEVARD/MINERAL SPRINGS ROAD 2. CONSTRUCT A SECOND WESTBOUND LEFT -TURN LANE ON US 70 WITH APPROPRIATE STORAGE AND TAPER. 3. EXTEND THE WESTBOUND RIGHT -TURN LANE ON US 70 TO PROVIDE ADEQUATE STORAGE WITH AN APPROPRIATE TAPER. US70/SANDERS AVE 4. CONSTRUCT A DIRECTIONAL CROSS -OVER ON US 70 TO PERMIT LEFT -TURNS FROM US 70 WHILE PROHIBITING LEFT TURNS FROM SANDERS AVE. 5. EXTEND THE EASTBOUND LEFT -TURN LANE ON US 70 TO PROVIDE ADEQUATE STORAGE WITH AN APPROPRIATE TAPER. 6. CONSTRUCT A WESTBOUND RIGHT -TURN LANE ON US 70 WITH ADEQUATE STORAGE AND APPROPRIATE TAPER. US70/COPPERLEAF PARKWAY 7. CONSTRUCT A DIRECTIONAL CROSS -OVER ON US 70 TO PERMIT LEFT TURNS FROM US 70 WHILE PROHIBITING LEFT -TURNS FROM COPPERLEAF PARKWAY. 8. CONSTRUCT TWO EXCLUSIVE EASTBOUND LEFT -TURN LANES ON US 70 WITH ADEQUATE STORAGE AND APPROPRIATE TAPER. 9. CONSTRUCT COPPERLEAF PARKWAY WITH A THREE -LANE CROSS SECTION TO PROVIDE ONE EGRESS LANE AND TWO INGRESS LANES. 10. INSTALL A TRAFFIC SIGNAL IN ACCORDANCE WITH THE CITY AND NCDOT STANDARDS. US70/PROPOSED CITY STREET 11. CONSTRUCT THE PROPOSED CITY STREET WITH A FOUR -LANE CROSS SECTION TO PROVIDE THREE EGRESS LANES AND ONE INGRESS LANE. 12. MODIFY THE EXISTING MEDIAN ON US 70 TO PERMIT LEFT -TURNS FORM THE PROPOSED CITY STREET WHILE PROHIBITING TURNS FROM EASTBOUND US 70. 13. CONSTRUCT A WESTBOUND RIGHT -TURN LANE ON US 70 WITH ADEQUATE STORAGE AND APPROPRIATE TAPER. 14. INSTALL A TRAFFIC SIGNAL IN ACCORDANCE WITH CITY AND NCDOT STANDARDS. SHERRON ROAD/MINERAL SPRINGS ROAD 15. CONSTRUCT A SECOND SOUTHBOUND RIGHT -TURN LANE ON MINERAL SPRINGS ROAD WITH ADEQUATE STORAGE AND APPROPRIATE TAPER. SUMMARY OF COMMITTED IMPROVEMENTS BY OTHERS (AND REQUIRED FOR THIS DEVELOPMENT) US70/SOUTH MIAMI BOULEVARD/MINERAL SPRINGS ROAD 16. REVISE THE EASTBOUND US 70 APPROACH TO PROVIDE A SECOND LEFT -TURN LANE US70/LEESVILLE ROAD 17. EXTEND THE STORAGE OF THE EASTBOUND LEFT -TURN LANE ON US 70 TO PROVIDE ADEQUATE STORAGE WITH AN APPROPRIATE TAPER. SOUTH MIAMI BOULEVARD/ELLIS ROAD 18. CONSTRUCTAN EXCLUSIVE NORTHBOUND LEFT -TURN LANE ON SOUTH MIAMI BOULEVARD WITH APPROPRIATE STORAGE AND TAPER. SHERRON ROAD/GOLDEN BELT PARKWAY 19. INSTALL A TRAFFIC SIGNAL IN ACCORDANCE WITH CITY AND NCDOT STANDARDS. SHERRON ROAD/NORTHERN DURHAM PARKWAY 20. CONSTRUCTTHE NORTHERN DURHAM PARKWAY WITH EXCLUSIVE WESTBOUND LEFT -TURN AND RIGHT -TURN LANES WITH APPROPRIATE STORAGE AND TAPER. 21. CONSTRUCTAN EXCLUSIVE NORTHBOUND RIGHT -TURN LANE ON SHERRON ROAD WITH ADEQUATE STORAGE AND APPROPRIATE TAPER. 22. CONSTRUCTAN EXCLUSIVE SOUTHBOUND LEFT -TURN LANE ON SHERRON ROAD WITH ADEQUATE STORAGE AND APPROPRIATE TAPER. 23. INSTALL A TRAFFIC SIGNAL IN ACCORDANCE WITH CITY AND NCDOT STANDARDS. SOUTH MIAMI BOULEVARD/ANGIER AVE. 24. RESTRIPE THE WESTBOUND ANGIER AVENUE APPROACH TO PROVIDE TWO EXCLUSIVE LEFT -TURN LANES AND A SHARED THROUGH/RIGHT-TURN LANE. SEE SHEET C0.00 FOR GENERAL CONDITIONS OF APPROVAL CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. PUBLIC WORKS CONDITIONS OF APPROVAL 1. THE DESIGNING PROFESSIONAL (A NCPE, NCPLS OR NCRLA/NCPLA - AS REQUIRED) SHALL SUBMIT THREE (3) SETS OF CONSTRUCTION DRAWINGS TO THE PUBLIC WORKS DEPARTMENT - DEVELOPMENT REVIEW FOR REVIEW AND APPROVAL. CONSTRUCTION DRAWING APPROVAL IS REQUIRED PRIOR TO COMMENCING CONSTRUCTION (SEE CONSTRUCTION PLAN APPROVAL PROCESS). THE APPROVAL OF CONSTRUCTION DRAWINGS IS SEPARATE FROM SITE PLAN APPROVAL. CITY OFFICIALS SHALL REVIEW ALL SIZES, MATERIALS, SLOPES, LOCATIONS, EXTENSIONS AND DEPTHS FOR ALL PROPOSED UTILITIES (WATERLINES, SANITARY SEWER LINES AND STORM DRAINAGE CONVEYANCE SYSTEMS) FOR COMPLIANCE WITH ALL APPLICABLE REGULATORY STANDARDS, SPECIFICATIONS, AND BEST MANAGEMENT PRACTICES. 2. THE DESIGNING PROFESSIONAL (A NCPE, NCPLS OR NCRLA/NCPLA - AS REQUIRED) SHALL SUBMIT ONE (1) SET OF AS -BUILT DRAWINGS TO THE PUBLIC WORKS DEPARTMENT - DEVELOPMENT REVIEW FOR REVIEW AND APPROVAL. AS -BUILT DRAWING APPROVAL IS REQUIRED PRIOR TO WATER METER INSTALLATION AND/OR SANITARY SEWER SERVICE CONNECTION AND PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 3. FIRE FLOW ANALYSIS REQUIRED FOR REVIEW AND APPROVAL AS PART OF THE CONSTRUCTION DRAWING APPROVAL PROCESS. TO SCHEDULE A FLOW TEST OR TO OBTAIN CURRENT SYSTEM DATA, COMPLETE THE ONLINE APPLICATION AT http://codinetx.durhamnc.gov/sites/publicworks/sitepages/ fire%20flow%20 req uest. aspx. 4. IF A METER 2" OR LARGER IS PROPOSED, CONTACT WATER MANAGEMENT AT 919-560-4381 EXT 35268 PRIOR TO THE CONSTRUCTION OF THE METER VAULT TO VERIFY THE TYPE AND DIMENSIONS OF THE METER. 5. WATER PERMIT REQUIRED AFTER CONSTRUCTION DRAWING APPROVAL AND PRIOR TO COMMENCING WATER MAIN INSTALLATION. 6. SEWER PERMIT REQUIRED AFTER CONSTRUCTION DRAWING APPROVAL AND PRIOR TO COMMENCING SEWER MAIN INSTALLATION. 7. AN NCDOT DRIVEWAY PERMIT IS REQUIRED. 8. PROWAG STANDARDS ARE TO BE USED. SEE CITY OF DURHAM CURB CUTS DETAILS (http://durhamnc.gov/documentcenter/home/view/2114). 9. THE LOCATION OF THE SIDEWALKS SHOWN ON THIS PLAN IS SCHEMATIC. A CITY OF DURHAM AND/OR NCDOT ENCROACHMENT PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION. AFTER OBTAINING THE REQUIRED PERMITS, PLEASE CONTACT THE CITY OF DURHAM ENGINEERING CONSTRUCTION INSPECTION OFFICE AT 919-560-4326 FOR A PRE -CONSTRUCTION CONFERENCE AND FIELD VISIT PRIOR TO ANY WORK ON THE PROPOSED SIDEWALK. 10. A SECOND WATERLINE FEED IS REQUIRED PRIOR TO THE 100TH UNIT 11. AT A MINIMUM, THE STORMWATER DESIGN DETAILS FOR THIS PROJECT SHALL BE GOVERNED BY THE MINIMUM STANDARDS OF THE MOST RECENT EDITION OF THE COUNTY OF DURHAM STANDARDS AND DETAILS AND ANY LETTERS TO INDUSTRY (POSTED ON THE COUNTY'S WEBSITE) THAT ARE IN EFFECT THE DATE CONSTRUCTION DRAWINGS ARE FIRST RECEIVED FOR REVIEW BY THE CITY. 12. FINAL DESIGN CALCULATIONS FOR THE STORMWATER CONTROL MEASURE(S) (SCM[S)) REQUIRE THE USE OF STORAGE INDICATION ROUTING METHODOLOGY SUCH AS TR-20 OR HEC-1 MODELS. FOR EACH SCM, AS APPLICABLE, STAGE -STORAGE RELATIONSHIP AND INFLOW AND OUTFLOW HYDROGRAPHS ARE REQUIRED, ALL TABULATED DATA INCLUDING CALCULATIONS SHOWING THE LIMITING DISCHARGE, WHETHER ORIFICE, WEIR, BARREL, OR OUTLET CONTROL, AS APPROPRIATE IS REQUIRED. HYDROCAD, HYDRAFLOW HYDROGRAPHS, AND PONDPACK ARE COMMONLY USED AND RECOGNIZED SOFTWARE PROGRAMS WHICH INCORPORATE ROUTING METHODOLOGY ACCEPTED BY THE COUNTY. 13. STORMWATER CONTROL MEASURE(S) (SCM[S)) PERMIT FEE(S) AND A PAYMENT INTO THE STORMWATER REPLACEMENT FUND ARE REQUIRED FOR ALL SCM(S) SPECIAL CONDITIONS OF APPROVAL SEE TEXT COMMITMENTS ON COVERSHEET ORIGINAL REZONING SPECIAL CONDITIONS OF APPROVAL: ASSOCIATED WITH THIS DEVELOPMENT. CONSTRUCTION OF THE DEVELOPMENT IS NOT ALLOWED TO COMMENCE UNTIL THESE ITEMS ARE PROVIDED IN ACCORDANCE WITH COUNTY STORMWATER STANDARDS OR IN ACCORDANCE WITH WRITTEN POLICY. THE DESIGNER SHALL SUBMIT A SEALED ENGINEER'S CONSTRUCTION COST ESTIMATE FOR EVERY SCM PROPOSED IN THE DEVELOPMENT PRIOR TO APPROVAL OF THE CONSTRUCTION DRAWINGS. 14. AN AS -BUILT CERTIFICATION FOR THE STORMWATER CONTROL MEASURE(S) (SCM[S)), PROVIDED BY THE BMP CERTIFYING ENGINEER (BCE), IS REQUIRED. THE AS -BUILT CERTIFICATION SHALL BE SUBMITTED IN ACCORDANCE WITH THE COUNTY OF DURHAM BCE PROGRAM, REFER TO SECTION 8.6, BMP CERTIFYING ENGINEER PROGRAM FOR STORMWATER BMPS IN THE COUNTY OF DURHAM, OF THE REFERENCE GUIDE FOR DEVELOPMENT. THE SCM AS -BUILT CERTIFICATION(S) SHALL BE APPROVED BY THE STORMWATER DEVELOPMENT REVIEW SECTION PRIOR TO ISSUANCE OF ANY FINAL CERTIFICATES OF OCCUPANCY/COMPLIANCE FOR DEVELOPMENT, WITH THE EXCEPTION OF WHEN AN APPROPRIATE CONSTRUCTION SECURITY HAS BEEN PROVIDED FOR SINGLE FAMILY OR TOWNHOME DEVELOPMENT. WITH THIS PROVIDED CONSTRUCTION SECURITY, CERTIFICATES OF OCCUPANCY/COMPLIANCE CAN BE ISSUED FOR A PERCENTAGE OF SINGLE-FAMILY LOTS IN ACCORDANCE WITH COUNTY REQUIREMENTS. 15. STORMWATER CONTROL MEASURE(S) (SCM[S)) DESIGN CALCULATIONS WILL NOT BE REVIEWED OR APPROVED WITH THE SITE PLAN/PRELIMINARY PLAT SUBMITTAL. ALL SCM DESIGNS WILL BE REVIEWED AND APPROVED DURING THE CONSTRUCTION DRAWING SUBMITTAL PROCESS. IF, AT THE TIME OF CONSTRUCTION DRAWING SUBMITTAL, IT IS FOUND THAT THE PROPOSED SCM(S) IS UNDERSIZED, NOT PROPERLY ACCESSIBLE, OR OTHERWISE INSUFFICIENT OR UNSUITABLE FOR THE SITE, IT IS THE RESPONSIBILITY OF THE APPLICANT TO ENSURE THAT THE APPLICABLE STORMWATER ORDINANCE REQUIREMENTS ARE MET. A REVISED SITE PLAN OR PRELIMINARY PLAT MAY BE REQUIRED IF THE ORIGINALLY PROPOSED SCM(S) ARE FOUND INSUFFICIENT, NOT PROPERLY ACCESSIBLE, OR UNSUITABLE AND ALTERNATIVE SCM(S) WITH ASSOCIATED EASEMENTS ARE REQUIRED. 16. THE DEVELOPER/CONTRACTOR SHALL SCHEDULE A PRECONSTRUCTION MEETING WITH THE STORMWATER DEVELOPMENT REVIEW SECTION PRIOR TO COMMENCING WORK ON ANY STORMWATER CONTROL MEASURE (SCM). IF THE SCM WILL BE CONSTRUCTED INITIALLY AS A SEDIMENTATION AND EROSION CONTROL (S&EC) DEVICE, TO BE CONVERTED TO A PERMANENT SCM AT A LATER TIME, THE PRECONSTRUCTION MEETING SHOULD BE SCHEDULED PRIOR TO CONSTRUCTION OF THE S&EC DEVICE. CALL 919-560-4326 EXT. 30238 TO SCHEDULE THE REQUIRED MEETING A MINIMUM OF THREE BUSINESS DAYS PRIOR TO THE DESIRED MEETING DATE. THIS IS IN ADDITION TO OTHER PRECONSTRUCTION MEETING REQUIREMENTS FOR EROSION CONTROL, ENGINEERING INSPECTIONS, ETC. 17. TO RECEIVE CONSTRUCTION DRAWINGS APPROVAL FOR SINGLE FAMILY DETACHED, TOWNHOME AND DUPLEX RESIDENTIAL DEVELOPMENTS THAT ARE MAKING USE OF NUTRIENT BANKS AND/OR THE NCEEP, THE APPROVAL OF THE CONSTRUCTION DRAWINGS IS CONTINGENT UPON THE PURCHASE OF NUTRIENT CREDITS. IF A REVISED SITE PLAN/PRELIMINARY PLAT IS SUBMITTED FOR THIS SITE, THE REVISED SITE PLAN/PRELIMINARY PLAT WILL BE SUBJECT TO ANY ORDINANCES IN PLACE AT THE TIME OF THE REVISED SITE PLAN/PRELIMINARY PLAT SUBMISSION. PRIOR TO THE APPROVAL OF ANY CONSTRUCTION DRAWINGS OR PRIOR TO THE RELEASE OF ANY BUILDING PERMITS PERTAINING TO THIS DEVELOPMENT, WHICHEVER COMES FIRST, A LETTER/RECEIPT SHOWING THE PURCHASE OF THE NUTRIENT CREDITS FOR THIS DEVELOPMENT AND A COPY OF THE NUTRIENT BANK LEDGER IF APPLICABLE, SHOWING THE TOTAL NUTRIENT CREDITS AVAILABLE MINUS ANY AND ALL DEDUCTIONS, IS TO BE PROVIDED TO THE STORMWATER DEVELOPMENT REVIEW SECTION. HOWEVER, IF INSUFFICIENT CREDITS ARE AVAILABLE FROM NUTRIENT BANKS AND NCEEP WILL NOT ACCEPT PAYMENT, THEN THE APPLICANT SHALL SUBMIT A REVISED SITE PLAN/PRELIMINARY PLAT BACK TO THE DURHAM COUNTY PLANNING DEPARTMENT AND SHALL COMPLY WITH THE CURRENT STORMWATER PERFORMANCE STANDARDS IN PLACE AT THE TIME OF THE REVISED SITE PLAN/PRELIMINARY PLAT SUBMISSION. BUILDING DESIGN - THE FOLLOWING DESIGN ELEMENTS WILL SET THE GUIDELINES FOR THE DEVELOPMENT'S OVERALL BUILDING DESIGN: 1. GENERAL ARCHITECTURAL STYLE - THE ARCHITECTURAL DESIGN STYLE OF THE DEVELOPMENT IS ENCOURAGED TO BE OF A CONTEMPORARY NATURE INSTEAD OF PAST HISTORIC STYLES SUCH AS COLONIAL, NEO-CLASSICAL, VICTORIAN, ETC/. THE DESIGN OF THE SITE IN THE DEVELOPMENT PLAN WILL ALLOW THE DEVELOPMENT FLEXIBILITY IN RECRUITING MAJOR ANCOR TENANTS SINCE THE DEVELOPMENT WILL BE ABLE TO ACCOMMODATE THE TENANT'S BRAND IDENTITY IN THE DESIGN. 2. EXTERIOR BUILDING MATERIALS - THE PRIMARY BUILDING MATERIALS TO BE USED WITHIN THE DEVELOPMENT CAN BE A CHOICE OR COMBINATION OF BRICK, BLOCK, OR EFIS WITH TREIM AND ROOFS TO BE METAL. SIDES AND REAR ELEVATIONS OF BUILDINGS FACING A PUBLIC STREET AREA ENCOURAGED TO MATCH THE MATERIALS AND DESIGN ELEMENTS OF THE BUILDING'S FRONT FACADE. 3. COLORS - THE COLORS SCHEME TO BE LIMITED TO THREE EARTH TONE COLORS TO BE DICTATED BY THE FIRST MAJOR ANCHOR TENANT TO LOCATE WITHIN THE SITE. THIS WILL ALLOW NATIONAL CHAINS FLEXIBILITY WITH THEIR BUILDING ARCHITECTURE AND SETTHE GUIDELINES FOR FUTURE TENANTS. 4. ROOFLINES - ROOFLINES VISIBLE FROM THE FRONT FACING A PUBLIC STREET TO VARY IN HEIGHT AND SHAPE TO AVOID CONTINUOUS HORIZONTAL ROOFLINES. PARAPET WALLS WILL BE PERMITTED TO ALLOW FOR THIS DESIGN LOOK. ALL ROOFTOP EQUIPMENT SHALL BE COMPLETELY SCREENED FROM VIEWS ALONG PUBLIC STREET RIGHT OF WAYS. THE FIRST MAJOR ANCHOR TENANT WILL SET THE DESIGN GUIDELINE FOR THE ENTIRE DEVELOPMENT. 5. WINDOWS - WINDOWS WILL BE ALONG THE FRONTS OF ALL BUILDINGS FRONTING A PUBLIC STREET. WINDOWS ARE ENCOURAGED ON ALL SIDES OF BUILDING WITH OFFICE USES. BUILDING SIDES AT THE SETBACK LINE OF U.S. 70 WILL BE ENCOURAGED TO PROVIDE WINDOWS OR THE APPEARANCE OF ONE USING FALSE WINDOWS. 6. ENTRYWAYS - PRIMARY ENTRANCES TO BUILDINGS WILL BE AT THE FRONT OF THE BUILDING WHERE FACING A PUBLIC STREET OR FACING A PARKING AREA. BULDINGS WHICH FRONT DIRECTLY ON THE RIGHT OF WAY. WITHOUT HAVING PARKING BETWEEN THE BUILDING AND THE ROAD, ARE ALLOWED TO HAVE THEIR PRIMARY ENTRANCES ON THE SIDE OF THE BUILDING LOCATED NEAREST THE LARGEST PARKING AREA SERVING THE BUILDING. 7. BUILDING HEIGHT - BUILDINGS CAN VARY THE NUMBER OF STORIES. THEY MAY RANGE FROM 1 TO 3 STORIES. 8. LANDSCAPING - THE DEVELOPMENT IS ENCOURAGED TO FOLLOW THE LIST OF PLANT MATERIALS FOUND IN THE DURHAM LANDSCAPE GUIDELINES. NATIVE PLANT SPECIES ARE ENCOURAGED BUT NOT REQUIRED. EACH PUBLIC STREET SHALL USE THE TREE SPECIES SELECTED FOR THAT STREET. THE FOLLOWING MUST BE DONE PRIOR TO ISSUANCE OF BUILDING PERMIT: 1. A RECOMBINATION PLAT MUST BE RECORDED AS SHOWN IN APPROVED SITE PLAN D2100274. 2. DEDICATE 25 FEET OF ADDITIONAL RIGHT-OF-WAY FOR THE U.S. 70 FRONTAGE OF THE SITE. THE FOLLOWING MUST BE DONE PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY: 1. US 70 AND SANDERS AVE 1.1. CONSTRUCT SANDERS AVENUE TO CITY OF DURHAM STANDARDS AS A LIMITED MOVEMENT INTERSECTION WITH ONE INGRESS LANE AND ONE EGRESS LANE (RIGHT -OUT ONLY) 1.2. INSTALL CHANNELIZED EASTBOUND AND WESTBOUND LEFT -TURN LANES (LEFT-OVERS) ON US 70 AND SANDERS AVENUE. 1.3. CONSTRUCT AN EXCLUSIVE WESTBOUND RIGHT -TURN LANE ON US 70 AT SANDERS AVENUE WITH ADEQUATE STORAGE AND APPROPRIATE TAPER; AND, 1.4. INSTALL A TRAFFIC SIGNAL WITH STEEL STRAIN POLES FOR THE EASTBOUND LEFT -TURN INTO SANDERS AVENUE. 2. PERMANENT SIGNS CLEARLY IDENTIFYING THE RIPARIAN BUFFER SHALL BE INSTALLED PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY AND MAINTAINED IN PERPETUITY. 3. CONSTRUCT MAY STREET TO THE CITY OF DURHAM/NCDOT STANDARDS WITH A TURN AROUND FOR THE SITE FRONTAGE. 4. A MAXIMUM OF 90 UNITS MAY RECEIVE A CERTIFICATE OF OCCUPANCY PRIOR TO THE COMPLETION OF A SECOND POINT OF ACCESS TO THE ROADWAY NETWORK. 5. AN APPROVED AND EXECUTED DUKE ENERGY STREET LIGHT SERVICE AGREEMENT MUST BE PROVIDED TO THE CITY OF DURHAM. FOR ADDITIONAL DETAILS CONCERNING LIGHTING REQUIREMENTS AND DESIGN PROCESS CONTACT THE CITY DEPARTMENT OF TRANSPORTATION (TERRY THOMPSON AT 919-560-4366). SHEET INDEX C0.00 PROJECT NOTES C1.00 EXISTING CONDITIONS C1.01 DEMOLITION PLAN C2.00 OVERALL SITE PLAN C2.01 SITE PLAN - AREA A C2.02 SITE PLAN - AREA B C2.03 SITE PLAN - AREA C C2.04 SITE PLAN - AREA D C2.10 TYPICAL STREET SECTIONS C3.00 OVERALL GRADING AND STORM DRAINAGE PLAN C3.01 GRADING AND STORM DRAINAGE PLAN - AREA A C3.02 GRADING AND STORM DRAINAGE PLAN - AREA B C3.03 GRADING AND STORM DRAINAGE PLAN - AREA C C3.04 GRADING AND STORM DRAINAGE PLAN - AREA D C3.05 STORM DRAINAGE PIPE AND STRUCTURE TABLES C4.00 OVERALL UTILITY PLAN C4.01 UTILITY PLAN - AREA A C4.02 UTILITY PLAN - AREA B C4.03 UTILITY PLAN - AREA C C5.00 PLAN & PROFILE - MAY STREET STA. 10+00.00THRU STA. 23+50.00 C5.01 PLAN & PROFILE - SANDERS AVE STA. 10+00.00THRU STA. 22+00.00 C5.02 PLAN & PROFILE - STREET A STA. 10+00.00THRU STA. 13+00.00 C5.03 PLAN & PROFILE - SS O/F A STA. 10+00.00THRU STA. 21+00.00 C5.04 PLAN & PROFILE - SS O/F A STA. 20+00.00THRU STA. 25+25.00 C5.05 PLAN & PROFILE - SS O/F A STA. 30+00.00 THRU 34+00.00/ 40+00.00 THRU 41+50.00/ C6.00 EROSION CONTROL NOTES STA. 50+00.00THRU STA. 51+50.00 C6.01 EROSION CONTROL PLAN - PHASE 1 C6.02 EROSION CONTROL PLAN - PHASE 2 C6.03 EROSION CONTROL PLAN - PHASE 3 C7.01 PAVEMENT MARKING & SIGNAGE PLAN - AREA A C7.02 PAVEMENT MARKING & SIGNAGE PLAN - AREA B C7.03 PAVEMENT MARKING & SIGNAGE PLAN - AREA C C8.00 SITE DETAILS C8.01 SITE DETAILS C8.02 SITE DETAILS C8.03 STORM DRAINAGE DETAILS C8.04 STORM DRAINAGE DETAILS C8.05 SANITARY SEWER DETAILS C8.06 WATER DETAILS C8.07 WATER DETAILS C8.08 WATER DETAILS C8.09 EROSION CONTROL DETAILS C8.10 EROSION CONTROL DETAILS C8.11 EROSION CONTROL DETAILS C8.12 EROSION CONTROL DETAILS C8.13 EROSION CONTROL DETAILS C9.00 STORMWATER CONTROL MEASURE W DETAILS C9.01 STORMWATER CONTROL MEASURE W DETAILS C9.02 STORMWATER CONTROL MEASURE W DETAILS C9.03 STORMWATER CONTROL MEASURE W DETAILS C9.04 STORMWATER CONTROL MEASURE'B' DETAILS C9.05 STORMWATER CONTROL MEASURE W DETAILS C9.06 STORMWATER CONTROL MEASURE'B' DETAILS C9.07 STORMWATER CONTROL MEASURE'B' DETAILS C9.08 STORMWATER CONTROL MEASURE W PLANTING PLAN C9.09 STORMWATER CONTROL MEASURE'C' DETAILS C9.10 STORMWATER CONTROL MEASURE'C' DETAILS C9.11 STORMWATER CONTROL MEASURE'C' DETAILS C9.12 STORMWATER CONTROL MEASURE'C' DETAILS C9.13 STORMWATER CONTROL MEASURE'D' DETAILS C9.14 STORMWATER CONTROL MEASURE'D' DETAILS C9.15 STORMWATER CONTROL MEASURE'D' DETAILS C9.16 STORMWATER CONTROL MEASURE'D' DETAILS C9.17 STORMWATER CONTROL MEASURE'E' DETAILS C9.18 STORMWATER CONTROL MEASURE'E' DETAILS C9.19 STORMWATER CONTROL MEASURE'E' DETAILS C9.20 STORMWATER CONTROL MEASURE'E' DETAILS C9.21 STORMWATER CONTROL MEASURE'F' DETAILS C9.22 STORMWATER CONTROL MEASURE'F' DETAILS C9.23 STORMWATER CONTROL MEASURE'F' DETAILS C9.24 STORMWATER CONTROL MEASURE'G' DETAILS C9.25 STORMWATER CONTROL MEASURE'G' DETAILS C9.26 STORMWATER CONTROL MEASURE'G' DETAILS C9.27 STORMWATER CONTROL MEASURE W DETAILS C9.28 STORMWATER CONTROL MEASURE W DETAILS C9.29 STORMWATER CONTROL MEASURE W DETAILS C9.30 COMBINED OUTFALL PLAN VIEW AND DETAILS L5.00 OVERALL LANDSCAPE PLAN L5.01 LANDSCAPE PLAN - AREA A L5.02 LANDSCAPE PLAN - AREA B L5.03 LANDSCAPE PLAN -AREA C L5.04 LANDSCAPE DETAILS L6.00 LIGHTING PERFORMANCE PLAN APPROVAL STAMP CASE # D2100274 'J McADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CONTACT NATHAN BALES bales@mcadamsco.com PHONE: 919.287.0727 CLIENT DHI COMMUNITIES 2000 AERIAL CENTER PARKWAY, SUITE 110 MORRISVILLE, NC 27560 PH ON E: 919. 460. 2999 PROJECT DIRECTORY • O� ESS��• � �. � F SEAL ��•' 044862 0% THAN •• OP.• REVISIONS NO. DATE 1 06.10.2022 PER DURHAM COMMENTS CONSTRUCTION DRAWINGS: ASCEND BRIGHTLEAF APARTMENTS DURHAM, NC 27703 PROJECT NUMBER: 202110337 N.T.S. Know what's below. Call before you d PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION