Loading...
HomeMy WebLinkAbout310022_Plan of Action_20220907PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION Facility Number: 31-22 County: Duplin Facility Name: Dexter Jackson (1-20) Certified Operator Name: Al 'AA Z, l� l (1►' I Operator #: / 41?'1 L Note: A certified Sludge Management Plan may be submitted in lieu of this POA. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6 a. Lagoon Name/ Identifier (6-10) b. Total Sludge Depth (ft) 5.2 c. Sludge Depth to be Removed for Compliance (ft) .2 d. Sludge Volume to be Removed (gallons) 87,314 e. Sludge PAN (Ibs/1000 gal) f. Liquid PAN (Ibs/1000 gal) g. PAN of Sludge (Ibs) (d x e)/1000 Compliance Timeframes: If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level results in an elevated waste analysis, a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to DWQ within 180 days. Work to reduce the sludge level must begin within another 180 days. Compliance with NRCS Standard 359 must be achieved by the expiration date of the current permit, July 1, 2007, If the sludge level is non -compliant, but below the stop pump level of the lagoon, compliance with NRCS Standard 359 must be achieved by the expiration date of the current permit, July 1, 2007. If future sludge surveys do not show improvement in sludge levels, DWQ may require the owner to develop a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1,26. SPOA 5-18-04 Page 1 of 2 NARRATIVE: Use this section to describe the method(s) that will be used to lower the sludge depth. If microbe use is planned, specify the product to be used. Sludge Management/Operation Plan Sludge Management Guide Lagoon evaluation data developed by NCSU and a review of lagoon management records of several lagoons showed that treatment capacity of the swine lagoons evaluated In NC was not significantly adversely affected by sludge accumulations of 50% or more of the planned treatment volume of the lagoon , Therefore it is felt that it is permissible to allow sludge accumulation into the planned treatment zone of properly monitored and managed lagoons provided that: • Nutrient values of the lagoon effluent are within the normal operating range. • There is no noticeable increase In lagoon odor. • Nutrients land applied from the lagoon are properly accounted for in the application plan (WUP) Sludge Management Sludge in my lagoon will be managed by the following • Adequately monitor to define sludge volume, location, and rate of accumulation by conducting an annual sludge survey. • Maintain a minimum 2.5 feet deep zone, free of sludge at the pump intake during irrigation. • Position the pump intake and manage the Irrigation operation such that the material irrigated is not more concentrated than the nutrient analysis samples. • Sufficient monitoring to address concerns that nutrients are not over applied. • Other items as required by DWQ. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. A/ it Iv, d G, I6.� Phon.:R19-63)2721 Facility Owner/Manager (print) (Iiivoi Facility r/Manager (signature) Date: Return this form to: NC Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 SPOA 5-18-04 Page 2 of 2 Prestage Farms, Inc. Irrigation Equipment Field Calibration Form Farm Name: Dexter Jackson 31-22 Date of Field Calibration: 9/7/22 Flow Meter Serial Number: V 1006764 Equipment Number: A36369 Measured ring size: .97R inches Is ring size ithin 0.01" of original manufactured size? Yes or No. If not, replace ring. Pressure Gauge Readings At Pump: 125 psi At Traveler: psi At Sprinker/Gun: 80 psi Expected Flow Rate (from manufactures chart): 165 GPM Measured Flow Rate (from flow meter): 168 GPM Flow rate variance grea r than 10% Yes No Expected Wetted Diameter (from the wettable acres determination): Measured Wetted Diameter: 290 ft. 300 ft. Wetted diameter varianc greater than 15% &/or measured flow variance greater than 10%: Yes No V If yes, then contact a technical specialist or irrigation dealer for assistance. Comments: Calibrator: Alan Parh m 4)'-` (signature) Irrigation Equipment Field Calibration Form 5/1/03 Prestage Farms, Inc. Irrigation Equipment Field Calibration Form Farm Name: Dexter Jackson 31-22 Date of Field Calibration: 9/7/22 Flow Meter Serial Number: V 1006764 Equipment Number: 370918 Measured ring size: •97R inches Is ring size ithin 0.01" of original manufactured size? Yes or No. If not, replace ring. Pressure Gauge Readings At Pump: 125 psi At Traveler: psi At Sprinker/Gun: 80 psi Expected Flow Rate (from manufactures chart): 165 GPM Measured Flow Rate (from flow meter): 168 GPM Flow rate variance grea r than 10% Yes No Expected Wetted Diameter (from the wettable acres determination): 300 ft. Measured Wetted Diameter: 290 ft. Wetted diameter variance greater than 15% &/or measured flow variance greater than 10%: Yes No If yes, then contact a technical specialist or irrigation dealer for assistance. Comments: Calibrator: Alan Parh m "e) (signature) Irrigation Equipment Field Calibration Form 5/1/03 Prestage Farms, Inc. Irrigation Equipment Field Calibration Form Farm Name: Dexter Jackson 31-22 Date of Field Calibration: 9/7/22 Flow Meter Serial Number: V 1006764 Equipment Number: 361691 Measured ring size: .87 inches Is ring sizepdithin 0.01" of original manufactured size? Yes or No. If not, replace ring. Pressure Gauge Readings At Pump: 125 psi At Traveler: psi At Sprinker/Gun: 60 psi Expected Flow Rate (from manufactures chart): 167 GPM Measured Flow Rate (from flow meter): 168 GPM Flow rate variance grea r than 10% Yes No NOr Expected Wetted Diameter (from the wettable acres determination): 292 ft. Measured Wetted Diameter: 290 ft. Wetted diameter varianc.greater than 15% &/or measured flow variance greater than 10%: Yes No V If yes, then contact a technical specialist or irrigation dealer for assistance. Comments: Calibrator: Alan Par am (signature) Irrigation Equipment Field Calibration Form 5/1/03