Loading...
HomeMy WebLinkAbout20221220 Ver 1_0703_POSSOM_TROT_PERMIT_DRAWING_02SEP2022_20220906POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY — NORTH CAROLINA USACE ACTION ID#: TBD NCDWR WQC#: TBD LANDOWNER SHERRI LEE PAGE (443) 985-0723 3301 POSSUM TROT RD BURNSVILLE, NC PROJECT MANAGER BLUE RIDGE RC&D of Rio RHO JONATHAN HARTSELL EXECUTIVE DIRECTOR (828) 284-9818 HARTSELLJONATHAN@GMAIL.COM ENGINEER JENNINGS ENVIRONMENTAL PLLC GREG JENNINGS, PhD, PE PRESIDENT (919) 600-4790 GREG@JENNINGSENV.COM Jennings Environmental SHEET INDEX COVER SHEET 0.1 PROJECT NOTES AND SPECIFICATIONS 0.2 NCGO1 CONSTRUCTION GENERAL PERMIT 0.3 - 0.4 PROJECT OVERVIEW 0.5 STREAM DESIGN CHANNEL SECTIONS 1.1 - 1.2 STREAM DESIGN PLAN AND PROFILE 2.1 - 2.4 STREAM DESIGN DETAILS 3.1 - 3.4 EROSION AND SEDIMENTATION CONTROL PLAN 4.1 - 4.5 RE -VEGETATION PLAN 5.1 - 5.3 ,.y z CpaSfeetMep ,an, mntribuhvs„. --,.5r. 1 SITE Ailk NORTH 0 0.125 I D.25 I 0.5 Miles I PERMIT DRAWING SEPTEMBER 1, 2022 NOT RELEASED FOR CONSTRUCTION CDC C (I) E C ° n, L W > POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA COVER SHEET PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17 AS NOTED H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 0.1 GENERAL PROJECT NOTES AND SPECIFICATIONS 1. DEFINITIONS: 1.1. CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE DRAWINGS, DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS OF THE MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. 1.2. LANDOWNER: SHERI LEE PAGE 1.3. PROJECT MANAGER: BLUERIDGE RC&D 1.4. ENGINEER: JENNINGS ENVIRONMENTAL PLLC 2. THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 2.1. NC DEMLR'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 2.2. NC DEMLR'S CONSTRUCTION GENERAL PERMIT NUMBER NCG01000 2.3. GENERAL, REGIONAL AND SPECIAL CONDITIONS OF USACE'S 404 NATIONWIDE PERMIT NUMBER 27 2.4. GENERAL AND SPECIAL CONDITIONS OF NCDWR'S 401 WATER QUALITY CERTIFICATION 4134 2.5. THE CONSTRUCTION DOCUMENTS 3. NOT ALL EXISTING UTILITIES ARE SHOWN. SOME LOCATIONS MAY BE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION AND COORDINATION. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING AND PROTECTING EXISTING UTILITIES. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. 5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY THE ENGINEER AND PROJECT OWNER. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 6. THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK ON THE SITE. 7. EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME THE OWNER OR ENGINEER DETERMINES THAT THE CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO THE PROJECT OWNER, SO AS TO ASSURE COMPLIANCE WITH SAFETY CONCERNS. FAILURE OF THE DESIGNATED REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO ENSURE THE SAFE CONDUCT OF ITS WORK. 8. THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 9. THE CONTRACTOR SHALL ONLY USE ACCESS PATHS AND STAGING AREAS SHOWN ON THE DRAWINGS. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE ENGINEER AND PROJECT OWNER PRIOR TO USE. 10. NO NON -PERMITTED FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STABILIZATION AND GRADING WORK SHALL BE PLACED IN DESIGNATED AREAS ON THE SITE. 11. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY AND WORK WEEK. TOPOGRAPHIC NOTES AND SPECIFICATIONS 13. HORIZONTAL DATUM IS NAD83(2011) & VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. 14. EXISTING GROUND SURFACES ARE BASED ON NCEM'S QL1 LIDAR DATASET. STREAM RESTORATION NOTES AND SPECIFICATIONS 15. FIELD CONDITIONS MAY REQUIRE ADAPTATION OF THE DESIGN AND/OR DETAILS PROVIDED IN THE DRAWINGS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN IN THE DRAWINGS AND DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. THE ENGINEER WILL WORK WITH THE CONTRACTOR TO ADDRESS ANY FIELD CHANGES. 16. IN -STREAM ROCK STRUCTURES MAY BE SUBSTITUTED WITH WOOD STRUCTURES WITH WRITTEN APPROVAL FROM THE ENGINEER. 17. THE CONTRACTOR SHALL MARK THE LOCATIONS OF BANK STABILIZATION STRUCTURES USING SURVEY GRADE GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. 18. CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO ADJACENT SIGNIFICANT TREES. 19. CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL BANK STABILIZATION STRUCTURES. 20. DESIGN ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE DRAWINGS AND DETAILS. 21. IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 22. BANK STABILIZATION STRUCTURES SHALL BE INSTALLED AS SHOWN IN THE DRAWINGS AND DETAILS. ALL STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE DRAWINGS AND DETAILS. THE FINISHED STRUCTURE SLOPES AND GRADES SHALL BE WITHIN 0.1' OF DESIGN ELEVATIONS. 23. AFTER THE STRUCTURE IS COMPLETE AND NORMAL FLOW IS RESTORED TO THE CHANNEL, SOME ADJUSTMENT TO THE STRUCTURE OR ADDITIONAL STABILIZATION MEASURE MAY BE NECESSARY TO ACHIEVE THE DESIRED FUNCTION. 24. THE GRADED RIVER BANKS SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING AS SHOWN IN THE DRAWINGS AND DETAILS. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL SURFACE BY LOOSENING 3 - 6" OF SOIL OR APPLYING 3 - 6" OF TOPSOIL TO THE DESIGN ELEVATIONS AND APPLY TEMPORARY AND PERMANENT SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY OVER THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE DRAWINGS. MATTING USED FOR STREAMBANK STABILIZATION MUST BE CERTIFIED WEED -FREE STRAW OR OTHER NATURAL WEED -FREE / NON -PROPAGATING VEGETATIVE MATERIALS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IN THE MATTING SEPARATES FROM THE SOIL. 25. TOPSOIL SHALL BE REMOVED FROM EXCAVATION AND FILL AREAS PRIOR TO EXCAVATION AND GRADING AND RE -APPLIED TO AREAS AFTER ROUGH GRADING IS COMPLETE. 2 - 4" OF TOPSOIL SHALL BE PLACED ON DISTURBED AREAS TO THE ELEVATIONS AND GRADES INCLUDED IN THE DRAWINGS. EROSION AND SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS 26. ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND REQUIREMENTS OF NCDEML'S NG01 CONSTRUCTION GENERAL PERMIT. 27. ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 28. ALL WETLANDS AND STREAMS LOCATED WITHIN 50 FEET OF THE CONSTRUCTION AREA ON THE PROJECT SITE SHALL BE CLEARLY MARKED (EXAMPLE- ORANGE FABRIC FENCING) PRIOR TO ANY LAND DISTURBING ACTIVITIES AND MUST BE MAINTAINED ON THE PROPERTY UNTIL THE PROJECT PHASE IS COMPLETED. [15A NCAC 02H .0506 (B)(2)] 29. THE CONTRACTOR SHALL USED A STANDARD CONSTRUCTION ENTRANCE AT ALL SITE ACCESS POINTS TO PREVENT SEDIMENT FROM BEING TRACKED ONTO PUBLIC ROADS. 30. THE CONTRACTOR SHALL USED TEMPORARY SILT FENCE ALONG THE DOWNSLOPE SIDE OF ALL STAGING AREAS AND TEMPORARY STOCK PILE AREAS. 31. THE TURBIDITY STANDARD OF 50 NTUS (NEPHELOMETRIC TURBIDITY UNITS) SHALL NOT BE EXCEEDED AS DESCRIBED IN 15A NCAC 02B .0200. APPROPRIATE SEDIMENT AND EROSION CONTROL PRACTICES MUST BE USED TO MEET THIS STANDARD. [15A NCAC 02B .0211 (21)] 32. EQUIPMENT SHALL BE WELL -MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING, LUBRICATION AND GENERAL EQUIPMENT MAINTENANCE SHOULD NOT TAKE PLACE WITHIN 50 FEET OF A WATERBODY OR WETLANDS TO PREVENT CONTAMINATION BY FUEL AND OILS. [15A NCAC 02H .0506 (B)(3) AND 15A NCAC 02B .0211(12)] 33. CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 34. THE DESIGNER OR HIS DESIGNEE SHALL SUPERVISE THE INSTALLATION OF IN -STREAM STRUCTURES. [15A NCAC 02H .0506(B)(1) AND (2)]. 35. ALL STREAM RESTORATION WORK SHALL BE CONDUCTED DURING DRY WORKING CONDITIONS. A TEMPORARY PUMP AROUND SYSTEM SHALL BE USED TO DURING ALL STREAM RESTORATION AND STABILIZATION WORK WITHIN THE CHANNEL OR AT RESTORED STREAM TIE INS AS SHOWN IN THE DETAILS. 36. EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS. DISTURBED AREAS SHOULD BE SEEDED, MULCHED, AND/OR MATTED AS SOON AS POSSIBLE, PREFERABLY AT THE END OF EACH WORKDAY. [15A NCAC 02B .0201] 37. IF BORROW OR WASTE MATERIAL IS REQUIRED OR GENERATED DURING GRADING OPERATIONS, AN APPROVED EROSION AND SEDIMENT CONTROL PERMIT MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY. {15A NCAC 04B .0110}. QUANTITIES AND MATERIALS NOTES AND SPECIFICATIONS 38. THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE CONSTRUCTION DOCUMENTS. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 39. COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS SHALL BE THE EXPENSE OF THE CONTRACTOR. QUANTITIES LISTED ARE ESTIMATES ONLY AND SHALL BE CONFIRMED BY THE CONTRACTOR. 40. THE EROSION CONTROL MEASURES DEPICTED ON THE DRAWINGS SHALL BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOWN ON THE DRAWINGS) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE PROJECT OWNER AND ENGINEER PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES. 41. ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOWN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL FROM THE PROJECT OWNER AND ENGINEER. 42. THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 43. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND ALL LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE PROJECT OWNER AND ENGINEER. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE PROJECT OWNER. THE CONTRACTOR SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE OF BY THE PROJECT OWNER AND SHALL REPLACE ANY PORTIONS THAT FAIL DUE TO FAULTY MATERIALS OR WORKMANSHIP, AT NO ADDITIONAL COST TO THE PROJECT OWNER. A SIX (6) MONTH AND ELEVEN (11) MONTH INSPECTION WILL BE PERFORMED DURING THE WARRANTY PERIOD. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ALL ITEMS DETERMINED BY THE PROJECT OWNER OR AUTHORIZED REPRESENTATIVE TO BE DEFECTIVE UPON NOTIFICATION. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE FAILED ITEMS UPON NOTIFICATION BY THE PROJECT OWNER. SEASONALLY INSTALLED ITEMS SHALL BE REPAIRED OR REPLACED DURING THE NEXT AVAILABLE INSTALLATION PERIOD. ITEMS REPAIRED OR REPLACED UNDER THIS PROVISION SHALL HAVE AN ADDITIONAL ONE (1) YEAR WARRANTY PERIOD FROM THE NEW DATE OF ACCEPTANCE. AREAS AND/OR OTHER WORK DISTURBED WHILE ACCESSING AND/OR REPAIRING/REPLACING WARRANTY COVERED ITEMS SHALL BE STABILIZED. u) 73 CD C N E c C C O � W POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA PROJECT NOTES AND SPECIFICATIONS PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" AS NOTED H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 0.2 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION will not dislodge the soil. Use one of the Stabilize the ground sufficiently so that rain techniques in the table below: ill Temporary Stabilization MI Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. PLAN ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER SECTION A -A NOTED IvEl.E2 LOCATION DETERMINED IN HELD 2 THE CONCRETE WASHOUT o/o„ouoREACHES BELOW GRADE WASHOUT STRUCTURE PLAN sANDBAGs SECTION 8-8 PITDCAL LOCATION DETERMINED IN HELD o`oaDoLITE Ep'oaE °E°, oF. Ea IDTEIVSoFFaEEBOV DEVICE ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA NCG01 CONSTRUCTION GENERAL PERMIT PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17 NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 0.3 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self -inspections are required during below. When adverse weather or personnel to be in jeopardy, the inspection which it is safe to perform the inspection. greater than 1.0 inch occurs outside performed upon the commencement were delayed shall be noted in the Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours ofa rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Nameofthe person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be documented in the manner 1. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC Plan. Initial and date each E&SC Measure on a copy of the approved E&SC Plan or complete, date and sign an inspection report that lists each E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC Plan. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC Measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC Measures. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(I)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA NCG01 CONSTRUCTION GENERAL PERMIT PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 0.4 SHEET 2.1 POSSUM TROT CREEK STA 0+00 TO 2+00 POSSUM TROT CREEK SHEET 2.2 POSSUM TROT CREEK STA 2+00 TO 3+64 SHEET 2.4 UT POSSUM TROT CREEK STA 2+00 TO 3+10 SHEET 2.3 UT POSSUM TROT CREEK STA 0+00 TO 2+00 0 0 60 Fee[ SCALE 1" = 60' EXISTING SITE FEATURES • • - PARCEL BOUNDARY --- EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR = = = = EXISTING CULVERT - - - - - EXISTING STREAM CENTERLINE STANDARD LINES AND SYMBOLS DESIGN STREAM FEATURES -(2855)- DESIGN MAJOR CONTOUR DESIGN MINOR CONTOUR - - - - DESIGN GRADING LIMITS DESIGN STREAM BANKFULL ----- DESIGN STREAM CENTERLINE DESIGN STREAM FEATURES DESIGN CULVERT DESIGN CONSTRUCTED RIFFLE (CR) DESIGN BOULDER J-HOOK VANE (BJV) DESIGN LOG STEP (LS) POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA PROJECT OVERVIEW PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" 1' = 150' H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 0.5 DESIGN CHANNEL SECTION SPECIFICATIONS 1. CONSTRUCT THE DESIGN CHANNEL SECTION TO THE LINES, ELEVATIONS AND GRADES SHOWN ON THE DRAWINGS AND DETAILS. 2. CHANNEL CONSTRUCTION WORK SHALL BE IMPLEMENTED BY FIRST GRADING THE FLOODPLAIN ADJACENT TO THE CHANNEL TO THE DESIGN ELEVATIONS AND GRADES SPECIFIED IN THE DRAWINGS AND DETAILS. THE DESIGN CHANNEL SHALL THEN BE EXCAVATED TO THE DESIGN CHANNEL GEOMETRY AND PROFILE. THIS CHANNEL WORK SHALL BE DONE WITH LOW GROUND PRESSURE TRACK EQUIPMENT. DRAWINGS PROVIDE DIMENSIONS, ELEVATIONS AND SLOPES TO AID IN CONSTRUCTION OF THE CHANNEL. THE THALWEG (CENTERLINE) CAN FIRST BE EXCAVATED TO THE ELEVATION SPECIFIED IN THE PROFILE. EXCAVATION OF THE SIDE SLOPES AND FINE GRADING OF THE CHANNEL SHALL THEN BE PREFORMED. ANY TEMPORARY STOCKPILING OR DOUBLE HANDLING OF EXCESS EARTH NECESSARY TO BUILD THE CHANNEL SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 3. BANKFULL CHANNEL DIMENSIONS WILL BE HELD TO THE DIMENSIONS SHOWN IN THE DESIGN CHANNEL SECTION DETAIL ON THIS SHEET. ELEVATIONS AND DEPTHS SHALL BE CONSTRUCTED TO WITHIN 0.1' (VERTICAL). CHANNEL WIDTHS AND OTHER HORIZONTAL (X,Y) DIMENSIONS SHALL BE WITHIN 0.2'. 4. IF THE EXISTING FLOODPLAIN IS LESS THAN 0.2' HIGHER THAN THE DESIGN BANKFULL ELEVATION, IT IS NOT NECESSARY TO GRADE THE FLOODPLAIN TO THE FLOODPLAIN TO THE ELEVATIONS AND GRADES IN THE DRAWINGS. 5. IN -STREAM STRUCTURES SHALL BE INSTALLED AS THE CHANNEL IS BEING CONSTRUCTED. INSTREAM STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE DRAWINGS AND DETAILS. THE FINISHED STRUCTURE SLOPES AND ELEVATIONS SHALL BE WITHIN 0.1' (VERTICAL) OF THE DRAWINGS AND DETAILS. 6. INSTALL EROSION CONTROL MATTING ON ALL DISTURBED STREAMBANKS TO 3.0' (MIN.) BEYOND THE BANKFULL STAGE. WIDTH VARIES PER PLAN FLOODPLAIN 5:1 TIE TO EXISTING GROUND PER PLAN WIDTH VARIES PER PLAN TIE TO EXISTING GROUND PER PLAN DESIGN CENTERLINE ALIGNMENT DESIGN GRADE DESIGN BANKFULL STAGE 1 5.9' PO//vT R \ BA \ DESIGN GRADE 4.8' 7.3' � 1 0.6' 0.5' MAX DEPTH AT CENTER OF RIFFLE CROSS-SECTION POSSUM TROT CREEK DESIGN RIFFLE DESIGN CENTERLINE ALIGNMENT 1.2' 9.6' 3.7' POSSUM TROT CREEK DESIGN POOL 1 0.5' WIDTH VARIES PER PLAN FLOODPLAIN 5:1 TIE TO EXISTING GROUND PER PLAN WIDTH VARIES PER PLAN FLOODPLAIN 5:1 TIE TO EXISTING GROUND PER PLAN RIFFLE DESIGN SECTION AT DOWNSTREAM P.T. POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA DESIGN CHANNEL SECTION: POSSUM TROT CREEK PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 1.1 DESIGN CHANNEL SECTION SPECIFICATIONS 1. CONSTRUCT THE DESIGN CHANNEL SECTION TO THE LINES, ELEVATIONS AND GRADES SHOWN ON THE DRAWINGS AND DETAILS. 2. CHANNEL CONSTRUCTION WORK SHALL BE IMPLEMENTED BY FIRST GRADING THE FLOODPLAIN ADJACENT TO THE CHANNEL TO THE DESIGN ELEVATIONS AND GRADES SPECIFIED IN THE DRAWINGS AND DETAILS. THE DESIGN CHANNEL SHALL THEN BE EXCAVATED TO THE DESIGN CHANNEL GEOMETRY AND PROFILE. THIS CHANNEL WORK SHALL BE DONE WITH LOW GROUND PRESSURE TRACK EQUIPMENT. DRAWINGS PROVIDE DIMENSIONS, ELEVATIONS AND SLOPES TO AID IN CONSTRUCTION OF THE CHANNEL. THE THALWEG (CENTERLINE) CAN FIRST BE EXCAVATED TO THE ELEVATION SPECIFIED IN THE PROFILE. EXCAVATION OF THE SIDE SLOPES AND FINE GRADING OF THE CHANNEL SHALL THEN BE PREFORMED. ANY TEMPORARY STOCKPILING OR DOUBLE HANDLING OF EXCESS EARTH NECESSARY TO BUILD THE CHANNEL SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 3. BANKFULL CHANNEL DIMENSIONS WILL BE HELD TO THE DIMENSIONS SHOWN IN THE DESIGN CHANNEL SECTION DETAIL ON THIS SHEET. ELEVATIONS AND DEPTHS SHALL BE CONSTRUCTED TO WITHIN 0.1' (VERTICAL). CHANNEL WIDTHS AND OTHER HORIZONTAL (X,Y) DIMENSIONS SHALL BE WITHIN 0.2'. 4. IF THE EXISTING FLOODPLAIN IS LESS THAN 0.2' HIGHER THAN THE DESIGN BANKFULL ELEVATION, IT IS NOT NECESSARY TO GRADE THE FLOODPLAIN TO THE FLOODPLAIN TO THE ELEVATIONS AND GRADES IN THE DRAWINGS. 5. IN -STREAM STRUCTURES SHALL BE INSTALLED AS THE CHANNEL IS BEING CONSTRUCTED. INSTREAM STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE DRAWINGS AND DETAILS. THE FINISHED STRUCTURE SLOPES AND ELEVATIONS SHALL BE WITHIN 0.1' (VERTICAL) OF THE DRAWINGS AND DETAILS. 6. INSTALL EROSION CONTROL MATTING ON ALL DISTURBED STREAMBANKS TO 3.0' (MIN.) BEYOND THE BANKFULL STAGE. WIDTH VARIES PER PLAN WIDTH VARIES PER PLAN FLOODPLAIN 4:1 - 5:1 DESIGN CENTERLINE ALIGNMENT TIE TO EXISTING GROUND PER PLAN DESIGN BANKFULL STAGE DESIGN GRADE 7 3.6' 5.5' 1 0.5' 0.4' WIDTH VARIES PER PLAN FLOODPLAIN 4:1- 5:1 L5 ' TIE TO EXISTING GROUND PER PLAN MAX DEPTH AT CENTER OF RIFFLE CROSS-SECTION UT POSSUM TROT CREEK DESIGN RIFFLE TIE TO EXISTING GROUND PER PLAN 4.5' : DESIGN GRADE 7.3' 2.8' 1 1.0' DESIGN CENTERLINE ALIGNMENT 0.4' UT POSSUM TROT CREEK DESIGN POOL WIDTH VARIES PER PLAN FLOODPLAIN 4:1- 5:1 TIE TO EXISTING GROUND PER PLAN RIFFLE DESIGN SECTION AT DOWNSTREAM P.T. POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA DESIGN CHANNEL SECTION: UT POSSUM TROT CREEK PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 1.2 •••• (.. ..\ •� J _y. 286s EXISTING 36" HDPE CULVERT •�• 2865 / /• • SCALE 1" = 20' 2865 2860 2855 2850 2845 zsss �' _ GRADING LIMITS __- �� j� _� GRADE FLOODPLAIN CONSTRUCTED RIFFLE (CR) aeo AT 5:1 SLOPE SEE DETAIL SHEET 3.11 "' �N 0 0 7, SEE DETAIL SHEET 3.11 th I ` / / •. I _.� i /� `-� ± / I 000 Y �% iIiJ �J 0+50 ��t1-iLFr���X� �y 0+0 11.4A ���� T '— _ l \v BOULDER J-HOOK VANE (BJV) EXISTING 36" HDPE �� v CULVERT TO BE REMOVED — POSSUM TROT CREEK SEE DETAIL SHEET 3.11 V _ A V v �86 0 \ v /..` •-.V ', A Dr. VTVV.V EPC: 0+02.3 _V: 2860.0 0 rl ELV: 2859.8 o; m ELV: 2859.4 I I PT: 0+54.5 ELV: 2859.2 v3 I, _V: 2858.4 PT: 0+92.3 ELV: 2857.9 N. M rl ELV: 2857.1 m N ELV: 2856.5 00 m 4 ELV: 2855.7 4 o ELV: 2855.2 I I ,C: 1+82.5 ELV: 2854.5 4 m _V: 2853.9 o 0 o c+-I c+-I c+-I c+-I c+-I — - EXISTING GRADE 1 \ ` DESIGN BANKFULL �� __—\\ '''Aili. 3.4% —� _ — ____ �\ 50/ -. �— V DESIGN THALWEG ``/ S.09 4 0/ 11• 0 '1 iO 0 O . O PC: 0+02.3 ELV: 2858.6 I I I ELV: 2858.7 PT: 0+54.5 I I I ELV: 2856.7 I I I ELV: 2855.0 PC: 1+49.8 I I I ELV: 2854.0 Mid: 1+57.0 I I I ELV: 2854.7 PC: 1+82.5 I I I ELV: 2852.7 Mid: 1+90.0 I I I _ ELV: 2853.4 PT: 1+97.4 Mid: 0+10 ELV: 2859 00 N. , -I I I ELV: 2858 PC: 0+39.1 ELV: 2858 Mid: 0+46 ELV: 2857 ,-I- l0 N. Mid: 0+84 ELV: 2857 PT: 0+92.E. ELV: '2856 PC: 1+13. d ELV: 2855 �- N + c I I I ELV: 2856 Lc) 01 N ,-I 4 0 ELV: 2853 O O - c+-I .-+I 1 1 1 I+nn n+.)c n+cn n+LiC i+nn 1 1 •I 1 ' 1+.)c i+cn 1+7c •)+Inr 2865 2860 2855 2850 2845 POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA STREAM DESIGN PLAN - PROFILE: POSSUM TROT STA 2+00 TO 3+64 PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" 1"=20' H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 2.1 _• —. / ti I • • m " GRADING LIMITS i� /1 7 z/ j �1 7111.— /� ��� GRADE FLOODPLAIN �' CONSTRUCTED RIFFLE (CR) / AT 5 1 SLOPE // �' SEE DETAIL SHEET 3 1 I �� 1 / / / I l / , , J_----��--- -- -/ LOG STEP(LS) / �) / / / ��-_ %) l.'rG-- / l i -. / SEE DETAIL SHEET 3.2 I 1 , / / �- / . —' � / J / i �� —i A / AI i _�// —. �i �� / 0o / � i 1 M = o+ POSSUM TROT CREEK c- EXISTING 30" - 36" HDPE CULVERT TO BE REMOVED ri.--11/4144 o 10 20 ,e a, 41) SCALE I"=20' 2860 2855 2850 2845 2840 _ ------- �8s J)$ \\"� "4 kj / i _.4So BOULDER J-HOOK VANE (BJV) SEE DETAIL SHEET 3.3 EXISTING 18" HDPE CULVERT TO BE REMOVED m - ELV: 2853.0 PT: 2+34.0 - ELV: 2852.4 I I PC: 2+53.4 ELV: 2851.6 N 00 — ELV: 2851.0 PC: 2+88.1 ELV: 2850.2 PT: 3+02.8 ELV: 2849.6 ,C: 3+21.9 _V: 2849.0 3T: 3+42.1 _V: 2848.3 N CJ a N a -__— EXISTING GRADE --- \ -- _ DESIGN BANKFULL 5.o ` ....."a \50\ \\ 4.0% o 1 50% \ 4.49/ DESIGN THALWEG 0 ELV: 2851.9 PT: 2+34.0 O ELV: 12850.5 ELV: 2849.6 PC: 2+88.1 I I I ELV: 2848.4 Mid: 2+95.5 I I I ELV: 2847.1 Mid: 3+32.0 ELV: 2847.8 PT: 3+42.1 ELV: 2852 PC: 2+19.1 I I I ELV: 2851 Mid: 2+26 ELV:2850 PC: 2+53.z ELV: 2849 ,-I- LD + N. N- D + ELV: 2849 PT: 3+02.E ELV: 2848 PC: 3+21. N. a 2860 2855 2850 2845 2840 • POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA STREAM DESIGN PLAN - PROFILE: POSSUM TROT STA 2+00 TO 3+64 PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" 1"=20' H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 2.2 2+00 2+25 2+50 2+75 3+00 3+125 3+50 3+64 / ../ // / // / ,/// LOG STEP (LS) // / ��° // // / / // / SEE DETAIL SHEET 3.2 // /�' // / / / / / // / / / / / // / // / / CONSTRUCTED RIFFLE (CR) //// // /// / tibv�� // // /' /// SEE DETAIL SHEET 3.1 / // / / / / / / / / i / / / / // ,// - / / / / • // • // -o // f o / // / /C? / / / o / 1 //�/ / 1 Q / 1. / tip // NCDOT CLASS B RIPRAP I / N ARMORING A CULVERT Q / / /� DESIGN 20 LF 36" HDPE CULVERT �` FOR FUTURE FARM ACCESS / VI _ I �� I �I I V ��Z. / �����Ni UT POSSUM TROT CREEK /77 .7; A GRADE FLOODPLAIN AT4:1SLOPE i GRADING LIMITS - - ` 2865 ------ ▪ EXISTING 18" HDPE �\ ▪ C TO BE REMOVED \ \ 0 10 20 ,e at SCALE 1" = 20' 2870 2865 2860 2855 285C 16yr �•' +00 T!/ �� uittamtioiere a a Q , i1l+cn O 4 Dr. UTUU.V ELV: 2867.0 PC: 0+08.5 ELV: 2866.6 NI Ol ,-I _V: 2866.0 PC: 0+33.5 ELV: 2865.2 I II I ' I PT: 0+44.2 ELV: 2864.6 /I I ,C: 0+57.6 CO l0 Cr; n l0 l0 CO rvi l0 m c-I 00 _V: 2862.5 n c-I 01 ELV: 2861.9 PC: 1+05.4 ELV: 2861.1 I I 0 n c-I _V: 2860.5 0 n N _V: 2860.0 PI: 1+47.0 O n Lr1 _V: 2858.5 PT:1+68.2 ELV: 2858.1 II c-I 00 _V: 2857.3 c-I Ol _V: 2856.6 + o 00 -+ N 0 a 00 N + 0 0_ + 0 0_ -+ .--I + c-I a -+ c-I 0_ -+ c-I —+ .--I -0_ GRADE — —a — ....AsEXISTING >`_ / ` _� 111 DESIGN BANKFULL — ro- ...../...- •-• / 1 \ --- ---- .?..... s................ --..., I \, % \ 1 DESIGN THALWEG 1 /� 20 LF OF BURY 36" HDPE BOTTOM CULVERT MIN. 1.0' 0 CLV.L000.O BP: 0+00.0 Mid: 0+13.9 ELV: 2865.6 ELV: 2864.6 PC: 0+33.5 ELV: 2863.7 Mid: 0+38.8 ELV: 2864.2 PT: 0+44.2 PC: 0+57.6 ELV: 2862.3 Mid: 0+62.6 J ELV: 2862.9 PT: 0+67.6 Mid: 0+86.4 ELV: 2861.5 Ln c-I 01 o o_ ELV: 2860.6 ELV: 2858.2 Mid: 1+62.6 ELV: 2857.8 PT: 1+68.2 ELV:2866 PC: 0+08._ ELV: 2865 N Ol c-I ELV: 2863 III ELV: 2861 PC: 0+81.i ELV: 2861 PC: 1+05.z ELV: 2859 Mid: 1+11 ELV: 2860 O n c-I ELV: 2859 O ^ N + ELV: 2858 PI: 1+47.0 PC: 1+57.( ELV: 2857 III ELV:2856 PC: 1+81.z ULV:2655 Mid: 1+86 LLV: L255b c c-I 01 o o_ .-+-I o_ c a .-+I o_ , , , 1+nn n+DS n+Sn , , , , n+7S , , 1 1+nn 1 1 II 1+75 1+Sn 1+7c D+nf 2870 2865 2860 2855 2850 POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA STREAM DESIGN PLAN - PROFILE: UT POSSUM TROT CREEK STA 0+00 TO 2+00 PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" 1"=20' H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 2.3 ��A 0 10 2[ SCALE 1" = 20' EXISTING 36" HDPE CULVERT TO BE REMOVED CONSTRUCTED RIFFLE (CR) SEE DETAIL SHEET 3.1 1 I LOG STEP (LS) — I SEE DETAIL SHEET 3.2 1 1 i / --- 2 1 _ � N N ler � �� �yt► 2+50 1 Q UT POSSUM TROT CREEK - - \• \ EXISTING 18" HDP• I vv CULVERT TO BE REMOVED vv• 2865 2860 2855 2850 2845 2+00 I • • \\ • ,;N'\\\ �A�i • GRADE FLOODPLAIN AT 5:1 SLOPE GRADING LIMITS BOULDER J-HOOK VANE (BJV) SEE DETAIL SHEET 3.3 • • I I PC: 2+04.6 ELV: 2855.7 N H a ELV: 2855.1 I I PC: 2+28.2 ELV: 2854.3 I I PT: 2+39.2 ELV: 2853.6 I I PC: 2+53.0 ELV: 2852.7 I I PT: 2+64.3 ELV: 2852.1 I I I I PC: 2+79.6 ELV: 2851.2' PT: 2+92.2 ELV: 2850.4 I EXISTING GRADE \. _, DESIGN BANKFULL \ \ ` \-. o I' N. DESIGN THALWEG ...."----- 4 8.32 I I ELV: 2855.2 PC: 2+04.6 ELV: 2854.2 Mid: 2+09.5 ELV:2854./ Mid: 2+33.7 ELV: 2853.2 PT: 2+39.2 ELV: 2852.2 PC: 2+53.0 ELV: 2851.1 Mid: 2+58.7 ELV: 2851.7 PT: 2+64.3 I I I I ELV: 2850.5 PT: 2+92.2 ELV:2853 PC: 2+28.; ELV: 2852 PC: 2+79.( ELV: 2849 Mid: 2+85 ELV: 2850 N a "A 6Li I I \ r I. I = � , 001 �� 1 vv —9 -vv v�A��_---- ov\ �• \� \V A ��� v� \ \ F\ \�\ \ N I \\ \\ \ \ = __ \ \ I / / V A v \�� V' • V�� \' • 2865 2860 2855 2850 2845 2850 --� POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA STREAM DESIGN PLAN - PROFILE: UT POSSUM TROT CREEK STA 2+00 TO 3+10 PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" 1"=20' H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 2.4 2+25 2+50 2+75 3+00 3+10 EXTEND RIFFLE SUBSTRATE INTO GLIDE MIN. 3 WBKF A P.T. STATION PER PLAN P.T. ELEVATION PER PROFILE GLIDE CO RIFFLE LENGTH VARIES PER PLAN EXTEND RIFFLE SUBSTRATE INTO RUN MIN. 3 WBKF P.C. STATION PER PLAN BANKFULL STAGE STREAMBANK TOE OF SLOPE DETAILED PLAN NOT TO SCALE BANKFULL—\\N... RIFFLE SLOPE VARIES PER PROFILE �t r� ;�T P.C. ELEVATION �' `L' �' Ird"u IWRUN ' PER PROFILE RIFFLE MATERIAL PER NOTES DETAILED SECTION A - A' NOT TO SCALE �j STREAM BED CONSTRUCTED RIFFLE (CR) NOTES AND SPECIFICATIONS 1. FOR INSTALLATION, THE CONTRACTOR SHALL OVER EXCAVATE THE LENGTH OF THE RIFFLE AND BACKFILL THE TRENCH WITH THE SPECIFIED RIFFLE SUBSTRATE MATERIAL TO THE ELEVATIONS SHOWN ON THE PROPOSED PROFILE. 2. RIFFLE MATERIAL SHALL EXTEND A MINIMUM OF 3 WBKF U/S OF THE P.T. INTO THE GLIDE AND A MINIMUM OF 3 WRKF D/S OF THE P.C. INTO THE RUN. 3. THE RIFFLE MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS-SECTION, ITS LOWEST ELEVATION OCCURS IN THE CENTER OF THE CHANNEL. 4. RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR BUCKET SUCH THE DEEPEST POINT OF THE CHANNEL IS ALONG THE CENTERLINE AND THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 5. CONSTRUCTED RIFFLES SHALL BE BACKFILLED WITH RIFFLE MATERIAL CONSISTING OF QUARRIED STONE. RIFFLE MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS-SECTION, ITS LOWEST ELEVATION OCCURS IN THE CENTER OF THE CHANNEL. RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR BUCKET SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 6. CONSTRUCTED RIFFLE MATERIAL SPECIFICATIONS: • NCDOT CLASS 1- 50% • NCDOT CLASS B - 50% 7. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 8. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. KEY MATTING INTO RIFFLE TRENCH BANKFULL EROSION CONTROL MATTING RIFFLE MATERIAL MIN. 2.0' RIFFLE MATERIAL PER NOTES DETAILED SECTION B - B' NOT TO SCALE POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA STREAM DESIGN DETAIL: CONSTRUCTED RIFFLE (CR) PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 3.1 RIFFLE TOE OF SLOPE 0 0 0 0 0 0 B t O O O O HIGH DENSITY LIVE STAKING BANKFULL -n SCOUR POOL DETAILED PLAN NOT TO SCALE BANKFULL —\\ SELECT BACKFILL MATERIAL BEHIND STRUCTURE NON -WOVEN GEOTEXTILE 0 B 0 EXTEND LOGS BEYOND BANKFULL STAGE 3 WBKF HEADER LOG GRAVEL BACKFILL MATERIAL NON -WOVEN FILTER FABRIC FOOTER LOG SCOUR POOL BELOW STRUCTURE DETAILED SECTION A - A' NOT TO SCALE LOG STEP SPECIFICATIONS 1. ALL LOGS SHALL BE RELATIVELY STRAIGHT AND LIMBS AND BRANCHES SHALL BE TRIMMED FLUSH. LOGS SHALL HAVE MINIMUM DIAMETER OF 1.0'. LOGS USED FOR LOG SILLS SHALL BE SUFFICIENTLY LONG ENOUGH TO EXTEND BEYOND BANKFULL STAGE A MINIMUM OF 3 WRKF ON EACH END. 2. HEADER LOGS SHALL BE UNDERLAIN BY FOOTER LOGS TO PROVIDE A FOUNDATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. HEADER LOGS SHALL BE OFFSET SLIGHTLY DOWNSTREAM OF THE FOOTER LOG. 3. SET SILL INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE LOG SILL MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. 4. ALL GAPS/VOIDS LARGER THAN 1 INCHES BETWEEN THE HEADER AND FOOTER LOGS SHALL BE CHINKED WITH LIMBS AND/OR BRUSH ON THE UPSTREAM SIDE PRIOR TO PLACEMENT OF THE GEOTEXTILE. 5. ON THE UPSTREAM SIDE OF THE LOGS A LAYER OF NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED AS SHOWN IN THE DETAIL THE ENTIRE LENGTH OF THE LOG. SECURE ALL GEOTEXTILE FABRIC ON TOP OF FOOTER LOG USING 3 INCH 10D GALVANIZED COMMON NAIL ON 12 IN SPACING ALONG LOG. NAIL NON -WOVEN GEOTEXTILE TO EDGE OF HEADER LOG AND BACKFILL. 6. SELECT BACKFILL MATERIAL SHALL BE FILL MATERIAL GENERATED ON -SITE WITH A MINIMUM D50 OF 60 MM OR A GRADATION SUBMITTED IN WRITING AND APPROVED BY THE ENGINEER. A WELL -GRADED BLEND OF NCDOT CLASS A RIP -RAP AND ASTM #57 ROCK MIXED WITH EARTH WILL BE AN ACCEPTABLE SUBSTITUTE. SELECT BACKFILL AND SOIL BACKFILL MATERIAL SHALL BE COMPACTED SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 7. COBBLE AND GRAVEL SHALL BE PLACED IMMEDIATELY DOWNSTREAM OF THE LOG STEP ALONG THE CHANNEL TOE OF SLOPE. 8. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 9. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. HEADER LOG EXTEND LOGS BEYOND BANKFULL STAGE 3 WBKF FOOTER LOG BANKFULL EROSION CONTROL MATTING INSTALL LOG SILL FLAT DETAILED SECTION B - B' NOT TO SCALE FIT LOGS TIGHTLY TOGETHER POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA STREAM DESIGN DETAIL: LOG STEP (LS) PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 3.2 GRAVEL BACKFILL UPSTREAM OF STRUCTURE NON -WOVEN FILTER FABRIC HIGH DENSITY PLANTINGS O 0 O O O O O O O O O BANKFULL GRAVEL BACKFILL MATERIAL NON -WOVEN FILTER FABRIC O O O BANKFULL DETAILED PLAN NOT TO SCALE O O O sh O HEADER BOULDER FOOTER BOULDER 1 FT OFFSET / SCOUR POOL BELOW STRUCTURE DETAILED SECTION A - A' NOT TO SCALE EXTEND VANE ARM INTO STREAMBANK MIN.10.0' OR THREE FULL BOULDER LENGTHS BOULDER J-HOOK VANE (BJV) NOTES AND SPECIFICATIONS 1. ALL BOULDERS USED FOR THE PROPOSED STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE. BOULDERS DIMENSIONS SHALL BE 3.0' X 5.0' X 2.0' (W X L X H) +/- 0.5 FT. THE MINIMUM ACCEPTABLE BOULDER THICKNESS (H) IS 1.5'. BOULDERS LONGER (L) THAN 5.5' WILL BE ACCEPTED. 2. DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER TO FIT CONDITIONS ONSITE. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY. 3. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A ROCK OR CHINKING STONE APPROVED BY ENGINEER. 2. HEADER BOULDERS SHALL BE UNDERLAIN BY FOOTER BOULDERS TO PROVIDE A FOUNDATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. HEADER BOULDERS SHALL BE OFFSET 1.0 FT UPSTREAM OF THE FOOTER. 3. SET BOULDER INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE BOULDERS MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. 4. NON -WOVEN GEOTEXTILE SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. SELECT BACK FILL MATERIAL SHALL BE PLACED UPSTREAM OF THE GEOTEXTILE MATERIAL. 5. GRAVEL MATERIAL CONSISTING OF A WELL -GRADED BLEND OF NCDOT CLASS A RIP -RAP AND ASTM #57 ROCK MIXED WITH EARTH SHALL BE USED TO BACKFILL THE STRUCTURE. BACKFILL MATERIAL SHALL BE COMPACTED SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 6. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 7. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. KEY BOULDERS INTO STREAMBANK MIN. 10 FT OR THREE FULL BOULDER LENGTHS KEY BOULDERS INTO STREAMBANK ©z TO 3 BKF STAGE P.C. ELEVATION PER PROFILE SLOPE = 1 3% FIT BOULDERS TIGHTLY TOGETHER PLACE BOULDERS INTO STREAMBED A MINIMUM OF THE BOULDER DIAMETER DETAILED SECTION B - B' NOT TO SCALE POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA STREAM DESIGN DETAIL: BOULDER J-HOOK VANE (BJV) PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 3.3 BANKFULL r-1°,1�°�1�°;1� CONSTRUCTED RIFFLE AT CULVERT ENTRANCE BANKFULL THALWEG 10.0' MIN. 36" CIRCULAR HDPE CULVERT CULVERT LENGTH = 20 LF DETAILED PLAN NOT TO SCALE 1y. . "sr' _4,0 L' frl OPP 36" HDPE CULVERT INV. ELV = 2,859.7' / i i/ GEOTEXTILE FABRIC CULVERT SLOPE = 0.05 FT/FT //2//,// M// /! / / / / BURY BOTTOM OF CULVERT MIN. 1.0' DETAILED SECTION A - A' NOT TO SCALE 741 CONSTRUCTED RIFFLE AT CULVERT EXIT NC DOT CLASS B RIPRAP STABILIZATION / 36" HDPE CULVERT INV. ELV = 2,858.7' 4-*„ / CULVERT CROSSING NOTES 1. ALL CULVERT INSTALLATION WORK SHALL TAKE PLACE DURING DRY WORKING CONDITIONS. THE CONTRACTOR SHALL MINIMIZE THE EXPORT OF SEDIMENT TO ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE BY USING E&SC MEASURES AS NEEDED. 2. THE BOTTOM OF THE 36" HDPE CULVERT SHALL BE BURIED A MINIMUM OF 1.0' WITH A SLOPE OF 0.05 FT/FT TO SUPPORT ECOSYSTEM CONNECTIVITY AND AQUATIC ORGANISM PASSAGE. 3. INSTALL NCDOT CLASS B RIPRAP ON THE CULVERT CROSSING SIDE SLOPES. 4. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. 5. RE -DRESSING AND STABILIZATION OF THE SURROUNDING WORK AREA WITH TEMPORARY AND PERMANENT SEEDING AND MULCHING WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF CULVERT CROSSING AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 20.0' CROSSING CREST ELEVATION PER PLAN • - - - - - - - - s - c> 40 Am% A.% ImAk — - - - — - - - - — Aribmilliraogiraporibi // CONSTRUCTED RIFFLE AT CULVERT ENTRANCE AND EXIT 36" HDPE CULVERT • 0 f i/ //// % i//i/ // / / / DETAILED SECTION B - B' NOT TO SCALE / / // // / / NC DOT CLASS B RIPRAP STABILIZATION POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA STREAM DESIGN DETAIL: UT POSSUM TROT CULVERT PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 3.4 E&SC PLAN TBD POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA EROSION AND SEDIMENTATION CONTROL PLAN PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" 1' = 60' H.D.: NAD83 V.D.: NAVDSS JE PID: 0703 4.1 4" MIN. HORIZONTAL — OVERLAP BANKFULL TOE OF SLOPE EROSION CONTROL MATTING FROM TOE OF CHANNEL TO 3.0' BEYOND BANKFULL STAGE DETAILED PLAN NOT TO SCALE VERTICAL OVERLAP MIN. 12" WITH DOUBLE ECO-STAKES 2' DETAILED STAKING PLAN EDGE OVERLAP MIN. 4" WITH DOUBLE ECO-STAKES AT 2' O.C. EROSION CONTROL MATTING BANKFULL STAGE SINGLE 12" ECO-STAKES OFFSET ROWS AT 2'-3' O.C. EROSION CONTROL MATTING NOTES AND SPECIFICATIONS 1. EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAMBANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. 2. BEFORE INSTALLING EROSION CONTROL MATTING, RAKE SOIL LEVEL, ADD TEMPORARY AND PERMANENT SEED, SOIL PREPARATION AND MULCH. 3. EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPE OUT TO A MINIMUM OF 3.0' BEYOND THE BANKFULL STAGE. 4. SECURE MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE -TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAM FLOW AS SHOWN IN THE DETAIL. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. 5. EROSION CONTROL MATTING SHALL BE MADE OF 100% NATURAL FIBERS AND MATERIALS AND BE BIODEGRADABLE UNDER NORMAL CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR PLASTIC BASED MATERIALS SHALL NOT BE USED. 6. EROSION CONTROL MATTING MAY BE SUBSTITUTED FRO LIVE TRANSPLANTS AVAILABLE ONSITE. USE AND LOCATION OF ALL TRANSPLANT MUST BE APPROVED BY THE ENGINEER ONSITE. EROSION CONTROL MATTING 3.0' BANKFULL ECO-STAKE MIN 12" LENGTH BURY 6" BELOW STREAMBED DETAILED SECTION A - A' NOT TO SCALE NOT TO SCALE SECURE MATTING WITH 4" OVERLAP AND DOUBLED ECO-STAKES POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA E&SC DETAIL: EROSION CONTROL MATTING PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 4.2 EXISTING ROADWAY A 50' MINIMUM 0 o o`Z oCo 0 ( 2"-3" STONE TO BE USED 000� o OCo� (NCDOT CLASS A OR RAILROAD o��o�o��� BALLAST) oUO00 0 • o 00_0_ �00 cl)� o 000 7LO w, o EXISTING ROADWAY L/D���30�3�100�000 0 0 0 DETAILED PLAN NOT TO SCALE A 12' MINIMUM 50' MINIMUM STANDARD CONSTRUCTION ENTRANCE SPECIFICATIONS 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION ROOTS, AND OTHER OBJECTIOABLE MATERIAL AND PROPERLY GRADE THE AREA. 2. PLACE THE 2"-3" STONE TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLAND AND SMOOTH IT. 3. USE GEOTEXTILE FABRICS TO IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR A HIGH WATER TABLE. 4. INSTALL SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 5. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE LENGTH OF THE CONSTRUCTION ENTRANCE SHALL BE INCREASED. 6. SEE SECTION 6.06.1 OF NC DEMLR'S EROSION AND SEDIMENT CONTROL DESIGN MANUAL (2013) FOR ADDITIONAL INFORMATION, NOTES AND SPECIFICATIONS. NEW CONSTRUCTION Hlh III III cDocD cD0c, ���0 �Oo� vo0o�o�000�70�?o�OUowo� 6" MIN. FILTER FABRIC UNDER STONE DETAILED CROSS-SECTION A - A' NOT TO SCALE n III III III III III 1 1- III POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA E&SC DETAIL: CONSTRUCTION ENTRANCE PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 4.3 MIN. 10 GA. LINE WIRES 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP III IIII III = ill III = DETAILED FRONT NOT TO SCALE 0 N 6 MINffil STEEL POST WOVEN WIRE FABRIC FILL SLOPE GRADE DETAILED SIDE NOT TO SCALE SILT FENCE GEOTEXTILE FABRIC PLASTIC OR WIRE TIES MIN. 12-1/2 GA. INTERMEDIATE WIRES GRADE TEMPORARY SILT FENCE NOTES AND SPECIFICATIONS 1. CONSTRUCT THE SILT FENCE WITH STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. SUPPORT THE STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50 POUND TENSILE STRENGTH. 3. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FT APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 2 FT. 4. EXTRA STRENGTH FILTER FABRIC WITH 6 FT POST SPACINGS DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. 5. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSE LINE OF POSTS AND UPSLOPE OF THE BARRIER. 6. PLACE 12 INCHES OF FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. 9. CONSTRUCTION SITE RUNOFF SHALL NOT RUN PARALLEL WITH THE FENCE. 10. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 11. SEE SECTION 6.62.1 OF NC DEMLR'S EROSION AND SEDIMENT CONTROL DESIGN MANUAL (2013) FOR ADDITIONAL INFORMATION, NOTES AND SPECIFICATIONS. POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA E&SC DETAIL: TEMPORARY SILT FENCE PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 4.4 SEDIMENT FILTERING BAG. PROVIDE POSITIVE DRAINAGE FROM FILTERING DEVICE TO STREAM. DISCHARGE ONTO STABLE RIPRAP PAD TO PREVENT SCOUR HOLE FLOW 14,40 .1111417-41 7-z//////i7 GRAVEL OR EARTHEN BERM DISCHARGE HOSES O DEWATERING PUMP INTAKE HOSE GRAVEL OR EARTHEN BERM WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE O COMPLETED IN ONE DAY DETAILED PLAN NOT TO SCALE TEMPORARY PUMP AROUND SYSTEM NOTES AND SPECIFICATIONS 1. BERMS SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA. THE DIVERSION PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP. DIVERSION PUMP DISCHARGE SHALL NOT GENERATE SCOUR, EROSION OR THE EXPORT OF EXCESS SEDIMENT TO SURFACE WATERS. 2. WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING BAG. THE MEASURE SHALL BE LOCATED ON A RIPRAP OR GRAVEL PAD SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM BERM WITHOUT CAUSING FURTHER EROSION. 3. THE CONTRACTOR SHALL SIZE THE PUMP AROUND SYSTEM SUFFICIENTLY FOR A RANGE OF POSSIBLE BASEFLOW DISCHARGES AND THE SYSTEM SHALL RUN CONTINUOUSLY WHILE WORKING IN THE STREAM. 4. THE STREAMBANKS AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE PUMP AROUND SYSTEM IS SHUT DOWN AND BEFORE FLOW IS RETURNED THE CHANNEL. STREAM DIVERSION PUMP INTAKE HOSE STREAMBANK FLOW SUMP -HOLE FOR INTAKE POOL (12" TO 18" DEEP, 2-FT DIAMETER) POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA E&SC DETAIL: TEMPORARY PUMP AROUND SYSTEM PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 4.5 / ��\� ��� /L- /_�/ i - , POSSUM TROT CREEK .—._--� — --�•. 1 �-� - �� --_ , AV.,//�.�� --_�� A ---__ - _ \ V V A V A : :1 \ coto 0 0 60 SCALE 1" = 60' GENERAL RE -VEGETATION NOTES 1. FINAL VEGETATION SPECIES SELECTION MAY CHANGE DUE TO REFINEMENT OR SPECIES AVAILABILITY AT THE TIME OF PLANTING. SPECIES SUBSTITUTIONS WILL BE COORDINATED BETWEEN THE LANDOWNER, ENGINEER AND PLANTING CONTRACTOR PRIOR TO THE PROCUREMENT OF PLANT/SEED STOCK. 2. ANY INVASIVE SPECIES VEGETATION WITHIN THE IMMEDIATE WORK AREA, SUCH AS CHINESE PRIVET (LIGUSTRUM SINENSE) AND MULTIFLORA ROSE (ROSA MULTIFLORA) SHALL BE REMOVED BY PHYSICAL AND MECHANICAL METHODS PRIOR TO INSTALLATION OF NATIVE STREAMBANK AND BUFFER SPECIES. 3. LARGER NATIVE TREE SPECIES TO BE PRESERVED WILL BE FLAGGED BY THE ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES. ANY TREES HARVESTED FOR WOODY MATERIAL WILL BE UTILIZED TO PROVIDE BED AND BANK STABILIZATION AND COVER OR NESTING HABITAT ON THE FLOODPLAIN. ANY EXCESS WOODY MATERIALS MAY USED TO BACKFILL OLD CHANNELS. 4. ALL DISTURBED AREAS SHALL BE STABILIZED USING TEMPRORY AND PERMANENT SEEDING AS DEFINED IN THE SEEDING SCHEDULE AND THE APPROVED E&SC PLANS. 5. SUPPLEMENTAL PLANTING ACTIVITIES MAY BE REQUIRED WITHIN THE CONSERVATION EASEMENT. \ 111\11 v Vv1 v I I I 1vv\IIi11111 v1j11111,I V v \ \ 1 (c.�V A A \ 11 1 I I\ \ 1 1 A A\ V A 1 v v v v A V V A 1 r � / // \ A V 1 dV �" 0 • / Q / /// vvvvvv �11J� /ii//�i/�. vvvvvv�v1v�1 ��/ i///// v v v v 1 1 1 �� /liilllll\ \vvvv AIvI\\111$(�//j/ Vvv /1111Al\ II 0�/ /�1/ll/� vv`v 1 1 I II y vI v vvvll' <</ 1; y `v,1 vvI 1I �111A1 I v, �p�ly / /1// IIIIv / \1\\ilI1111\\ \)j111 11111/l\I\fill 1\I I \ \ �I\I1j1���/1��)�1�� 1 \°j11 /\11//llll/ll, i1 1 'v v�l�i/, ;l/ ll/Ii V ! 1/ / /ll/ lr/ll/llll/ V A ���.1il/ _ / / /(/,l�I liilAll�i "ii �' �-,i ___-_- \ ,i,�-:�ci� -(�ii/-7 ,/ / - _- ��� /� ii I/ / I� —7:- -7.., /i i-� �__/ i�c- --- _ -� ---- _— _- ZONE 1: STREAMBANK �� �, �� ��' �� i /� - �i� ��'�' / 1\ \ — FROM TOE OF CHANNEL TO 3.0' BEYOND TOP OF BANK /' �/ ' /— / v/ 1 y s l / �i _ — -- _ �— i / /� / 1 _ /%`' _ ice \_=�__- %--i -- -i;�— / V c / \ __ ���/! i��"_�"� _ 1 / / i / - - - -� •_ -� %' /- _ -- -- /�j���/�I11�1,1 ZONE 2: BUFFER RE-ESTABLISHMENT vF 3.0' FROM TOP OF BANK TO 20.0' FROM TOP OF BANK ! —� MINIMUM TWO (2) ROWS OF WOODY PLANTINGS j/j/i//�i�/� ////Ri i //////�J//. v \�.��--- ZONE 1: STREAMBANK NOTES 6. LIVESTAKES AND HERBACEOUS PLUGS LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 4,840 STEMS PER ACRE (3.0' 0.C.) FROM TOE OF THE STREAMBANK TO 3.0' OUTSIDE TOP OF BANK. HERBACEOUS PLUGS SHALL BE PLANTED ALONG THE TOE OF THE CHANNEL. ZONE 2: BUFFER RE-ESTABLISHMENT NOTES 7. WOODY SPECIES LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 440 STEMS PER ACRE (10.0' 0.C.) FROM 3.0' OUTSIDE TOP OF BANK TO 25.0' FROM TOP OF BANK. A MIMIMUM OF TWO (2) ROWS OF WOODY PLANTINGS SHALL BE IN THE BUFFER RE-ESTABLISHMENT AREA. EXACT PLACEMENT OF THE SPECIES SHALL BE DETERMINED BY THE CONTRACTOR'S VEGETATION SPECIALIST PRIOR TO SITE PLANTING AND BASED ON THE WETNESS CONDITIONS OF PLANTING LOCATIONS. RE -VEGETATION PLAN FEATURES ----- DESIGN STREAM CENTERLINE ZONE 1: STREAMBANK ZONE 2: BUFFER RE-ESTABLISHMENT POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA RE -VEGETATION PLAN PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" 1' = 60' H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 5.1 SEEDING SCHEDULE TEMPORARY SEEDING DATE TYPE APP. RATE (LBS/AC) JAN 1 - MAY 1 RYE GRAIN (Secale cereale) 120 COMMON OATS (Avena sativ) 100 GROUND AG. LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 MAY 1-AUGUST 1 GERMAN MILLET (Setaria italica) 50 COMMON OATS (Avena sativ) 100 GROUND AG. LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 AUGUST 1- DECEMBER 31 RYE GRAIN (Secale cereale) 120 WINTER WHEAT (Triticum aestivum) 100 GROUND AG. LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 PERMANENT RIPARIAN SEEDING - 25 LBS / AC SPECIES COMMON NAME PERCENT Asclepias incarnata SWAMP MILKWEED 10% Asclepias syriaca COMMON MILKWEED 10% Ecinacea purpurea PURPLE CONEFLOWER 5% Rudbeckia fulgida ORANGE CONEFLOWER 5% Rudbeckia triloba BROWN EYED SUSAN 10% Coreopsis lanceolata LANCE LEAFTICKSEED 5% Eupatorium perfoliatum BON ESET 5% Eutrochiummaculatum JOE PYE WEED 5% Monarda didyma BEE BALM 5% Lobelia cardinalis CARDINAL FLOWER 10% Phlox stolonifera CREEPING PHLOX 5% Andropogonscoparium LITTLE BLUESTEM 5% Chasmanthium latifolium RIVER OATS 10% Sorgasthrum nutans INDIAN GRASS 10% TOTAL 100% ZONE 1: STREAMBANK ZONE 1- STREAM BANK - 3' O.C. (4,840 STEMS / AC) SPECIES COMMON NAME % OF STEMS LIVE STAKES Corpus amomum SILKY DOGWOOD 30% Salix sericea SILKY WILLOW 30% Salix nigra BLACK WILLOW 10% Salk caroliniana CAROLINA WILLOW 10% Sambucus canadensis ELBERBERRY 10% Physocarpus opulifolius NI N EBARK 10% TOTAL 100% HERBACEOUS PLUGS Xanthorhiza simplicissima YELLOW ROOT 40% Carex PE N N SY LVAN IA SEDGE 60% TOTAL 100% 00000< ZONE 2: BUFFER RE-ESTABLISHMENT ZONE 2 - BUFFER RE-ESTABLISHMENT - 10' O.C. (440 STEMS / AC) SPECIES COMMON NAME % OF STEMS OVERSTORY Betula lento SWEET BIRCH 10% Betulaalleghaniensis YELLOW BIRCH 104 Carya cordiformis BITTERNUT HICKORY 10% Quercus marilandica BLACKJACK OAK 10% Ceanothus americanus NEW JERSEY TEA 59 Nyssa sylvatica BLACK GUM 54 UNDERSTORY Cephaianthus occidentalis BUTTON BUSH 5, Ainus serrulata HAZEL ALDER 5? Hamamelis virginiana WITCH HAZEL 5% Vaccinium macrocarpon AMERICAN CRANBERRY 5% Vaccinium altomontanum BLUE RIDGE BLUEBERRY 5% Viburnum carolinianum CAROLINAARROWWOOD 5% Viburnum iantanoides HOBBLEBUSH 5% Viburnum acerifolium MAPLE -LEAF ARROW WOOD 5% TOTAL 100% POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA PLANTING SCHEDULE PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 5.2 BUFFER WIDTH VARIES 10.0' 0.0 INSERT THE DIBBLE STRAIGHT DOWN INTO THE SOIL TO THE FULL DEPTH OF THE BLADE AND PULL BACK ON THE HANDLE TO OPENT THE PLANTING HOLE. DO NOT ROCK THE SHOVEL BACK AND FORTH AS THIS CAUSES THE SOIL IN THE PLANTING HOLE TO BE COMPACTED, INHIBITING ROOT GROWTH. BANKFULL TOE OF SLOPE + + + + + + + + + + + + + + + + TOB / BARE ROOT SEEDLING LIVE STAKE HERBACEOUS PLUG / REMOVE THE DIBBLE AND PUSH THE SEEDLING ROOTS DEEP INTO THE PLANTING HOLE. PULL THE SEEDLING BACK UP TO THE CORRECT PLANTING DEPTH. THE ROOT COLLAR SHOULD BE 1" - 3" BELOW THE SOIL SURFACE. GENTLY SHAKE THE SEEDLING TO ALLOW THE ROOTS TO STRAIGHTEN OUT. DO NOT TWIST OR SPIN THE SEEDLING OR LEAVE THE ROOTS 1-ROOTED. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ZONE 2: 10' 0.C. SPACING / 10' ROW SPACING ZONE 1: 3' 0.C. SPACING / 3' ROW SPACING BARE ROOT PLANTINGS 3.0' FROM BANKFULL INSERT THE DIBBLE SEVERAL INCHES IN FRONT OF THE SEEDLING AND PUSH THE BLADE HALFWAY INTO THE SOIL. TWIST AND PUSH THE HANDLE FORWARD TO CLOSE THE TOP OF THE PLANTING HOLE TO HOLD THE SEEDLING IN PLACE. DIBBLE BAR PLANTING BAR SHALL HAVE A BLADE WITH A TRIANGULAR CROSS-SECTION, AND SHALL BE 12" LONG, 4" WIDE AND 1" THINK AT THE CENTER. ROOT PRUNING ALL ROOTS SHALL BE PRUNED TO AN APPROPRIATE LENGTH FOR PLANTING TO PREVENT J-ROOTIING. PUSH THE DIBBLE DOWN TO THE FULL DEPTH OF THE BLADE. BARE ROOT DETAILS PLANT LIVE STAKES AND HERBACEOUS PLUGS 3.0' 0.C. IN OFFSET ROWS FROM TOE OF SLOPE TO 3.0' BEYOND THE BANKFULL STAGE NOTES 1. ALL SOILS WITHIN THE BUFFER PLANTING AREA SHALL BE FINE GRADED AND / OR DISKED, AS REQUIRED, PRIOR TO PLANTING. 2. PLANT BAREROOT SEEDLINGS 10.0' 0.C. IN OFFSET ROWS FROM 3.0' BEYOND THE BANKFULL STAGE TO THE GRADING LIMITS PULLBACK ON THE HANDLE TO CLOSE THE BOTTOM OF THE PLANTING HOLE. THEN PUSH FORWARD TO CLOSE THE TOP ELIMINATING AIR POCKETS AROUND THE ROOT. PLANT BAREROOT SEEDLINGS 10.0' 0.C. IN OFFSET ROWS FROM 3.0' BEYOND THE BANKFULL STAGE TO THE GRADING LIMITS + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + REMOVE THE DIBBLE. CLOSE AND FIRM UP THE OPENING WITH YOUR HEEL. BE CAREFUL TO AVOID DAMAGING THE SEEDING. LIVE STAKES IN OFFSET ROWS PER PLANTING PLAN HERBACEOUS PLUGS NOTES 1.5x CONTAINER DEPTH 2' 3' I 2x CONTAINER WIDTH NOTES 1. PLANTS SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER. 2. PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS. 3. THE DIAMETER OF THE PLANTING PITS FOR EACH PLANT SHOULD BE AT LEAST TWO TIMES THE DIAMETER OF THE ROOT MASS. SCARIFY THE PLANTING PIT PRIOR TO EACH PLANT INSTALLATION. 4. SET PLANTS UPRIGHT IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED SOIL. 5. PLACE BACKFILL AROUND BASE AND SIDES OF ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL. 3.0' 0.C. //' SECTION A - A' 3.0' CONTAINER PLANT DETAILS 1/2" TO 2" DIAMETER 2' TO 3' LIVE STAKE TAPERED AT BOTTOM LIVE STAKE 1. LIVE STAKES MUST BE DORMANT WHEN CUT. KEEP LIVE STAKES MOIST UNTIL PLANTING. THE STAKE SHOULD BE PREPARED WITH THE BUDS POINTED UP, AND THE BOTTOM SHOULD BE CUT AT AN ANGLE FOR INSERTION INTO THE GROUND. AN IRON BAR CAN BE USED TO MAKE A PILOT HOLE TO PREVENT BARK FROM BEING DAMAGED DURING INSTALLATION. 2. LIVE STAKES SHALL BE 0.5" - 2" IN DIAMETER AND 2' - 3' IN LENGTH. 3. LIVE STAKES SHOULD BE PLACED WITH 3 TO a OF THE LENGTH OF THE STAKE BELOW GROUND AND ANGLED DOWNSTREAM. ENSURE THE BASE OF THE LIVE STAKE WILL REACH THE WATER TABLE. AFTER INSTALLATION THE TOP OF THE LIVE STAKE SHALL BE PRUNED WITH A SQUARE CUT LEAVING NO LESS THAN 3" AND NO LESS THAN 6" ABOVE THE GROUND. 4. PLANT LIVE STAKES AND HERBACEOUS PLUGS IN OFFSET ROWS AND SPACINGS PER PLANTING PLAN. LIVE STAKING DETAILS POSSUM TROT CREEK DAYLIGHTING AND STREAM RESTORATION YANCEY COUNTY - NORTH CAROLINA RE -VEGETATION AND PLANTING DETAILS PERMIT DRAWING REVISIONS DATE: 09/01/2022 PLOT SIZE: 11" x 17" NTS H.D.: NADS3 V.D.: NAVDSS JE PID: 0703 5.3