Loading...
HomeMy WebLinkAbout20140723 Ver 1_Scoping Comments_20140925 Department of Environment and Natural Resources Project Review Form Project Number: 15-0225 County: Carteret Date Received: 09/22/2014 Due Date: 10/17/2014 Project Description: Sco ng Proposal is for the replacement of the existing two lane bridge on US fi 0 over-North River with a new two lane highway bridge on new alignment to the north by the NCDOT. This Pro.lect is being reviewed as indicated below: Regional Office Regional Office Area In-House Review Asheville ✓ Air Air Quality ✓ Coastal Management Fayetteville ✓ DWR-Surface Water Parks&Recreation DCM-Marine Fisheries Mooresville DWR-Aquifer ✓ Waste Mgtut Military Affairs Raleigh ✓ DEMLR(LQ&SW) Water Resources Mgmt D (PUbl ic Water, Planning& Water MF-Shellfish Sanitation Washington UST Quality Program) Wildlife Wilmington ✓ DWRTUblic Water v/ DWR-Transportation Unit ✓ Wildlife--DOT Travis Wilson Winston-Salem Manager Sign-01URcgion: Date: In-House Reviewer/Agency: Response(check all applicable) 0 G 4 SU r,& ).c i q t-�7 2:3 No objection to proJect as proposed. No Comment Insufficient information to complete review Cither(specify or attach comments) If you have any questions, please contact: Lyn Hardison at lYn.hardison(&ncdenr.gov or(252) 948-3842 943 Washington Square Mall Washington NC 27889 Courier No. 16-04-01 U.S.Department of Commander 431 Crawford Street Homeland Security United States Coast Guard Portsmouth,Va.23704-5004 Fifth Coast Guard District Staff Symbol:(dpb) United States Phone:(757)39&6557 Fax:(757)398-6334 Coast Guard Email: f Jarnes.L.Rousseau2(ZDusco.mal ! 16591 SEP 19 2014 PUBLIC NOTICE 5-1346 TO WHOM IT MAC'CONCERN. All interested parties are notified that the Commander, Fifth Coast Guard District has received an I application from North Carolina Department of Transportation(NCDOT), for a replacement bridge to be constructed across navigable waters of the United States. WATERWAY AND LOCATION. 6.0 miles above the mouth of North River, in Carteret County.,NC. CHARACTER OF WORK: NCDOT proposes to replace the existing two-lane US 70 bridge 'i over North River,with a new two-lane highway bridge on a new alignment immediately to the north of the existing structure. The applicant is also requesting a waiver of a bridge permit under Title 33 Code of Federal Regulations, Section 115.70;Advance approval for bridges. Advance approval waterways are those that are navigable in law,but not actually navigated by other than small boats. The Commandant of the Coast Guard has given advance approval to the construction or repair of bridges across such waterways. MINIMUM NA MATIONAL CLEARANCES. i !i Exastun, .Fro used �j Vertical Clearance: 8 feet above mean high Vertical Clearance: 8 feet above MHW water(MHW) Horizontal Clearance: 20 feet between bents Horizontal Clearance: 85 feet between bents SOLICITATION OF COMMENTS: Interested parties are requested to express their views,in writing, on the proposed construction of the replacement bridge giving sufficient detail to establish a clear understanding of their reasons for support of or opposition to the proposed project. Comments will.be addressed for the record at the Office of Commander(dpb), Fifth.. Co�G tW lgd ct,431 Crawford Street, Portsmouth, VA 23'p4-5004 through Location and plan sheets e attach d. WAVERL� G GC R , Bridge Pro am Manage By direction of the Commander Fifth Coast Guard District 1300 70 WTiE- BfAUFO i�y ti VICINITY MAP i' 0 1322 1300 u BRIDGE SITE 1323 . 1322 BEAU ORT � t BETTIE 70 . 70 .� 1238 Ad worth q E no TIDAL 1324 445 435 FLOW a MURRAY � CS DR. LOCATION MAP v PROJECT NO. B--4722B CARTERET COUNTY N. a SHEET 1 OF 2 is STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION j p RALEIGH a 0 w PROPOSED HIGHWAY BRIDGE. OVER NORTH RIVER ON m US 70 BETWEEN BEAUFORT AND BETTIE NLQ O DRAWN OV. DATE 9'12-14 0 G,ELY oA'1E i B-l5.14 I SPAN 0 90'-S'ANO 6,SPANS W 90'-O'=630'-6' 90'-0' SPAN H I SPAN 10 90'-S"AND 6 SPANS 0 90'-O'=630'-6' JV 4 UNCLASSIFIED °Hn UNCLASSIFIED. STRUCTURE 100 YEAR ¢^ STRUCTURE EXCAVATION FLOOD y� EXCAVATION 00� N.W.S. Ati:.tY. ELI 0.00 t.90 EL.1.20- —— — — INTEGRAL END BENT I RENT 7 BENT 8 INTEGRAL ENp_DENT 2 ELEVATION STEEL SHEET PILE STEEL SHEET PILE 85'.l0. RETAINING.WALL RETAINING -WALL HORIZONTAL CLEARANCE - FILL FACE 0 IIRIOOE.IA. INTEGRAL TO ePAUFORTj - ! STATION$7+75.00-L. 1 -E<yp BRIT 2 FILL FACE 0� 1 'NORTH RIVER � �TO BETTZE END$ENT i L_& (TIDAL FLOW) Y-.{ ! BRIDGE Lu 1 SPAN w 90'-61AND B SPANS 4D 9O'-O•=.&30'-b 40-0"SPANK i SPAN W 90'-b'At81 S SPANS m 90'-0'=63o'.-fi• TOTAL BRIDGE LENGTH=f351•^0• PLAN PROJECT NO. B-47228 CARo o -• .�f�, , CARTERET COUNTY SSIG s; SHEET 2 OF 2 ' A ^ STATE OF NORTH CAROLINA 3 - t M DEPARTMENT OF TRANSPORTATION w RALEIGH %° Gt �-'��'.�` PROPOSED HIGHWAY BRIDGE �l'� ijN' A� �;.�`` OVER NORTH RIVER ON UFT BETWEEN BEAOR TIE Q'"s N`v° m DRAWN SY: 8 H BAM AL�j R DATE 8-12-34 �, k - 'GNEt3tED BT i. D.G.ELY DATE,H-IS-t4 x a �. :� l i i