Loading...
HomeMy WebLinkAboutNCC223164_Site Plan or Location Map_202209091 2 3 E! 5 7 -P WE 10 G F E FBI C 0 VICINITY MAP SCALE: 1"=2,000' )zo SITE e / QUAD ,. i0 GdYS l � B '- SITE O n WWIIwas, ;ullai EROSION & SEDIMENTATION CONTROL PLANS TAXIWAY AND APRON REPAIR `r POPE ARMY AIRFIELD j" FORT BRAGG, NORTH CAROLINA SEQUENCE OF CONSTRUCTION NOTES: SOIL TYPE SOIL NAME HYDROLOGIC GROUP BLANEY—URBAN LAND COMPLEX, 2 TO 8 PERCENT B BdB SLOPES SOIL INFORMATION AND DELINEATION OBTAINED FROM NCRS WEBSITE. 1. RECEIVE FORT BRAGG DIRECTORATE OF PUBLIC WORKS APPROVAL AND CERTIFICATE OF COVERAGE FROM NCDEQ. 2. PRIOR TO ANY LAND DISTURBANCE ACTIVITY CONDUCT A SWPPP PRE -CONSTRUCTION CONFERENCE. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT SWPPP PRE -CONSTRUCTION MEETING WITH SWPPP PREPARING ENGINEER, FORT BRAGG DPW, CONTRACTING OFFICER'S REPRESENTATIVE AND ALL LAND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. 3. CONDUCT LIMITED DEMOLITION AS REQUIRED TO INSTALL SILT FENCE AND CONSTRUCTION ENTRANCE. 4. INSTALL SILT FENCE, SILT FENCE OUTLETS, INLET PROTECTION AND CONSTRUCTION ENTRANCE AS SHOWN ON THE PLANS. 5. DEMOLISH AND REMOVE EXISTING PAVEMENT WITHIN LIMITS OF DISTURBANCE. REFER TO PHASING PLANS FOR WORK RESTRICTIONS ASSOCIATED WITH AIRFIELD CONSTRUCTION. 6. UTILIZE PUMPS AND TEMPORARY SWALES TO DRAIN SITE AS NECESSARY. 7. TEMPORARILY SEED OTHER DISTURBED AREAS IN ACCORDANCE WITH THE PLANS AND THE CONSTRUCTION GENERAL PERMIT. 8. CONDUCT GRADING OPERATIONS. 9. ADJUST AND STABILIZE SILT FENCE, SILT FENCE OUTLETS AS SITE IS BROUGHT TO ROUGH GRADE. 10. BEGIN INSTALLATION OF PERMANENT STORM DRAINAGE SYSTEM. INSTALL INLET PROTECTION AS INLETS ARE INSTALLED. 11. BEGIN INSTALLATION OF AIRFIELD ELECTRICAL FEATURES. EROSION CONTROL NOTES: 1. ALL CONTRACTORS/SUBCONTRACTORS/PERSON THAT WILL BE ENGAGED IN LAND DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION CONTROL AND STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS AND PERMITS. 2. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL BMP INSPECTIONS IAW SWPPP AND NCDEQ REQUIREMENTS. 3. REMOVE ACCUMULATED SEDIMENT AND DEBRIS FROM EXISTING AND NEW STORM DRAINAGE SYSTEM WITHIN THE LIMITS OF DISTURBANCE. 12. FINE GRADE SITE TO ELEVATIONS GIVEN ON GRADING PLANS. 13. PREPARE SITE FOR PAVING. 14. COMPLETE PAVING OPERATIONS. 15. COMPLETE ANY REMAINING GRADING. 16. STABILIZE SITE. 17. MAINTAIN BEST MANAGEMENT PRACTICES THROUGHOUT CONSTRUCTION. 18. REMOVE ACCUMULATED SEDIMENT AND DEBRIS FROM EXISTING AND NEW STORM DRAINAGE SYSTEM WITHIN THE LIMITS OF DISTURBANCE. 19. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AFTER APPROVAL OF FORT BRAGG DPW, THE ENGINEER AND THE CONTRACTING OFFICER AND STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF THE BEST MANAGEMENT PRACTICES. 20. PERMANENTLY STABILIZE DISTURBED AREAS IAW PROJECT PLANS AND DETAILS. 21. CONTINUE INSPECTION REPORTS IAW CONSTRUCTION GENERAL PERMIT UNTIL THE SITE IS FULLY STABILIZED AND THE PERMIT MAY BE TERMINATED. 22. SUBMIT NOTICE OF TERMINATION. CONTRACTOR STAGING AND BATCH PLANT AREAS: 1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL REQUIRED PERMITS, INCLUDING LAND DISTURBANCE PERMIT, ASSOCIATED WITH ANY AND ALL STAGING, LAYDOWN AND BATCH PLANT LOCATIONS. 2. CONCRETE WASHOUT LOCATIONS NOT SHOWN WITHIN LIMITS OF DISTRUBANCE ON THESE PLANS AND SHALL BE PROVIDED FOR AT CONTRACTOR STAGING/ BATCH PLANT LOCATIONS AND INCLUDED IN CONTRACTOR'S PERMIT PACKAGE. GC-717 GC-718 J GC-711 :GC-712ZGC GC-714 GC-715 GC-716 O 0 0 0 O Al vry neon EROSION CONTROL DRAINING LIST SHEET NUMBER SHEET TITLE SHEET DESCRIPTION DATE SUBMITED 23 GC-700 EROSION CONTROL COVER SHEET 20 July 2022 24 GC-701 EROSION CONTROL NOTES - SHEET 1 20 July 2022 25 GC-702 EROSION CONTROL NOTES - SHEET 2 20 July 2022 26 GC-703 EROSION CONTROL NOTES - SHEET 3 20 July 2022 27 GC-711 EROSION CONTROL PLAN 1 20 July 2022 28 GC-712 EROSION CONTROL PLAN 2 20 July 2022 29 GC-713 EROSION CONTROL PLAN 3 20 July 2022 30 GC-714 EROSION CONTROL PLAN 4 20 July 2022 31 GC-715 EROSION CONTROL PLAN 5 20 July 2022 32 GC-716 EROSION CONTROL PLAN 6 20 July 2022 33 GC-717 EROSION CONTROL PLAN 7 20 July 2022 34 GC-718 EROSION CONTROL PLAN 8 20 July 2022 35 GC-750 EROSION CONTROL DETAILS - SHEET 1 20 July 2022 36 GC-751 EROSION CONTROL DETAILS - SHEET 2 20 July 2022 37 CG-752 EROSION CONTROL DETAILS - SHEET 3 20 July 2022 ENGINEERING 25 WOODS LAKE ROAD, SUITE 210 GREENVILLE, SC 29607 864.751.9121 ADCENGINEERING.COM C �OFESS1,7 0 83 ENGINEER N,l 07/20/2022 a] US Army Corps of Engineers® N O N > O N O N w z > O N O N w z > CO w a o J H H O mmma O Uj w CD Y a o w z p c��l 0 N0 z0 �0 � o>- �Lo W J U 00 U N WLU J Z H N LU �00 OU�U� 0 w WI 2 N zLQ W OO coU UMw0 ,Lao womoow �-1 z Z Y W L J (q W a W 0- 2 D a N Z =0=UUCn�c/)a cn w Z � z r z w w Z Q M U � Z L�wm p LL � 0 0 � z w < -D W O JZ2 O z Uoaz W U) Q w a 0 U) cn o I— w w z ly (_ J a o a QwW w o =�0 U o�a 0 r Q Q z OW Ofoa p U ED Z �wX Ofo o v) w N O V_ Cw G J O 100% SUBMITTAL - PRIOR ITY PROJECT;