HomeMy WebLinkAbout20140723 Ver 1_Scoping Comments_20140925 Department of Environment and Natural Resources
Project Review Form
Project Number: 15-0225 County: Carteret Date Received: 09/22/2014
Due Date: 10/17/2014
Project Description: Sco ng Proposal is for the replacement of the existing two lane bridge on
US fi 0 over-North River with a new two lane highway bridge on new alignment to
the north by the NCDOT.
This Pro.lect is being reviewed as indicated below:
Regional Office Regional Office Area In-House Review
Asheville ✓ Air Air Quality ✓ Coastal Management
Fayetteville ✓ DWR-Surface Water Parks&Recreation DCM-Marine Fisheries
Mooresville DWR-Aquifer ✓ Waste Mgtut Military Affairs
Raleigh ✓ DEMLR(LQ&SW) Water Resources Mgmt
D
(PUbl ic Water, Planning& Water MF-Shellfish Sanitation
Washington UST Quality Program) Wildlife
Wilmington ✓ DWRTUblic Water v/ DWR-Transportation Unit ✓ Wildlife--DOT Travis Wilson
Winston-Salem
Manager Sign-01URcgion: Date: In-House Reviewer/Agency:
Response(check all applicable) 0 G 4
SU r,& ).c i q t-�7 2:3
No objection to proJect as proposed. No Comment
Insufficient information to complete review Cither(specify or attach comments)
If you have any questions, please contact:
Lyn Hardison at lYn.hardison(&ncdenr.gov or(252) 948-3842
943 Washington Square Mall Washington NC 27889
Courier No. 16-04-01
U.S.Department of Commander 431 Crawford Street
Homeland Security United States Coast Guard Portsmouth,Va.23704-5004
Fifth Coast Guard District Staff Symbol:(dpb)
United States Phone:(757)39&6557
Fax:(757)398-6334
Coast Guard Email:
f Jarnes.L.Rousseau2(ZDusco.mal
! 16591
SEP 19 2014
PUBLIC NOTICE 5-1346
TO WHOM IT MAC'CONCERN.
All interested parties are notified that the Commander, Fifth Coast Guard District has received an
I application from North Carolina Department of Transportation(NCDOT), for a replacement
bridge to be constructed across navigable waters of the United States.
WATERWAY AND LOCATION. 6.0 miles above the mouth of North River, in Carteret
County.,NC.
CHARACTER OF WORK: NCDOT proposes to replace the existing two-lane US 70 bridge
'i over North River,with a new two-lane highway bridge on a new alignment immediately to the
north of the existing structure. The applicant is also requesting a waiver of a bridge permit under
Title 33 Code of Federal Regulations, Section 115.70;Advance approval for bridges. Advance
approval waterways are those that are navigable in law,but not actually navigated by other than
small boats. The Commandant of the Coast Guard has given advance approval to the
construction or repair of bridges across such waterways.
MINIMUM NA MATIONAL CLEARANCES.
i
!i Exastun, .Fro used
�j Vertical Clearance: 8 feet above mean high Vertical Clearance: 8 feet above MHW
water(MHW)
Horizontal Clearance: 20 feet between bents Horizontal Clearance: 85 feet between bents
SOLICITATION OF COMMENTS: Interested parties are requested to express their views,in
writing, on the proposed construction of the replacement bridge giving sufficient detail to
establish a clear understanding of their reasons for support of or opposition to the proposed
project. Comments will.be addressed for the record at the Office of Commander(dpb), Fifth..
Co�G tW
lgd ct,431 Crawford Street, Portsmouth, VA 23'p4-5004 through
Location and plan sheets e attach d.
WAVERL� G GC R ,
Bridge Pro am Manage
By direction of the Commander
Fifth Coast Guard District
1300 70
WTiE-
BfAUFO i�y
ti
VICINITY MAP
i'
0 1322
1300
u
BRIDGE SITE
1323 .
1322
BEAU ORT �
t BETTIE
70
. 70
.� 1238 Ad worth q
E no
TIDAL 1324
445 435 FLOW a
MURRAY � CS
DR.
LOCATION MAP
v PROJECT NO. B--4722B
CARTERET
COUNTY
N.
a SHEET 1 OF 2
is
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
j p RALEIGH
a
0
w PROPOSED HIGHWAY BRIDGE.
OVER NORTH RIVER ON
m US 70 BETWEEN
BEAUFORT AND BETTIE
NLQ
O
DRAWN OV. DATE 9'12-14
0 G,ELY oA'1E i B-l5.14
I SPAN 0 90'-S'ANO 6,SPANS W 90'-O'=630'-6' 90'-0' SPAN H I SPAN 10 90'-S"AND 6 SPANS 0 90'-O'=630'-6'
JV
4
UNCLASSIFIED °Hn UNCLASSIFIED.
STRUCTURE 100 YEAR ¢^ STRUCTURE
EXCAVATION FLOOD y� EXCAVATION
00� N.W.S. Ati:.tY.
ELI 0.00 t.90 EL.1.20-
—— — —
INTEGRAL END BENT I RENT 7 BENT 8 INTEGRAL ENp_DENT 2
ELEVATION
STEEL SHEET PILE
STEEL SHEET PILE 85'.l0. RETAINING.WALL
RETAINING
-WALL HORIZONTAL CLEARANCE -
FILL FACE 0
IIRIOOE.IA. INTEGRAL
TO ePAUFORTj - ! STATION$7+75.00-L. 1 -E<yp BRIT 2
FILL FACE 0� 1 'NORTH RIVER � �TO BETTZE
END$ENT i L_& (TIDAL FLOW) Y-.{ !
BRIDGE
Lu
1 SPAN w 90'-61AND B SPANS 4D 9O'-O•=.&30'-b 40-0"SPANK i SPAN W 90'-b'At81 S SPANS m 90'-0'=63o'.-fi•
TOTAL BRIDGE LENGTH=f351•^0•
PLAN
PROJECT NO. B-47228
CARo
o -• .�f�, , CARTERET COUNTY
SSIG s; SHEET 2 OF 2
' A ^ STATE OF NORTH CAROLINA
3 - t M DEPARTMENT OF TRANSPORTATION
w RALEIGH
%° Gt �-'��'.�` PROPOSED HIGHWAY BRIDGE
�l'� ijN' A� �;.�`` OVER NORTH RIVER ON
UFT BETWEEN BEAOR TIE
Q'"s
N`v°
m DRAWN SY: 8 H BAM AL�j R DATE 8-12-34
�, k - 'GNEt3tED BT i. D.G.ELY DATE,H-IS-t4
x a �.
:�
l
i
i