Loading...
HomeMy WebLinkAbout20220938 Ver 1_USACE Permit_20220908Action Id. SAW-2022-01533 Permittee: Address: U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT County: Guilford U.S.G.S. Quad: NC-Gibsonville GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Piedmont Conservation Council Attn: Emma Jablonski 201 East Main Street, 5th Floor Durham, NC 27701 Size (acres) -0.33 Nearest Town Gibsonville Nearest Waterway Rock Creek River Basin Cape Fear USGS HUC 03030002 Coordinates 36.065605, -79.599512 Location description: The project area is located along Rock Creek, between Golf House Road East and US Highway 70, in Gibsonville, Guilford County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of fill material (not a loss of waters of the US) into 0.081 acre (107 linear feet) of stream channel, necessary to stabilize a section of Rock Creek using natural channel design principles, to protect an existing greenway. Applicable Law(s): © Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permit 13. Bank Stabilization SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 7/12/2022, and the enclosed plans "Rock Creek Streambank Restoration Impacts Exhibit", and "Rock Creek Streambank Restoration Construction Drawings", Sheets C0.00, C1.00, C3.00, C6.00, C6.01, C6.02, C6.03, C8.00, and L5.00. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at (919) 817-2436 or David.E.Bailey2@usace.army.mil. Corps Regulatory Official: Date: 2022.09.08 14:57:11 04'00' Date: 09/08/2022 Expiration Date of Verification: 3/14/2026 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Copy furnished electronically: Jennifer Burdette, Natural Resource Consultants Sue Homewood, NCDEQ-DWR Site Plan M:\Projects\STN\000STN2101.00 - StoneyCreek HOA Contract\04-Production\Water Resources\Current Drawings\McAdams-TitleBlock-24x36-Cover.dwg, 7/7/2022 12:39:35 PM, Cameron Jernigan VICINITY MAP N.T.S. ROCK CREEK STREAMBANK RESTORATION 932 GOLF HOUSE ROAD E WHITSETT, NC 27377 CONSTRUCTION DRAWINGS PROJECT NUMBER: STN-2101.O1 DATE: DULY 7, 2022 Know what's below. Call before you dig. SITE DATA TABLE PROJECT AREA 0.33 AC DISTURBED AREA 0.33 AC PIN 8824221711; 8824332596; 8824330268 STREAM NAME ROCK CREEK RIVER BASIN CAPE FEAR 8-DIGIT HUC 03030002 RIPARIAN BUFFER ORDINANCE JORDAN LAKE CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. SHEET INDEX C0.00 C1.00 C3.00 C6.00-C6.01 C6.02-C6.03 C8.00 L5.00 PROJECT NOTES EXISTING CONDITIONS GRADING PLAN EROSION CONTROL PLAN EROSION CONTROL DETAILS STREAM DETAILS PLANTING PLAN LIMITS OF DISTURBANCE 0.33 AC PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CONTACT REBECCA STUBBS, PE rstubbs@mcadamsco.com PHONE: 919. 287 .0740 CLIENT PIEDMONT CONSERVATION COUNCIL 201 E MAIN ST, 5TH FLOOR DURHAM, NC 27701 PHONE: 919. 525. 3037 PROJECT DIRECTORY PROJECT OWNER STONEY CREEK HOA PROJECT SPONSOR GUILFORD COUNTY SWCD `•� SEAL 049073 •'*...LC I NEF.�:•' C CCA • ., REVISIONS NO. DATE CONSTRUCTION DRAWINGS FOR: ROCK CREEK STREAMBANK RESTORATION WHITSETT, NC 27377 PROJECT NUMBER: STN-2101.01 \\DUR-X3\MDrive\Projects\STN\000STN2101.00 - StoneyCreek HOA Contract\04-Production\Water Resources\Current Drawings\STN2101-XC.dwg, 7/8/2022 2:01:53 PM, Cameron Jernigan GENERAL NOTES: 1. CONTRACTOR SHALL OBTAIN ALL NECESSARY LICENSES AND PERMITS REQUIRED TO COMPLETE THE WORK INCLUDED IN THE CONTRACT DOCUMENTS AT THE CONTRACTOR'S EXPENSE. 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THAT THEY AND THEIR SUBCONTRACTOR'S HAVE THE CORRECT/MOST UP-TO-DATE PLANS AVAILABLE. 3. CONTRACTOR SHALL GIVE MINIMUM 72 HOURS NOTICE TO THE STONEY CREEK HOA AND PROJECT ENGINEER PRIOR TO CONSTRUCTION. 4. ALL WORK WITHIN JURISDICTIONAL BOUNDARIES (WETLAND AND STREAMS) SHALL BE PERFORMED IN STRICT ACCORDANCE WITH APPROVED NATIONWIDE PERMIT. THE CONTRACTOR MUST COMPLY WITH THE NATIONWIDE PERMITS GENERAL CONDITIONS, WILMINGTON DISTRICT REGIONAL CONDITIONS AND THE SPECIAL CONDITIONS. 5. CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION IS MINIMIZED. 6. IF THE CONTRACTOR, IN THE COURSE OF WORK, FINDS ANY DISCREPANCIES IN THE PLANS OR NOTES GIVEN BY THE PROJECT ENGINEER, IT SHALL BE HIS/HER DUTY IMMEDIATELY INFORM THE PROJECT ENGINEER, IN WRITING, AND THE PROJECT ENGINEER WILL PROMPTLY VERIFY THE SAME. ANY WORK DONE AFTER SUCH DISCOVERY, UNTIL AUTHORIZED, WILL BE AT THE CONTRACTOR'S RISK. 7. ANY DAMAGE TO PRIVATE PROPERTY AND/OR EXISTING UTILITIES INCURRED DURING CONSTRUCTION ACTIVITIES SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 8. ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHALL BE INSPECTED AND MAINTAINED REGULARLY TO PREVENT CONTAMINATION OF SURFACE WATERS FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, OR OTHER TOXIC MATERIALS. CONSTRUCTION SHALL BE STAGED IN ORDER TO MINIMIZE THE EXPOSURE OF EQUIPMENT TO SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE. FUELING, LUBRICATION, AND GENERAL EQUIPMENT MAINTENANCE SHALL BE PERFORMED IN A MANNER TO PREVENT, TO THE MAXIMUM EXTENT PRACTICABLE, CONTAMINATION OF SURFACE WATERS BY FUELS AND OILS. 9. HEAVY EQUIPMENT WORKING IN WETLANDS SHALL BE PLACED ON MATS OR OTHER MEASURES SHALL BE TAKEN TO MINIMIZE SOIL DISTURBANCE. EXISTING CONDITION & DEMOLITION NOTES: 1. THERE SHALL BE NO DEMOLITION ACTIVITIES UNTIL AFTER A PRE -CONSTRUCTION MEETING HAS TAKEN PLACE. 2. ALL MATERIAL TO BE DEMOLISHED SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT A PERMITTED SITE IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS. 3. EXISTING UTILITIES AND STRUCTURES SHOWN, BOTH UNDERGROUND AND ABOVE GROUND, ARE BASED ON A FIELD SURVEY AND THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 4. TOPOGRAPHIC DATA WITHIN THE PROJECT AREA IS FROM FIELD SURVEY PERFORMED BY JOHN R. McADAMS COMPANY. QL2 LIDAR TOPOGRAPHIC DATA OUTSIDE OF THE PROJECT AREA WAS OBTAINED FROM NCEM RISK MANAGEMENT SPATIAL DATA DOWNLOAD. ALL GEOSPATIAL DATA IS SET TO NAD83 NORTH CAROLINA STATE PLANE, NAVD88. 5. PROPERTY LINES SHOWN ARE FROM GUILFORD COUNTY GIS AND NOT SURVEYED. 6. EXISTING UTILITIES PRESENT WITHIN THE LIMITS OF DISTURBANCE SHOULD BE PROTECTED DURING ALL CONSTRUCTION ACTIVITIES. 7. BEDROCK MAY BE PRESENT WITHIN THE PROJECT AREA. SHOULD BEDROCK BE ENCOUNTERED DURING CONSTRUCTION, CONTRACTOR SHALL NOTIFY DESIGN ENGINEER IMMEDIATELY. CONSTRUCTION SEQUENCE: 1. OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS. 2. OBTAIN AN APPROVED (STAMPED) EROSION & SEDIMENT CONTROL PLAN AND KEEP IT ON -SITE EITHER IN THE INSPECTION BOX, CONSTRUCTION OFFICE, OR WITH THE CONTRACTOR. 3. SCHEDULE AND HOLD AN ON -SITE PRE -CONSTRUCTION CONFERENCE AT LEAST ONE WEEK PRIOR TO BEGINNING ANY LAND -DISTURBING ACTIVITIES. THE CONFERENCE SHOULD BE ATTENDED BY THE GENERAL CONTRACTOR, ANY SUBCONTRACTORS, THE ENGINEER, AND A REPRESENTATIVE OF THE OWNER. 4. CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. 5. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION, FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 6. ESTABLISH CONSTRUCTION ENTRANCE (SEE DETAIL ON SHEET C6.01) AND STAGING AREA. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE -CONSTRUCTION MEETING. 7. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT TRAPS, DIVERSION DITCHES, TREE PROTECTION, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 8. LIMITS OF DISTURBANCE SHALL BE MARKED BY SAFETY FENCING EITHER WITH SILT FENCE OR ORANGE TREE PROTECTION FENCE (SEE DETAIL ON SHEET C6.01). 9. USE THE AREA DESIGNATED ON THE PLANS FOR ALL STAGING ACTIVITIES RELATED TO THE PROJECT. 10. PARK ALL CONSTRUCTION EQUIPMENT, INCLUDING TRUCKS AND HEAVY EQUIPMENT WITHIN THE LIMITS OF DISTURBANCE. 11. WHEN ACCESS TO A CONSTRUCTION AREA REQUIRES CROSSING A DELINEATED JURISDICTIONAL FEATURE, OUTSIDE OF THE AREAS SHOWN TO BE REGRADED AND STABILIZED ON THE PLANS, IMPACTS SHALL BE MINIMIZED BY PLACING A TEMPORARY STREAM/WETLAND CROSSING ACROSS THE FEATURE PRIOR TO ACCESSING THE AREA WITH HEAVY EQUIPMENT PER APPROVED PLANS AND SPECIFICATIONS. SEE DETAIL SHEETS C6.01 FOR TEMPORARY STREAM AND WETLAND CROSSINGS. 12. INSTALL REMAINING EROSION CONTROL MEASURES AS SHOWN ON SHEETS C6.00 THROUGH C6.02. CLEAR AND GRUB ONLY AS NECESSARY TO INSTALL THESE DEVICES. 13. BEGIN GRADING ACTIVITIES. IN GENERAL, THE CONTRACTOR SHALL WORK FROM UPSTREAM TO DOWNSTREAM AND CONSTRUCTION IN A LIVE CHANNEL UTILIZE A PUMP -AROUND OR FLOW DIVERSION MEASURE AS SHOWN ON THE PLANS. MAINTAIN AND ADJUST E & SC MEASURES AS GRADING PROGRESSES. 14. CONTRACTOR SHALL EXCAVATE THE PROPOSED CHANNEL AND MODIFY PORTIONS OF THE EXISTING CHANNEL BASED ON RIFFLE ELEVATIONS IN SECTIONS NO GREATER THAN 300' IN LENGTH AT A TIME (EXCEPT WHERE LONGER SECTIONS ARE NECESSARY TO MAINTAIN CONSTRUCTABILITY). 15. AT THE END OF EACH WORKING DAY, THE CONTRACTOR WILL BE RESPONSIBLE FOR THE APPLICATION OF SEED AND STRAW, AS APPLICABLE, TO NEWLY ESTABLISHED STREAMBANKS AND DISTURBED AREAS. EROSION CONTROL MATTING WILL BE INSTALLED ON TOP OF THE SEED AND STRAW IN ACCORDANCE WITH THE EROSION CONTROL CONSTRUCTION SEQUENCE. 16. AFTER EXCAVATING THE CHANNEL TO DESIGN GRADES, INSTALLING IN -STREAM STRUCTURES, SEED AND MULCH, MATTING, AND TRANSPLANTS, THE NEW CHANNEL CAN RECEIVE FLOW AFTER APPROVAL BY THE ENGINEER. 17. WATER WILL BE TURNED INTO THE CONSTRUCTED CHANNEL ONCE THE AREA IN AND AROUND THE NEW CHANNEL HAS BEEN STABILIZED. NO WATER SHALL BE TURNED INTO ANY SECTION OF CHANNEL PRIOR TO THE CHANNEL BEING COMPLETELY STABILIZED WITH ALL STRUCTURES INSTALLED. 18. ANY GRADING ACTIVITIES ADJACENT TO THE STREAM CHANNEL SHALL BE COMPLETED PRIOR TO TURNING WATER INTO THE NEW STREAM CHANNEL SEGMENTS. THE CONTRACTOR SHALL NOT GRADE OR ROUGHEN ANY AREAS WHERE EXCAVATION ACTIVITIES HAVE NOT BEEN COMPLETED. 19. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 20. WHEN APPLICABLE, THE LAND DEVELOPMENT INSPECTOR SHOULD BE CALLED TO CONDUCT INSPECTIONS ON STORM DRAINAGE, SIDEWALKS, DRIVE WAY IMPROVEMENTS, AND ALL ASPECTS OF ROAD CONSTRUCTION. 21. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. AT THE CONCLUSION OF GRADING AND CONSTRUCTION OR IF LAND -DISTURBING ACTIVITY STOPPED FOR MORE THAN 14 CONSECUTIVE CALENDAR DAYS, PERMANENT VEGETATIVE COVER SHALL BE INSTALLED ACCORDING TO SHEET L5.00. 22. CONTRACTOR SHALL PLANT WOODY VEGETATION AND LIVE STAKES, ACCORDING TO PLANTING DETAILS AND SPECIFICATIONS. THE CONTRACTOR SHALL COMPLETE THE LIVE STAKING AND REFORESTATION (BARE -ROOT PLANTING) PHASE OF THE PROJECT AND APPLY PERMANENT SEEDING AT THE APPROPRIATE TIME OF YEAR. 23. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. 24. STABILIZE ALL DISTURBED AREAS. REMOVE STAGING AREA AND CONSTRUCTION ENTRANCE. 25. REMOVE ALL EROSION CONTROL MEASURES. 26. DEMOBILIZE ALL EQUIPMENT AND MATERIALS FROM SITE. 27. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. GENERAL WATERSHED NOTES: 1. THIS PROPERTY IS LOCATED WITHIN THE WATER SUPPLY WATERSHED (WSW) FOR LAKE MACKINTOSH (BIG ALAMANCE CREEK), A TRIBUTARY TO THE JORDAN LAKE WSW. THE BIG ALAMANCE CREEK WATERSHED IS CLASSIFIED AS WATER SUPPLY IV (WS-IV). THE PROPERTY IS LOCATED WITHIN THE GENERAL WATERSHED AREA OF BIG ALAMANCE CREEK. DEVELOPMENT RESTRICTIONS MAY APPLY. RIPARIAN BUFFER & STREAM NOTES: 1. THIS PROPERTY IS LOCATED WITHIN THE JORDAN LAKE WATERSHED WHERE ASSOCIATED RIPARIAN BUFFER RULES APPLY. 2. JURISDICTIONAL STREAMS, WETLANDS, AND OTHER WATERS OF THE U.S. ARE SUBJECT TO USACE AND NCDEQ REGULATIONS. REQUIRED APPROVALS AND PERMITS MUST BE OBTAINED FROM USACE AND NCDEQ PRIOR TO IMPACTS TO JURISDICTIONAL STREAMS, WETLANDS AND OTHER WATERS OF THE U.S. THE OWNER AND CONTRACTOR ARE RESPONSIBLE FOR ENSURING ALL APPROPRIATE PERMITS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION. 3. BUFFER AUTHORIZATION APPLICATION MUST BE APPROVED BY GUILFORD COUNTY (OR NCDEQ FOR PROJECTS REQUIRING THEIR REVIEW OF BUFFERS) PRIOR TO LAND DISTURBANCE WITHIN A RIPARIAN BUFFER, UNLESS THE LAND DISTURBANCE IS EXPLICITLY STATED AS AN "EXEMPT" USE IN THE GUILFORD COUNTY UDO AND NCAC RULES THAT APPLY. 4. RESTORE DISTURBED AREAS OF RIPARIAN BUFFERS TO PRE -CONSTRUCTION VEGETATIVE AND HYDROLOGIC CONDITIONS WITH COMPARABLE NATIVE VEGETATION AS SOON AS PRACTICABLE DURING CONSTRUCTION. TREE PLANTINGS MAY OCCUR DURING THE DORMANT SEASON. A ONE-TIME APPLICATION OF FERTILIZER MAY BE USED TO ESTABLISH VEGETATION. 5. TREE TRIMMING AND OTHER VEGETATION MANAGEMENT IN RIPARIAN BUFFER ZONE 2 (20') SHALL NOT RESULT IN IMPACTS TO VEGETATION IN RIPARIAN BUFFER ZONE 1 (30'). 6. RIPARIAN BUFFER ZONE 1 MUST REMAIN UNDISTURBED. REMOVAL OF VEGETATION IS NOT ALLOWED EXCEPT FOR THE BELOW EXEMPT ACTIVITIES THAT DO NOT REQUIRE BUFFER AUTHORIZATION: a. REMOVAL OF INDIVIDUAL TREES THAT ARE IN DANGER OF CAUSING DAMAGE TO DWELLINGS, OTHER STRUCTURES OR HUMAN LIFE, OR ARE IMMINENTLY ENDANGERING STABILITY OF THE STREAMBANK. b. REMOVAL OF INDIVIDUAL TREES WHICH ARE DEAD, DISEASED OR DAMAGED. c. REMOVAL OF POISON IVY. d. REMOVAL OF INVASIVE EXOTIC VEGETATION AS DEFINED IN: SMITH, CHERRI L. 1998. EXOTIC PLANT GUIDELINES. DEPT. OF ENVIRONMENT AND NATURAL RESOURCES. DIVISION OF PARKS AND RECREATION. RALEIGH, NC. GUIDELINE #30 7. PLANTING VEGETATION TO ENHANCE THE RIPARIAN BUFFER IS ALLOWED, AS LONG AS NO VEGETATION IS REMOVED FROM ZONE 1. PRUNING FOREST VEGETATION IS ALSO ALLOWED, PROVIDED THAT THE HEALTH AND FUNCTION OF THE FOREST VEGETATION IS NOT COMPROMISED. FLOODPLAIN NOTES 1. A SPECIAL FLOOD HAZARD AREA (SFHA) EXISTS ON THE PROPERTY BASED ON FIRM MAP NUMBER 3710882400J WITH EFFECTIVE DATE JUNE 18, 2007. 2. NO DEVELOPMENT OR LAND DISTURBANCE IS ALLOWED WITHIN THE SFHA (A.K.A. 1% ANNUAL CHANCE SFHA OR 100-YEAR FLOODPLAIN) UNLESS APPROVED BY GUILFORD COUNTY VIA A FLOODPLAIN DEVELOPMENT PERMIT. NO DEVIATIONS FROM THE APPROVED PLAN FOR PROPOSED WORK IN THE SFHA SHALL BE MADE, UNLESS OTHERWISE REQUESTED BY THE APPLICANT AND APPROVED IN WRITING BY GUILFORD COUNTY PRIOR TO WORK BEING PERFORMED. 3. NO FILL IS ALLOWED WITHIN THE SPECIAL FLOOD HAZARD AREA (SFHA) PER GUILFORD COUNTY UDO SECTION 9.3.P.1.P. EXCEPT FOR MINOR FILLING FOR PROJECTS THAT RESTORE NATURAL FLOODPLAIN FUNCTIONS AND ARE APPROVED VIA ISSUANCE OF A FLOODPLAIN DEVELOPMENT PERMIT. 4. THE 1% ANNUAL CHANCE SFHA AND FLOODWAY LIMITS WITHIN 50' OF PROPOSED LIMITS OF DISTURBANCE SHALL BE STAKED BY A PROFESSIONAL LICENSED SURVEYOR PRIOR TO CONSTRUCTION. STAKING SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION AND SHALL NOT BE REMOVED UNTIL AFTER FINAL INSPECTION BY THE GUILFORD COUNTY FLOODPLAIN ADMINISTRATOR OR THEIR ASSIGNS IS APPROVED. 5. FLOODPLAIN DEVELOPMENT PERMIT CLOSE-OUT REQUIREMENTS: a. PROVIDE AS -BUILT SURVEY CERTIFIED BY A LICENSED PROFESSIONAL SURVEYOR SHOWING ANY DEVIATION FROM PERMITTED PLANS. b. PROVIDE PHOTO DOCUMENTATION OF RESTORED AREAS TO THE GUILFORD COUNTY WATERSHED SECTION. c. FINAL INSPECTION BY GUILFORD COUNTY WATERSHED SECTION UPON RECEIPT OF ABOVE COMPLETED INFORMATION. PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT PIEDMONT CONSERVATION COUNCIL 201 E MAIN ST, 5TH FLOOR DURHAM, NC 27701 PHONE: 919. 525. 3037 WHITSETT, NC 27377 U"' a I''''i fSS /5•IcL/ Q SEAL���': 049073 REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. FILENAME CHECKED BY DRAWN BY SCALE DATE SHEET STN-2101.01 STN2101-XC RAS CHJ N.T.S. 07. 07. 2022 PROJECT NOTES co.00 LEGEND AND SYMBOLS 250 LD Fw 100 YR 500 YR SD ss / r / 0 E 1 N N N 1.6 U X N 0 z C 0 C v U cc m TN2101.00 - StoneyCreek HOA C DUR-X3\MDri LD SD ss PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING MAJOR CONTOUR MINOR CONTOUR TOP OF BANK TOE OF BANK STREAM THALWEG JORDAN LAKE BUFFER ZONES EFFECTIVE FEMA FLOODWAY EFFECTIVE FEMA 100—YR FLOODPLAIN EFFECTIVE FEMA 500—YR FLOODPLAIN LIMITS OF DISTURBANCE PROPERTY LINE UTILITY EASEMENT EXISTING STORMWATER PIPE EXISTING SANITARY SEWER EXISTING MANHOLE EXISTING ROAD ISLAND WITH CURB AND GUTTER 20 FT — EXISTING CURB A GUTTER LD —� , EXISTING) SIDEWA N fI OLF\ CART 'PATH TREE LEGEND (12 BE 00 Tree BEECH MISC. HARDWOOD OAK CALIPER INCH SIZE OF TREE TYPE OF TREE TREE TO BE REMOVED GRAPHIC SCALE 10 20 40 1 inch = 20 ft. LIMITS OF DISTURBANCE 0.33 AC LD 77( STONEY A, EEK HOA STE 30( PIN: 8824236532 PB:107 PP:57 • ( PROPERTY LINE (17 / NJ PRELIMINARY FEMA MODEL CROSS SECTION -\, L\ (--J \ 7— I j / -- A N EFFECTIVE FEMA 500—YR FLOODPLAIN rpE \PRqTEC,ETEV/ / EXISTINp CITY OF AERIAL 'SANITARY SEW TO BEj PROTECTED 7 ------------------- LIMITS OF / CifS / 77 • 7 / /6' /7 //, / 7r,(7//,,,/r-/-c;////// I I I/ // / / 7 // I EXISTING TREE (TYP.) / Ckg 9$&, Cir / EXISTING THALWEG (TYP.) — EXISTING TOP OF BANK (TYP.) PRELIMINARY "F-EMA Is/PDEL CROSS SECTION-. - N. BRIGHTWOODNFARM INC 6441 BURLINGTON RD WHITSETT, NC 27377 ( r / PROPERTY LINE (TYP.) LN 2-7 re EFFECTIVE FEMA 100—YR FLOODPLAIN (TYP.) EFFECTIVE FEMA FLOODWAY (TYP.) loo re EFFECTIVE FEMA FLOODWAY (TYP.) -- c)0 st. 0\-.(b\> _ 4) 'N / / 7 7- PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 CLIENT PIEDMONT CONSERVATION COUNCIL DURHAM, NC 27701 PHONE: 919. 525. 3037 § r9 LIU < LT] CeLLIOD UZU—I OCC co `) < 0 WHITSETT, NC 27377 REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. FILENAME CHECKED BY DRAWN BY SCALE DATE SHEET RAS CHJ 07. 07. 2022 EXISTING CONDITIONS C1.00 ra C E m N m N s\STN2101-PP.dwg, 7/7/2 C ce v C 0 u 0 0 d y U 0 TN2101.00 - Stoney 0 0 Z I — LEGEND AND SYMBOLS 250 FW 100 rR Lo Lo PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING MAJOR CONTOUR MINOR CONTOUR TOP OF BANK TOE OF BANK STREAM THALWEG JORDAN LAKE BUFFER ZONES EFFECTIVE FEMA FLOODWAY EFFECTIVE FEMA 100—YR FLOODPLAIN PROPOSED STREAM CENTERLINE LIMITS OF DISTURBANCE PROPERTY LINE UTILITY EASEMENT PROPOSED RIFFLE MATERIAL PROPOSED VEGETATED SOIL LIFT PROPOSED BOULDER J—HOOK PROPOSED BOULDER TOE EXISTING GRADE EXISTING GRADE NORTH CAROLINA PIEDMONT REGIONAL CURVE STATISTICS ABKF = 103.1 FT2 WBKF = 33.3 FT DBKF = 3.2 FT DRAINAGE AREA = 10.03 MI2 BANKFULL INNER BERM (WIDTH VARIES) WBKF = 36.6 FT DBKF = 2.8 FT °MAX = 3.8 FT NKr = 103 FT2 BANKFULL INNER BERM (WIDTH VARIES) WPooL= 47.6 FT °POOL = 7.0 FT 'POOL = 156.3 FT2 WPOOL/WBKF = 1.3 DPOOL/DBKF = 2.5 SECTION - STREAM CENTERLINE STA 0+50 580 580 570 570 EXISTING OFGREENSB CITY n AERIAL SSSS PPEE J �� _7I 1 / / �7 \fsTNG (TYP GADE ) \\ / PATHXIST ING WALKING 560 \\ \ \ I BANKFULL (TYID ) 560 \ I \\ I EROSION CONTROL \ I I MATTING (TYP.) \ \ \ \ I \ 11 I I xis -1 vim• .,c PROPOS D RIFFLE MATERIAL 10% NC 30% NC 60% NC FILL TO OT CLASS OT CLASS OT CLASS DESIGN PROFILE A B 1 —0+50 0+00 0+50 BANKFULL WIDTH = 36.6' EROSION CONTROL MATTING Dnwx = 3.8' 1 TYPICAL RIFFLE BANKFULL WIDTH = 47.6' UPSTREAM RIFFLE SECTION PROPOSED GRADE EROSION CONTROL MATTING PROPOSED GRADE TYPICAL POOL TYPICAL SECTIONS N.T.S. TOP OF BANK TOP OF BANK \ 1 EFFECTIVE FEMA FLOODWAY (TYP.)'I 2� \ \\ \ \ \ EXISTING CITY OF GREENSBORO SS MANHOLE (TYPA TO BE PROTECX \ \\ \\ \ SECTION - STREAM CENTERLINE STA 0+86 580 580 570 570 EXISTING AERIAL CITY SS PIPE EXISTIN GRADE 1- \ PROPOSED SOIL 1_,IFTS — EXISTING PATH WALKING .._ ---- 560 560 PROPOSED GRADE \ BACKFIL MATERIA 60% NCDOT CLASS 1 J—HOO (TYP.) VANE ARM —0+45 0+00 0+65 EXISTING TOP OF BANK (TYP.' \\ \ \ \\ \ \ '\ QQ�. \ O, o, i\Ss Jao c' ,o co.�, i \ \ \ \ . / LIMITS OF DISTURBANCE \ \TYP.) \ JC>� BUF 04, 560 558 EXIS1\NG TOE OF B NK (TYP, DOI I EXISTING WALKING • • • 1.3-cy co • O STREAM cENTERLINE • EXIFING TOP cpWV BEG* REACH STATIQNING EXISTING IHALVTG (TYP.) • • • • PROPOSED BOULDER Ss PROPOSED S011:— LIFTS (TYP.) EXISTING CITY OF 10% NCDOT .,LASS A Ss SECTION — S+REAM CENTERLINE STk 0+50 (SEE PROFILE VhAA1) RIAL GREENSBORO 18" DIP EXISTING CITY OF STREAM CENTERLINE PROPOSED 139ULDER VANE ANGLE ,(TYP.) — z / CENTE cri 572 571 570 569 568 maivor-swza.. r LINE STA 0+86 LINE'10E OF SLOPE WITH 60% .C13-0T CLASS 1 %ss, I / r , / , / V STA=1 + 14.28 ELEV=564.50 ( 0 II II FIROPOSED RIFFLE 30% NCDOT FILL TO DESIGN—PROF-I-L-E MATERIAL LASS B PROPOSED GRADE PROPOSED BOULDER csi to STA=0+8 ELEV=56 560 558 GRAPHIC SCALE 5 10 1 inch = 10 ft. 2° MCADAMS LIMITS OF DISTURBANCE 0.33 AC co- PROPERTY LINE EXISTING TREE EXISTING TREE TO BE REMOVED (TYP.) EFFECTIVE FEMA 100—YR FLOODPLAIN The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT PIEDMONT CONSERVATION COUNCIL DURHAM, NC 27701 PHONE: 919. 525. 3037 CeLLIOD 0 < c) ea; < 0 tn WHITSETT, NC 27377 $°11...i.Q.:OcS.:4 EA: 0:71L?'13/11:5 7.0 • lllllllll REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. FILENAME CHECKED BY DRAWN BY SCALE DATE SHEET RAS CHJ 07. 07. 2022 GRADING PLAN C3.00 a) 0+00 1 +00 1+46.33 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION M:\Projects\STN\000STN2101.00 - StoneyCreek HOA Contract\04-Production\Water Resources\Current Drawings\STN2101-EC.dwg, 7/7/2022 3:11:15 PM, Cameron Jernigan GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days far slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 17 -7 days far perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting Permanent Stabilization • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting ' • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control A roducts with grass seed POLYACRYLAMIDES (PAPAS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculorrts. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply fiocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. R, NORTH CAROLINA . / Environmental Quality WW1 1VAIX WA Bata ONSITE CONCRETE WASHOUT STRUCTURE WITH LIFER rElix LnaTa rn•mx•.,LAi i nc MOOT wort 111u1rt sLLA le *WAWA 1AC Of. Lan awn 10.11 MACAd 10 O TiC MAMA= Ill fl HAsdR 1111XLIE KUL m i WAIT Mlwn enD Fats ,mM nil wi nv l A%I r "it stein -Titer ""„ to now WPC MIN 111/42.1 I 1 t LsstOA rmwrs . L nt moor wMR tnAxn•c SW- s ,11110a13 IAo, nc LI•n MOM an s xL la v nc flCiVCL r..anr TO MAIM M AAR MAW r+VW:iTY SUN x,••Lt1 u LOWS v nmaru 'roxxx 0aAmsOF mrtMGM MEW INCE isBOVE GR614, gP uT STRUCTURE. CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 5. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTIC!DES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. 2. 3. Create designated hazardous waste collection areas on -site. Place hazardous waste containers under cover or in secondary containment. Do not store hazardous chemicals, drums or bagged materials directly on the ground. i N C GO l GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01 / 19 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self -inspections are required during below. When adverse weather or personnel to be in jeopardy, the inspection which it is safe to perform the inspection. greater than 1.0 inch occurs outside performed upon the commencement were delayed shall be noted in the Inspect Frequency (during normal business hours) Daily Inspection records must include: (1) Rain gauge maintained in good working order Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall Information Is available, record the cumulative rain measurement for those un- attended days lane this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event> 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of mrintenance needs for the measure, 6. Description, evidence_, and date of corrective actions taken. 01 Storm water discharge outfalls ISUCs} At least once per 7 calendar days and within 24 hours of a rain event1,0Inch in 24 hours 1. Identification of the discharge autfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, Floating or suspended solids or discoloration, 5. indication of visible sediment leaving the site, 6. Description. evidence, and date of corrective actions taken, (4) Pevimeter of site At least once per 7 calendar days and within 24 hours of a rain event ? 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to dean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event a 1.0 inch in 24 hours if the stream or wetland has increased visible sedimentation or a stream has visible Increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records ref the required reports to the appropriate Division Regional Office par Part III, Section C, Item (2)(a) of this permit. I61Ground stabilisation measures After each phase of grading 1. The phase of grading (installation OF perimeter E&SC measures, clearing and grubbing, installation of storm drainage fatlities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required tlmeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be kept on site and available for hours. 1. 2. 3. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC inspection at all times during normal business item to Document Documentation Requirements (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan_ Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures arc modified after initial installation. (h) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Completer date and sign an Inspection report. (e) Corrective actions have been taken to E&SC measures. r Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART !I, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. (b) (c) (d) (e) (f) PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. 2. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Repotting Timeframes [After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • within 24 hours, an oral or electronic notification. • within 7calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 3030) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (h) Oil spills and release of hazardous substances per item 1(b}-ic) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill cr release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, ►J' possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(0(7)i • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance, [40 CFR 122.41(ij(Fy. ■ Division staff may waive the requirement for a written report on a case -by -case basis. NORTH CAROLINA Environmental Quality NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01 / 19 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT PIEDMONT CONSERVATION COUNCIL 201 E MAIN ST, 5TH FLOOR DURHAM, NC 27701 PHONE: 919. 525. 3037 WHITSETT, NC 27377 ,,,tssssllllt,,, \N CARQ4 i SEAL v(•: 049073 REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. FILENAME CHECKED BY DRAWN BY SCALE DATE SHEET STN-2101.01 STN2101-EC RAS CHJ N.T.S. 07. 07. 2022 EROSION CONTROL PLAN C6.00 EROSION & SEDIMENT CONTROL NOTES: 1. GRADING AND EROSION CONTROL METHODS SHALL ADHERE TO THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NC DEQ) DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (NC DEMLR) STANDARDS AND SPECIFICATIONS. WHERE METHODS DIFFER FROM THE GUILFORD COUNTY EROSION CONTROL DEPARTMENT, THE MORE STRINGENT METHOD SHALL BE APPLIED. 2. E & SC DEVICES MUST BE INSTALLED AND INSPECTED PRIOR TO ANY GRADING ON SITE. THE CONTRACTOR SHALL CALL FOR AN INSPECTION BY NC DEMLR ONCE INITIAL MEASURES ARE IN PLACE. 3. A COPY OF THE APPROVED EROSION CONTROL PLAN MUST BE ON FILE AT THE JOB SITE AT ALL TIMES. FAILURE TO FOLLOW THE APPROVED PLAN SEQUENCE AND DETAILS COULD SUBJECT THE CONTRACTOR TO FINES AND PENALTIES ISSUED BY EITHER GUILFORD COUNTY EROSION CONTROL DEPARTMENT OR NC DEMLR. 4. CONSTRUCTION, MAINTENANCE, AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF THE GRADING CONTRACTOR UNLESS OTHERWISE NOTED. 5. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE APPROVED EROSION CONTROL PLAN AND IS SUBJECT TO A FINE BY THE GUILFORD COUNTY EROSION CONTROL DEPARTMENT. 6. DISTURBANCE OUTSIDE OF THE SITE PROPERTY LIMITS OR PUBLIC R/W SHALL ONLY BE ALLOWED BY SIGNED GRADING AGREEMENTS AND/OR EASEMENTS BETWEEN THE DEVELOPER AND OFFSITE PROPERTY OWNER. 7. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN SAFE OPEN ACCESS TO ALL PROPERTIES ALONG ADJACENT PROPERTIES DURING CONSTRUCTION PERIOD FOR IMPROVEMENTS. 8. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 9. STAGING AREAS, STOCKPILE AREAS, CONSTRUCTION ENTRANCES, AND ACCESS ROAD WILL BE IDENTIFIED AND LOCATED ACCORDING TO THE EROSION CONTROL PLANS AND LANDOWNER. VARIANCES WILL BE ALLOWED ASSUMING BOTH THE CONTRACTOR AND THE ENGINEER VERBALLY AGREE. 10. CONTRACTOR SHALL SEED AND STABILIZE ALL STEEP SLOPES (GREATER THAN 3H:1V) WITHIN 7 DAYS, 10 DAYS FOR MODERATE SLOPES (3H:1V OR LESS) AND WITHIN 14 CALENDAR DAYS EVERYWHERE ELSE ACCORDING TO THE TEMPORARY SEEDING SCHEDULE ON SHEET L5.00. 11. FOR ANY LAND DISTURBING ACTIVITY WHERE GRADING ACTIVITIES HAVE BEEN COMPLETED, TEMPORARY OR PERMANENT GROUND COVER (SHEET L5.00) SUFFICIENT TO RESTRAIN EROSION SHALL BE PROVIDED AS SOON AS PRACTICAL, BUT IN NO CASE LATER THAN SEVEN (7) DAYS AFTER COMPLETING THE WORK. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE ON THE PLAN. 12. THE EROSION CONTROL INSPECTOR MAY REQUIRE ADDITIONAL FIELD MEASURES AS NECESSARY TO PROVIDE ADEQUATE PROTECTION FROM RECEIVING WATER COURSES. 13. PROTECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE STRIPPING OF TOPSOIL OR LOWERING OF EXISTING GRADE AROUND A TREE, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA AT THE SAME TIME AS OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA AND SHALL BE POSTED ON THE PROTECTION FENCE. A PROTECTION FENCE CONSTRUCTED OF MATERIAL RESISTANT TO DEGRADATION BY SUN, WIND, AND MOISTURE FOR THE DURATION OF THE CONSTRUCTION, SHALL BE INSTALLED AT THE SAME TIME AS THE EROSION CONTROL MEASURES AND SHALL BE IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE (SEE DETAIL ON SHEET C6.02 THROUGH C6.03). 14. A CONSTRUCTION SEQUENCE HAS BEEN PROVIDED (SEE SHEET C0.00). INSTALLATION OF ALL PROPOSED E & SC MEASURES IN THE SEQUENCE(S) PROVIDED AND MAINTENANCE OF THOSE DEVICES IS REQUIRED. THE CONTRACTOR MAY BE ALLOWED, WITH PRIOR APPROVAL FROM THE OWNER, TO COORDINATE CHANGES TO THE PLAN WITH THE ON -SITE E & SC INSPECTOR AND THE ENGINEER. 15. CONTRACTOR SHALL INSPECT AND REPAIR ALL EROSION CONTROL DEVICES AT LEAST ONCE PER WEEK AND AFTER EVERY SIGNIFICANT RAINFALL EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE HALF THE CAPACITY OF THE DEVICE. 16. CONTRACTOR WILL FIELD LOCATE SILT FENCE OUTLETS AT LOW POINTS IN SILT FENCE AND/OR A MINIMUM OF EVERY 100 LINEAR FEET OF SILT FENCE AS REQUIRED TO PROVIDE RELIEF FROM CONCENTRATED FLOWS. SILT FENCE OUTLETS SHOWN ON THESE PLANS ARE BASED ON THE BEST TOPOGRAPHIC INFORMATION AVAILABLE AT THE TIME OF DESIGN. CONTRACTOR TO FIELD VERIFY AND ADJUST LOCATIONS OF SILT FENCE OUTLETS AND/OR PLACE ADDITIONAL OUTLETS TO INSURE THAT ALL LOW SPOTS ALONG THE SILT FENCE HAVE AN OUTLET. 17. WASHED STONE AND WIRE BACKING SHALL BE USED WITH SILT FENCE WHENEVER SILT FENCE IS PLACE AT THE TOE OF A SLOPE >10' VERTICAL OR ALONG ANY CHANNEL OR WATER COURSE WHERE 50' OF BUFFER IS NOT PROVIDED. 18. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE OWNER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 19. NO DEBRIS SHALL BE TRACKED ONTO PUBLIC RIGHT OF WAY. IF THE SITUATION OCCURS WHERE MUD, ROCKS AND DEBRIS IS TRACKED ONTO PAVEMENT, THE CONTRACTOR SHALL CLEAN THE PAVEMENT AND INSTALL ADDITIONAL MEASURES TO PREVENT FUTURE OCCURRENCES. 20. INSTALL SILT FENCE FOR ALL STAGING AND STOCKPILE AREAS (SEE DETAIL ON SHEET C6.02). ANY STOCKPILE AREAS SHALL USE TWO (2) ROWS OF SILT FENCE. 21. IF CONCRETE WASHOUTS ARE UTILIZED, THESE AREAS ARE TO BE WITHIN THE LIMITS OF DISTURBANCE AND SHOULD BE LOCATED AT LEAST 50 FT. AWAY FROM STORM DRAIN INLETS AND SURFACE WATER. 7/2022 3:11:20 0 ce U1 v v C 0 i 0 U 0 TN2101.00 - Stoney J S 2 CHANNEL CONSTRUCTION (PUMP AROUND): 1. INSTALL PUMP AROUND ALONG 200' TO 300' OF STREAM CHANNEL, OR NO MORE THAN CAN BE CONSTRUCTED IN ONE (1) WORKING DAY (DEWATERING AND PUMP AROUND DETAILS ON SHEET C6.01. 2. RIPRAP APRONS WILL BE CONSTRUCTED TO IMPEDE ANY EROSION OF THE CHANNEL AND STREAM BANKS BY THE WATER DIVERTED FROM THE PUMP -AROUND PROCEDURE. 3. WORK SECTIONS THAT INVOLVE THE CONSTRUCTION OF A CONFLUENCE OR TWO REACHES MAY REQUIRE THE USE OF TWO PUMP -AROUND OPERATIONS. 4. HARVEST MATERIAL FROM THE BOTTOM OF THE EXISTING CHANNEL TO BE PLACED IN THE BOTTOM OF THE PROPOSED CHANNEL. THIS SHALL INCLUDE THE SURFACE MATERIAL AND UP TO ONE (1) FOOT BELOW TO INCLUDE THE HYPORHEIC ZONE. ADDITIONAL RIVER STONE SHALL BE MIXED WITH EXISTING CHANNEL MATERIAL AS NECESSARY. 5. IN -STREAM STRUCTURES WILL BE INSTALLED ACCORDING TO THE DETAILS PRESENTED ON SHEET C8.00. 6. ANY EXCAVATED MATERIAL CONTAINING MANMADE MATERIAL IS NOT SUITABLE MATERIAL FOR CHANNEL FILL AND MUST BE DISPOSED OF OFFSITE UNLESS OTHERWISE DIRECTED BY OWNER. 7. THE PROPOSED CHANNEL BANKS SHALL BE STABILIZED WITH EROSION CONTROL MATTING AND TEMPORARY SEEDING UPON COMPLETION OF EACH SECTION AS PER DETAIL ON SHEETS C6.03 AND L5.00. 8. COMPLETE ALL EARTHWORK, STRUCTURE INSTALLATION, AND STABILIZATION IN THE PUMP AROUND AREA. 9. CONTRACTOR SHALL NOTIFY ENGINEER UPON DISCOVERY OF ANY CONSTRAINTS DISCOVERED IN THE CONSTRUCTION OF THE PROPOSED CHANNEL OR STRUCTURE PLACEMENT AND ADJUSTMENTS CAN BE MADE ON SITE. 10. GRADING OF THE PROPOSED FLOODPLAIN MAY NEED TO BE DELAYED UNTIL AFTER WORK IN SUBSEQUENT SECTIONS HAS BEEN COMPLETED, ESPECIALLY NEAR CONFLUENCES. HAUL ROADS AND TEMPORARY SILT FENCE MAY ALSO NEED TO BE REMOVED BEFORE THE PROPOSED FLOODPLAIN CAN BE COMPLETED AND/OR UNUSED EXISTING CHANNEL CAN BE FILLED. 11. CONTRACTOR TO PROTECT ALL EXISTING UTILITIES IN THE PROJECT AREA DURING CHANNEL CONSTRUCTION. EXISTING ROAD ISLAND WITH CURB AND GUTTER 20 f7- 1 2 - EXISTING CURB A GUTTER , EXISTING SIDEWA Alp Nata. _wgrio SFLD EROSION & SEDIMENT CONTROL MAINTENANCE PLAN: 1. QUALIFIED PERSONNEL, ON A DAILY BASIS WILL EVALUATE ALL TEMPORARY EROSION AND SEDIMENT CONTROL PRACTICES FOR STABILITY AND OPERATION. 2. INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 7 DAYS AND AFTER EACH SIGNIFICANT RAINFALL (0.5" OR GREATER) AND DOCUMENT WITH INSPECTION REPORTS AND WRITTEN LOGS SHALL BE KEPT. 3. A RAIN GAUGE WILL ALSO BE KEPT ON -SITE AND DAILY RAINFALL AMOUNTS WILL BE RECORDED. 4. ANY REPAIRS NEEDED WILL BE PERFORMED IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF TEMPORARY ON -SITE E & SC MEASURES. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING AND FOLLOWING THE APPROVED E & SC PLAN. 7. A COPY OF THE COMBINED SELF -INSPECTION MONITORING FORM CAN BE FOUND ON THE NC DEMLR WEBSITE AT: PIN: L8824236532 PROPERTY LINE (TYP.) SF -7 SC LEGEND AND SYMBOLS 250 LD SF TP LD SF TP SF TP PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING EXISTING EXISTING EXISTING MAJOR CONTOUR MINOR CONTOUR TOE OF BANK STREAM THALWEG PROPOSED STREAM CENTERLINE LIMITS OF DISTURBANCE PROPERTY LINE UTILITY EASEMENT SILT FENCE TREE PROTECTION FENCE CONSTRUCTION ENTRANCE HAUL ROAD STAGING/STOCKPILE AREA IMPERVIOUS DIKE SILT FENCE OUTLET -411- PUMP AROUND / EFFECTIVE FEMA (5Ty00p-.)YR FLOODPLAIN z /// / / /10:' // // f j / / / / / Li 77 DOUBLE ROW SILT ENCE LIMITS OF DISTURBANCE / EXISTING TREE TO BE REMOVED (TYP.) EXISTING TREE (TYP.) oRDPN // / /2) \\:1 GRAPHIC SCALE 10 20 40 LIMITS OF DISTURBANCE 0.33 AC CITY (:),F GREEN BORO 7....;_ _-_H:;J:::::::----71: ar- PUMP AROUND N r ,j/ /,-- i___ _ ,,,:2-/,_,„-_-__.>_---c-___:"---2-7.-----\\ ROpp)ERTY_. LIINIE - N MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT PIEDMONT CONSERVATION COUNCIL DURHAM, NC 27701 PHONE: 919. 525. 3037 § n9 LIU < LTJ CeLLIOD 0 < ° sn, < 0 tn WHITSETT, NC 27377 llllllllll st:ccs • Is'% i\s‹) ,:\;:i1ACH AS0 REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. FILENAME CHECKED BY DRAWN BY SCALE DATE SHEET RAS CHJ 07. 07. 2022 EROSION CONTROL PLAN C6.01 FILTER OF 1" DIA. M:\Projects\STN\000STN2101.00 - StoneyCreek HOA Contract\04-Production\Water Resources\Current Drawings\STN2101-EC.dwg, 7/7/2022 3:11:22 PM, Cameron Jernigan MIN. 10 GA. LINE WIRES io 0 In 8' MAX. O N NOTES VARIABLE AS DIRECTED BY THE ENGINEER THE E PROTECTION DO NOT AR ENTER EA '►'iiiiii'i ORANGE, UV RESISTANT HIGH -TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) FRONT VIEW STEEL POST WOVEN WIRE FABRIC WARNING SIGN ORANGE, UV RESISTANT HIGH -TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) GRADE 40" MIN. 12-1/2 GA. INTERMEDIATE WIRES GRADE TREE PROTECTION AREA DO NOT ENTER 18" WARNING SIGN DETAIL 40" AREA PARA PROTECCION DE LOS ARBOLES PROHIBIDO ENTRAR 18" SIDE VIEW WARNING SIGN DETAIL 1. INSTALL FENCING AS SHOWN ON THESE PLANS. 2. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 3. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 4. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. ADDITIONAL SIGNS MAY BE REQUIRED BY GOVERNMENT ENTITIES BASED ON ACTUAL FIELD CONDITIONS. 5. IN SPITE OF PRECAUTIONS, SOME DAMAGE TO PROTECTED TREES MAY OCCUR. IN SUCH CASES REPAIR ANY DAMAGE TO THE CROWN, TRUNK OR ROOT SYSTEM IMMEDIATELY. REFER TO THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL CHAPTER 6 SECTIONS 6.05E AND 6.05C FOR DIRECTIONS ON WOUND REPAIR AND PRUNING OF DAMAGED TREES. 6. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. MAINTENANCE 1. INSPECT TREE PROTECTION FENCES AT LEAST ONCE A WEEK. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. TREE PROTECTION FENCE N.T.S. 4' NOTES PROVIDE HIGH STRENGTH DOUBLE STITCHED J TYPE SEAMS SEWN IN SPOUT HEAVY DUTY DIRTBAG 55 OR EQUAL 6' a HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE WATER FLOW FROM PUMP OPENING TO ACCOMMODATE UP TO 4" DISCHARGE HOSE AGGREGATE UNDERLAYMENT (3" THICK NCDOT NO. 57 STONE) 1. THE DEWATERING BAG SHALL BE MADE OF NON -WOVEN GEOTEXTILE WITH A MIN. SURFACE AREA OF 225 SQUARE FEET PER SIDE. 2. ALL STRUCTURAL SEAMS SHALL BE SEWN WITH A DOUBLE STITCH USING A DOUBLE NEEDLE MACHINE WITH HIGH STRENGTH THREAD. 3. THE SEAM STRENGTH SHALL WITHSTAND 100 LB/IN USING ASTM D-4884 TEST METHOD. 4. THE GEOTEXTILE FABRIC SHALL BE 10 OZ NON -WOVEN FABRIC. 5. DISCHARGE FROM THE DEWATERING BAG SHALL BE DIRECTED SUCH THAT PRE -DISTURBANCE HYDROLOGY IS NOT CHANGED. 6. TRANSPORT AND PLACE DEWATERING BAGS WITH CARE TO PREVENT RIPPING OR TEARING THE FABRIC. 7. AVOID INSTALLING ON STEEP SLOPES AS THE BAG MAY ROLL, CAUSING FAILURE. 8. INSERT THE DISCHARGE HOSE A MINIMUM OF 1-FOOT INSIDE THE DEWATERING BAG. DO NOT INSERT MORE THAN ONE DISCHARGE HOSE INTO THE DEWATERING BAG. 9. AVOID USE OF EXCESSIVE FLOW RATES OR OVERFILLING THE DEWATERING BAG. THIS MAY CAUSE THE BAG TO RUPTURE OR CAUSE FAILURE TO THE HOSE TO BAG CONNECTION. MAINTENANCE 1. FOLLOW ALL MANUFACTURER RECOMMENDATIONS FOR INSPECTION AND MAINTENANCE GUIDELINES. REPLACE DEWATERING BAGS WHEN TRAPPED SEDIMENT HAS ACCUMULATED TO 50% OF THE BAG CAPACITY OR IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 2. DEWATERING BAGS ARE FULL WHEN THEY NO LONGER EFFICIENTLY FILTER SEDIMENT OR PASS WATER AT A REASONABLE RATE. SEDIMENT FILTER BAG DETAIL N. T.S. 0 6" MIN COARSE AGGREGATE 2-3" NOTES So. eke 94, � it 44: I AM' 444111110,00 cis JIOYsor 410 APO 400, kdrittr NOTES: APPLICABLE AT ALL POINTS OF INGRESS & EGRESS UNTIL SITE IS STABILIZED, FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED. 1. GRAVEL PAD TO BE 12'X 50' AND 6" THICK MINIMUM. 2. TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS IS TO BE PROVIDED. 3. ENTRANCE(S) SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. 4. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOP DRESSING WITH STONE SILL BE NECESSARY; KEEP SOME HANDY. 5. ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED UP IMMEDIATELY. 6. APPLICABLE AT ALL POINTS OF INGRESS & EGRESS UNTIL SITE IS STABILIZED, FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED. MAINTENANCE 1. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. 2. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. 3. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY CONSTRUCTION ENTRANCE/ EXIT N.T.S. MIN. 10 GA. LINE WIRES I' - NOTES 8' MAX. 1 I VARIABLE AS DIRECTED BY THE ENGINEER 1r I I I I fr fr PA 46 40 Oi�0000�Oi`. �O�iiiiiii�i'i�i�iiii►� I•A 'q' i ` i Lal fl:=ta�- 1a T L-` 11 -1:=:11:=� 11:=11L1=-�:11 :1 11lig11:=�:11:=�:11 .II II SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP FRONT VIEW 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN MAINTENANCE O N SIDE VIEW STEEL POST MIN. 12-1/2 GA. INTERMEDIATE WIRES GRADE WOVEN WIRE FABRIC SILT FENCE GEOTEXTILE FABRIC FILL SLOPE GRADE 6" MIN. COVER OVER SKIRT * ANCHOR SKIRT AS DIRECTED BY ENGINEER * 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SILT FENCE N.T.S. NOTES: 1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS OF CHANNEL UNLESS DRAINAGE AREA EXCEEDS 6 SQUARE MILES. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. 4. EACH PUMP AROUND PUMP SHOULD ADEQUATELY CONVEY BASE FLOW VOLUMES. 5. PUMP AROUND OPERATIONS SHOULD NOT BE UNDERTAKEN IF SIGNIFICANT RAINFALL IS FORECAST IN THE CONSTRUCTION PERIOD. SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND 1. INSTALL SEDIMENT BAG AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE THE TEMPORARY PIPING THAT WILL CONVEY UPSTREAM OF THE WORK SITE TO THE SEDIMENT BAG. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL ALSO BAG. 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SEDIMENT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE STILLING BASINS AND STABILIZE DISTURBED AREAS TO SPECIFICATIONS AS SHOWN ON PLANS. TEMPORARY RIPRAP DISSIPATION PAD (SEE DETAIL, LOCATE AS DIRECTED AT THE TIME OF CONSTRUCTION) IMPERVIOUS DIKE (LOCATE AS DIRECTED AT THE TIME OF CONSTRUCTION) TEMPORARY PIPING PUMP AROUND PUMP SEDIMENT BAG (AS DIRECTED AT THE TIME OF CONSTRUCTION) DEWATERING PUMP TEMPORARY FLEXIBLE HOSE oq y�r EXISTING CHANNEL FILTER FABRIC FOR DRAINAGE (NON -WOVEN) COMPACTED FILL LINED WITH STONE WORKING AREA THE BASE FLOW FROM AREA. THE PUMP AND FLOW INTO A SEDIMENT BASEFLOW V IMPERVIOUS DIKE (LOCATE AS DIRECTED AT THE TIME OF CONSTRUCTION) TYPICAL PUMP AROUND SETUP N.T.S. IMPERVIOUS SHEET IMPERVIOUS DIKE DETAIL (PROFILE VIEW) WASHED STONE 3' '•I�i'if�•�t•�1. 'Ab_ntoft,•;. ls�ield�if�.'� ;. •Otl; 0:4�fir :• +� P, °.•r. 4 i4 4 END OF FILTER FABRIC PLAN VIEW STEEL FENCE POST WIRE FENCE HARDWARE CLOTH FILTER OF 1" DIA. WASHED STONE TOP OF SILT FENCE MUST BE AT LEAST 1' ABOVE THE TOP OF THE WASHED STONE ( SILT FENCE FILTER FABRIC ON /GROUND BURY WIRE FENCE AND SECTION END OF FILTER FABRIC 4' MIN. 1 A i i A i , J A STEEL FENCE POST SET MAX. 2' APART i A i FRONT VIEW HARDWARE CLOTH BURY WIRE FENCE, FILTER FABRIC, AND HARDWARE CLOTH IN TRENCH MAINTENANCE 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. 3. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY 4. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 5. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 6. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SILT FENCE GRAVEL OUTLET N.T.S. A 1 TOE OF BANK (TYP) 0 v 0 > z v / TOP OF BANK (TYP) TOE OF BANK (TYP) 01 U- PLAN VIEW NOTE: DETAIL PROVIDED FOR INFORMATIONAL PURPOSES. USE OF LOG MAT IS AT THE CONTRACTORS DISCRETION. 12"X12" +/- ROUGH CUT TIMBER LENGTH VARIES B' 12"X12" +/- ROUGH CUT TIMBER LENGTH VARIES 5' MIN. 12' MAX 5' MIN. 12"X12" +/- Ai ROUGH CUT TIMBER LENGTH VARIES TEMPORARY STREAM / WETLAND CROSSING N.T.S. III II SECTION A - A' +/- 108" SECTION B - B' 11= BOLT TIMBERS TOGETHER AS NECESSARY III III I1 11 3 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT PIEDMONT CONSERVATION COUNCIL 201 E MAIN ST, 5TH FLOOR DURHAM, NC 27701 PHONE: 919. 525. 3037 WHITSETT, NC 27377 fSS /5, / ���: �� SEAL�t� 049073 .,,�p�, NEF'F''�C7llllllllllllllll REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. FILENAME CHECKED BY DRAWN BY SCALE DATE SHEET STN-2101.01 STN2101-EC RAS CHJ N.T.S. 07. 07. 2022 EROSION CONTROL DETAILS C6.02 M:\Projects\STN\000STN2101.00 - StoneyCreek HOA Contract\04-Production\Water Resources\Current Drawings\STN2101-EC.dwg, 7/7/2022 3:11:24 PM, Cameron Jernigan NOTES: 1. AN EROSION CONTROL BLANKET SHALL BE USED TO STABILIZE THE NEWLY CONSTRUCTED CHANNEL FROM THE TOP OF BANK TO TOE OF SLOPE AND SHALL BE 100% BIODEGRADABLE. TOP OF BANK (TYP) 2. THE CHANNEL SIDE SLOPES SHALL BE FINE GRADED, SEEDED, FERTILIZED, AND LIMED PRIOR TO INSTALLING THE EROSION CONTROL BLANKET. REMOVE ROOTS, TWIGS, AND BLANKET OTHER DEBRIS WHICH WOULD CAUSE BULGES IN THE MATTING AS WELL AS PREVENT THE KEYED 6" MIN MATTING FROM BEING LAID FLUSH TO THE FINISHED SURFACE. 3. KEY -IN EDGES OF MATTING A MINIMUM OF 6 INCHES INTO FINISHED GRADE. LAY MATTING SHINGLED DOWNSTREAM TO UPSTREAM, OVERLAPPING AT EDGES A MINIMUM OF 1 FOOT. 4. INSTALL STAKES TO ENSURE GOOD GROUND CONTACT OF THE MATTING TO WITHSTAND MEDIUM TO HIGH FLOWS. STAKES SHALL BE 100% BIODEGRADABLE AND INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS INCLUDING, BUT NOT LIMITED TO, THE MANUFACTURER'S RECOMMENDED DENSITY AND PATTERN. 5. KEY -IN EDGES OF MATTING A MINIMUM OF 6 INCHES, PARTICULARLY NEAR RESTORATION STRUCTURES, BOULDERS, LOGS, ETC. CHECK MATTING FOR LOOSE ENDS, FLAPS, OR OTHER WEAKNESSES OR DAMAGE WHICH MAY CAUSE IT TO BECOME LOOSE UNDER FLOW CONDITIONS. 6. MATTING SHALL BE PLACED ALONG THE OUTSIDE BANK OF ALL BENDS AND ALONG BOTH SIDES OF THE CHANNEL IN TANGENT AREAS. 7. FIELD ADJUSTMENTS TO MATTING LOCATION MAY BE MADE AT THE DISCRETION OF THE ENGINEER. WITH SEED IN 8. THE EROSION CONTROL BLANKET SHALL CONSIST OF A MACHINE -PRODUCED BLANKET MADE OF COCONUT FIBER AND BE EQUIVALENT OR BETTER THAN THE FOLLOWING SPECIFICATION. SOIL STABILIZATION MATTING WHICH USES PLASTICS, METALS, OR OTHER MAN-MADE MATERIALS IN THE CONSTRUCTION OF THE MATERIAL WILL NOT BE PERMITTED. WEIGHT = 20.3 OZ/SY TENSILE STRENGTH DRY (ASTM D 4595) = TENSILE STRENGTH WET (ASTM D 4595) = ELONGATION FAILURE WET (ASTM D 4595) TOP OF BANK (TYP) 1512 LBS/FT MACHINE DIRECTION 1032 LBS/FT CROSS DIRECTION 924 LBS/FT MACHINE DIRECTION 684 LBS/FT CROSS DIRECTION OPEN AREA = 50% RECOMMENDED SHEAR STRESS = 4.5 LBS/SQ.FT. RECOMMENDED FLOW = 12 FT/S RECOMMENDED SLOPE </= 1:1 69% MACHINE DIRECTION 34% CROSS DIRECTION BLANKET KEYED 6" MIN OVERLAP ROLL EDGES 1 FOOT MINIMUM (TYP.) 6 INCH DEEP (MIN.) KEY IN TRENCH + + + + + + - + + + + + + + + + + + + + + + 4' MIN BANKFULL STAGE EROSION CONTROL BLANKET TOE OF BANK (TYP) CROSS-SECTION VIEW PREPARED SLOPE + PLACE ▪ + + + + + 4 • • + + + - + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + SLOPE APPLICATION ISOMETRIC VIEW EROSION CONTROL BLANKET DETAILS N.T.S. PLAN VIEW FILL MAT VOIDS IF SPECIFIED 6 IN MIN. OVERLAP AT ROLL END (TYP.) COIR FIBER MATTING TO BE INSTALLED ON CHANNEL SIDE SLOPES FROM TOE OF BANK TO MIN. 4' BEYOND TOP OF BANK OR GRADING LIMITS NOTES: 1. AREAS NOTED AS LIVE STAKES WITHIN THE PLANTING ZONE SHALL BE PLANTED WITH SILKY DOGWOOD (CORNUS AMOMUM), SILKY WILLOW (SALIX SERICEA), AND BLACK WILLOW (SALIX NIGRA). 2. ONE LIVE STAKE SPECIES PER LIVE STAKE AREA. ALTERNATE SPECIES PER LIVE STAKE AREA. 3. LIVE STAKE AREA IS BASED ON A 4' X 4' GRID. THIS SPACING REFERS TO PLANTING THE PLANTS EACH 6 FEET APART FROM EACH OTHER IN ALL DIRECTIONS. THIS SPACING DOES NOT RELATE TO PLANTING DISTANCE AT THE ZONE BOUNDARY. 4. ALL LIVE STAKES SHALL BE DORMANT AT TIME OF ACQUISITION AND PLANTING. 5. LIVE STAKES SHALL BE 1/2-2" IN DIAMETER. LIVE STAKES SHALL ALSO BE 2 - 4 FEET IN LENGTH. 6. DURING PREPARATION, THE BASAL ENDS OF THE LIVE STAKES SHALL BE CLEANLY CUT AT AN ANGLE TO FACILITATE EASY INSERTION INTO THE SOIL, WHILE THE TOPS SHALL BE CUT SQUARE OR BLUNT FOR TAMPING. ALL LIMBS SHALL BE REMOVED FROM THE SIDES OF THE LIVE CUTTING PRIOR TO INSTALLATION. 7. CUTTINGS FOR LIVE STAKES SHALL BE HARVESTED IN A MANNER SUCH THAT THEY ARE CUT, IMMEDIATELY PUT INTO WATER TO BE SOAKED FOR 10 DAYS, AND THEN PLANTED IMMEDIATELY AFTER THE 10 DAYS ARE COMPLETED. CUTTINGS SHALL REMAIN WET UNTIL THEY ARE PLANTED. OUTSIDE STORAGE LOCATIONS SHOULD BE CONTINUALLY SHADED AND PROTECTED FROM WIND AND DIRECT SUNLIGHT. 8. LIVE STAKES SHALL BE TAMPED AT AN ANGLE INTO THE GROUND SURFACE WITH A DEAD BLOW HAMMER, WITH BUDS ORIENTED IN AN UPWARD DIRECTION. STAKES SHOULD BE TAMPED UNTIL APPROXIMATELY 3/4 OF THE STAKE LENGTH IS WITHIN THE GROUND. ANY STAKES THAT ARE SPLIT OR DAMAGED DURING INSTALLATION SHALL BE REMOVED AND REPLACED. 9. THE AREA AROUND EACH LIVE STAKE SHALL BE COMPACTED BY FOOT AFTER THE LIVE STAKE HAS BEEN INSTALLED. 10. ONE TO TWO INCHES SHALL BE CUT CLEANLY OFF OF THE TOP OF EACH LIVE STAKE (WITH LOPPERS) AT AN ANGLE OF APPROXIMATELY 15 DEGREES FOLLOWING INSTALLATION. LIVE STAKE (SEE DETAIL NOTES) BANKFULL EROSION CONTROL BLANKET (SEE DETAIL SHEET 2C-2) CHANNEL BED \ / / \ /‘,\/ �r �.v s�T LIVE STAKE DETAIL N.T.S. NOTE: GEOTEXTILE FABRIC (NON -WOVEN) SHALL CONFORM TO THE FOLLOWING SPECIFICATIONS. MECHANICAL PROPERTIES TEST METHOD UNIT MINIMUM AVERAGE ROLL VALUE MD CD GRAB TENSILE STRENGTH ASTM D 4632 N (Ibs) 912 (205) 912 (205) GRAB TENSILE ELONGATION ASTM D 4632 % 50 50 TRAPEZOID TEAR STRENGTH ASTM D 4533 N (Ibs) 356 (80) 356 (80) CBR PUNCTURE STRENGTH ASTM D 6241 N (Ibs) 2225 (500) APPARENT OPENING SIZE (AOS)i ASTM D 4751 mm (U.S. SIEVE) 0.18 (80) PERMITTIVITY ASTM D 4491 sec -1 1.1 FLOW RATE ASTM D 4491 1/min/m2 (gal/min/ft2) 3870 (95) UV RESISTANCE (AT 500 HOURS) ASTM D 4355 % STRENGTH RETAINED 70 1 ASTM D 4751: AOS IS A MAXIMUM OPENING DIAMETER VALUE PHYSICAL PROPERTIES TEST METHOD UNIT TYPICAL VALUE WEIGHT ASTM D 5261 g/m2 (oz/yd2) 271 (8.0) THICKNESS ASTM D 5199 mm (mils) 1.8 (72) ROLL DIMENSIONS (WIDTH X LENGTH) - ft 12.5 X 360 15 X 300 ROLL AREA - m2 (yd2) 418 (500) ESTIMATED ROLL WEIGHT - kg (lb) 120 (265) NON -WOVEN GEOTEXTILE FABRIC MATERIAL SPECIFICATIONS PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT PIEDMONT CONSERVATION COUNCIL 201 E MAIN ST, 5TH FLOOR DURHAM, NC 27701 PHONE: 919. 525. 3037 WHITSETT, NC 27377 s,, �� 11 CARC< ,,��i :�O.. V_SS/ •/,.�: l�� SEAL���•) ' iit. 049073 -pI. �• �.NC I NEF'.0 c-, .,,#,, CCA s" \Is'ss ,'Dnn . n•'''• REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. FILENAME CHECKED BY DRAWN BY SCALE DATE SHEET STN-2101.01 STN2101-EC RAS CHJ N.T.S. 07. 07. 2022 EROSION CONTROL DETAILS C6.03 M:\Projects\STN\000STN2101.00 - StoneyCreek HOA Contract\04-Production\Water Resources\Current Drawings\STN2101-D.dwg, 7/7/2022 3:09:58 PM, Cameron Jernigan GENERAL NOTES: 1. ALL BOULDERS USED FOR THE PROPOSED STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE. BOULDER DIMENSIONS SHALL BE 3.0' X 3.5' X 2.0' (W X L X H) +/- 0.5 FT UNLESS OTHERWISE NOTED. THE MINIMUM ACCEPTABLE BOULDER THICKNESS (H) IS 2.0'. BOULDERS LONGER (L) THAN 4.0' WILL BE ACCEPTED. 2. DIMENSIONS AND SLOPES OF THE STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER TO FIT CONDITIONS ONSITE. 3. HEADER BOULDERS SHALL BE UNDERLAIN BY FOOTER BOULDERS TO PROVIDE A FOUNDATION AND SCOUR PROTECTION FOR THE HEADER BOULDERS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. FOOTER BOULDERS SHALL BE OFFSET 1.0 FT DOWNSTREAM OF THE HEADER BOULDERS WHERE SCOUR POOLS ARE ANTICIPATED TO FORM AS SHOWN IN THE DETAIL. 4. HEADER BOULDERS ARE THE TOP MOST BOULDER USED IN EACH BOULDER STRUCTURE. ALL HEADER BOULDERS CAN BE SEEN PARTIALLY PROTRUDING FROM THE WATER SURFACE DURING EXTREMELY LOW FLOWS. 5. SILL BOULDERS SHALL BE PLACED PERPENDICULAR TO THE BANKFULL FLOW DIRECTION. KEY SILL BOULDERS INTO THE STREAMBANK AT i TO 3 BKF STAGE (MEASURED AT THE NEXT DOWNSTREAM RIFFLE). 6. THE BOULDER VANE ARM AND BOULDER J-HOOK ARM SHALL EXTEND UP TO THE OUTSIDE STREAMBANK AT A 2-5% SLOPE. BOULDER VANE ARM SHALL TIE INTO THE STACKED BOULDER TOE. 7. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY WITH NO VOIDS/GAPS LARGER THAN 1 INCH. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A ROCK OR CHINKING STONE APPROVED BY THE ENGINEER. BOULDERS SHALL BE FLUSH WITH THE TOP SURFACES OF ADJACENT STONES. 8. SET BOULDER INVERTS AT ELEVATIONS SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE BOULDERS MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. 9. NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. SELECT BACKFILL MATERIAL SHALL BE PLACED UPSTREAM OF THE GEOTEXTILE MATERIAL. 10. SELECT BACKFILL AND SOIL BACKFILL MATERIAL SHALL BE A WELL GRADED BLEND OF NCDOT CLASS A RIP -RAP AND ASTM #57 ROCK MIXED WITH EARTH. SELECT BACKFILL MATERIAL SHALL BE COMPACTED SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 11. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 12. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. BANKFULL EXTEND VANE ARM AND SILL INTO STREAMBANK MIN. 10 FT OR THREE BOULDER LENGTHS. KEY BOULDERS INTO STREAM BANK AT 3 TO BKF STAGE HEADER BOULDER ARM SLOPE=2-5% HEADER BOULDER SELECT BACKFILL MATERIAL NON -WOVEN GEOTEXTILE INVERT STREAM BED ELEVATION \/// FOOTER SECTION A - A' BOULDER FLOW FOOTER BOULDER BANKFULL WSE 1.0 FT OFFSET / SECTION B - B' SCOUR POOL D/S OF J-HOOK BOWL -OUT BANK U/S OF VANE ARM NON -WOVEN GEOTEXTILE 0 0 0 0 0 EXTEND VANE ARM INTO STREAMBANK MIN. 10.0 FT OR THREE FULL BOULDER LENGTHS SELECT BACKFILL MATERIAL BEHIND STRUCTURE 0 0 0 0 ° 0 0 co 40BKF 1 I I 11 I I I ilit, ',._ 11 t "0.0 °° ° 0 o 0 0 0 �� i o 0 00`►�� ° 0 0 o 0 0 0 0 - HIGH DENSITY LIVE STAKING KEY BOULDERS INTO STREAMBANK AT 3 TO Z3 BKF STAGE KEY BOULDERS INTO STREAMBANK MIN. 10FT OR THREE BOULDER LENGTHS. PLACE BOULDERS INTO STREAMBED A MINIMUM OF THE BOULDER DIAMETER BOULDER VANE WITH BOULDER J-HOOK N.T.S. co FOOTER BOULDER SCOUR POOL I I / PLAN VIEW BANKFULL WSE HEADER BOULDER BANKFULL INVERT ELEVATION PER PROFILE ' //\./2 CROSS-SECTION EXTEND BOULDER SILL INTO STREAMBANK MIN. 10.0 FT OR THREE FULL BOULDER LENGTHS 0 GENERAL NOTES: 1. FOOTER BOULDERS SHOULD BE FLAT AND RECTANGULAR AND PROVIDE AN EVEN SURFACE FOR STACKING. 2. BOULDERS SHALL BE ANGULAR, FLAT, OR CUBED ROCK. INDIVIDUAL ROCK FRAGMENTS SHALL BE DENSE, SOUND, AND FREE FROM CRACKS, SEAMS OR OTHER DEFECTS CONDUCIVE TO ACCELERATED WEATHERING. NO CONCRETE, MAN-MADE ROCKS, OR SOFT ROCKS SHALL BE USED FOR THE CONSTRUCTION OF THE BOULDER TOE REVETMENT. BOULDER DIMENSIONS SHALL BE 3.0' X 3.5' X 2.0' (W X L X H) +/- 0.5 FT. THE MINIMUM ACCEPTABLE BOULDER THICKNESS (H) IS 2.0'. BOULDERS LONGER (L) THAN 4.0' WILL BE ACCEPTED. 3. BOULDERS SHALL BE PLACED BY MECHANICAL OR OTHER ACCEPTABLE METHODS, MINIMIZING VOIDS. THE BOULDERS SHALL BE PLACED TO FORM A NEAT AND UNIFORM SURFACE AREA. NO MORTAR IS PERMITTED. 4. COMPACTED FILL MATERIAL SHALL BE CONSIDERED SUITABLE SOIL MATERIAL, FREE OF ROOTS, STICKS, ROCKS, BRUSH, LITTER AND OTHER OBJECTIONABLE MATERIAL. 5. NO SIGNIFICANT VOIDS SHOULD EXIST BETWEEN ADJOINING FOOTER AND TOP ROCK. IN ORDER TO PREVENT PIPING OF WATER THROUGH STRUCTURE ROCKS, THE CONTRACTOR SHALL CHINK BY HAND OR EQUIPMENT ALL UNDESIRABLE VOIDS WITH SMALLER ROCKS SUCH AS ANY EXISTING STREAMBED MATERIAL OR SPECIFIED SUBSTRATE. CONSTRUCTION GUIDELINES: 1. ALL EROSION AND SEDIMENT CONTROL DEVICES SHOULD BE INSTALLED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN. 2. CHANNEL FLOW SHOULD BE DIVERTED AWAY FROM THE WORK AREA IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SITE SHOULD BE DEWATERED. 3. LOOSE MATERIAL AT THE TOE OF THE EMBANKMENT SHOULD BE EXCAVATED UNTIL A STABLE FOUNDATION IS REACHED. 4. EXCAVATE THE STREAM BANK UNTIL A STABLE SLOPE ANGLE IS ACHIEVED. THE SUBGRADE SHOULD BE SMOOTH, FIRM, AND FREE FROM PROTRUDING OBJECTS OR VOIDS THAT WOULD EFFECT THE PROPER POSITIONING OF THE FIRST LAYER OF STONES AND FILTER FABRIC. REMOVE ROOTS, TWIGS, AND OTHER DEBRIS IN BOULDER TOE EXCAVATION LIMITS. 5. COARSE BACKFILL MATERIAL AND A BEDDING COURSE CONSISTING AASHTO NO. 57 STONE SHALL BE INSTALLED BELOW THE FIRST ROW OF BOULDERS. IF BEDROCK IS ENCOUNTERED ONSITE, THE FIRST LIFT OF BOULDERS SHALL BE PLACED DIRECTLY ON THE BEDROCK. THE FIRST ROW OF BOULDERS SHALL EXTEND BELOW THE STREAM BED A MINIMUM OF 1.0'. INSTALL EACH LIFT OF BOULDERS WITH A 0.5 FT SETBACK FROM THE FRONT EDGE OF THE PREVIOUS LIFT OF BOULDERS. 6. INSTALL BOULDER LIFTS UP TO 3.0 FT ABOVE THE UPSTREAM INVERT ELEVATION PER THE DESIGN PROFILE. INSTALL SOIL LIFTS ON TOP OF THE BOULDER TOE STRUCTURE AT A 2H:1V GRADE OR FLATTER TO TIE INTO EXISTING GRADE (SEE DETAIL ON THIS SHEET). 7. PLACE NON WOVEN GEOTEXTILE FILTER FABRIC LOOSELY AND EVENLY ON PREPARED FILL SLOPE AND SECURE WITH STAPLES 2 FEET ON -CENTER MAXIMUM. RETAIN A SUITABLE LENGTH OF NON WOVEN GEOTEXTILE FABRIC TO CONTINUE 12" PAST THE FOOTER ROCK. ADJACENT STRIPS SHOULD OVERLAP 12 INCHES AND BE STAPLED ON 12 INCH CENTERS. UPSTREAM OR UPSLOPE FILTER FABRIC SHOULD ALWAYS BE PLACED OVER THE DOWNSTREAM OR DOWNSLOPE FILTER FABRIC. IF THE FILTER FABRIC IS TORN OR DAMAGED DURING CONSTRUCTION, IT SHOULD BE REPAIRED OR REPLACED. STAPLES SHALL BE 0.125 INCHES DIAMETER NEW STEEL WIRE FORMED INTO A "U" SHAPE NOT LESS THAN 6 INCHES IN LENGTH WITH A THROAT OF 1 INCH WIDTH. 8. FOOTER ROCKS SHALL BE PLACED INDIVIDUALLY AND KEYED INTO THE CHANNEL, BED, STREAM BANK AS SHOWN IN THE DETAIL. THE TOP ROCKS OF THESE STRUCTURES SHALL BE PLACED LINEARLY, WITH TIGHT AND CONTIGUOUS SURFACE CONTACT WITH ADJACENT ROCK. ENSURE THE ROCKS ARE STACKED SO THE PLACED STONE RESTS ON TWO STONES IN THE TIER BELOW IT. HEADER BOULDERS SHOULD BE SET SLIGHTLY BACK FROM FOOTER BOULDERS SUCH THAT PART OF THE HEADER BOULDER IS RESTING ON THE POROUS BACKFILL. 9. PLACEMENT OF COARSE BACKFILL SHOULD OCCUR CONCURRENTLY WITH THE PLACEMENT OF EACH CONSECUTIVE ROCK LAYER. THE BACKFILL SLOPE ANGLE SHOULD BE 2H:1V OR FLATTER BUT SHOULD ALWAYS PROVIDE AT MINIMUM POSITIVE DRAINAGE. 10. IF GEOTEXTILE IS PUNCTURED DURING BOULDER PLACEMENT, THE BOULDERS SHALL BE FULLY REMOVED FOR AT LEAST THREE FEET OUTSIDE THE LIMITS OF THE FABRIC PUNCTURE AND A NEW GEOTEXTILE PATCH WITH MINIMUM OVERLAP SHALL BE SECURELY FASTENED OVER THE PUNCTURE WITH SECURING PINS. EROSION CONTROL BLANKET (SEE DETAIL SHEET C6.03) BANKFULL SOIL LIFTS (SEE DETAIL ON THIS SHEET) MIN. 2.0-FT (H) BOULDERS BASEF EXISTING GRADE (TYP.) STREAM BED 6" MIN TOPSOIL (TYP.) 'IIIII I I -III BOULDER TOE REVETMENT N.T.S. SECTION VIEW LIVE STAKES (SEE DETAIL SHEET C6.03) EXISTING GRADE (TYP.) I IF INSITU SOILS COMPACTED SUITABLE FILL MATERIAL (SEE GENERAL NOTE 6) NON WOVEN GEO-TEXTILE FABRIC (TYP.) COARSE BACKFILL COMPOSED OF AASHTO NO. 57 STONE (MAX OF 5% FINES) EXCAVATION LIMITS (TYP.) EMBED FOOTER BOULDERS (MINIMUM 1') GRAVEL SUBBASE NON WOVEN GEOTEXTILE FABRIC TO EXTEND MIN. 12" PAST FOOTER ROCK GENERAL NOTES: 1. DO NOT EXCEED A 2H:1V SLOPE FOR SOIL LIFTS 2. MAXIMUM LIFT THICKNESS 12", MINIMUM, 6". 3. KEY -IN AND OVERLAP LIFTS A MINIMUM OF 1'. 4. EACH SOIL LIFT WILL BE SECURELY STAKED AND KEYED INTO THE EXISTING BANK. 5. WOODEN STAKES SHALL BE DESIGNED TO SAFELY AND EFFECTIVELY SECURE EROSION CONTROL BLANKETS, COIR LOGS, FASCINES, AND OTHER BIOENGINEERED STRUCTURES FOR TEMPORARY OR PERMANENT APPLICATIONS. 6. SOIL LIFT FILL MATERIAL SHALL BE TOPSOIL OR 50 PERCENT MIX OF TOPSOIL AND SUITABLE SOIL MATERIAL AS DETERMINED BY THE DESIGN ENGINEER. ALL FILL MATERIAL SHALL BE FREE OF ROOTS, STICKS, ROCKS, BRUSH, LITTER AND OTHER OBJECTIONABLE MATERIAL. 7. LIVE CUTTINGS SHALL MEET ALL OF THE SPECIFICATIONS STATED IN THE LIVE STAKES DETAIL (SHEET C6.03) EXCEPT THAT LIMBS SHALL REMAIN ON THE SIDES OF THE CUTTING IN THIS APPLICATION. THE LIVE BRANCHES SHOULD BE RELATIVELY STRAIGHT, WITH NO VISIBLE SIGNS OF DISEASE, DAMAGE OR DEFORMITY. CONSTRUCTION GUIDELINES: 1. INSTALL SUBGRADE GRADING AND BOULDER TOE TO FINISHED ELEVATIONS, REMOVING ROOTS, TWIGS, AND OTHER DEBRIS WHICH WOULD PREVENT THE MATTING FROM BEING LAID FLUSH TO THE FINISHED SURFACE. 2. PLACE EROSION CONTROL BLANKET ON TOP OF THE SUBGRADE/BOULDER TOE PERPENDICULAR TO THE DIRECTION OF STREAM FLOW. RETAIN A SUITABLE LENGTH OF EROSION CONTROL BLANKET TO CONTINUE MATTING UP THE SLOPE. INSTALL THE EROSION CONTROL BLANKET SUCH THAT THE UPSTREAM SIDE WILL BE ON TOP AND WILL OVERLAP THE DOWNSTREAM SIDE BY AT LEAST ONE FOOT AS NECESSARY TO COVER THE LONGITUDINAL LENGTH REQUIRED. 3. PLACE SALVAGED AND/OR FURNISHED TOPSOIL UPON EROSION CONTROL BLANKET TO APPROPRIATE GRADE ELEVATION AND BANK SLOPE. PLACE SELECT FILL TO A VERTICAL DEPTH OF 12 INCHES AND MINIMUM OF 4 FEET IN LENGTH. TAMP SOIL FIRMLY. 4. APPLY PERMANENT SEED TO TOPSOIL IN ACCORDANCE WITH PLANTING SCHEDULES, SEED MIXES, AND PLANTING AS DESIGNED AND AS SPECIFIED. SEED MIXTURE TO BE APPLIED TO FRONT PORTION OF LIFT THAT WILL BE LEFT EXPOSED. 5. ENCAPSULATE THE TOPSOIL WITH UNBURIED LENGTH OF EROSION CONTROL BLANKET TO COVER THE LIFT. FASTEN EROSION CONTROL BLANKET WITH WOODEN STAKES. HANDLE THE FABRIC AND SOIL MATERIALS IN A MANNER THAT DOES NOT DAMAGE THE MATTING OR DEPOSIT SOIL MATERIAL IN THE STREAM CHANNEL. REPAIRS AND FABRIC REPLACEMENT ARE THE RESPONSIBILITY OF THE CONTRACTOR. 6. AFTER SOIL LIFT IS COMPLETED, THE LIVE CUTTINGS SHALL BE CRISS-CROSSED ON TOP OF THE LIFT AT 8 TO 12 BRANCHES PER LINEAR FOOT ALONG THE STREAM BANK. THE BASAL END OF THE BRANCHES SHOULD EXTEND AT LEAST 1 FOOT PAST THE BACK OF THE SOIL LIFT, AGAINST THE BACK OF THE EXCAVATION. NO MORE THAN 6 INCHES OF THE BUDDING END OF THE LIVE BRANCH SHOULD EXTEND PAST THE FRONT OR FINISHED FACE OF THE SOIL LIFT. ORIENT THE BRANCHES SO THE EXPOSED PORTIONS HAVE THEIR BUDS FACING UPWARDS AND REMOVE THE TERMINAL BUD TO PROMOTE ROOT AND STEM DEVELOPMENT. 7. COVER THE LIVE BRANCHES WITH TOPSOIL TO CREATE AN EVEN SURFACE FOR THE CONSTRUCTION OF THE NEXT LIFT. 8. REPEAT TO FORM UNTIL A MINIMUM 3 SOIL LIFTS HAVE BEEN CREATED AT A SLOPE NO STEEPER THAN 2H:1V. 9. INSTALL LIVE STAKES IN FINISHED SLOPE AND/OR APPROVED PLANTING PLAN. INSTALL EROSION CONTROL BLANKET IN 6" TRENCH, ANCHOR WITH WOODEN STAKE (PREFERRED) OR STAPLE, BACKFILL, AND COMPACT. RESTORE DISTURBED AREA WITH TOPSOIL, SEEDING, AND PLANTING ESTABLISHED PERMANENT SEEDING (SEE SHEET L5.00) EROSION CONTROL BLANKET (SEE DETAIL) LIVE CUTTINGS (SEE GENERAL NOTE 7) SOIL LIFTS MAX HEIGHT 12" TOPSOIL OR 50% MIX (SEE NOTES) 2 I -MIN = 411Fir _ _ lIg -41-I I-� I -I I MATTING EMBEDMENT SOIL LIFTS N.T.S. LIVE STAKES (SEE SHEET C6.03) EXISTING GRADE (TYP.) T711 WEI MEW- I INSITU SOILS WOODEN STAKE COARSE AGGREGATE FILTER LAYER SECTION VIEW PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT PIEDMONT CONSERVATION COUNCIL 201 E MAIN ST, 5TH FLOOR DURHAM, NC 27701 PHONE: 919. 525. 3037 WHITSETT, NC 27377 fSS/5• „5,‘ .ate SEAL 049073 ) i '''' C I ' NEF' .•' .,��ps,(t7 REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. FILENAME CHECKED BY DRAWN BY SCALE DATE SHEET STN-2101.01 STN2101-D RAS CHJ N.T.S. 07. 07. 2022 STREAM DETAILS C8.00 GENERAL NOTES: GRADING AND SOIL PREPARATION NOTES: TEMPORARY SEEDING SCHEDULE: M:\Projects\STN\000STN2101.00 - StoneyCreek HOA Contract\04-Production\Water Resources\Current Drawings\STN2101-L.dwg, 7/7/2022 3:12:31 PM, Cameron Jernigan 1. ALL RIPARIAN BUFFER AREAS WITHIN THE LIMITS OF DISTURBANCE TO BE SEEDED TO SPECIFICATIONS UNLESS OTHERWISE NOTED. 2. ALL AREAS OUTSIDE OF THE LIMITS OF DISTURBANCE TO REMAIN IN THEIR NATURAL CONDITION. 3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER AND DESIGNER, PRIOR TO PROCEEDING WITH THE WORK. 4. THE CONTRACTOR IS RESPONSIBLE FOR HAVING ALL UTILITIES LOCATED 48 HOURS PRIOR TO MOBILIZATION TO THE SITE. "CALL BEFORE YOU DIG." TOLL FREE NUMBER (800-698-4949). 5. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL EXISTING UTILITIES (IF ANY). SEQUENCE OF PLANTING EVENTS: THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING GENERAL SEQUENCE OF CONSTRUCTION: 1. SET UP STAGING AREAS AND ACCESS ROADS. INSTALL CONSTRUCTION ENTRANCES, SILT FENCE, AND SILT FENCE OUTLETS (AS REQUIRED). SEE EROSION AND SEDIMENT CONTROL DETAILS FOR ADDITIONAL INSTRUCTIONS. 2. CONTRACTOR TO STOCKPILE AND STAGE MATERIALS ONLY AT THE LOCATIONS SHOWN ON THE PLANS UNLESS OTHERWISE APPROVED BY THE DESIGNER. NO WASTE STOCKPILING IS ALLOWED. ALL WASTE MATERIALS MUST BE REMOVED FROM THE FLOODPLAIN AND THE PROJECT SITE. 3. PREPARE PLANTING AREAS AS NEEDED. APPLY TEMPORARY OR PERMANENT SEED. SEE PLANTING NOTES AND SEEDING NOTES THIS SHEET FOR ADDITIONAL INSTRUCTIONS. 4. PLANT SITE ACCORDING TO THE PLANTING SPECIFICATIONS. 5. IN SEEDED AREAS, TO LIMIT EROSION POTENTIAL, THE CONTRACTOR SHALL LIMIT SUB -GRADE AND FINISH GRADE PREPARATION TO AREAS THAT WILL BE PLANTED IMMEDIATELY. PREPARED AREAS SHALL BE MOISTENED PRIOR TO SEEDING WHEN THE SOIL IS DRY, BUT CARE SHALL BE TAKEN TO NOT CREATE MUDDY CONDITIONS. 6. COMPLETE ALL FINAL SITE WORK NECESSARY TO COMPLETE THE PROJECT. PLANTING NOTES: 1. THE PLANTING STOCK SHALL BE GROWN WITHIN THE PIEDMONT REGION BY NURSERIES WITHIN 200 MILES OF THE PROJECT SITE. THE SEED SOURCES FOR THE PLANT MATERIAL SHALL ALSO BE FROM THE PIEDMONT REGION AND SHALL BE OBTAINED WITHIN 200 MILES OF THE PROJECT SITE. PLANT STOCK AND SEED MIXES MAY BE USED FROM NURSERIES BEYOND THE 200 MILE LIMIT WITH THE APPROVAL OF THE DESIGNER. 2. THE CONTRACTOR (I.E. PLANTING SUPERVISOR) INSTALLING THE VEGETATION SHALL HAVE ONE OF THE FOLLOWING QUALIFICATIONS / CERTIFICATIONS: CERTIFIED LANDSCAPE TECHNICIAN, CERTIFIED PLANT PROFESSIONAL, REGISTERED FORESTER, REGISTERED LANDSCAPE CONTRACTOR, OR CERTIFIED NURSERYMEN. 3. THE CONTRACTOR (I.E. PLANTING SUPERVISOR) WILL BE RESPONSIBLE FOR MANAGING ALL ACTIVITIES INVOLVING PERMANENT PLANTING, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: SITE PREPARATION FOR PLANTING, SEEDLING HANDLING AND STORAGE, PLANTING OPERATIONS, QUALITY CONTROL INSPECTIONS, AND MANAGING PLANT COMPETITION. 4. THE PLANTING PERIOD FOR THIS PROJECT SHALL OCCUR IN THE FALL OR WINTER (IF THE GROUND IS NOT FROZEN). PLEASE NOTE PLANTING SHALL NOT TAKE PLACE IF ANY OF THE FOLLOWING OCCUR: (1) THE TEMPERATURE IS BELOW 32°F, (2) THE SOIL TO BE EXCAVATED FOR THE PLANT HOLE IS FROZEN, OR (3) THE SOIL TO BE USED FOR BACKFILLING IS FROZEN OR TOO WET. 5. FOR ALL PLANTED MATERIAL (BARE ROOT / CONTAINERIZED SEEDLINGS, LIVE STAKES, AND PERMANENT SEEDING) THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING (I.E. A WARRANTY) AN 80% SURVIVAL RATE FOR THE DURATION OF THE FIRST YEAR MONITORING PERIOD. ANY COSTS ASSOCIATED WITH REPLACING PERMANENT PLANTINGS THAT DO NOT SURVIVE THE FIRST YEAR SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. PLEASE NOTE THE ONE-YEAR MONITORING PERIOD BEGINS UPON ACCEPTANCE OF THE PERMANENT PLANTINGS BY THE DESIGNER. AT THE END OF THE FIRST YEAR MONITORING PERIOD, AN ON -SITE INSPECTION WILL BE CONDUCTED BETWEEN THE CONTRACTOR AND DESIGNER. AT THAT TIME, THE CONTRACTOR WILL BE DIRECTED ACCORDINGLY ON REPLACEMENT OF ANY NECESSARY PLANTINGS. 6. THE ONE-YEAR WARRANTY SHALL INCLUDE MORTALITY AND POOR GROWTH DEFECTS, BUT SHALL NOT INCLUDE DEFECTS RESULTING FROM ABUSE BY OTHER PARTIES AND ABNORMAL WEATHER CONDITIONS. PLEASE NOTE THE 80% SURVIVAL RATE IS A MINIMUM STANDARD AND THE CONTRACTOR MAY PROVIDE ADDITIONAL MEASURES THEY DETERMINE WILL BE BENEFICIAL TO PLANT SURVIVABILITY. ANY ADDITIONAL MEASURES WILL BE CONSIDERED PART OF THE 80% SURVIVAL CLAUSE AND WILL NOT CONSTITUTE A CHANGE ORDER. THIS MAY INCLUDE, BUT IS NOT LIMITED TO, SOIL AMENDMENTS, IRRIGATION, AND MULCH. 7. AT THE CONTRACTOR'S DISCRETION, THE PROPAGATION METHOD LISTED FOR EACH PLANT MAY BE ALTERED IF IT IS LIKELY TO IMPROVE SURVIVABILITY. THIS WILL BE SOLELY AT THE CONTRACTOR'S DISCRETION AND WILL THEREFORE NOT BE CONSIDERED A CHANGE ORDER. ALSO, NO CHANGE IN THE PLANTING DENSITY WILL BE GIVEN. 8. THE CORRECT SPACING OF VEGETATION WITHIN THE PLANTING ZONE SHOULD BE CHECKED BY THE PLANTING SUPERVISOR ON A REGULAR BASIS. 1. THE TOPSOIL MUST BE STOCKPILED. 2. ANY AREAS ON THE SITE THAT ARE COMPACTED DURING THE CONSTRUCTION PROCESS, MUST BE DEEP TILLED TO ENSURE THAT THE ROOT GROWTH OF THE PLANTS WILL NOT BE IMPEDED BY COMPACTED SOIL. THIS DOES NOT INCLUDE ANY AREAS THAT ARE PURPOSEFULLY COMPACTED IN THE SUBSOIL TO PREVENT THE DOWNWARD MOVEMENT OF WATER. 3. ALL TOPSOIL SHALL BE STOCKPILED SEPARATELY FROM ANY SUBSOIL MATERIAL. 4. ANY AREA THAT HAS FILL APPLIED TO IT OR ANY AREA EXCAVATED TO THE SUBSOIL MUST BE TOP DRESSED WITH AT LEAST 4 INCHES OF STOCKPILED TOPSOIL. BEFORE THE APPLICATION OF TOPSOIL, THE SURFACE MUST BE TILLED TO ENSURE GOOD INTERACTION BETWEEN THE TOPSOIL AND THE SUBSOIL. 5. UPON COMPLETION OF FINAL GRADING, THE PLANTING SUPERVISOR SHALL CONDUCT A SITE ASSESSMENT TO DETERMINE IF THE SOIL IS APPROPRIATELY PREPARED FOR PLANTING. IF ANY PROBLEMS EXIST, THEY SHALL BE NOTED AND CORRECTED BEFORE PLANTING MAY COMMENCE. 6. TO PROMOTE PROPER GROWTH, THE CONTRACTOR SHALL DEEPLY TILL AND SCARIFY THE PLANTING ZONES TO ENSURE THAT THE ROOT GROWTH OF THE PLANTS WILL NOT BE IMPEDED BY COMPACTED SOIL. ANY SUB -SURFACE HARDPANS WITHIN THE PLANTING ZONE SHALL BE ELIMINATED. RIPPING, DISKING, OR RAKING SHALL BE PERFORMED IN ALL AREAS TO BE SEEDED TO A MINIMUM DEPTH OF 3 INCHES TO 4 INCHES. 7. IN SEEDED AREAS, TO LIMIT EROSION POTENTIAL, THE CONTRACTOR SHALL LIMIT SUB -GRADE AND FINISH GRADE PREPARATION TO AREAS THAT WILL BE PLANTED IMMEDIATELY. PREPARED AREAS SHALL BE MOISTENED PRIOR TO SEEDING WHEN THE SOIL IS DRY, BUT CARE SHALL BE TAKEN TO NOT CREATE MUDDY CONDITIONS. 8. THE PLANTING ZONE SHALL NOT BE GRADED LEVEL. MICROTOPOGRAPHY IS DESIRED TO PROMOTE DIFFUSE FLOW AND SURFACE WATER STORAGE. MICROTOPOGRAPHICAL DEPRESSIONS SHALL NOT BE GREATER THAN 6 INCHES IN DEPTH. 9. UPON COMPLETION OF FINAL GRADING, THE PLANTING SUPERVISOR SHALL CONDUCT A SITE ASSESSMENT TO DETERMINE IF THE SOIL IS APPROPRIATELY PREPARED FOR PLANTING. IF ANY PROBLEMS EXIST, THEY SHALL BE NOTED AND CORRECTED BEFORE PLANTING MAY COMMENCE. SEEDBED PREPARATION 1. APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED EXCEPT TO BREAK UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS. SEEDBED PREPARATION WITHIN LIMITS OF DISTURBANCE AREAS ONLY 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. PER ONE TIME ONLY, APPLY LIME UNIFORMLY AND MIX WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, RESONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON FRESHLY PREPARED SEEDBED AND COVER. 7. MULCH IMMEDIATLEY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. 9. CONSULT INSPECTOR ON MAINTENANCE TREATMENT AFTER PERMANENT COVER IS ESTABLISHED. PLANTING ZONES T + + 1.- + + + + + + ++++ �+ + + + -I_ + � + ++ PERMANENT SOD - BERMUDA AREA = 2,600 SF (0.06 AC) PERMANENT SEED MIX AREA = 6,700 SF (0.15 AC) PERMANENT RIPARIAN SEED MIX AREA = 800 SF (0.02 AC) PERMANENT RIPARIAN SEED MIX + LIVE STAKES AREA = 2,500 SF (0.06 AC) l r / / / TEMPORARY SEEDING SHALL BE APPLIED AS NEEDED DURING CONSTRUCTION TO STABILIZE BARE OR DISTURBED AREAS OF SOIL AND AT THE COMPLETION OR ALL GRADING AND EARTHWORK ACTIVITIES WITHIN A PARTICULAR AREA OF THE SITE. PERMANENT SEED MAY BE DISTRIBUTED WITH TEMPORARY SEED UPON THE FINAL APPLICATION OF TEMPORARY SEED. SEEDING DATE SEEDING MIXTURE AUG 15 - MAY 1 RYE (GRAIN) AUG 15 - MAY 1 WHEAT MAY 1 - AUG 15 GERMAN MILLET MAY 1 - AUG 15 BROWNTOP MILLET SEEDING METHODS APPLICATION RATE 30 LBS/AC 30 LBS/AC 10 LBS/AC 10 LBS/AC 1. EVENLY APPLY SEED USING A CYCLONE SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. THIS MUST BE DONE WITHIN 48 HOURS OF LAND DISTURBING ACTIVITIES. 2. MULCH WITH CLEAN WHEAT STRAW. 3. AFTER SEEDING, APPLY MULCH TO AREAS UNDER HARSH CONDITIONS SUCH AS AREAS THAT HAVE BEEN GRADED, OR THOSE WHICH WILL RECEIVE CONCENTRATED FLOWS. AREAS CONSIDERED TO BE UNDER HARSH CONDITIONS WILL BE CONSIDERED THE AREAS GRADED FOR THE WETLAND VALLEY. 4. RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS LESS THAN 80% COVERAGE, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. NOTES 1. TEMPORARY ANNUAL SEED SELECTION SHOULD BE BASED ON SEASON OF PROJECT INSTALLATION. 2. A SINGLE SPECIES FOR TEMPORARY COVER IS ACCEPTABLE 3. IN SOME CASES WHERE SEASONS OVERLAP, A MIXTURE OF TWO OR MORE SPECIES MAY BE NECESSARY. HOWEVER, APPLICATION RATES SHOULD NOT EXCEED THE TOTAL RECOMMENDED RATE PER ACRE. 4. TEMPORARY SEED SHOULD BE MIXED AND APPLIED SIMULTANEOUSLY WITH THE PERMANENT SEED MIX IF OPTIMAL PLANTING DATES ALLOW. PERMANENT SEEDING SCHEDULE: PLANT MATERIAL SELECTION 1. REFER TO THIS SHEET FOR APPROPRIATE SELECTIONS OF NATIVE PERMANENT SEEDS. 2. PERMANENT SEED INCLUSION IN THE MIXTURE SHOULD TOTAL 15 LBS OF PURE LIVE SEED (PLS) PER ACRE DRILLED OR 15-20 LBS pls/AC BROADCAST APPLIED. 3. AT LEAST4 SPECIES SHOULD BE SELECTED FOR THE MIXTURE INCLUDING ONE SPECIES FROM EACH TYPE (WARM SEASON, COLD SEASON, WETLAND). SELECTION OF MORE THAN 4 SPECIES IS RECOMMENDED FOR INCREASING CHANCES OF SUCCESSFUL VEGETATION ESTABLISHMENT. 4. IF OTHER SPECIES SUCH AS WILDFLOWERS ARE ADDED TO THE MIX, THEY SHOULD NOT BE COUNTED IN THE MINIMUM SEEDING RATE FOR GRASSES. SEEDBED PREPARATION 1. DISTURBED SOILS WITHIN RIPARIAN AREAS MUST BE AMENDED TO PROVIDE AN OPTIMUM ENVIRONMENT FOR SEED GERMINATION AND SEEDLING GROWTH. 2. THE pH OF THE SOIL MUST BE SUCH THAT IT IS NOT TOXIC AND NUTRIENTS ARE AVAILABLE. 3. SOIL ANALYSIS SHOULD BE PERFORMED TO DETERMINE NUTRIENT AND LIME NEEDS OF EACH SITE. 4. APPROPRIATE pH LEVELS ARE BETWEEN 5.5 - 7. 5. RIPARIAN BUFFERS REGULATED FOR NUTRIENT MANAGEMENT MAY BE LIMITED TO A SINGLE APPLICATION OF FERTILIZER. 6. SUITABLE MECHANICAL MEANS SUCH AS DISKING, RAKING, OR HARROWING MUST BE EMPLOYED TO LOOSEN COMPACTED SOIL PRIOR TO SEEDING. PLANTING 1. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, DRILL, OR HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. 2. IN FINE SOILS, SEEDS SHOULD BE DRILLED 0.25 - 0.5 INCHES. IN COARSE SANDY SOILS, SEEDS SHOULD BE PLANTED NO DEEPER THAN 0.75 INCHES. MULCH 1. MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING. 2. IF PLANTING ON STREAM BANKS STEEPER THAN 10% OR AREAS SUBJECT TO FLOODING, A BIODEGRADABLE ROLLED EROSION CONTROL PRODUCT IS RECOMMENDED TO HOLD SEED AND SOIL IN PLACE. MAINTENANCE 1. THE RECOMMENDED PERMANENT GRASS SPECIES MAY REQUIRE TWO YEARS FOR ESTABLISHMENT, DEPENDING ON SITE CONDITIONS. 2. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS, SOIL AMENDMENTS, AND RE-SEEDINGS. 3. IF WEEDY EXOTIC SPECIES HAVE TAKEN OVER THE AREAS AFTER THE FIRST GROWING SEASON, THE INVASIVE SPECIES MUST BE ERADICATED TO ALLOW NATIVE SPECIES TO GROW. 4. MONITOR THE SITE UNTIL LONG-TERM STABILITY HAS BEEN ESTABLISHED. PERMANENT RIPARIAN SEED MIX SPECIES SPECIES (COMMON NAME) MIN. PERCENTAGE Panicum rigidulum (Redtop Panicgrass) 25 Panicum anceps (Beaked Panicgrass) 21 Chasmanthium latifolium (River Oats) 20 Elymus virginicus (Virginia Wildrye) 20 Sorghastrum nutans (Indiangrass) 10 Juncus coriaceous (Leathery Rush) 2 Agrostis hyemalis (Winter Bentgrass) 2 TOTAL = 100 - 0 GRAPHIC SCALE 10 20 40 1 inch = 20 ft. LIMITS OF DISTURBANCE 0.33 AC /y r al -�i al - l '� - 1 _ _ :'F 1' .4-7. 37. +t+ +t t- -_/ 1'�- _ -- -.t __,____ ji-__ _ md. LF 7 cn _ __,_--,,---t, ---+ + + „..# -j--,4-z_i_._i__1'+: + + + ,_ 01 \ / � �- _ter -- \ \ \- i--L/ j� / �- ��-vim S�NEYC / / �, -r ya REEK H // , / / �v / �// // �P / / / /// / / / // / // /, // // / // ,�// ///,/ ,// / / / / �/ / // / /;, / / 7) 1 / 1 / / / / / fr/r 1 ` / / p/ / / / / /// I I �// /�V// I \ I \ %' // \ \ r/ /I // >II..,/ �J/ I/ /I / i I//i/� //7 J(' // /��, / I/1 / ( / // I //�� . I /r jt/l ,/ // /I I 6- ,/ i /g///// / / '' //' 1 (�� I1 / / / / ' zcs. i \/\\ ! //// si` 1%.. ,.•.f \ \i s \/1. s, \\ \\U� /t;/ \ \ \ l-� r \_- 1 .. _ Ini.,� ne - r LIMITS OF �ISTL ANCEI \ '1) / / / / /// , /�_� /i / / / / / _ _ / �//~ //X▪ / --- • ) iLW \ SS ss ---------------- MC ADA M S The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 CLIENT PIEDMONT CONSERVATION COUNCIL DURHAM, NC 27701 PHONE: 919. 525. 3037 LIU < LTJ CeLIJOD 14 co < 0 WHITSETT, NC 27377 0S4E90A7L3 ) ------------------ REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. FILENAME CHECKED BY DRAWN BY SCALE DATE SHEET RAS CHJ 07. 07. 2022 PLANTING PLAN L5.00 Action ID Number: SAW-2022-01533 Permittee: Piedmont Conservation Council, Attn: Emma Jablonski Project Name: Rock Creek Bank Stabilization / Gibsonville Date Verification Issued: 09/08/2022 Project Manager: David E. Bailey County: Guilford Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date