Loading...
HomeMy WebLinkAboutWQ0043637_Application (FTSE)_20220711wR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: leap _t- All items must be completed or the am is tion will be returned 3_2(to be completed by DWR) NC Dept of Environmental Quality JUL 112022 I. APPLICANT INFORMATION: I . Applicant's name: City of Rocky Mount, North Carolina (company, municipality, HOA, utility, etc.cigh Regional (eve 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Scott Miles, P.E. per 15A NCAC 02T .0106(b) Title: Assistant City Engineer - Water Resources 4. Applicant's mailing address: Post Office Box 1180 City: Rocky Mount State: NC Zip: 27802-1180 5. Applicant's contact information: Phone number: 2O 972-1122 Email Address: scott.miles@rockymountnc.gov II, PROJECT INFORMATION: 1. Project name: Old Mill Road Sewer p Station Replacement 2. Application/Project status: ❑ Proposed (New Permit) ® Exis ' g Permit/Project If a modification, provide the 'fig permit number: WQ00 and issued date: old r-A.-A-- CAI/' a- ncr1-ex1,si� For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Nash 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.94527' Longitude:-77.83552: 5. Parcel ID (if applicable): 384018404860 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Thomas D. Dienes License Number: 027372 Firm: Green Engineering, PLLC Mailing address: Post Office Box 609 City: Wilson State: NC Zip: 27893-0609 Phone number: (252) 237-5365 Email Address: t.dienesCiigreeneng.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Tar River Regional WWTP Permit Number: NC0030317 Owner Name: City of Rocky Mount V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ0035660 2. Downstream (Receiving) Sewer Information: 30 inch El Gravity 0 Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): City of Rocky Mount FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑Yes ❑No ZN/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® N/A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ® Retail (stores, centers, malls) ® Residential (Leased) ® Retail with food preparation/service ® School / preschool / day care ® Medical / dental / veterinary facilities ® Food and drink facilities ® Church ® Businesses / offices / factories ® Nursing Home ® Car Wash ❑ Hotel and/or Motels Z Swimming Pool/Clubhouse Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 90 % Domestic 10 % Commercial % Industrial (See 15A NCAC 02T .0101(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ® No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow Lb No. of_Units Flow gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total GPD a See l5A NCAC 02T #01144b},(4, iejil) and kV) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42k 4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: GPD (per 15A NCAC 02T .0114) > Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: __ Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ® Other (Explain): Pump station replacement for existing flows FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 24 131 Ductile Iron ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: Old Mill Road Station 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.94527' Longitude:-77.83552' 3. Total number of pumps at the pump station: 3 3. Design flow of the pump station: 5.500 millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): Three (3) pumps (2 duty: 1 standby) each sized for 2,530 gallons per minute (GPM) at 76 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 14 3,290 PVC 14 1,005 HDPE 14 340 Ductile Iron If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.1.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)( • Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (g)? 15A NCAC 02T.0305(fi contains minimum separations that shall be vrovided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 2Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 2Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **My other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T 0305(t) or (g), see Section X.1 of this application * 15A NCAC 02T.0 O5(g) contains alternatives where separations in 02T.0305() cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water cla sifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin name: Tar River If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is req Yes El No ❑N/A ❑ No ® Yes ❑ No ❑ Yes ®No uired. 6. Does project comply with 15A NCAC 02T.0105{c6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T,0105Cc6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.D402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1, Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria For the Permitting of Pump Stations and Force Mains (latest version), and the rgaviet Sewer Minimum Design Criteria (latest version) as applicable? ®Yes El No If no, for projects requiring a single variance, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer review times. For protects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project. the full technical review is required. 2. Professional Engineer's Certification: 1, Thomas D. Dienes, P.E. , attest that this application for Old Mill Road Sewer Pump Station Replacement (Professional Engineer's name from Application Item 111.1.) (Project Name from Application Item ILl) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for ()ravijy Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations anti Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Scott Miles, P.E., Assistant City Engineer , attest that this application for (Signature Authority Name from Application Item 1.3.) (Project Name from Application Item II.I) .•` .N CARa f ill 4• lib ��SS /10/k;+• mar 4tZ f, v D. t I 1 47if ' i CO <41,44Q.. 1,4 bolassr Old Mill Road Sewer Pump Station Replacement attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: FORM: FTA 06-21 Date: r Z Page 5 of 5 R Division of Water Resources NC Dept of Environmental Quality JUL 112022 State of North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional. Ow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Rocky Mount, North Carolina Project Name for which flow is being requested: Old Mill Rd Sewer PS Replacement More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Tar River Regional WWTP b. WWTP Facility Permit #: NC0030317 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 21.0 o- '}42 ID.o3 0.0 11.c,oI, II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pO, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** q L 1 p-; st 3 l a, (c, . c o.1 - -4 . a.4a `1 .q2� * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is ¢ 0. Downstream Facility Name (Sewer): Tar River Regional WWTP Downstream Permit Number: NC00303 17 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Scott Miles, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Sign n, Ilfcial Signature Ass- ISi1r1 L.1r% ram` )11C('� Title of Signing Official J Wicorr' - 4,5 01-02.. S. 6rZ4.- cL Date Page 2 of 6 FTSE 10-18 DIvIOo4l cif 4uarf, Resotxrr.t s State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Rocky Mount, North Carolina Project Name for which flow is being requested: Old Mill Rd Sewer PS Replacement More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Tar River Regional WWTP b. WWTP Facility Pernit #: NC00303 17 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 21.0 l0•v3 0.0 tl_coo 1, s2r-1,Io II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station (Name or Permit Number) No. S.- Firm Capacity, * MGD 3c (A) Design Average Daily Flow** (Firm 1 pf), MGD Ea (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Approx. Not Yet Total Current Current Tributary Flow Plus Avg. Daily Daily Flow, Obligated Flow, MGD MGD Flow Available Capacity*** Lk * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pt) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Tar River Regional WWTP Downstream Permit Number: NC0030317 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Scott Miles, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 6rZ1-LL Sign n: j j cial Signature Date jivrm_ cc_ Title of Signing Official Page 2 of 6 FTSE 10-18 1 ' 4' , een Engineering Green Engineering, PLLC Water, Wastewater, Surveying Planning, Project Management 303 Gotdsboro Street East • PO Box 609 • Wilson, NC 27894 TEL 252.237.5365 • FAX 252.243.7489 WWW.GREENENGINEERING.COM July 6, 2022 North Carolina Department of Environment and Natural Resources Raleigh Regional Office Division of Water Quality 3800 Barrett Drive Raleigh, North Carolina 27609 Attention: Mr. Ted Cashion Environmental Specialist Water Resources, Water Quality Regional Operations Section NC Dept of Environmental Quality Subject: Fast -Track Sewer System Extension Application City of Rocky Mount Old Mill Road Sewer Pump Station Replacement Nash County, North Carolina PN: 20-154 Dear Mr. Cashion: JUL 11 2022 Raleigh Regional Office On behalf of the City of Rocky Mount, North Carolina, please find attached two (2) copies of each of the following items for your review: • Fast -Track Application for Gravity Sewers, Pump Stations, and Force Mains (one original and one copy) • Flow Tracking / Acceptance for Sewer Extension Permit Applications (one original and one copy) • 8'/2" x 11" Color copy of USGS Topographic Map of the project area • 8'/z" x 11" Street Level Map The City of Rocky Mount's existing Old Mill Road Sewer Pump Station contains two (2) 6-inch self -priming centrifugal pumps; each with its own 8-inch force main and each capable of pumping 700 gpm. This station was constructed in the 100-year flood plain and to an elevation that does not protect it from flooding. During heavy rainfall events, the existing duplex pumps run for long periods of time due to infiltration in the collection system and from pumping flood waters when the site becomes flooded. The City is proposing to construct a replacement pump station which will include three (3) self -priming sewage pumps with a firm pumping capacity of 5.50 MGD; sufficient for both current and potential future flows for this sewer basin. The new station will be constructed adjacent to the existing pump station on property owned by the City and will be elevated above both the 100 and 500-year flood plain. Initially, the City proposes to construct only the new pump station and enough force main to connect to the existing 8-inch force main that runs along the right-of-way of Old Mill Road. Construction of a proposed 14-inch force main will follow in a future fiscal year with a new discharge into the existing 30-inch River Drive Outfall sewers that are capable of handling the anticipated future flows. Mr. Ted Cashion July 6, 2022 Page -2- NC Dept of Environmental Quality J U L 112022 Raleigh Regional Ofce The new pump station will be equipped with 3 pumps; 2 duty and 1 standby; however, until the new force main is constructed, the station's control scheme will be set to use 1 pump as the duty pump with the remaining 2 pumps as standby. This control scheme will alternate the three pumps to even out pump run times and the duty pump's maximum speed (controlled by variable frequency drives) will be reduced to not exceed the capacity of the existing downstream sewers. The initial pumping capacity will be 1.8 MGD whereas the ultimate pumping capacity will be 5.50 MGD. All improvements; pump station and force main, are being permitted in this Fast Track Application. A partial certification will be prepared once construction of the pump station is complete, the station is placed into service and the old pump station is abandoned per Division of Water Resource's staff recommendations. A final certification will be prepared upon completion of the proposed force main and abandonment of the existing force main. Also, please find attached one (1) check in the amount of $480.00 to cover the application review fee. Please note that the application lacks the System Wide Collection System Permit Number(s) as the new Collection System Facility Map on the NCDEQ website is currently not working. Please also not that City staff were unable to find documentation on the City's System Wide Collection System Permit Number(s) or obtain a copy of the existing permit. If you should have any questions or require additional information, please do not hesitate to contact this office. Respectfully, ---7-4.....„ ,b,;,„.. Thomas Dienes, P.E. TDD Enclosures: As stated. Cc: Mr. Scott Miles, P.E. — Assistant City Engineer, City of Rocky Mount W:1R0CKM1201541OfficeTermits\Pump Station\NCDEQ - SewerlTed Cashion Fast Track Sewer permit Ilr (7-6-22).doc Printed By: TomD Date: 10/18/2021 Old Mill Road Pump Station Downstream Sewers: River Drive Outfall Sewers, Permit No. WQ0035660 Existing 30-inch PVC Pipe 14"a PVC FORCE MAIN Old Mill Road Pump Station Replacement City of Rocky Mount USGS TOPOGRAPHIC MAP gEnglneering 0 1,000 2,000 4,000 Feet Printed By: TomD Date: 10/11 /2021 A Jac ¢D 4 Foe Rd i3s.1h 0114 er av*erai , 0744 MospJkai rorrtiorse7ry %, o1eb T r rl z Stony Gfpek Robe 000e0 11Cr Ave Sunset Ave -g z Fiaw Dare Bo o r Skerfferdpr--+�?`w ;0in Rd ai \ I. Ridge O 'kilned I)r • �a L. `r Zia +a0 i abeka Dr de flit GTeeeiield Or Sunset Ave ':17ni t4J eay 0�" 'P CV0h4 e1�# Ketch P011144 Ins • m _rest: se klevt a Gay se h Rocky I a 1' t a A Bcnvenue Country Club ito a �4\\t/ Susie! 3eitreys Ct 4 o1 ,p�h11any'SIk4 t1 )e0 0 OT, re ▪ 11,d 0 06 48 43. Rives OTC, i t,91 ).�,� ; . fry 64% r eat yi r •Yy, h sr I r .---i I.._: h.41114.21. tl+t 4 . as ar 0et Old Mill Road SX.o, ,, 4 eh� a, Pump Station ', ��ecg • frer t. • Ra tin et to -.i "erhteh. oT.. °� M ) Ott f _ - e urlnUlSt Oa 4 .1b '<-<-/.5.e!yd . - .. 1 e>1 . 7 ''' : -. . .‘ 47.Z" PI PT goo L4 0 0 0 uu 0 a 1ast�+� I lr� I.; ' i , - Culpeppbr a► l� r� 1T'lrkl) ";141 to Rd a ` it001o414,1 He,s qte y n )"Jr , - st c Si!' / 8141ixW� ugmtth Klnpston Ave g7 Klnchen.pr Clayton St art • Su� b Sources: Est Old Mill Road Pump Station Replacement City of Rocky Mount STREET LEVEL MAP 0 0 1,500 geen ngineering 3,000 6,000 Feet Robinson, Jason From: Tom Dienes <t.dienes@greeneng.com> Sent: Wednesday, August 31, 2022 2:27 PM To: Robinson, Jason; Scott Miles; Leo Green III Cc: Kurtz, Cassidy; Thomas, Zachary T Subject: RE: [External] RE: Re: Old Mill Rd. Sewer PS Replacement CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jason, Yes, that sounds good. That is the exact recommendations you provided last October. Thanks, Thomas D. Dienes, P.E. Engineering Green Engineering, PLLC 303 Goldsboro St. E. P.O. Box 609 Wilson, NC 27893 Phone: 252.237.5365 Fax: 252.243.7489 t.dienes@greenenx.com httn://www.greeneng.com From: Robinson, Jason <jason.t.robinson@ncdenr.gov> Sent: Wednesday, August 31, 2022 2:23 PM To: Torn Dienes <t.dienes@greeneng.com>; Scott Miles <scott.miles@rockymountnc.gov>; Leo Green III <elg3@greeneng.com> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: RE: [External] RE: Re: Old Mill Rd. Sewer PS Replacement Thanks Tom. Based on your explanation, I think it would make the most sense for us to just permit this for the "final" scenario that includes the forcemain, and the pump station operating with two duty pumps and one standby pump (3,820 GPM operating point). If bidding results in just the PS being initially built, but utilizing the existing 8" forcemain, then a "partial" certification could be submitted at that point. And a "final" certification would be submitted after the 14" is constructed and tested. Sound good? Thanks, Jason Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 **Subscribe to Collection System & Sewer Permitting Updates** E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Tom Dienes <t.dienes@greeneng.com> Sent: Wednesday, August 31, 2022 7:54 AM To: Robinson, Jason <jason.t.robinson@ncdenr.gov>; Scott Miles <scott.miles@rockvmountnc.gov>; Leo Green III <elg3@greeneng.com> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Thomas, Zachary T <zachary.thomas(a)ncdenr.gov> Subject: [External) RE: Re: Old Mill Rd. Sewer PS Replacement CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning Jason, Initially, this project was designed as two (2) separate projects; the pump station and the force main. The pump station was to be constructed first with the force main a year or two later. However, recently the City has decided to bid both projects together as one project with the hopes that they can get better pricing if combined together. Until pricing is obtained, it will be undetermined if the projects will be constructed concurrently or separately. If constructed separately, you are correct that there will be one duty pump and two standby pumps. The new station will pump into an existing 8-inch force main along Old Mill Road with pumped flows limited to 1.8 MGD; the capacity of the existing station (1,250 gpm). If constructed concurrently, the new station will pump through the proposed 14-inch force main. In this situation, the station will have two duty pumps and one standby pump with a firm pumping capacity of 5.50 MGD (3,820 gpm). The operating points will be 1,250 gpm @ 87' TDH initially if the proposed force main is not constructed with the pump station or 3,820 gpm @ 106' TDH if the proposed force main is constructed with the pump station. Please let me know if you should have any additional questions. Thanks, Thomas D. Dienes, P.E. eEngineering Green Engineering, PLLC 1 303 Goldsboro St. E. P.O. Box 609 Wilson, NC 27893 Phone: 252.237.5365 Fox: 252.243.7489 t.dienes@greeneng.com http://www.greenene.com From: Robinson, Jason <jason.t.robinson@ncdenr.gov> Sent: Tuesday, August 30, 2022 4:32 PM To: Tom Dienes <t.dienes@greeneng.com>; Scott Miles <scott.miles@rockymountnc.eov>; Leo Green III <eIg3@greenene.com> Cc: Kurtz, Cassidy <Cassidv.Kurtz@ncdenr.gov>; Thomas, Zachary T <zacharv.thomas@ncdenr.gov> Subject: RE: Re: Old Mill Rd. Sewer PS Replacement Tom & Scott, We're reviewing the subject application and have the following question: 1. Section VIII.4 states that there are 3 pumps (2 duty; 1 standby), and each is sized for 2,530 GPM. a. Based on the narrative, it sounds like it will initially be designed to operate using one pump, with two on standby (run-times will be alternative between all 3 pumps). At some point, it will be switched for two pump to run simultaneously to achieve the operational point, with one pump on standby (run-time alternating between all the pumps). Is that correct? YES b. What is the overall operational point of the pump station? (3,820 gpm @ 106' TDH) I assume there's one operational point for the initial scenario (1,250 gpm @ 87' TDH), and one for the final scenario? (3,820 gpm @ 106' TDH) Thanks, Jason Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 **Subscribe to Collection System & Sewer Permitting Updates** E mar, correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID 19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Tom Dienes <t.dienes@ereeneng.com> Sent: Tuesday, July 26, 2022 5:47 PM To: Scott Miles <scott.miles@rockymountnc.gov>; Robinson, Jason <jason.t.robinson@ncdenr.gov>; Leo Green III 3 <elg3@greeneng.com> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov> Subject: RE: [External] Re: Old Mill Rd. Sewer P5 Replacement CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. No, that was not the intent. I assumed the existing station was permitted and that the new station would modify the existing permit; however, if there isn't an existing permit, then a new permit would be necessary. Jason, Is there anything you need from me? Did you want me to revised the permit application submitted to indicate it is for a new permit? Thomas D. Dienes, P.E. e Engineering Green Engineering, PLLC 303 Goldsboro St, E. P.O. Box 609 Wilson, NC 27893 Phone: 252.237.5365 Fox: 252.243.7489 t.dienes@greeneng.com http://www.xreenem.com From: Scott Miles <scott.miles@rockvmountnc.gov> Sent: Tuesday, July 26, 2022 3:41 PM To: Robinson, Jason <jason.t.robinson@ncdenr.gov>; Leo Green III <elg3@greeneng.com> Cc: Kurtz, Cassidy <Cassidv.Kurtz@ncdenr.gov>; Tom Dienes <t.dienes@greeneng.com> Subject: Re: [External] Re: Old Mill Rd. Sewer P5 Replacement Yes, 1 believe the intent was to get a new permit for the new station and force main. Tom/Leo, please confirm? Scott Miles, PE Assistant City Engineer - Water Resources Office: 252-972-1122 Cell: 252.343 3169 www.rockymountnc.gov 331 S. Franklin St., PO Box 1180, 4 Rocky Mount, NC 27802-1180 ROCKY MOUNT, NC 1HE CEN"EIS OF it ALL Please note that email sent to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Facebook Twitter Instagram YouTube From: Robinson, Jason <iason.t.robinson@ncdenr.gov> Sent: Tuesday, July 26, 2022 3:01 PM To: Scott Miles <scott.miles@ rockvmountnc.gov> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Tom Dienes <t.dienes@greeneng.com> Subject: RE: [External] Re: Old Mill Rd. Sewer PS Replacement [EXTERNAL EMAIL] D0 NOT CLICK links or attachments unless you recognize the sender and know the content is safe, Thanks Scott, All individual sewer extension permits we issue (WQ00XXXXX) are incorporated into your overall Collection System Permit (WQCS00011). I'm thinking that maybe the pump station is so old that it was permitted under a different program, or maybe never permitted at all. If that's the case, it would make sense just for us to create a new sewer extension permit that will cover the relocated PS, gravity and formcemain. Please let me know if you are okay with that. Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 **Subscribe to Collection System & Sewer Permitting Updates** E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 5 Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Scott Miles <scott.miles@rockvmountnc.gov> Sent: Tuesday, July 26, 2022 2:56 PM To: Robinson, Jason <jason.t.robinson@ncdenr.gov> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; t.dienes <t.dienes@greeneng.com> Subject: [External] Re: Old Mill Rd. Sewer PS Replacement CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jason, Thanks for the information. We have been in a state of transition here recently, so I am still trying to figure out the filing system. I will be sure to have the permit on hand from here on out. As far as the pump station, I was told it is permitted as part of the collection system permit you just sent (#WQCS00011). Scott Miles, PE Assistant City Engineer - Water Resources Office: 252-972-1122 Cell: 252-343-3169 www.rockymountnc.gov 331 S. Franklin St., PO Box 1180, Rocky Mount, NC 27802-1180 ROCKY MOUNT, NC 1HE CENTER OF 1 .ALL Please note that email sent to and from this address is subject to the 6 North Carolina Public Records Law and may be disclosed to third parties. Facebook Twitter Instagram YouTube From: Robinson, Jason <jason.t.robinson@ncdenr.gov> Sent: Tuesday, July 26, 2022 10:43 AM To: Scott Miles <scott.miles@rockymountnc.gov> Cc: Kurtz, Cassidy <Cassidv.Kurtz@ncdenr.gov>; Tom Dienes <tdienes@greeneng.com> Subject: Old Mill Rd. Sewer PS Replacement [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. Thomas & Scott, We are entering the referenced sewer extension application into our database and have a couple initial questions: 1. Item 11.2 is checked "Existing", but the existing permit number is not provided. We have attempted to see if we can find an existing permit that includes the Old Mill Rd. PS, but have been unsuccessful. We found two permits for Olde Mill Stream — Phases 1 and 2, but neither of them include a pump station. If an existing permit did not cover the Old Mill Pump Station, then we'll need to issue a new permit. 2. Item V.3 was not completed, and the narrative states that the City does not have a copy of their existing overall Collection System Permit Number and doesn't know their permit number. This is concerning, as staff should be able to readily find their permit number, and should always have a copy of their Collection System permit available. The permit number is WQCS00011 and a copy of the most recent permit is attached. Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 **Subscribe to Collection System & Sewer Permitting Updates** E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 7