Loading...
HomeMy WebLinkAboutNC0089052_Authorization to Construct_20111011ALWKWA Q= J NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Alec Chaplin, Jr. Zooland Family Campground, LLC P.O. Box 12187 Cola, South Carolina 29211 Dear Mr. Chaplin: Division of Water Quality Coleen H. Sullins Director October 31, 2011 Dee Freeman Secretary SUBJECT: Authorization to Construct A to C No. 089052A01 Zooland Family Campground Wastewater Treatment Facilities Randolph County A letter of request for an Authorization to Construct was received August 9, 2011, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of the new 0.006 MGD Zooland Family Campgound Wastewater Treatment Plant, with discharge of treated wastewater into the Little River in the Yadkin River Basin. This authorization results in a design and permitted capacity of 0.006 MGD, and is awarded for the construction of the following: The new Zooland Family Campground wastewater treatment facility, to include construction of an 8,000 gallon concrete septic tank; a 2,000 gallon concrete flow equalization tank with dual 15 gpm pumps; an AquaCell aerobic moving bed biofilm reactor (MBBR) tank with two chambers (4,800 gallon and 4,800 gallon) with coarse bubble diffusers and dual 116 scfm blowers; alkalinity 50- gallon storage and feed system; 8 -foot square hopper clarifier with air -lift sludge pump; a 1,500 gallon filter feed tank with dual 11 gpm filter feed pumps; a 24 -inch diameter pressure sand filter; a dual UV disinfection system; an effluent flow meter; a 1,500 clear-well with dual 60 gpm filter backwash pumps; approximately 360 linear feet of 6 -inch gravity effluent outfall pipe; a 35 kW emergency generator; associated electrical and controls work, sitework, and yard piping, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 One Location, 512 N Salisbury St, Raleigh, North Carolina 27604 North Caroli na Phone 919 - 807 -6300 \ FAX 919 -807 -64921 Customer Service 1- 877 - 623 -6748 Internet www.ncwaterquality org �atu[ y+ all An Equal Opportunity i Affirmative Action Employer Mr. Alex Chaplin, Jr. October 31, 2011 Page 2 This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO089052 issued September 19, 2011, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0089052. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143 -215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston -Salem Regional Office, telephone number (336) 771 -5000, shall be notified at least forty -eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ /DENR, 1633 Mail Service Center, Raleigh, NC 27699 -1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back -up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Mr. Alex Chaplin, Jr. October 31, 2011 Page 3 During the construction of the proposed additions /modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Darn Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143- 215.6A to 143- 215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number (919) 715 -6206. kp:sr cc Sincerely, Coleen H Sullins John F. Phillips, P.E., Diehl & Phillips, P.A., 219 E. Chatham Street, Cary, NC 27511 Randolph County Health Department DWQ Winston -Salem Regional Office, Surface Water Protection DWQ, Technical Assistance and Certification Unit DWQ, Point Source Branch, NPDES Program Ken Pohlig, P.E. ATC File Zooland Family Campground Wastewater Treatment Facilities A To C No. 089052A01 Issued October 31, 2011 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically /weekly /full time) the construction of the modifications and improvements to the Zooland Family Campground WWTP, located on 3671 Pisgah Covered Bridge Road, Asheboro in Randolph County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: The new Zooland Family Campground wastewater treatment facility, to include construction of an 8,000 gallon concrete septic tank; a 2,000 gallon concrete flow equalization tank with dual 15 gpm pumps; an AquaCell aerobic moving bed biofilm reactor (MBBR) tank with two chambers (4,800 gallon and 4,800 gallon) with coarse bubble diffusers and dual 116 scfm blowers; alkalinity 50- gallon storage and feed system; 8 -foot square hopper clarifier with air -lift sludge pump; a 1,500 gallon filter feed tank with dual 11 gpm filter feed pumps; a 24 -inch diameter pressure sand filter; a dual UV disinfection system; an effluent flow meter; a 1,500 clearwell with dual 60 gpm filter backwash pumps; approximately 360 linear feet of 6 -inch gravity effluent outfall pipe; a 35 kW emergency generator- associated electrical and controls work, sitework, and yard piping, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. We understand that the new limits associated with the modifications to expand to 0.006 MGD now apply. Signature Date Mail this Certification to Registration No. Attn: Ken Pohlig, P.E. Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699 -1633 Zooland Family Campground Wastewater Treatment Facilities A To C No. 089052AOI Issued October 31, 2011 Engineer's Certification I, TO 14N F PIN %LLI P.3 , as a duly re istered Professional Engineer in the State of North Carolina, having been authorized to observe eriodical d}e) the construction of the modifications and improvements to the Zoo an amily Campground WWTP, located on 3671 Pisgah Covered Bridge Road, Asheboro in Randolph County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: The new Zooland Family Campground wastewater treatment facility, to include construction of an 8,000 gallon concrete septic tank; a 2,000 gallon concrete flow equalization tank with dual 15 gpm pumps; an AquaCell aerobic moving bed biofilm reactor (MBBR) tank with two chambers (4,800 gallon and 4,800 gallon) with coarse bubble diffusers and dual 116 scfm blowers; alkalinity 50- gallon storage and feed system; 8 -foot square hopper clarifier with air -lift sludge pump; a 1,500 gallon filter feed tank with dual 11 gpm filter feed pumps; a 24 -inch diameter pressure sand filter; a dual UV disinfection system; an effluent flow meter; a 1,500 clearwell with dual 60 gpm filter backwash pumps; approximately 360 linear feet of 6 -inch gravity effluent outfall pipe; a 35 kW emergency generator; associated electrical and controls work, sitework, and yard piping, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. We understand that the new limits associated with the modifications to expand to 0.006 MGD now apply. Signature Registration No. 10130 Date 3/11 / m Mail this Certification to: Attn: Ken Pohlig, P.E. Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699 -1633 ' ..`,0" CAR0 ".0 SEAL 9� 0 \ 111, nn11110%--