EROSION & SEDIMENTATION CONTROL PLANS
TAXIWAY AND APRON REPAIR
`r POPE ARMY AIRFIELD
j" FORT BRAGG, NORTH CAROLINA
SEQUENCE OF CONSTRUCTION NOTES:
SOIL TYPE
SOIL NAME
HYDROLOGIC
GROUP
BLANEY—URBAN LAND COMPLEX, 2 TO 8 PERCENT
B
BdB
SLOPES
SOIL INFORMATION AND DELINEATION OBTAINED FROM NCRS WEBSITE.
1. RECEIVE FORT BRAGG DIRECTORATE OF PUBLIC WORKS APPROVAL
AND CERTIFICATE OF COVERAGE FROM NCDEQ.
2. PRIOR TO ANY LAND DISTURBANCE ACTIVITY CONDUCT A SWPPP
PRE -CONSTRUCTION CONFERENCE. GENERAL CONTRACTOR SHALL
SCHEDULE AND CONDUCT SWPPP PRE -CONSTRUCTION MEETING
WITH SWPPP PREPARING ENGINEER, FORT BRAGG DPW,
CONTRACTING OFFICER'S REPRESENTATIVE AND ALL LAND
DISTURBING CONTRACTORS BEFORE PROCEEDING WITH
CONSTRUCTION.
3. CONDUCT LIMITED DEMOLITION AS REQUIRED TO INSTALL SILT
FENCE AND CONSTRUCTION ENTRANCE.
4. INSTALL SILT FENCE, SILT FENCE OUTLETS, INLET PROTECTION AND
CONSTRUCTION ENTRANCE AS SHOWN ON THE PLANS.
5. DEMOLISH AND REMOVE EXISTING PAVEMENT WITHIN LIMITS OF
DISTURBANCE. REFER TO PHASING PLANS FOR WORK
RESTRICTIONS ASSOCIATED WITH AIRFIELD CONSTRUCTION.
6. UTILIZE PUMPS AND TEMPORARY SWALES TO DRAIN SITE AS
NECESSARY.
7. TEMPORARILY SEED OTHER DISTURBED AREAS IN ACCORDANCE
WITH THE PLANS AND THE CONSTRUCTION GENERAL PERMIT.
8. CONDUCT GRADING OPERATIONS.
9. ADJUST AND STABILIZE SILT FENCE, SILT FENCE OUTLETS AS SITE IS
BROUGHT TO ROUGH GRADE.
10. BEGIN INSTALLATION OF PERMANENT STORM DRAINAGE SYSTEM.
INSTALL INLET PROTECTION AS INLETS ARE INSTALLED.
11. BEGIN INSTALLATION OF AIRFIELD ELECTRICAL FEATURES.
EROSION CONTROL NOTES:
1. ALL CONTRACTORS/SUBCONTRACTORS/PERSON
THAT WILL BE ENGAGED IN LAND DISTURBING
ACTIVITIES SHALL COMPLY WITH ALL EROSION
CONTROL AND STORMWATER POLLUTION
PREVENTION REQUIREMENTS CONTAINED
THROUGHOUT THE DRAWINGS, SPECIFICATIONS
AND PERMITS.
2. THE CONTRACTOR IS RESPONSIBLE FOR
COMPLETING ALL BMP INSPECTIONS IAW SWPPP
AND NCDEQ REQUIREMENTS.
3. REMOVE ACCUMULATED SEDIMENT AND DEBRIS
FROM EXISTING AND NEW STORM DRAINAGE
SYSTEM WITHIN THE LIMITS OF DISTURBANCE.
12. FINE GRADE SITE TO ELEVATIONS GIVEN ON GRADING PLANS.
13. PREPARE SITE FOR PAVING.
14. COMPLETE PAVING OPERATIONS.
15. COMPLETE ANY REMAINING GRADING.
16. STABILIZE SITE.
17. MAINTAIN BEST MANAGEMENT PRACTICES THROUGHOUT
CONSTRUCTION.
18. REMOVE ACCUMULATED SEDIMENT AND DEBRIS FROM EXISTING
AND NEW STORM DRAINAGE SYSTEM WITHIN THE LIMITS OF
DISTURBANCE.
19. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT
CONTROL DEVICES AFTER APPROVAL OF FORT BRAGG DPW, THE
ENGINEER AND THE CONTRACTING OFFICER AND STABILIZE ANY
AREAS DISTURBED BY THE REMOVAL OF THE BEST MANAGEMENT
PRACTICES.
20. PERMANENTLY STABILIZE DISTURBED AREAS IAW PROJECT PLANS
AND DETAILS.
21. CONTINUE INSPECTION REPORTS IAW CONSTRUCTION GENERAL
PERMIT UNTIL THE SITE IS FULLY STABILIZED AND THE PERMIT MAY
BE TERMINATED.
22. SUBMIT NOTICE OF TERMINATION.
CONTRACTOR STAGING AND BATCH
PLANT AREAS:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
ANY AND ALL REQUIRED PERMITS, INCLUDING LAND
DISTURBANCE PERMIT, ASSOCIATED WITH ANY AND ALL
STAGING, LAYDOWN AND BATCH PLANT LOCATIONS.
2. CONCRETE WASHOUT LOCATIONS NOT SHOWN WITHIN
LIMITS OF DISTRUBANCE ON THESE PLANS AND SHALL
BE PROVIDED FOR AT CONTRACTOR STAGING/ BATCH
PLANT LOCATIONS AND INCLUDED IN CONTRACTOR'S
PERMIT PACKAGE.
GC-717
GC-718
J
GC-711 :GC-712ZGC GC-714 GC-715 GC-716
O 0 0 0 O Al
vry neon
EROSION CONTROL DRAINING LIST
SHEET
NUMBER
SHEET
TITLE
SHEET DESCRIPTION
DATE SUBMITED
23
GC-700
EROSION CONTROL COVER SHEET
20 July 2022
24
GC-701
EROSION CONTROL NOTES - SHEET 1
20 July 2022
25
GC-702
EROSION CONTROL NOTES - SHEET 2
20 July 2022
26
GC-703
EROSION CONTROL NOTES - SHEET 3
20 July 2022
27
GC-711
EROSION CONTROL PLAN 1
20 July 2022
28
GC-712
EROSION CONTROL PLAN 2
20 July 2022
29
GC-713
EROSION CONTROL PLAN 3
20 July 2022
30
GC-714
EROSION CONTROL PLAN 4
20 July 2022
31
GC-715
EROSION CONTROL PLAN 5
20 July 2022
32
GC-716
EROSION CONTROL PLAN 6
20 July 2022
33
GC-717
EROSION CONTROL PLAN 7
20 July 2022
34
GC-718
EROSION CONTROL PLAN 8
20 July 2022
35
GC-750
EROSION CONTROL DETAILS - SHEET 1
20 July 2022
36
GC-751
EROSION CONTROL DETAILS - SHEET 2
20 July 2022
37
CG-752
EROSION CONTROL DETAILS - SHEET 3
20 July 2022
ENGINEERING
25 WOODS LAKE ROAD, SUITE 210
GREENVILLE, SC 29607
864.751.9121
ADCENGINEERING.COM
C
�OFESS1,7
0 83
ENGINEER
N,l
07/20/2022
a]
US Army Corps
of Engineers®
N
O
N
>
O
N
O
N
w
z
>
O
N
O
N
w
z
>
CO
w
a
o
J
H
H
O
mmma
O
Uj
w
CD
Y
a
o w
z p c��l 0
N0 z0
�0 �
o>- �Lo
W J U 00 U
N WLU
J Z H N LU
�00 OU�U� 0
w WI
2 N
zLQ
W OO
coU UMw0 ,Lao
womoow �-1
z Z Y W L J
(q W a
W 0- 2 D a N Z
=0=UUCn�c/)a
cn w Z
� z
r z
w w
Z Q M
U �
Z L�wm
p LL � 0 0 � z
w < -D W
O JZ2
O z
Uoaz
W U) Q w
a 0 U)
cn o
I—
w
w
z ly
(_
J a
o a
QwW
w
o
=�0
U
o�a
0
r Q Q
z
OW
Ofoa
p
U
ED
Z
�wX
Ofo
o
v)
w
N
O
V_
Cw
G
J
O
100% SUBMITTAL - PRIOR
ITY PROJECT;